Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
LTD
______________________________________________________________________________________
BUCKMAN LABORATORIES (ASIA) PTE LTD
Task description
Make a floor and construct
Provide water, air, power 220 V and 380 V
Equipment arrive IKPP Perawang and cutom clearance
Start Installation
Water Trial for equipment
Ready equipment
End date
9/27/2009
10/4/2009
10/14/2009
10/24/2009
10/28/2009
10/30/2009
Please dont hesitate to call us if you have any questions. Thank you for your
kind attention and support.
Sincerely yours,