FAEL KHAIR PROGRAM

Construction of School cum Cyclone Shelter


Contract No: BD1-0033 (Package-14)
Contractor-MBPL

IPC No. 09
Shelter ID: Z4-896
Al-Helal Academy
Duration: 8th August 2016-19th November 2016

DETAILS OF MEASUREMENT (PRELIMINARIES)


Item No. Item Description

Unit

BOQ
Quantity

Revised
Quantity

Previous
IPC

Quantity to
Date

1.5

Provide all required pnsurance policies

L. S

0.08

0.08

0.08

0.08

1.6.1

Construction of site office

each

1.00

1.00

1.00

1.00

1.6.2

Office furnishings including office


furniture as per specification and
consumable etc.

each

1.00

1.00

1.00

1.00

1.6.3

Operation and maintenance of site office each/month

18.00

18.00

14.00

18.00

1.7

Project profile signboards

each

1.00

1.00

0.50

0.50

1.9

Progress photographs

month

18.00

18.00

7.00

1.10

Mobilization and clearing site before


commencing and demobilization after
completion

each

1.00

1.00

0.50

Remarks

from January 2015 - June 2016

11.00 from January 2016 - November 2016

0.50

IPC No. 09
Shelter ID: Z4-896
Al Helal Academy
Duration: 8th August 2016 - 19th November
2016

Fael KHAIR PROGRAM


Construction of School cum Cyclone Shelter
Contract No: BD1-0033 (Package-14)
Mahabub Brothers (Pvt.) Ltd.
SUMMARY SHEET for BILL NO-2 (CIVIL WORK)

This IPC Previous IPC


Unit

BOQ
Quantity

Previous
IPC

Quantity to
Date

Lay out and marking for earthwork

sqm

573.00

574.00

574.00

Earthwork in excavation

cum

144.00

84.00

84.00

2.1.3

Pumping and bailing out of water

LS

1.00

2.5

Earth filling in foundation trances

2.6.1

Site development/improvement by carted/dredged

2.6.2

Sand filling in plinth ramp area and entre stair ( Fm 0.8)

A-1.2

B/W, soling, mass conc, poly. Sheet

2.8

Item No.

Item Description

A-1.1

Excavation, Palisading, Filling, Site Development and Turfing

2.1.1
2.1.2

Remarks

#REF!

117
120
111

cum

685.00

310.50

310.50

115

One layer brick flat soling

sqm

491.00

320.81

320.81

122

2.9

Mass/Plain cement concrete

cum

9.50

7.17

7.17

108

2.10

Double layer of polythene sheet

sqm

618.00

321.00

321.00

110

A-1.3

Pile Work

2.11.1.1

Boring CIS pile: 500mm dia.- depth up to 20m

rm

1660.00

1660.00

1,660.00

120

2.11.1.2

Boring CIS pile: 500 mm dia.- depth >20m up to 30m

rm

747.00

747.00

747.00

142

2.12

Cast -in-situ pile with Class I concrete

cum

461.79

461.79

461.79

112

2.13

Point welding

61171.00

61171.00

61,171.00

1420

2.14

Welded splice

rm

747.00

498.00

498.00

2.17.1

40 grade ribbed or deformed bar

ton

9.50

9.18

#REF!

2.17.2

60 grade ribbed or deformed bar

ton

39.20

38.55

#REF!

2.18

Breaking head of piles

cum

10.60

10.59

10.59

2.19.1

Static load test (Cast-in-situ pile)

per test

1.00

1.00

1.00

2.20

Integrity test

per test

1.00

1.00

1.00

A-1.4

Reinforced Cement Concrete (RCC) Works


1.71

1.71

83.00

82.27

82.27

125

118

per point

2.21.1

Individual and continuous footing

cum

2.21.3

In Pile cap

cum

2.21.4

Bracing beam etc. below PL.

cum

11.00

10.43

10.43

2.21.5

Grade beam at plinth level

cum

24.00

30.00

30.00

2.21.6

Ground floor slab at PL

cum

49.00

30.53

30.53

2.21.7

Staircase slab, steps & ramp below PL

cum

10.00

1.60

1.60

2.21.8

Ramp Wall & Railing

cum

2.22.1

Pedestals, column, column capitals etc. below PL

cum

40 grade ribbed or deformed bar

ton

13.00
7.50

12.60
4.40

12.60

2.23.1
2.23.2

60 grade ribbed or deformed bar

ton

14.10

12.79

12.79

A-1.5

B/W, Paving Brick, Plaster, Patent Stone

2.24

250mm brick work

cum

11.00

15.00

15.00

2.26.1

38mm artificial patent stone in ground floor at PL

A-2

Super Structure (Above PL)

A-2.1

Reinforced Cement Concrete (RCC) Works

2.29.1(a)

Pedestal,column,column capitals - in ground floor

cum

40.00

41.04

41.04

(b)

in 1st floor

cum

25.00

25.65

25.65

(c)

in 2nd floor

cum

25.00

25.65

25.65

(d)

on roof

cum

3.00

2.34

2.34

2.30.1(a)

Tie beam and lintels - in ground floor

cum

(b)

in first floor

cum

(c)

in 2nd floor

cum

2.30.2(a)

T-beam, L-Beam & Rectangular beams etc. - in ground floor

cum

38.00

25.06

25.07

(b)

in first floor

cum

28.00

27.77

27.77

(c)

in 2nd floor

cum

28.00

25.36

25.63

(d)

on roof

cum

3.00

2.69

2.71

2.30.3(a)

In Floor and Roof slab - in ground floor

cum

63.00

51.37

51.37

(b)

in 1st floor

cum

in 2nd floor

cum

66.00
71.00

65.42
68.52

65.42

(c)
(d)

on roof slab

cum

6.00

5.94

5.90

2.30.4(a)

Concrete (cornice, railing, drop wall, louver, parapet, window sill, fins) - in GF

cum

7.77

(b)

in first floor

cum

9.88

(c)

in 2nd floor

cum

9.78

(d)

on roof

cum

0.18

2.30.5(a)

Concrete (sunshade,false ceiling) - in GF

cum

(b)

in 1st floor

cum

(c)

in 2nd floor

cum

2.30.6(a)

Staircase slab,steps,ramp etc - in ground floor

cum

21.00

24.95

17.97

(b)

in 1st floor

cum

6.00

4.63

5.46

(c)

in 2nd floor

cum

6.00

5.46

5.46

2.30.7.2

In water Tank-bottom slab

cum

11.00

4.50

4.50

2.30.7.3

in wall

cum

14.00

9.25

9.25

2.30.9

Filled Chamfer

rm

730.00

702.60

703.75

2.30.10

Groove on plaster 25x8mm for Fair Face

rm

2.31.1

40 grade ribbed or deformed bar

ton

42.00

34.89

38.25

2.31.2

60 grade ribbed or deformed bar

ton

46.50

35.91

38.57

A-2.2

B/W, facing bricks, fancy screen block work

2.32.1

B/W (250 mm)-in ground floor

cum

2.32.2

B/W (250 mm)-in 1st floor

cum

28.00

23.66

34.12

2.32.3

B/W (250 mm)-in 2nd floor

cum

4.40

2.75
5.15

68.12

1.13
2.51

48.12

30.62

141.74

2.35.1

B/W(125 mm)-in GF

sqm

2.35.2

B/W (125 mm)-in 1st floor

sqm

2.35.3

B/W (125 mm) -in 2nd floor

sqm

2.35.4

On roof

sqm

27.82

2.36.2

12 mm cement sand plaster - first floor

sqm

101.55

2.36.3

12mm cement sand plaster - second floor

sqm

127.15

A-2.3

Cement Plaster & Pre-cast ventilator

2.39.2

6 mm thick plaster-in 1st floor

sqm

547.00

2.39.3

6 mm thick plaster-in 2nd floor

sqm

1310.00

A-4

Miscellaneous works

2.63.2

Dismantling existing semi-pucca/kacha structure

sqm

489.00

759.47

559.47

2.65

Temporary school accommodation

sqm

105.00

105.00

105.00

48.00

26.16

72.38
143.16

462.18

485.78
541.82

Fael KHAIR PROGRAM


Construction of School cum Cyclone Shelter
Contract No: BD1-0033 (Package-14)
Mahabub Brothers (Pvt.) Ltd.

IPC No. 09
Shelter ID: Z4-896
Al Helal Academy
Duration: 8th August 2016 -19th November 2016

DETAILS OF MEASUREMENT (CIVIL WORK)


Item No. Item Description

Unit

A-1.1
2.1.1
2.1.2

sqm
cum

Excvn, Palisading, Filling, Site Dev., Turfing


Lay out and marking for earthwork
Earth work in excavation

No. of
Members
1
31
7
83
4

2.1.3
2.6.1
2.6.2

Total=
Pumping and bailing out of water
Site development (FM = 0.20)
Sand filling in plinth, ramp area & entry stair ( FM = 0.80)

2.7.1

Clay lining

2.7.2
A-1.2
2.8

Creating turf
Brickwork, Soling /Mass concrete/ Polythine sheet
One layer brick flat soling

Length
Cumulative
Width (m) Height (m)
(m)
Quantity
24.625

23.325

574.38

1.000
1.000
0.500

0.618
0.618
0.618

47.90
21.24
-10.07
15.73
74.79

0.950

460.44
-30.00
-10.43
-12.60
-15.00
-5.48
386.94

442.39
(-) deduction for grade beam
(-) deduction for bracing beam
(-) deduction for pedestal column
(-) deduction for brickwork
(-) deduction for ramp portion

96.43
0.00
65.87
62.98
79.47
0.00
0.00
16.88
0.00
321.62

grid A-B (GF panel slab)


grid A-B (GF panel slab)
Grid B-C (GF panel slab)
Grid C-D (GF panel slab)
Grid D-E (GF panel slab)
Grid D-E (GF panel slab)
Grid B-D-1-2 -7-8) (GF panel slab)
cattle ramp (grid A-B-7-8))
entry stair

LS

cum

22.675

21.375

5
0
5
5
4
0
0
1
0

5.800
5.800
3.962
3.788
5.975
5.975
7.875
9.575
3.875

3.325
1.763
3.325
3.325
3.325
1.762
1.763
1.763
3.762

31

2.500

1.000

0.075

5.81

4.910

1.000

0.075

2.58

PC3

-1.22

(-) deduction for pile

sqm

Total =
Mass Concrete

cum

83

0.500

0.075

Total=
2.10

Double Layer polythene sheet

7.17
321.62
109.70
24.90
456.21

Pile Work
Boring for CIS pile (500mm dia) depth up to 20m
Depth exceeding 20 m and not exceeding 30 m
Cast-in-situ pile concreting
Point welding
Welded splice
Breaking of pile head
Static Load test (CIS pile)
Integrity test (CIS pile)
RCC Work
Individual and continuous footing
In pile Cap
PC2
PC3

rm
rm
cum
per point
rm
cum
per test
per set

83
83
83
83
83
83
1
1

20.000
9.000
28.350
737.000
6.000
1.00

0.500

0.500

0.650

cum
cum

Bracing Beam

Qty. same as BFS


for pile cap
for stair area

1660.00
747.00
461.79
61171.00
498.00
10.59
1.00
1.00
1.71

31
7
83

2.500
4.910
1.000

1.000
1.000
0.500

0.750
0.750
0.100

58.13
25.78
-1.63
82.27

3
1
1
1
4
2

19.276
14.875
4.838
1.6158
5.45
7.45

0.300
0.300
0.300
0.300
0.300
0.300

0.300
0.300
0.300
0.300
0.300
0.300

5.20
1.34
0.44
0.15
1.96
1.34

Total=
2.21.4

PC2

sqm

Total=
A-1.3
2.11.1.1
2.11.1.2
2.12
2.13
2.14
2.18
2.19.1
2.20
A-1.4
2.21.1
2.21.3

PL=6.90, AGL=5.70, EGL=5.493


PC2
PC3
(-) dedution for pile
in entry stair, cattle ramp etc.

2.500
4.910
1.000
3.875

Total =

2.9

Remarks

(-) deduction for pile

cum

4 of 29

Total=
2.21.5

Ground Floor Beam at Plinth (Grade Beam)

10.43
cum
3
1
1
2
4
4

19.276
17.6158
14.875
18.350
18.350
5.450

0.300
0.300
0.300
0.300
0.300
0.300

0.450
0.450
0.450
0.450
0.450
0.450

7.81
2.38
2.01
4.95
9.91
2.94
30.00

5
2
5
5
0
4
0

5.800
5.800
3.962
3.813
8.075
5.950
5.950

3.325
1.763
3.325
3.325
1.763
3.325
1.763

0.100
0.100
0.100
0.100
0.100
0.100
0.100

9.64
2.05
6.59
6.34
0.00
7.91
0.00
32.53

gridline A-B
gridline A-B-1-2
gridline B-C
gridline C-D
gridline B-D-1-2 & gridline B-D-7-8
gridline D-E
gridline D-E-1-2 & gridline D-E-7-8

9.450

2.013

0.100

1.90

cattle ramp

38

0.650

0.425

1.200

12.60

Total=
2.21.6

Ground Floor Slab at Plinth

cum

Total=
2.21.7

Staircas slab & steps, ramp below plinth level

2.21.8
2.22.1
A-1.5
2.24
2.25
2.26.1
A-2.1
2.29.1
2.29.1(a)
2.29.1(b)
2.29.1(c)
2.29.1(d)
2.30.1
2.30.1(a)
2.30.1(b)

Ramp wall & railing


Pedestals, column, column capitals (below PL)
B/W, Paving Brick, Plaster, Patent Stone
250mm brick work
125mm brick work
38mm artificial patent stone in ground floor at PL
RCC Work (Superstructure above Plinth)
Pedestals, column, column capital etc.
In ground floor
In first floor
In 2nd floor
on Roof
Tie beams & lintes
in ground floor
in 1st floor
Lintel (6)
Lintel (4)
Lintel (2)
HW 5
HW 2
HW 3, 3a
HW 4
HW 6

cum

15.00

cum
cum
cum
cum

38
38
38
4

0.600
0.600
0.600
0.600

0.375
0.375
0.375
0.375

4.800
3.000
3.000
2.600

41.04
25.65
25.65
2.34

1
1
1
2
3
2
1
1
1
1
4
4

5.500
5.500
5.500
1.825
2.275
2.150
1.937
1.175
1.369
1.225
0.250
1.106

0.250
0.125
0.125
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.150
0.100

0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
1.106
0.450

4
4
1
1
1
1
1

3.250
3.250
1.150
1.150
1.000
1.050
2.287

0.200
0.200
0.125
0.125
0.125
0.125
0.125

0.150
0.150
0.150
0.150
0.150
0.150
0.150

0.21
0.10
0.10
0.14
0.26
0.16
0.07
0.04
0.05
0.05
0.17
0.20
1.55
0.39
0.39
0.02
0.02
0.02
0.02
0.04
0.90
4.90

4
4
2
2
4
1
1
3
1
1
4
2
1
2
2

3.250
3.250
1.825
5.500
5.500
5.500
5.500
5.500
4.225
3.350
2.275
2.150
1.937
1.825
1.225

0.200
0.200
0.125
0.125
0.450
0.125
0.250
0.450
0.450
0.250
0.250
0.250
0.250
0.250
0.250

0.150
0.150
0.150
0.150
0.100
0.150
0.150
0.100
0.100
0.150
0.150
0.150
0.150
0.150
0.150

cum

gridline D
gridline E
Store
Toilet (female)
General store
Toilet (male)
Total =
2.30.1(c) in 2nd floor

cum
G.line D (4 panel)
G.line E (4 panel)
G.line 2 (2 Side)
G.line 4 (2 Side)
G.line 4 (2 Side)
G.line 6 (2 Side)
G.line 6 (2 Side)
G.line 6 (2 Side)
G.line 8
G.line 8
HW 2
HW 3, 3a
HW 4
HW 5
HW 6

0.39
0.39
0.07
0.21
0.99
0.10
0.21
0.74
0.19
0.13
0.34
0.16
0.07
0.14
0.09

5 of 29

1.175

0.250

0.150

0.04
4.26

3
4
4
3
3
1
1
2
4
1
3
1
1
1
1
1
1
1
9
8
3

19.626
5.500
0.400
7.200
0.400
7.775
0.400
18.550
0.400
14.688
7.775
3.025
1.688
14.125
1.838
13.000
5.500
3.250
1.600
0.250
0.375

0.300
0.300
0.375
0.300
0.375
0.300
0.375
0.300
0.375
0.300
0.300
0.300
0.300
0.225
0.300
0.250
0.300
0.300
0.375
0.160
0.075

0.350
0.350
0.500
0.350
0.500
0.350
0.500
0.350
0.500
0.350
0.350
0.350
0.350
0.300
0.225
0.200
0.350
0.250
0.300
0.200
0.200

6.18
2.31
0.30
2.27
0.23
0.82
0.08
3.90
0.30
1.54
2.45
0.32
0.18
0.95
0.12
0.65
0.58
0.24
1.62
0.06
-0.02
25.07

1
3
6
12
1
2
1
1
2
1
1
18
7

3.775
19.625
18.550
0.400
14.688
7.775
29.250
15.125
7.775
1.688
3.250
0.250
0.375

0.300
0.300
0.300
0.375
0.300
0.300
0.250
0.300
0.300
0.300
0.300
0.160
0.075

0.500
0.350
0.350
0.500
0.350
0.350
0.200
0.350
0.350
0.350
0.300
0.200
0.200

0.57
6.18
11.69
0.90
1.54
1.63
1.46
1.59
1.63
0.18
0.29
0.14
-0.04
27.77

3
6
12
1
1
2
2
1
1

19.624
18.550
0.400
14.688
15.125
7.775
7.775
1.688
3.250

0.300
0.300
0.375
0.300
0.300
0.300
0.300
0.300
0.300

0.350
0.350
0.500
0.350
0.350
0.350
0.350
0.350
0.300

6.18
11.69
0.90
1.54
1.59
1.63
1.63
0.18
0.29
25.63

Total =
2.30.1(d) on Roof
Tee beam, L-beam & rectangular beam
2.30.2
2.30.2(a) In Ground Floor Beam
B1
B2
B2 (outer)
B3
B3 (outer)
B3 (a)
B3 (a)-outer
B5
B5 (outer)
B6
B7
B8
B9
B10
B10(a)
B11
B12
Stair Beam (ground floor)
Ramp Beam
Downward projection for arch beam

cum

Total=

(-) deduct for B11

2.30.2(b) In 1st Floor Beam


B4
B13
B14
B14 (outer)
B15
B16
B17
B18
B19
B20
Stair Beam (1st Floor)
Downward projection for arch beam
Total=

(-) deduct for B14

2.30.2(c) In 2nd Floor Beam


B21
B22
B22 (outer)
B23
B24
B25
B26
B27
Stair beam (2nd floor)
Total=
2.30.2(d) on Roof
Pent house roof

2
2
1

8.175
3.250
3.250

0.300
0.300
0.300

0.350
0.350
0.300

Total=
2.30.3
In Floor & Roof Slab
2.30.3(a) In Ground Floor Slab
Gross area
North side
Cantiliver part (north-west side)
Cantiliver part (north-east side)
Cantiliver part (south-west side)
Cantiliver part (south-east side0
Columns

1.72
0.68
0.29
2.69

SRB-1
SRB-2
SRB-3

cum
1
4
1
1
1
1
1
1
1
1
1
5
25

22.625
3.250
2.435
2.435
2.435
2.435
0.300
5.650
14.200
3.375
5.500
3.250
0.600

20.725
0.300
0.525
0.525
1.125
1.125
0.075
2.435
6.225
2.137
3.250
0.300
0.375

0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150

70.34
0.59
0.19
0.19
0.41
0.41
0.00
-2.06
-13.26
-1.08
-2.68
-0.73
-0.84

near ramp (west side)


ramp
void (east side)
stair area
north side
column

6 of 29

3
1
1

0.375
0.412
0.412

0.300
0.375
0.375

0.150
0.150
0.150

Total=
2.30.3(b) In 1st Floor Slab

column
column
column

51.37
cum

Gross area
4-corner

1
4
2
1
8
2
28

22.625
2.435
3.375
5.800
0.375
0.413
0.600

20.725
0.825
2.137
3.250
0.300
0.375
0.375

0.150
0.150
0.150
0.150
0.150
0.150
0.150

70.34
1.21
-2.16
-2.83
-0.14
-0.05
-0.95
65.42

2-corner
(-) dedcution at grid C (2 sides)
(-) dedcution for stair portion
(-) dedcution for column portion
(-) dedcution for column portion
(-) dedcution for column portion

1
2
2
1
8
4
38

22.625
0.188
2.138
6.625
0.750
0.900
0.600

22.375
0.375
3.375
3.250
0.750
0.900
0.375

0.150
0.150
0.150
0.150
0.150
0.150
0.150

75.94
0.02
-2.16
-3.23
-0.68
-0.49
-1.28

overall area
for column area
(-) for void area
(-) for stair area
(-) for skylight
(-) for opening
(-) for column

Total =
2.30.3(c) In 2nd Floor Slab

cum

Total =
2.30.3(d) on Roof

68.12
cum
1
4

10.125
0.600

4.000
0.375

0.150
0.150

Total =
2.30.4

-0.05
-0.02
-0.02

6.08
-0.14

overall area
for column area

5.94

in cornice railing, drop wall, louver, fins, parapet, window


sill & frames etc

2.30.4(a) in ground floor


2.30.4(b) in 1st floor
window sill

cum

4
2
2
2

3.250
2.187
2.187
0.250

0.125
0.125
0.125
0.125

0.200
0.200
0.200
0.125

28
8
8
1
1
8

0.200
0.200
0.150
14.125
14.125
0.435

0.150
0.160
0.160
0.200
0.100
0.770

1.350
2.320
2.320
0.180
0.150
0.150

5
5
4
4
2
2
3

3.250
2.187
2.187
3.250
3.143
2.312
1.500

0.125
0.125
0.125
0.125
0.125
0.125
0.125

0.200
0.200
0.200
0.200
0.200
0.200
0.150

77
8
8
1
1
8
10
10
1
1
10

0.200
0.200
0.150
14.125
14.125
0.435
0.200
0.150
17.750
17.750
0.435

0.150
0.160
0.160
0.200
0.100
0.770
0.160
0.160
0.200
0.100
0.770

1.350
2.320
2.320
0.180
0.150
0.150
2.320
2.320
0.180
0.150
0.150

1
1
1
1
8
2

95.750
95.750
95.750
27.850
3.600
4.000

0.100
0.125
0.063
0.100
0.150
0.100

Total =
Louver
acrh column

cum

arch beam

Total =

0.325
0.109
0.109
0.008
0.552
1.134
0.594
0.445
0.509
0.212
0.402
2.16

Gride line E
Gride line D
4 to 6

0.41
0.27
0.22
0.33
0.16
0.12
0.08
1.17
3.12
0.594
0.445
0.509
0.212
0.402
0.742
0.557
0.639
0.266
0.502
4.87

Gride line A
Gride line B
Gride line D
Gride line E

8.14
1.20
0.30
0.70
1.30
0.20

parapet wall
parapet wall
parapet wall
pent house railing
upstrand of sky light:
upstrand of water reservoir

2.30.4(c) in 2nd floor


Window sill

cum

Head master room

Total =
Louver
acrh column

cum

arch beam

acrh column

cum

arch beam

Total =
(d)

on roof
cum

0.850
0.100
0.050
0.250
0.300
0.250

Total =
2.30.5
in sunshade, false ceiling etc.
2.30.5(b) Sunshade & False Ceiling-1st floor

11.83
4

5.500

0.450

0.100

0.99

False slab

7 of 29

2.30.5(c) Sunshade & False Ceiling-2nd floor


2.30.6
Concrete (staircase slab,steps,ramp)
2.30.6(a) In Ground Floor
1st Flight

cum

2nd Flight

1
1
1
1
2
1
7.5
1
1
1
6.5
1

2.704
1.600
1.831
3.250
0.400
3.250
1.600
1.831
1.600
2.122
1.600
2.500

1.600
1.500
1.600
1.750
0.375
0.750
0.250
1.600
1.500
1.600
0.250
1.600

0.250
0.250
0.250
0.250
0.250
0.175
0.150
0.250
0.250
0.250
0.150
0.200

1
1
1

18.318
14.288
3.575

1.700
1.700
2.388

0.150
0.150
0.225

1
1
2
1
4.5
1
1
4.5

2.704
3.250
0.400
3.250
1.600
2.704
3.250
1.600

1.600
1.750
0.375
0.750
0.250
1.600
2.500
0.250

0.200
0.200
0.200
0.150
0.150
0.200
0.200
0.150

1
1
2
1
4.5
1
1
4.5

2.704
3.250
0.400
3.250
1.600
2.704
3.250
1.600

1.600
1.750
0.375
0.750
0.250
1.600
2.500
0.250

0.200
0.200
0.200
0.150
0.150
0.200
0.200
0.150

2
4

4.800
0.600

2.438
0.375

0.200
0.200

2
2
4
4
2
1
1
4

4.200
3.325
4.200
2.038
2.038
0.525
0.125
0.200

1.650
1.650
0.650
1.000
0.875
0.350
0.350
0.125

0.200
0.200
0.200
0.200
0.125
0.200
0.200
0.225

Total =
Ramp

Total =
Total for Ground Floor (including ramp) =
3rd Flight

4th Flight

2.30.6(b)

Total for 1st Floor =


5th Flight

6th Flight

2.30.6(c)
2.30.7
In Water Tank
2.30.7.2 in bottom slab

Total for 2nd Floor =

Total =
2.30.7.3

in wall

Total =
2.30.8
2.30.9

Fair face finish


Filled Chamfer (Stilt-2)

4.68
-0.18
4.50
2.77
2.19
2.18
1.63
0.45
0.04
0.01
-0.02
9.25

waist slab-1st half


intermediate landing
waist slab-2nd half
main landing
landing (near column)
canopy
steps
waist slab-1st half
intermediate landing
waist slab-2nd half
steps
landing (on ground floor slab)
waist slab 1st flight
waist slab 2nd flight
landing

waist slab
landing
landing (near column)
canopy
steps
waist slab
landing (on 1st floor slab)
steps
waist slab
landing
landing (near column)
canopy
steps
waist slab
landing (on 2nd floor slab)
steps

(-) dedcution for column


long wall
stroe wall
water resrevoir wall
side wall
partition wall

(-) deduction

rm

(-) deduction

Total=
2.30.10
A-2.2

1.08
0.60
0.73
1.42
0.08
0.43
0.45
0.73
0.60
0.85
0.39
0.80
8.16
4.67
3.64
1.92
10.23
18.39
0.87
1.14
0.06
0.37
0.27
0.87
1.63
0.27
5.46
0.87
1.14
0.06
0.37
0.27
0.87
1.63
0.27
5.46

32
8
6
6
12
16
2
2
2
2
32
32
2
2
8
6

4.300
4.300
4.300
4.800
4.300
7.300
4.300
4.800
4.300
4.800
4.300
4.300
0.225
0.150
0.150
0.150

1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000

1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000

137.60
gridline A (1 to 8)
34.40
gridline B (1 to 2)
25.80
gridline B (3 to 5), inside
28.80
gridline B (3 to 5), outside
51.60
gridline B (6 to 8)
116.80
gridline C (2 to 5)
8.60
gridline C-6, inside
9.60
gridline C-6, outside
8.60
gridline C-7, inside
9.60
gridline C-7, outside
137.60
gridline D (1 to 8)
137.60
gridline E (1 to 8)
-0.45 in ramp 1st flight-gridline C-2 (oneside)
-0.30 in ramp 1st flight-gridline C-2 (otherside)
-1.20 in ramp 1st flight-gridline C-3-4-5-6
-0.90 in ramp 2nd flight-gridline C-3-4-5
703.75

25mm x 8mm Grove in plaster


B/W, facing bricks, fancy screen block work

8 of 29

2.32
2.32.2

250 mm brickwork
in 1st floor

2.32.3

in 2nd floor

cum

2
1
2
1
1
1
1
1
1
1
1
1
1
1
1
2
1
2
1
1
1
1
1
1
1
1
1
1
1

0.275
2.425
0.275
2.425
3.675
1.825
1.688
3.350
3.350
2.150
2.275
1.174
0.500
5.000
0.725
0.275
2.425
0.275
2.425
3.675
1.825
2.275
5.500
5.500
3.350
2.150
2.025
2.187
0.375

0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.276
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250

0.630
0.630
0.630
0.630
2.500
1.950
1.950
1.950
0.550
1.950
1.950
1.950
1.950
1.950
1.950
0.630
0.630
0.630
0.630
2.500
1.950
1.950
2.100
2.500
2.500
1.950
1.950
1.950
1.950

cum

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

3.350
2.275
1.175
1.950
1.950
3.350
2.025
2.187
2.500
1.950
2.025
1.950
2.500
2.500
1.950
2.025
1.950
2.500
2.500

0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250
0.250

0.550
1.950
1.950
0.750
0.525
0.550
1.950
1.950
0.375
1.825
1.950
1.425
0.750
0.525
1.825
1.950
1.425
0.750
0.525

sqm

4
4
1
1

3.25
2.18
4.48
5.5

0.625
0.625
2.1
2.1

1.000
1.000
1.000
1.000

sqm

3
2
2
1
1
1
1
11
5
1
2
1

5.500
1.000
4.300
1.688
1.688
0.888
1.250
2.962
1.375
6.876
1.000
1.000

1.950
1.950
1.950
2.850
2.500
2.850
2.500
0.625
0.625
0.625
1.950
2.850

1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000

Total =

Total =
2.34
2.34.1
2.34.2
2.35
2.35.1
2.35.2

Fancy Screen Work


in 1st floor
in 2nd floor
125 mm brickwork
in GF
in 1st floor

2.35.3

in 2nd floor

Total=

0.09
0.38
0.09
0.38
2.30
0.89
0.82
1.63
0.46
1.05
1.11
0.57
0.24
2.69
0.35
0.09
0.38
0.09
0.38
2.30
0.89
1.11
2.89
3.44
2.09
1.05
0.99
1.07
0.18
29.99
0.46
1.11
0.57
0.37
0.26
0.46
0.99
1.07
0.23
0.89
0.99
0.69
0.47
0.33
0.89
0.99
0.69
0.47
0.33
12.25

8.13
5.45
9.41
11.55
34.53
32.18
3.90
16.77
4.81
4.22
2.53
3.13
20.36
4.30
4.30
-3.90
-2.85

gridline 8 (A to B)

gridline 8 (D to E)

gridline A-B-1
gridline B-C-1
gridline B-C-1-2

gridline D-E-1
gridline C-D-1
gridline C-1-2
gridline C-D-2

gridline E (2-6)
gridline E (2-6)
gridline 4 (D-E)
gridline 2 (D-E)

9 of 29

2.100

0.750

1.000

-1.58
88.16

sqm

1
6
2
1
1
1
1
1
1
1
2
4
4
3
1
1
1
1
1
1
1
1
1
1
1
1
1
5
1
5
1
2
2
4
2
1
2
2
1
2
1
4
4

20.215
5.500
5.500
20.215
20.215
4.100
3.775
3.250
3.025
3.775
4.100
3.250
3.025
3.775
3.775
2.275
4.100
4.100
2.575
2.275
2.575
4.100
4.100
4.100
4.100
4.100
2.575
3.025
1.688
3.250
1.687
2.275
2.025
3.775
3.775
5.500
1.688
5.500
5.500
1.687
1.688
3.250
3.250

5.500
1.050
0.350
0.350
0.350
3.280
0.350
0.650
0.350
1.050
3.315
0.650
0.350
1.050
0.350
0.650
3.380
3.250
1.837
0.350
1.838
3.280
3.315
3.315
3.380
3.250
1.837
0.650
0.650
0.350
0.650
0.350
0.650
1.050
0.350
1.838
0.350
0.350
1.837
0.350
0.650
0.650
0.350

1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000

sqm

1
2
1
1
1
4
1
1
1
1
3
1
1

5.500
5.500
5.500
5.500
5.500
3.250
5.500
5.500
5.500
5.500
5.500
5.500
4.100

3.280
3.315
3.380
3.250
1.837
0.350
0.350
1.050
0.350
0.650
1.050
0.350
3.280

1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000

111.183
34.650
3.850
7.075
7.075
13.448
1.321
2.113
1.059
3.964
27.183
8.450
4.235
11.891
1.321
1.479
13.858
13.325
4.730
0.796
4.733
13.448
13.592
13.592
13.858
13.325
4.730
9.831
1.097
5.688
1.097
1.593
2.633
15.855
2.643
10.109
1.182
3.850
10.104
1.181
1.097
8.450
4.550
431.24
18.040
36.465
18.590
17.875
10.104
4.550
1.925
5.775
1.925
3.575
17.325
1.925
13.448

Total=
2.35.4
2.36
2.36.1
2.36.2
2.36.3
2.36.4
2.37
2.38
2.38.1
2.38.2
2.38.3
2.38.4
2.39
2.39.1
2.39.2

on roof
12mm thick plaster
in ground floor
in 1st floor
in 2nd floor
on roof
12mm plsater with net cement finishing
Dado/skriting including marking groove
in ground floor
in 1st floor
in 2nd floor
on roof
6 mm thick plaster
in ground floor
in 1st floor

2.39.3

in 2nd floor

Total =

10 of 29

1
1
1
1
1
1
2
2
2
2
1
1
2
1
1
1
1
2
1
1
1
1
1
2
2
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Total =
2.39.4
2.40.2
2.42
2.42.1
2.42.2
2.42.3
2.43
2.44
2.44.2.1
2.44.2.2
2.45
2.45.2
2.45.3
2.46
2.46.2
2.46.3
2.46.4
A-2.5
2.47.1

4.100
4.100
4.100
5.500
5.500
5.500
3.250
3.025
3.250
3.025
3.775
3.775
3.775
3.775
3.250
3.025
4.100
4.100
4.100
4.100
5.500
5.500
5.500
3.025
3.250
3.775
3.775
3.025
3.250
3.025
3.250
3.775
3.775
3.775
5.500
3.250
3.250
5.500
5.500
3.250
3.250
5.500
5.500
5.500
3.250
3.250
5.500
5.500
5.500
3.250
3.250
5.500
5.500

3.315
3.380
3.250
0.350
1.000
0.650
0.650
0.650
0.650
0.650
0.350
1.000
0.350
0.650
0.650
0.650
3.280
3.315
3.380
3.250
0.350
1.000
0.650
0.350
0.350
0.350
0.650
0.350
0.350
0.350
0.350
0.350
1.000
0.350
3.280
0.650
0.350
0.350
3.315
0.650
0.350
0.475
0.650
3.315
0.650
0.350
0.650
0.350
3.380
0.650
0.350
0.350
0.400

1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000

13.592
13.858
13.325
1.925
5.500
3.575
4.225
3.933
4.225
3.933
1.321
3.775
2.643
2.454
2.113
1.966
13.448
27.183
13.858
13.325
1.925
5.500
3.575
2.118
2.275
1.321
2.454
1.059
1.138
2.118
2.275
1.321
3.775
1.321
18.040
2.113
1.138
1.925
18.233
2.113
1.138
2.613
3.575
18.233
2.113
1.138
3.575
1.925
18.590
2.113
1.138
1.925
2.200
437.70

on roof
Groove/drip course/nosing
Artificial patent stone
in ground floor
in 1st floor
in 2nd floor
Artificial patent stone (in Cattle area)
Screeding on roof
avg. 100 mm thick concrete
12 mm thick lime cement sand plaster
Glazed wall tiles
in 1st floor toilet
in 2nd floor toilet
Unglazed homogeneous floor tiles
in 1st floor toilet
in 2nd floor toilet
on roof for making S-mark
Metal work
Frame for double leaf door

11 of 29

2.47.3
2.48
2.49.1
2.49.3
2.50
2.51.1
2.51.2
2.51.3
2.52
2.53
2.54
A-2.6
2.55
2.56
2.57
2.58
2.59
A-3
2.60
2.61
2.62
2.62.1
A-4
2.63.2

Frame for grill door


Frame for single leaf door
Door shutter for single and double leaf
Grill door shutter
Steel glazed window shutter
Window grills
Grills over door and windows lintel
Security grill over railing
Collapsible gate
Pad lock
40mm dia GI ladder
Painting Work
Synthetic polyvinyl distemper
Plastic paint
Weather coat paint
Silicon based water repellent
Synthetic enamel paint
Notic board, Black board and Sign board
Notic board
Black board
Sign board
Marble name plate
Miscellaneous works
Dismantling of existing structure (semi pacca/kacha)

sqm
1
1
1
1
1
1
1
1
1

9.600
15.000
15.000
17.400
9.250
18.500
14.550
9.500
15.300

9.100
8.000
6.000
2.000
5.200
7.500
4.450
6.900
7.200

15.000

7.000

Total =
2.65
2.66
2.68
2.69
2.69.1
2.69.2

Temporary school accommodation


50mm dia GI pipe
Construction of toilet for temporary school
Door sill
125mm x 25mm
75mm x 25mm

sqm

87.36
120.00
90.00
34.80
48.10
138.75
64.75
65.55
110.16
759.47
105.00

12 of 29

DETAILS OF MEASUREMENT (REINFORCEMENT)


Item No.

Item Description

2.29.1

Pedestals, column, column capital etc above PL

Bar dia

No. of
Members

No. of
bars

20

24

13.045

2.436

4.576

20

24

13.045

2.436

4.576

10

24

97

1.700

0.615

2.434

C1-stirrup

10

24

97

0.980

0.615

1.403

C1-stirrup

20

10

13.045

2.436

0.636

20

10

12.420

2.436

1.210

25

10

14.195

3.846

2.184

10

10

97

1.700

0.615

1.014

C2-stirrup

10

10

97

1.240

0.615

0.740

C2-stirrup

25

14.195

3.846

1.310

25

14.195

3.846

1.310

10

97

1.700

0.615

0.406

C3-stirrup

10

97

0.980

0.615

0.234

C3-stirrup

20

3.975

2.434

0.116

20

2.900

3.434

0.120

10

21

1.700

0.615

0.044

stirrups

10

21

0.980

0.615

0.025

stirrups

20

3.975

2.434

0.097

20

2.900

2.434

0.071

10

21

1.700

0.615

0.044

stirrups

10

21

1.240

0.615

0.032

stirrups

Length (m)

Unit Wt

Quantity

Remarks

Rebar calculation for COLUMN (above Plinth Level)


C1

C2

C3

C1 (Pent house)

C2 (Pent house)

Total =
Summary of rebar for COLUMN (above Plinth Level)
2.30.2

22.580
ton

40 grade =

6.376

60 grade =

16.205

16

23.105

1.538

0.213

top bars

16

0.925

1.538

0.013

top bars-lapping

20

22.955

2.436

0.503

bot bars

20

0.675

2.436

0.020

bot bars-lapping

20

4.000

2.436

0.058

ext bot

20

3.688

2.436

0.054

ext top (both ends)

20

3.488

2.436

0.102

ext top (both ends)-2nd line

20

2.375

2.436

0.069

ext top (mid section)

20

1.975

2.436

0.115

ext top (mid section) -2nd line

10

161

1.350

0.615

0.401

stirrup

20

7.580

2.436

0.148

top bars

20

7.430

2.436

0.217

bot bars

20

2.640

2.436

0.026

ext top (left)

20

2.440

2.436

0.071

ext top (left)-2nd line

20

3.040

2.436

0.030

ext top (right)

20

2.840

2.436

0.083

ext top (right)-2nd line

16

6.450

1.538

0.079

ext bot

10

42

1.350

0.615

0.139

stirrup

20

9.290

2.436

0.136

top bars

20

9.215

2.436

0.202

bot bars

20

3.040

2.436

0.022

ext top (left)

20

2.840

2.436

0.062

ext top (left)-2nd line

20

2.540

2.436

0.019

ext top (right)

20

2.340

2.436

0.051

ext top (right)-2nd line

16

6.700

1.538

0.062

ext bot

10

58

1.350

0.615

0.144

stirrup

20

9.290

2.436

0.045

top bars

20

9.215

2.436

0.067

bot bars

20

3.040

2.436

0.007

ext top (left)

20

2.840

2.436

0.021

ext top (left)-2nd line

20

2.840

2.436

0.007

ext top (right)

20

2.640

2.436

0.006

ext top (right)-2nd line

10

61

1.350

0.615

0.051

stirrup

20

21.205

2.436

0.207

top bars

20

1.150

2.436

0.011

top bars-lapping

T-beam, L-beam and rectangular beams


Rebar calculation for GROUND FLOOR BEAM
FB1 (Gridline A, B & D)

FB2 (Gridline 2, 3, 4 & 5)

FB3 (Gridline 3, 4 & 5)

FB3(a) (Gridline 2)

FB5 (Gridline 6 & 7)

13 of 29

20

21.055

2.436

0.308

bot bars

20

0.850

2.436

0.017

bot bar- lapping

20

3.040

2.436

0.015

ext top (left)

20

2.840

2.436

0.042

ext top (left)-2nd line

20

3.040

2.436

0.015

ext top (right)

20

2.840

2.436

0.042

ext top (right)-2nd line

20

3.500

2.436

0.017

ext top (mid of grid D)

20

3.100

2.436

0.045

ext top (mid of grid D)-2nd line

20

3.600

2.436

0.018

ext top (mid of grid B)

20

3.200

2.436

0.047

ext top (mid of grid B)-2nd line

20

2.675

2.436

0.013

ext top (mid of grid C)

20

2.275

2.436

0.033

ext top (mid of grid C)-2nd line

16

6.700

1.538

0.041

ext bot

10

130

1.300

0.615

0.208

stirrup

16

21.043

1.538

0.065

top bars

16

0.925

1.538

0.004

top bars-lapping

20

20.893

2.436

0.153

bot bars

20

0.675

2.436

0.005

bot bars-lapping

20

3.678

2.436

0.009

ext top (left)

20

3.478

2.436

0.017

ext top (left)-2nd line

20

1.615

2.436

0.004

ext top (right)

20

1.415

2.436

0.007

ext top (right)-2nd line

20

2.375

2.436

0.017

extra top (mid section)

20

1.975

2.436

0.029

extra top (mid section)-2nd line

10

102

1.350

0.615

0.085

stirrup

20

9.155

2.436

0.134

top bars

20

9.055

2.436

0.199

bot bars

20

2.040

2.436

0.015

ext top (left)

20

1.840

2.436

0.027

ext top (left)-2nd line

20

4.600

2.436

0.034

ext top (right)

20

4.400

2.436

0.064

ext top (right)-2nd line

10

53

1.300

0.615

0.127

stirrup

20

10.105

2.436

0.074

top bars

20

9.955

2.436

0.073

bot bars

10

25

1.350

0.615

0.021

stirrup

20

2.918

2.436

0.021

top bars

20

2.768

2.436

0.020

bot bars

10

13

1.350

0.615

0.011

stirrup

16

15.080

1.538

0.046

top bars

16

0.925

1.538

0.004

top bars-lapping

16

14.930

1.538

0.046

bot bars

16

0.675

1.538

0.002

bot bars-lapping

16

1.290

1.538

0.002

ext top (left)

16

1.290

1.538

0.002

ext top (right)

16

2.300

1.538

0.011

ext top (mid section)

10

96

1.100

0.615

0.065

stirrup

16

2.718

1.538

0.013

top bars

16

2.568

1.538

0.008

bot bars

10

14

1.100

0.615

0.009

stirrup

16

17.700

1.538

0.054

top bars

16

0.925

1.538

0.004

top bars-lapping

16

17.580

1.538

0.054

bot bars

16

0.675

1.538

0.002

bot bars-lapping

10

88

0.650

0.615

0.035

stirrup

20

7.180

2.436

0.035

top bars

20

7.030

2.436

0.051

bot bars

20

2.040

2.436

0.005

ext top (Left)

20

1.840

2.436

0.009

ext top (left)-2nd line

20

2.040

2.436

0.010

ext top (right)

20

1.840

2.436

0.009

ext top right (2nd line)

10

34

1.350

0.615

0.028

stirrup

FB6 (Gridline E)

FB7 (Gridline 1 & 8)

FB8 (Gridline C)

FB9 (Gridline E)

FB10 (Between Gridline C-D)

FB10(a) (Between Gridline C-D)

FB11 (Outerside of Gridline E)

FB12 (Gridline 1)

Total =

6.041

14 of 29

Summary of rebar for GROUND FLOOR BEAM

ton

40 grade =

1.35

60 grade =

4.70

20

5.200

2.436

0.025

16

5.050

1.538

0.023

bot bars

20

1.765

2.436

0.004

ext top (left)

20

1.565

2.436

0.011

ext top (left)-2nd line

20

1.990

2.436

0.005

ext top (right)

20

1.790

2.436

0.013

ext top (right)-2nd line

10

26

1.350

0.615

0.022

stirrup

16

23.105

1.538

0.213

top bars

16

0.925

1.538

0.013

top bars-lapping

20

22.955

2.436

0.503

bot bars

20

0.675

2.436

0.020

bot bars-lapping

20

4.000

2.436

0.058

ext bot

20

3.688

2.436

0.054

ext top (both ends)

20

3.488

2.436

0.102

ext top (both ends)-2nd line

20

2.375

2.436

0.069

ext top (mid section)

20

1.975

2.436

0.115

ext top (mid section) -2nd line

10

136

1.350

0.615

0.339

stirrup

20

21.205

2.436

0.620

top bars

20

1.150

2.436

0.034

top bars-lapping

20

21.055

2.436

0.923

bot bars

20

0.850

2.436

0.050

bot bar- lapping

20

3.040

2.436

0.044

ext top (left)

20

2.840

2.436

0.125

ext top (left)-2nd line

20

3.040

2.436

0.044

ext top (right)

20

2.840

2.436

0.125

ext top (right)-2nd line

20

3.500

2.436

0.051

ext top (mid of grid D)

20

3.100

2.436

0.136

ext top (mid of grid D)-2nd line

20

3.600

2.436

0.053

ext top (mid of grid B)

20

3.200

2.436

0.140

ext top (mid of grid B)-2nd line

20

2.675

2.436

0.039

ext top (mid of grid C)

20

2.275

2.436

0.100

ext top (mid of grid C)-2nd line

16

6.700

1.538

0.124

ext bot

10

130

1.300

0.615

0.624

stirrup

16

21.043

1.538

0.065

top bars

16

0.925

1.538

0.004

top bars-lapping

20

20.893

2.436

0.153

bot bars

20

0.675

2.436

0.005

bot bars-lapping

20

3.678

2.436

0.009

ext top (left)

20

3.478

2.436

0.017

ext top (left)-2nd line

20

1.615

2.436

0.004

ext top (right)

20

1.415

2.436

0.007

ext top (right)-2nd line

20

2.375

2.436

0.017

extra top (mid section)

20

1.975

2.436

0.029

extra top (mid section)-2nd line

10

102

1.350

0.615

0.085

stirrup

20

9.155

2.436

0.089

top bars

20

9.055

2.436

0.132

bot bars

20

2.040

2.436

0.010

ext top (left)

20

1.840

2.436

0.018

ext top (left)-2nd line

20

4.600

2.436

0.022

ext top (right)

20

4.400

2.436

0.043

ext top (right)-2nd line

10

53

1.300

0.615

0.085

stirrup

16

18.780

1.538

0.058

top bars

16

0.925

1.538

0.004

top bars-lapping

16

18.630

1.538

0.057

bot bars

16

0.675

1.538

0.003

bot bars-lapping

10

110

0.650

0.615

0.044

stirrup

16

17.700

1.538

0.054

top bars

16

0.925

1.538

0.004

top bars-lapping

16

17.580

1.538

0.054

bot bars

16

0.675

1.538

0.002

bot bars-lapping

10

88

0.650

0.615

0.035

stirrup

Rebar calculation for 1ST FLOOR BEAM


FB4 (Gridline 2)
top bars

FB13 (Gridline A,B & D)

FB14 (Gridline 2,3,4,5,6 & 7)

FB15 (Gridline E)

FB16 (Gridline 8)

B17(A)-(Gridline A)

B17(B)-(Gridline E)

15 of 29

FB18 (Gridline C)
16

19.205

1.538

0.059

top bars

16

0.925

1.538

0.004

top bars-lapping

20

19.055

2.436

0.139

bot bars

20

0.675

2.436

0.005

bot bars-lapping

20

1.615

2.436

0.008

ext top (both ends)

20

1.415

2.436

0.014

ext top (both ends)-2nd line

20

2.375

2.436

0.023

ext top (mid section)

20

1.975

2.436

0.038

ext top (mid section)-2nd line

10

110

1.35

0.615

0.091

stirrup

20

9.155

2.436

0.089

top bars

20

9.055

2.436

0.132

bot bars

20

2.040

2.436

0.010

ext top (left)

20

1.840

2.436

0.018

ext top (left)-2nd line

20

4.600

2.436

0.022

ext top (right)

20

4.400

2.436

0.043

ext top (right)-2nd line

10

53

1.300

0.615

0.085

stirrup

20

2.918

2.436

0.021

top bars

20

2.768

2.436

0.020

bot bars

10

13

1.350

0.615

0.011

stirrup

FB19 (Gridline 1)

FB20 (Grideline 8)

6.765

Total =
Summary of rebar for 1ST FLOOR BEAM

ton

40 grade =

1.42

60 grade =

5.35

20

2.775

2.434

0.189

16

2.067

1.538

0.067

12

1.825

0.890

0.023

20

3.775

2.434

0.037

16

2.067

1.538

0.019

12

3.475

2.434

0.017

10

15

1.312

0.615

0.109

ton

40 grade =

0.109

16

23.125

1.538

0.213

top bars

16

0.925

1.538

0.017

top bars-lapping

20

23.045

2.436

0.505

bot bars

20

0.675

2.436

0.030

bot bars-lapping

20

3.688

2.436

0.054

ext top (both ends)

20

3.408

2.436

0.100

ext top (both ends)-2nd line

20

2.375

2.436

0.069

ext top (mid section)

20

1.975

2.436

0.115

ext top (mid section) -2nd line

10

158

1.350

0.615

0.394

stirrup

20

22.625

2.436

0.661

top bars

20

1.150

2.436

0.067

top bars-lapping

20

22.545

2.436

0.989

bot bars

20

0.675

2.436

0.059

bot bar- lapping

20

3.050

2.436

0.089

20

2.770

2.436

0.243

20

3.600

2.436

0.053

20

3.200

2.436

0.140

20

2.675

2.436

0.039

20

2.275

2.436

0.100

20

3.500

2.436

0.051

20

3.100

2.436

0.136

20

6.700

2.436

0.392

10

160

1.300

0.615

0.768

16

17.438

1.538

0.054

top bars

16

0.925

1.538

0.003

top bars-lapping

20

17.358

2.436

0.085

bot bars

20

0.850

2.436

0.006

bot bars-lapping

20

3.688

2.436

0.009

20

3.448

2.436

0.017

20

1.625

2.436

0.004

20

1.385

2.436

0.007

20

2.375

2.436

0.017

20

1.975

2.436

0.029

Rebar calculation for RAMP BEAM

Total =
Summary of rebar for RAMP BEAM

landing beam

0.460
60 grade =

0.351

Rebar calculation for 2ND FLOOR BEAM


FB21 (Gridline A,B & D)

FB22 (Gridline 2,3,4,5,6 & 7)

stirrup

B23 (Gridline E)

16 of 29

10

116

1.350

0.615

0.096

16

19.225

1.538

0.059

top bars

16

0.925

1.538

0.004

top bars-lapping

20

19.145

2.436

0.140

bot bars

20

0.675

2.436

0.005

bot bars-lapping

20

1.850

2.436

0.009

ext top (both ends)

20

1.570

2.436

0.015

ext top (both ends)-2nd line

20

2.200

2.436

0.043

ext top (mid section)

20

2.600

2.436

0.013

ext top (mid section)-2nd line

20

2.300

2.436

0.011

ext top (mid section)-2nd line

10

126

1.350

0.615

0.105

stirrup

20

9.175

2.436

0.089

top bars

20

9.135

2.436

0.134

bot bars

20

2.650

2.436

0.013

ext top (left)

20

2.370

2.436

0.023

ext top (left)-2nd line

20

4.625

2.436

0.023

ext top (right)

20

4.375

2.436

0.043

ext top (right)-2nd line

10

53

1.300

0.615

0.085

stirrup

20

9.175

2.436

0.089

top bars

20

9.135

2.436

0.134

bot bars

20

2.650

2.436

0.013

ext top (left)

20

2.370

2.436

0.035

ext top (left)-2nd line

20

4.625

2.436

0.023

ext top (right)

20

4.375

2.436

0.064

ext top (right)-2nd line

10

52

1.300

0.615

0.083

stirrup

20

2.938

2.436

0.021

top bars

20

2.858

2.436

0.021

top bars-lapping

10

14

1.350

0.615

0.012

stirrup

stirrup

FB24 (Gridline C)

FB25 (Gridline 8)

FB26 (Gridline 1)

FB27 (Gridline E)

6.917

Total =
Summary of rebar for 2nd FLOOR BEAM

ton

40 grade =

1.541

60 grade =

5.375

ton

9.875

1.538

0.061

16mm main st (T)

9.795

2.434

0.143

20mm main st (B)

1.000

2.825

2.434

0.014

20mm ext top E

3.000

2.585

2.434

0.038

20mm ext top E

1.000

4.700

2.434

0.023

20mm ext top D

3.000

4.460

2.434

0.065

20mm ext top D

58.000

1.350

0.615

0.096

10mm stirrup

Rebar calculation for STAIR ROOF BEAM


Beam SRB 1=02 nos. G.line-6&7.

Beam SRB 2=02 nos. G.line-D&E.

0.000
2

2.000

4.500

1.538

0.028

16mm main st (T)

3.000

4.420

2.434

0.065

20mm main st (B)

4.000

1.627

2.434

0.032

20mm ext top (E)

26.000

1.350

0.615

0.043

10mm stirrup

Beam SRB-3=01 nos.canti

0.000
1

2.000

4.500

1.538

0.014

16mm main st (T)

4.420

1.538

0.020

16mm main st (B)

26

1.250

0.615

0.020

10mm stirrup

Total =
Summary of rebar for STAIR ROOF BEAM
2.30.3

0.661
ton

40 grade =

0.159

60 grade =

0.501

in Floor & Roof slabs


Rebar calculation for GROUND FLOOR SLAB
REBAR "a" 10mm @ 125mm c/c alt ckd
str

10

15

22.625

0.615

0.209

ckd

10

14

23.225

0.615

0.200

lapping (top)

10

23

0.300

0.615

0.004

lapping ( bot)

10

21

0.375

0.615

0.005

str

10

14

16.938

0.615

0.146

ckd

10

13

17.458

0.615

0.140

lapping (top)

10

21

0.300

0.615

0.004

lapping ( bot)

10

20

0.375

0.615

0.005

REBAR "b" 10mm @ 200mm c/c alt ckd


str (gridline A-B)

10

6.100

0.615

0.075

ckd (gridline A-B)

10

6.380

0.615

0.063

str (gridline C-D)

10

22.625

0.615

0.083

ckd (gridline C-D)

10

23.225

0.615

0.071

17 of 29

lapping (top)

10

0.300

0.615

0.002

lapping ( bot)

10

0.375

0.615

0.002

str (gridline 6-7)

10

16.925

0.615

0.052

ckd (gridline 6-7)

10

17.265

0.615

0.042

lapping (str)

10

0.300

0.615

0.001

lapping (ckd)

10

0.375

0.615

0.001

str (gridline 2 - 6)

10

8.375

0.615

0.103

ckd (gridline 2 - 6)

10

8.635

0.615

0.085

REBAR "c" 2-10mm ext top in between ckd


gridline A-B/3-4-5-6

10

44

2.200

0.615

0.238

gridline 1-2/A-B & D-E

10

44

3.451

0.615

0.187

gridline 7-8/A-B

10

58

3.451

0.615

0.123

gridline 3, 4 & 5/D-E

10

44

2.200

0.615

0.179

gridline 6/D-E

10

44

1.350

0.615

0.037

gridline B/6-7

10

20

2.700

0.615

0.033

gridline C/ 6-7

10

20

2.550

0.615

0.031

gridline D/2-6)

10

20

2.450

0.615

0.121

gridline D/6-7

10

20

3.400

0.615

0.042

gridline A & E / 1,2 & 7-8

10

2.275

0.615

0.034

gridline A / 2-7

10

1.550

0.615

0.043

gridline E/ 2-6

10

1.550

0.615

0.034

gridline B-C/7-8

10

11

3.450

0.615

0.023

gridline B-D/void area

10

17

1.350

0.615

0.014

gridline B-D/ 6

10

28

1.350

0.615

0.023

gridline B-C/1-2

10

3.450

0.615

0.015

REBAR "d" 1-10mm ext top in between ckd

REBAR "e" 10mm @ 100mm c/c alt ckd


str (gridline B-C/6-7-8)

10

13

6.025

0.615

0.048

ckd,(gridline B-C/6-7-8)

10

12

6.305

0.615

0.047

str (gridline B-C/6-7)

10

17

3.925

0.615

0.041

ckd (gridline B-C/6-7)

10

16

4.205

0.615

0.041

gridline 1-2/A-B

10

22

2.438

0.615

0.033

gridline 7-8/A-B

10

34

2.488

0.615

0.052

gridline 1-2/D-E

10

34

2.437

0.615

0.051

gridline 7-8/D-E

10

12

2.487

0.615

0.018

top ( gridline A-B)

10

22.825

0.615

0.11

bot (gridline A-B)

10

22.625

0.615

0.11

lapping (top)

10

0.375

0.615

0.00

REBAR "f" 1-10mm ext bot in between two str.

REBAR "g" 10mm @ 250mm at top & bot as binder

lapping (bot)

10

0.300

0.615

0.00

4-corner (top & bot)

10

2.438

0.615

0.04

top (gridline 2-6)

10

6.300

0.615

0.12

bot (gridline 2-6)

10

6.100

0.615

0.12

top (gridline1 - 2)

10

7.225

0.615

0.03

bot (gridline1 - 2)

10

7.225

0.615

0.03

top (gridline 6-7)

10

15.215

0.615

0.07

bot (gridline 6-7)

10

15.015

0.615

0.07

lapping (top)

10

0.375

0.615

0.00

lapping (bot)

10

0.300

0.615

0.00

top (gridline DE /1-6)

10

17.138

0.615

0.09

bot (gridline DE /1-6)

10

16.938

0.615

0.09

lapping (top)

10

14

0.300

0.615

0.00

lapping (bot)

10

14

0.375

0.615

0.00

top (gridline D / cantiliver)

10

22.825

0.615

0.08

bot (gridline D / cantiliver)

10

22.625

0.615

0.08

lapping (top)

10

0.375

0.615

0.00

lapping (bot)

10

0.300

0.615

0.00

top (gridline DE & AB /1-2- & 7-8)

10

9.500

0.615

0.12

bot (gridline DE & AB /1-2- & 7-8)

10

9.500

0.615

0.12

top (gridline D /2-6)

10

8.575

0.615

0.17

bot (gridline D /2-6)

10

8.375

0.615

0.16

top (gridline 6-8)

10

25

4.138

0.615

0.064

bot (gridline 6-8)

10

25

4.038

0.615

0.062

for floor punch

10

10

12

0.600

0.615

0.044

for duct

10

12

1.000

0.615

0.015

corner bar (top & bot)

10

24

0.800

0.615

0.071

REBAR "h" 10mm @ 100mm at top & bot as binder

Miscellaneous

Total =

4.724

18 of 29

Rebar calculation for 1ST FLOOR SLAB


REBAR "a" 10mm @ 125mm c/c alt ckd
str (gridline A-B)

10

14

22.250

0.615

0.192

ckd (gridline A-B)

10

13

22.850

0.615

0.183

lapping (str)

10

21

0.300

0.615

0.004

lapping (ckd)

10

20

0.375

0.615

0.005

str (gridline D-E)

10

14

16.938

0.615

0.146

ckd (gridline D-E)

10

13

17.458

0.615

0.140

lapping (str)

10

21

0.300

0.615

0.004

lapping (ckd)

10

20

0.375

0.615

0.005

ckd (gridline BC & CD)

10

22.250

0.615

0.109

str (gridline BC & CD)

10

22.850

0.615

0.084

lapping (str)

10

0.300

0.615

0.002

lapping (ckd)

10

0.375

0.615

0.002

str (gridline B-C & CD)

10

18.425

0.615

0.045

ckd (gridline B-C & CD)

10

19.025

0.615

0.023

lapping (str)

10

0.300

0.615

0.001

lapping (ckd)

10

0.375

0.615

0.001

ckd (gridline A-E / line 2-6)

10

21.325

0.615

0.262

str (gridline A-E / line 2-6)

10

21.845

0.615

0.215

lapping (str)

10

0.300

0.615

0.006

lapping (ckd)

10

0.375

0.615

0.006

str (gridline A-D / line 6-7)

10

14.925

0.615

0.046

ckd (gridline A-D / line 6-7)

10

15.365

0.615

0.038

lapping (str)

10

0.300

0.615

0.001

lapping (ckd)

10

0.375

0.615

0.001

REBAR "b" 10mm @ 200mm c/c alt ckd

REBAR "c" 2-10mm ext top in between ckd

10

0.615

gridline B

10

14

3.150

0.615

gridline C

10

14

2.700

0.615

0.116

gridline D

10

14

3.150

0.615

0.108

gridline A & E (line 1 & 8)

10

12

3.150

0.615

0.070

gridline 3,4 5( line A-E)

10

124

2.200

0.615

0.503

gridline 6, line A-D

10

82

2.200

0.615

0.111

gridline 6, line D-E

10

42

1.400

0.615

0.036

gridline A-B (1-2 & 7-8) + D-E (7-8)

10

30

3.638

0.615

0.201

gridine A (line 2 to 7)

10

10

1.350

0.615

0.042

gridline E (2-6)

10

10

1.550

0.615

0.038

gridline C

10

10

1.500

0.615

0.018

gridline D

10

10

3.638

1.615

0.059

gridline A-B, C-D, 1-2 & 2-3, cantiliver

10

30

2.488

0.615

0.138

gridlline 7-8, D-2, cantiliver

10

10

2.488

0.615

0.015

bot (grid A line 1-8)

10

22.250

0.615

0.055

top (grid A 1- 8)

10

22.450

0.615

0.041

lapping (bot)

10

0.300

0.615

0.001

lapping (top)

10

0.375

0.615

0.001

bot (grid B line 1-7)

10

22.250

0.615

0.082

top (grid B line 1-7)

10

22.450

0.615

0.069

lapping (bot)

10

0.300

0.615

0.002

lapping (top)

10

0.375

0.615

0.002

bot (grid B & D, line 1-7, other side)

10

22.250

0.615

0.109

top (grid B& D, line 1-7, other side)

10

22.250

0.615

0.082

lapping (bot)

10

0.300

0.615

0.001

lapping (top)

10

0.375

0.615

0.001

bot (gridline C, line 2-7)

10

15.000

0.615

0.074

top (gridline C, line 2-7)

10

14.800

0.615

0.073

lapping (bot)

10

0.300

0.615

0.001

lapping (top)

10

0.375

0.615

0.001

bot (gridline D, line 1-8)

10

22.450

0.615

0.083

top (gridline D, line 1-8)

10

22.250

0.615

0.068

lapping (bot)

10

0.300

0.615

0.002

lapping (top)

10

0.375

0.615

0.002

bot (gridline E, line 1-6)

10

16.563

0.615

0.041

top (gridline E line 1-6)

10

16.763

0.615

0.082

lapping (bot)

10

0.300

0.615

0.001

lapping (top)

10

0.375

0.615

0.001

bot (four corner)

10

9.500

0.615

0.187

0.136

REBAR "d" 1-10mm ext top in between ckd

REBAR "f" 1-10mm ext bot in between two str.

REBAR "g" 10mm @ 250mm at top & bot as binder

19 of 29

top (four corner)

10

9.500

0.615

0.164

bot (four corner, line 1-2 & 7-8)

10

2.438

0.615

0.024

top (four corner, line 1-2 & 7-8)

10

2.638

0.615

0.026

bot ( 2-6)

10

21.325

0.615

0.420

top (2-6)

10

21.525

0.615

0.424

lapping (bot)

10

0.300

0.615

0.001

lapping (top)

10

0.375

0.615

0.001

10

15

0.300

0.615

0.003

10

15

0.375

0.615

0.003

bot (line 6-7)

10

14.925

0.615

0.073

top (line 6-7)

10

15.125

0.615

0.074

lapping (bot)

10

0.300

0.615

0.001

lapping (top)

10

0.375

0.615

0.001

bot

10

44

2.438

0.615

0.066

top

10

44

2.638

0.615

0.071

for floor punch

10

10

12

0.600

0.615

0.044

for duct

10

12

1.000

0.615

0.015

corner bar (top & bot)

10

24

0.800

0.615

0.071

REBAR "h" 10mm @ 100mm at top & bot as binder

Miscellaneous

Total =

5.658

Rebar calculation for 2ND FLOOR SLAB


REBAR "a" 10mm @ 125mm c/c alt ckd
str (gridline A-B)

10

14

22.250

0.615

0.192

ckd (gridline A-B)

10

13

22.850

0.615

0.183

lapping (str)

10

21

0.300

0.615

0.004

lapping (ckd)

10

20

0.375

0.615

0.005

str (gridline D-E)

10

14

16.938

0.615

0.146

ckd (gridline D-E)

10

13

17.458

0.615

0.140

lapping (str)

10

21

0.300

0.615

0.004

lapping (ckd)

10

20

0.375

0.615

0.005

ckd (gridline BC & CD)

10

22.250

0.615

0.109

str (gridline BC & CD)

10

22.850

0.615

0.084

lapping (str)

10

0.300

0.615

0.002

lapping (ckd)

10

0.375

0.615

0.002

str (gridline B-C & CD)

10

18.425

0.615

0.045

ckd (gridline B-C & CD)

10

19.025

0.615

0.023

lapping (str)

10

0.300

0.615

0.001

lapping (ckd)

10

0.375

0.615

0.001

ckd (gridline A-E / line 2-6)

10

22.975

0.615

0.283

str (gridline A-E / line 2-6)

10

23.495

0.615

0.231

lapping (str)

10

0.300

0.615

0.006

lapping (ckd)

10

0.375

0.615

0.006

str (gridline A-D / line 6-7)

10

17.425

0.615

0.054

ckd (gridline A-D / line 6-7)

10

17.865

0.615

0.044

lapping (str)

10

0.300

0.615

0.001

lapping (ckd)

10

0.375

0.615

0.001

REBAR "b" 10mm @ 200mm c/c alt ckd

REBAR "c" 2-10mm ext top in between ckd

10

0.615

gridline B

10

14

3.150

0.615

gridline C

10

14

2.700

0.615

0.116

gridline D

10

14

3.150

0.615

0.108

0.136

gridline A & E, 1 & 8

10

12

3.150

0.615

0.070

gridline 3,4, 5 & A-E

10

124

2.200

0.615

0.503

gridline 6, A-D

10

82

2.200

0.615

0.111

gridline 6, line D-E

10

42

1.400

0.615

0.036

gridline A-B,1-2 , 7-8, D-E,

10

30

3.638

0.615

0.201

gridine A, line 2 to 7

10

10

1.550

0.615

0.048

gridline E (2-6)

10

10

1.550

0.615

0.038

gridline C

10

10

1.550

0.615

0.019

gridline D (7-8)

10

10

3.638

1.615

0.059

gridline A-B, C-D, 1-2 & 2-3, cantiliver

10

30

2.488

0.615

0.138

grid 7-8, (D-2), cantiliver

10

10

2.488

0.615

0.015

REBAR "d" 1-10mm ext top in between ckd

REBAR "f" 1-10mm ext bot in between two str.

REBAR "g" 10mm @ 250mm at top & bot as binder


bot (grid A, 1-8)

10

22.250

0.615

0.096

top (grid A, 1- 8)

10

22.450

0.615

0.083

lapping (bot)

10

11

0.300

0.615

0.002

lapping (top)

10

0.375

0.615

0.002

20 of 29

bot (grid B line 1-7)

10

22.250

0.615

0.082

top (grid B, line 1-7)

10

22.450

0.615

0.069

lapping (bot)

10

0.300

0.615

0.002

lapping (top)

10

0.375

0.615

0.002

bot (grid B & D, line 1-7, other side)

10

22.250

0.615

0.109

top (grid B& D, line 1-7, other side)

10

22.250

0.615

0.082

lapping (bot)

10

0.300

0.615

0.001

lapping (top)

10

0.375

0.615

0.001

bot (gridline C, 2-7)

10

15.000

0.615

0.074

top (gridline C, 2-7)

10

14.800

0.615

0.073

lapping (bot)

10

0.300

0.615

0.001

lapping (top)

10

0.375

0.615

0.001

bot (gridline D,1-8)

10

22.450

0.615

0.083

top (gridline D, 1-8)

10

22.250

0.615

0.068

lapping (bot)

10

0.300

0.615

0.002

lapping (top)

10

0.375

0.615

0.002

bot (gridline E,line 1-6)

10

16.563

0.615

0.071

top (gridline E, line 1-6)

10

16.763

0.615

0.124

lapping (bot)

10

11

0.300

0.615

0.002

lapping (top)

10

0.375

0.615

0.002

bot (four corner)

10

9.500

0.615

0.187

top (four corner)

10

9.500

0.615

0.164

bot (A-E 2-6)

10

22.975

0.615

0.452

top (2-6)

10

23.175

0.615

0.456

lapping (bot)

10

0.300

0.615

0.001

lapping (top)

10

0.375

0.615

0.001

bot (line 6-7, A-D)

10

18.250

0.615

0.090

top (line 6-7 )

10

18.450

0.615

0.091

lapping (bot)

10

0.300

0.615

0.001

lapping (top)

10

0.375

0.615

0.001

bot

10

44

2.438

0.615

0.066

top

10

44

2.638

0.615

0.071

for floor punch

10

10

12

0.600

0.615

0.044

for duct

10

12

1.000

0.615

0.015

corner bar (top & bot)

10

24

0.800

0.615

0.071

skylight area

12

32

2.200

0.890

0.501

water reservoir opeing

12

32

1.960

0.890

0.223

(-) deduction for skylight

10

10

REBAR "h" 10mm @ 100mm at top & bot as binder

Miscellaneous

(-) deduction for water reservoir area


Total =

5.915

Rebar Calculation for STAIR ROOF SLAB


Rebar -a (gridline 6/7 & D/E)

15

4.000

0.615

0.037

14

4.160

0.615

0.036

4.000

0.615

0.012

4.160

0.615

0.010

10.125

0.615

0.044

10.465

0.615

0.039

10.265

0.615

0.051

10.125

0.615

0.037

4.060

0.615

0.010

4.000

0.615

0.010

13

4.06

0.615

0.032

14

4.000

0.615

0.034

Rebar -c (gridline D)

39

2.500

0.615

0.060

G.line -E.

39

2.630

0.615

0.063

Re -bar -D (gridline 6/7)

66

1.250

0.615

0.101

D.canti portion.

26

1.150

0.615

0.018

1.100

0.615

0.004

60

1.750

0.615

0.065

4.6

0.615

0.020

0.450

0.615

0.004

Rebar -b (gridline 6/7 & D/cantiliver)


Rebar-b (gridline 6/7 & D-cantiliver/E cantiliver)
Rebar-e (gridline 6/7 & D-cantiliver/E cantiliver)
Rebar-b.gap (D canti portion)
Re-bar -a.gap (D to E canti)

Drop wall portion

Total =
2.30.4

0.687

in cornice, arch, railing, louver, parapet, window sill/post etc.


Rebar calcualtion for ARCH COLUMN (1st & 2nd floor)
12mm Main (V)

12

26

3.400

0.890

0.472

12mm Main (V)

12

26

3.200

0.890

0.296

10mm Stimup

10

26

16

0.670

0.615

0.171

10mm Stimup

10

26

16

0.570

0.615

0.146

21 of 29

Total =
Summary of rebar for ARCH COLUMN

1.085
40 grade =

0.32

60 grade =

0.77

Rebar calcualtion for ARCH BEAM (1st & 2nd Floor)


10mm Stimup

10

94

0.710

0.615

0.082

10mm Drop panel

10

1.050

0.615

0.031

10mm Drop panel

10

0.550

0.615

0.016

10mm Drop panel

10

0.425

0.615

0.013

10mm Drop panel

10

0.325

0.615

0.005

10mm Binder

10

3.200

0.615

0.016

10mm Binder Side

10

0.350

0.615

0.003

10mm Binder Side

10

0.250

0.615

0.002

10mm Binder Side

10

0.160

0.615

0.002

10mm Binder Mid

10

0.650

0.615

0.006

10mm Binder Mid

10

0.350

0.615

0.003

10mm Binder Mid

10

0.200

0.615

0.002

10mm Stimup

10

118

0.710

0.615

0.052

10mm Drop panel

10

1.050

0.615

0.019

10mm Drop panel

10

0.550

0.615

0.010

10mm Drop panel

10

0.425

0.615

0.008

10mm Drop panel

10

0.325

0.615

0.006

10mm Binder

10

3.200

0.615

0.010

10mm Binder Side

10

0.350

0.615

0.002

10mm Binder Side

10

0.250

0.615

0.002

10mm Binder Side

10

0.160

0.615

0.001

10mm Binder Mid

10

0.650

0.615

0.004

10mm Binder Mid

10

0.350

0.615

0.002

10mm Binder Mid

10

0.200

0.615

0.001

16 mm H. bar

16

1.480

1.537

0.055

12 mm beam (M)

12

14.275

0.890

0.152

Sub Total =

G.line (E-gape 2 -6)

G.line A (5 panel)

0.298
G. Line E (1st & 2nd floor)

12 mm Capping (Top)

12

0.700

0.890

0.007

12 mm Capping (Bott.)

12

0.525

0.890

0.006

16 mm H. bar

16

1.480

1.537

0.036

12 mm beam (M)

12

17.950

0.890

0.096

12 mm Capping (Top)

12

0.700

0.890

0.004

12 mm Capping (Bott.)

12

0.525

0.890

0.003

40 grade =

0.30

60 grade =

10

98.000

1.560

0.615

0.094

10mm ver

10

6.000

14.420

0.615

0.053

10mm binder

10

6.000

0.300

0.615

0.001

10mm lapping

10

26.000

1.360

0.615

0.022

10mm ver

10

5.000

3.775

0.615

0.012

10mm bin

10

5.000

0.450

0.615

0.003

10mm lapping

10

22.000

1.360

0.615

0.166

10mm ver

10

6.000

3.250

0.615

0.108

10mm bin

10

0.487

0.615

0.016

10mm lapping

10

209.000

1.360

0.615

0.175

1st flight R. side

10

36.000

1.360

0.615

0.030

Landing R. side

10

25.000

1.360

0.615

0.021

2nd flight R. side

10

143.000

1.560

0.615

0.137

2nd flight R. side

10

31.000

1.360

0.615

0.130

1st flight L. side

10

31.000

1.560

0.615

0.119

2nd flight L. side

10

6.000

20.595

0.615

0.076

10

6.000

0.300

0.615

0.001

Lapping

10

3.495

0.615

0.013

Landing

10

16.770

0.615

0.062

2nd flight bin

10

3.050

0.615

0.101

L. side binder

10

2.000

0.615

0.066

L. side binder lapping

10

80

0.550

0.615

0.054

10mm q bar main(v) long

10

31

0.550

0.615

0.021

10mm q bar main(v) short

10

10.05

0.615

0.025

10mm q bar bin long

10

3.900

0.615

0.010

10mm q bar bin short

10

0.300

0.615

0.001

10mm q bar lapping

Total =
Summary of rebar for ARCH BEAM

G. Line A

0.359
0.36

Rebar calculation for RAILING


1st floor railing re-bar
Corridor side,

Gride line 6

Gride line A,B

Ramp railing:(ver) 10mm q bar:

Ramp R. side 1st flight bin

Pent house railing:

Total =

1.516

Rebar calcualtion of WINDOW SIILL (1st FLOOR)


gridline D

10

3.350

0.615

0.033

10

22

0.600

0.615

0.032

22 of 29

gridline E

10

2.212

0.615

0.022

10

15

0.600

0.615

0.022

10

3.350

0.615

0.041

10

2.212

0.615

0.027

10

2.212

0.615

0.022

10

3.350

0.615

0.033

10

3.093

0.615

0.015

10

2.262

0.615

0.011

10

1.525

0.615

0.011

10

22

0.600

0.615

0.041

10

15

0.600

0.615

0.028

10

15

0.600

0.615

0.022

10

22

0.600

0.615

0.032

10

20

0.600

0.615

0.015

10

15

0.600

0.615

0.011

10

10

0.500

0.615

0.009

Rebar calcualtion of WINDOW SIILL 2ND FLOOR)


gridline D
gridline E

Total =

0.319

gridlne A

10

4.000

3.350

0.615

0.041

Ring

10

4.000

2.212

0.615

0.027

Gride line E (40 grade)

10

4.000

0.615

0.000

Main

10

4.000

2.212

0.615

0.022

Ring

10

15.000

0.600

0.615

0.022

Gride line A

10

4.000

3.35

0.615

0.041

Gride line B

10

4.000

2.212

0.615

0.027

Gride line D

10

4.000

2.212

0.615

0.022

Gride line E

10

4.000

3.35

0.615

0.033

Head master room

10

4.000

3.093

0.615

0.015

10

4.000

2.262

0.615

0.011

10

4.000

1.525

0.615

0.011

Ring, A

10

22.000

0.600

0.615

0.041

Ring, B

10

15.000

0.600

0.615

0.028

Ring, D

10

15.000

0.600

0.615

0.022

Ring, E

10

22.000

0.600

0.615

0.032

Head master Room

10

20.000

0.600

0.615

0.015

10

15.000

0.600

0.615

0.011

10

10.000

0.500

0.615

0.009

Total =

0.431

Rebar calculation of PARAPET WALL


10

960

1.425

0.615

0.841

10

96.427

0.615

0.415

10

10

0.3

0.615

0.013

Total =

lapping

1.269

Rebar calculation of LOUVER (1st & 2nd Floor)


12

28

1.865

0.890

0.279

12

77

1.865

0.890

0.767

10

28

10

0.65

0.615

0.112

10

77

10

0.65

0.615

0.308

ton

40 grade =

Gride-6

10

45

1.385

0.615

Binder

10

5.800

0.615

0.011

Gride-2

10

45

1.010

0.615

0.028
0.011

Total =
Summary of rebar for LOUVER
2.30.5

1.465
0.42

60 grade =

1.05

in Sunshade, False ceiling


Rebar calculation of 1ST FLOOR FALSE SLAB & LINTEL
0.038

Binder

10

5.800

0.615

Gride-4

10

37

0.500

0.615

0.011

Binder

10

5.800

0.615

0.021

Main

10

45

0.975

0.615

0.027

1st floor lintel Rebar fabricaiton work


10 mm Gride Line D,E, ring.

10

23

0.650

0.615

0.074

10 mm Food store D,E, ring.

10

0.500

0.615

0.002

10 mm Toillet female, D,E ring.

10

0.500

0.615

0.002

10mm Toillet female, D,E,ring.

10

0.500

0.615

0.002

10mm G. store door D,E ring.

10

0.500

0.615

0.002

10mm Toillet male, D,E ring.

10

15

0.500

0.615

0.005

23 of 29

12 mm Gride Line D,E

12

3.350

0.890

0.095

12mm Food store

12

1.100

0.890

0.004

12 mm Toillet female

12

1.100

0.890

0.004

12 mm Toillet female

12

0.950

0.890

0.003

12 mm G. store door

12

1.000

0.890

0.004

12 mm Toillet male

12

2.250

0.890

0.008

Total =

0.205

Summary of rebar for 1ST SLAB FALSE SLAB, LINTEL, H/W 40 grade =

0.09

60 grade =

0.12

Rebar calculation of 2ND FLOOR FALSE SLAB & LINTEL, H/W


10 mm lintel ring G. Line ( D,E)

10

23

0.650

0.615

0.074

10 mm lintel ring G. Line-2

10

13

1.385

0.615

0.022

10 mm lintel ring G. Line-2

10

36

0.735

0.615

0.033

10mm lintel ring G. Line-4

10

38

0.500

0.615

0.023

10mm lintel ring G. Line-6

10

38

0.500

0.615

0.012

10mm lintel ring G. Line-6

10

45

1.385

0.615

0.038

10mm lintel ring G. Line-8

10

27

1.385

0.615

0.023

10mm lintel HW2

10

14

0.750

0.615

0.026

10mm lintel HW3, 3a

10

14

0.750

0.615

0.013

10mm lintel HW4

10

14

0.750

0.615

0.006

10mm lintel HW5

10

12

0.750

0.615

0.011

10mm lintel HW6

10

0.750

0.615

0.008

10mm lintel HW6

10

0.750

0.615

0.004

10mm G. line-2 false slab (Binder)

10

5.800

0.615

0.021

10mm G. line-4 Binder

10

5.800

0.615

0.043

10mm G. line-6 Binder

10

5.800

0.615

0.021

10mm G. line-6 Binder

10

5.800

0.615

0.011

10mm G. line-8 Binder

10

4.250

0.615

0.008

10

45

0.975

0.615

0.081

12mm D, E (4-panel)

12

3.35

0.890

0.095

12mm G. Line-2 (2 Side)

12

1.875

0.890

0.013

12mm G. Line-4 (2 Side)

12

5.600

0.890

0.040

12mm G. Line-6 (2 Side)

12

5.600

0.890

0.040

12mm G. Line-8

12

3.375

0.890

0.012

12mm G. Line-8

12

0.375

0.890

0.001

12mm HW 2

12

2.300

0.890

0.033

12mm HW 3, 3a

12

2.175

0.890

0.015

12mm HW 4

12

2.212

0.890

0.008

12mm HW 5

12

1.850

0.890

0.013

12mm HW 6

12

1.420

0.890

0.010

12mm HW 6

12

1.439

0.890

0.005

Ring HW5

10

12

0.750

0.615

0.011

Ring HW 2

10

14

0.750

0.615

0.019

Ring HW 3.3a

10

14

0.750

0.615

0.013

Ring HW 4

10

14

0.750

0.615

0.006

Ring HW 6

10

0.750

0.615

0.004

Ring HW 6

10

0.750

0.615

0.004

Ring HW 6

10

0.750

0.615

0.004

Lintel & Sunsed

10

0.750

0.615

0.013

12mm bar lintel 6

12

5.600

0.890

0.020

12mm bar lintel 4

12

5.600

0.890

0.020

12mm bar lintel 2

12

5.600

0.890

0.020

12mm bar HW 5

12

1.850

0.890

0.013

12mm bar HW 2

12

2.300

0.890

0.025

12mm bar HW 3.3a

12

2.175

0.890

0.015

12mm bar HW 4

12

2.212

0.890

0.008

12mm bar HW 6

12

1.438

0.890

0.005

12mm bar HW 6

12

1.469

0.890

0.005

12mm bar HW 6

12

1.420

0.890

0.005

12mm bar lintel & sunsed

12

1.056

0.890

0.015

40 grade =

0.55

60 grade =

16

16

4.300

1.538

0.106

16

16

1.700

1.538

0.042

ext bot

16

16

5.080

1.538

0.125

main bar

16

16

2.450

1.538

0.060

ext top

10mm G. line-4,6 Binder


Sub-Total =

0.478

Sub-Total =

0.286

Sub-Total =

0.075

Sub-Total =
Summary of rebar for 2ND SLAB FALSE SLAB, LINTEL, H/W
2.30.6

0.151
0.44

Staircase, steps, ramp


Rebar calculation for STAIRCASE
1st Flight

main bar

24 of 29

2nd Flight

3rd Flight

4th Flight

5th Flight

6th Flight

12

16

2.450

0.890

0.035

ext top

16

16

3.150

1.538

0.078

main (landing)

16

16

2.450

1.538

0.060

main (landing)

16

0.800

1.538

0.010

ext

10

3.150

0.615

0.015

binder landing

10

3.900

0.615

0.012

binder landing

10

3.150

0.615

0.012

binder landing-bot

10

3.900

0.615

0.012

binder landing-bot

10

74

1.520

0.615

0.069

binder

16

16

6.000

1.538

0.148

main bar

16

16

3.150

1.538

0.078

top

16

16

5.700

1.538

0.140

main mid landing

12

16

2.000

0.890

0.028

ext top

16

16

2.250

1.538

0.055

ext top

10

56

1.520

0.615

0.052

binder

12

16

6.500

0.890

0.093

main bar

12

16

1.400

0.890

0.020

ext top

12

16

4.400

0.890

0.063

top to main

12

16

3.000

0.890

0.043

landing bot

12

16

3.650

0.890

0.052

landing top

12

0.900

0.890

0.006

ext top

10

31

1.520

0.615

0.029

binder

10

12

3.150

0.615

0.023

binder

10

3.900

0.615

0.017

binder

12

16

6.000

0.890

0.085

main bar

12

16

3.350

0.890

0.048

ext bot

12

16

1.400

0.890

0.020

ext top

12

16

3.100

0.890

0.044

main bar with slab

12

16

4.800

0.890

0.068

main bar with slab

10

26

1.520

0.615

0.024

binder

12

16

6.500

0.890

0.093

main bar

12

16

1.400

0.890

0.020

ext top

12

16

4.400

0.890

0.063

top to main

12

16

3.000

0.890

0.043

landing bot

12

16

3.650

0.890

0.052

landing top

12

0.900

0.890

0.006

ext top

10

31

1.520

0.615

0.029

binder

10

12

3.150

0.615

0.023

binder

10

3.900

0.615

0.017

binder

12

16

6.000

0.890

0.085

main bar

12

16

3.350

0.890

0.048

ext bot

12

16

1.400

0.890

0.020

ext top

12

16

3.100

0.890

0.044

main bar with slab

12

16

4.800

0.890

0.068

main bar with slab

10

26

1.520

0.615

0.024

binder

Total =
Summary of rebar for STAIRCASE

2.408
ton

40 grade =

0.31

60 grade =

2.10

12

20.705

0.890

0.129

str

12

21.205

0.890

0.113

ckd

12

0.700

0.890

0.004

lapping top

12

0.525

0.890

0.003

lapping bot

12

1.050

0.890

0.007

ext top

12

2.625

0.890

0.049

ext top

12

3.470

0.890

0.022

landing

12

7.100

0.890

0.044

landing

12

1.870

0.890

0.008

landing (near column)

10

135

1.620

0.615

0.135

binder

10

19

3.475

0.615

0.041

landing binder

12

17.900

0.890

0.112

str

12

18.300

0.890

0.098

ckd

12

0.700

0.890

0.004

lapping top

12

0.525

0.890

0.003

lapping bot

12

3.370

0.890

0.021

ext top (landing)

12

7.100

0.890

0.044

ext top (C-2 & C-3)

12

2.625

0.890

0.033

C-4 & C-5

12

2.350

0.890

0.015

ext top (1st floor)

10

109

1.620

0.615

0.109

binder

Rebar calculation for RAMP


1st Flight

2nd Flight

Total =
Summary of rebar for RAMP

0.992
ton

40 grade =

0.28

60 grade =

0.71

25 of 29

2.30.7

Rebar calculation for WATER RESERVOIR


Vertical Wall (gridline-1)

Vertical Wall (gridline-2)

Bottom Slab

Short Wall (up to Bottom Slab)

Long Wall

Middle Wall

10

25

3.400

0.615

0.105

outer wall-outer side

10

34

3.400

0.615

0.142

outer wall-inner side

10

17

4.700

0.615

0.098

binder

10

34

0.300

0.615

0.013

lapping

10

19

3.400

0.615

0.079

inner wall-outer side

10

26

3.400

0.615

0.109

inner wall-inner side

10

17

3.785

0.615

0.079

binder

10

34

0.300

0.615

0.013

lapping

10

38

2.638

0.615

0.123

bot-main bar

10

5.000

0.615

0.055

bot - binder

10

17

2.338

0.615

0.049

top-main bar

10

4.700

0.615

0.046

top - binder

10

26

1.800

0.615

0.058

outer

10

34

1.800

0.615

0.075

inner

10

2.338

0.615

0.023

binder - outer

10

1.738

0.615

0.009

binder - outer

10

1.800

0.615

0.013

outer (above door)

10

1.800

0.615

0.015

inner (above door)

10

10

4.700

0.615

0.058

binder - outer

10

10

4.500

0.615

0.055

binder - inner

10

40

0.300

0.615

0.015

lapping

10

20

1.175

0.615

0.029

main

10

2.338

0.615

0.020

binder

Total =

1.281

Summary of REBAR for Supersturcture Member

40 Grade 60 Grade

(a) in Column (above Plinth Level)

6.376

16.205

(b) in Tie beams & lintels

4.467

15.918

(c) in Floor Slab

#VALUE!

(d) in Cornice, railing, drop wall, louver, parapet, window silll/post etc.

0.306

2.102

(e) in Sunshade & false ceiling

1.909

1.059

(f) in Stair, steps & ramp

1.281

(g) in Water Reservoir

1.700

2.31.1

40 grade ribbed or deformed bar

ton

#VALUE!

2.31.2

60 grade ribbed or deformed bar

ton

35.284

26 of 29

FAEL KHAIR PROGRAM


Construction of School cum Cyclone Shelter
Contract No: BD1-0033 (Package-14)
Contractor-MBPL
#REF!
Measurement Sheet
#REF!

#REF!

2. Name of Project : FAEL Khair Program


#REF!
#REF!
5. Details of Measurment sheet for Bill No.4: Electrical works
Item No.
4.1
4.1.1
4.1.2
4.1.3

Item Description
Concealed point wiring
Light/ Exhaust fan point
Fan point
2 pin 5amps Socket point

Unit
each
each
each

4.2
4.2.1

CONCEALED CONDUIT WIRING


Solar power submain wiring

4.2.2
4.3

Normal submain
pump connection
PVC CONDUIT
Minimum

4.3.1

dia

water

inner

Cumulative
Quanity

Remarks

95
25
14

1
1
1

95
25
14

meter

115.00

115.00

meter

90

90.00

meter

meter

20mm&

minimum wall thichness 1.5mm


Minimum

4.3.2

inner

and

No. of
Mbrs

Quanity

dia

40mm&
9

4.5.1
4.6.1
4.6.2.1
4.6.3.1

Providing
3-pin
15/16A
each
combined switch socket
each
Fan clamp
each
Ceiling Fan
each
250mm Exhaust fan plastic body

7
33
28
1

1
1
1
1

7
33
28
1

4.7.1

1x13Watt ceiling mounted light


each
fixture

40

40

4.7.2
4.7.3

1x11w, ceiling mounted saucer


each
light fixture
each
1x11w, water tight light fitting

58
4

1
1

58
4

4.8.1

11/13/14/15w,
lamp

4.10

Lightning protection and earthing


sustem

4.10.1
4.10.2
4.10.3
4.10.4
4.10.4.1

minimum wall thichness 1.9mm

Engery

each

100

25.4mm dia 457mm long solid Each


copper rod

110
24

1
1

110.00
24.0
0

20x3mmcopper roof conductor Rm


complete
HDBC copper wire

Rm

12m Electrical system earthing

Set

6.6m
Lightning
4.10.4.2 earthing
4.10.5

27

saving

protection Set

Construction of earth inspection Set


pit

IPC-14

Z1-061, PK-08

FAEL KHAIR PROGRAM


Construction of School cum Cyclone Shelter
Contract No: BD1-0033 (Package-14)
Contractor-MBPL
#REF!
Measurement Sheet
#REF!

#REF!

2. Name of Project : FAEL Khair Program


#REF!
#REF!
5. Details of Measurment sheet for Bill No. 3: Plumbing And Sanitary Works
Item No.
3.2.1

Item Description
Supplying fitting fixing long pan

Unit
Each

3.13
3.14

groove cutting in wall , rcc


100 mm dia rain water down pipe

rm
rm

3.15
3.16
3.17
3.19.2
3.19.4
3.21.2
3.22
3.22.2
3.24
3.24.1
3.25

100mm dia uPVC soil and waste


pipe
rm
50mm dia uPVC vent pipe
rm
100mm dia uPvc floor trap
no
19mm dia water supply pipe
rm
32mm dia water pipe
rm
150 mm dia pressure soil pipe
rm
Construction of masonry inspection pi no
Pit cover
no
SepTic Tank
Each
Septic Tank 5400x1250x2100 mm
Soak Well
each

3.25.1

28

Inner Dia 1500 mm And Depth


6000mm

Each

No. of
Mbrs
1

Cumulative
Quanity
7

45
44.85

1
1

45
44.85

89.1
17.8
4
20
8
45
7
7

1
1
1
1
1
1
1
1

89.1
17.8
4
20
8
45
7
7

Quanity
7

(3/4'' pipe 37 rm &


1.25'' -8 rm)

Variation item

0.9

0.900
-

1.00

0.7

0.700

IPC-14

Remarks

Z1-061, PK-08

FAEL KHAIR PROGRAM


Construction of School cum Cyclone Shelter
Contract No: BD1-0033 (Package-14)
Contractor-MBPL
#REF!
Measurement Sheet
#REF!

#REF!

2. Name of Project : FAEL Khair Program


#REF!
#REF!
5. Details of Measurment sheet for Bill No. 5: Hand Operated Deep Tube Well
Item No.

29

Item Description

Unit

5.1.1

40 mm dia water grade uPVC pipe


having wall thickness 2.5 mm to 3
mm

rm

5.1.2

40 mm dia Five Star uPVC strainer


3.0 m long

No. of
Mbrs

Quanity

Cumulative
Quanity

Remarks

307.83

307.833

each

2.000

5.2

Supplying, fitting and fixing deep set


tube well pump (Hand set)
each

1.000

5.3

Complete development of the tube


well to obtain sand and turbidity free
water at satisfactory yield, etc. all
complete as per direction of the
each
Engineer.

1.00

1.000

5.4

Construction of platform

each

5.5

After completion of development of


tube well, collection of water sample
to test the water
each

1.00

IPC-14

1.000

Z1-061, PK-08