Development of the Urban Water and Sanitation Sector in South

Sudan (DUWSS)

Bill of Quantities
for

Elevated Tank - 50 m

YEI RIVER COUNTY

South Sudan

JUN, 2012

GIZ - SOUTH SUDAN


DEVELOPMENT OF THE URBAN WATER AND SANITATION SECTOR
TENDER BID FOR SUPPLY AND CONSTRUCTION/INSTALLATION OF ONE WATER RESERVOIRS
WITHIN YEI TOWN, SOUTH SUDAN
I.

Supply of Water Reservoir (50m ), Steel Tower (10m high) and Plumbing Scheme at Yei
town, South Sudan.

Item
Description
1 Supply of Water Reservoir (50m 3 ), Steel
Tower and Plumbing Scheme to Yei, Southern
Sudan

II.

Qty

Unit

Unit rate in Total Price


EUR
in EUR

Remarks
One set includes the tank, tower,
and all accessories

set

Installation of one Water Reservoir (50m3), Steel Tower (10m high) and Plumbing Scheme
at Yei town.

Item
Description
Pre-construction surveys, mobilization and
1
setting out
Site Clearing, Excavation and Preparation of
2
Foundation
2.1 Clear of site to remove top soil to an average
depth of 20cm
2.2 Excavate in ordinary soil for foundation footings
2.3 Ditto but in rock
2.4 Return fill around foundation with good, dry
excavated material from site and well ram in
layers every 20cm interval.
Installation and Casting of Foundation
3
3.1 Reinforced concrete in C-40, 450kg cement/m3
filled into formworks and vibrated around rod
reinforcement. Price Includes Steel reinforcement
and formworks. Refer to Technical
Specifications for more details in foundation
footings
3.2 Install a set of diam. 16mm anchor bolts (4pcs)
and metal plate (size: 35x35cm & 10mm thick)
accurately in position for Steel tower columns
complete with all necessary accessories.
Installation of the Steel Structures and the
4
Tank Segments
4.1 Mounting & fabrication of steel members for
Steel Water Tower. Refer and follow Technical
Specifications, Manufacturers Instructions, Site
Instructions, Approved Work Method Statement
and Approved Working Drawings.
4.2 Mounting and installation of tank segments.
Refer and follow Technical Specifications,
Manufacturers Instructions, Site Instructions,
Approved Work Method Statement and
Approved Working Drawings.
Installation of Platforms, ladders, staircases,
5
level indicator, handrails and piping as per
drawing. Refer and follow Technical
Specifications, Manufacturers Instructions,
Site Instructions, Approved Work Method
Drawings.

Qty

Unit

LS

40
18
11.16

m2
m3
m3

23

m3

17.8

m3

set

LS

LS

Rate

EUR

Remarks

5.1 Provide a protected walkway around the tank as


per specs
5.2 Install a ladder to the walkway platform and up
to the tank roof as per specs
5.3 Install a level indicator to the tank as per specs
6
Plumbing works. Refer and follow Technical
Specifications, Manufacturers Instructions,
Site Instructions, Approved Work Method
Statement and Approved Working Drawings.)
6.1 Supply of HDPE OD 110, NP16 pipes and
fittings for inlet, outlet, washout and overflow
6.2 Installation of HDPE pipes includes concrete
thrust block and drainage (drainage to be
connected (and extended) to the Soak Away
Pit of the Tanker Filling Station)
6.3 Installation of flanged gate valves to following
pipes: transmission pipe from Luzira Borehole,
transmission pipe from HaiGabat Borehole,
Washout pipe and overflow pipe
7
Installation of lightening arrestors (Refer and
follow Technical Specifications,
Manufacturers Instructions, Site
Instructions, Approved Work Method
Statement and Approved Working Drawings).
7.1 Miscellaneous installation materials like bolts,
nuts, rivets, fastener, rods, cables etc.
7.2 Installation of the lightening equipment
8cm thick gravel (25-50mm)
8
compound floor
Test, disinfection and commissioning Refer
9
and follow Technical Specifications,
Manufacturers Instructions, Site
Instructions, Approved Work Method
Statement and Approved Material
Specifications.
9.1 Liquid- tightness test
9.2 Disinfection of the reservoir
9.3 Commissioning of the reservoir
10.0 Supply and Fixation of Securtity fence Refer
and follow Technical Specifications,
Manufacturers Instructions, Site
Instructions, Approved Work Method
Statement and Approved Material
Specifications.
11 Provisional sum against evidence (10% of pos.
1 to 10)
3
12 Total one 50m Tank

LS

1
1

LS
LS

65

LS

piece

1
1

LS
LS

40

m2

1
1
1

LS
LS
LS

LS

10

BOQ SUMMARY
AMOUNT (EUR)
Item
Description
I.
Supply of ONE Water Reservoir (50M3), Steel
Tower and Plumbing Scheme to Yei (see
Technical Specifications below)
II. Installation of One Water Reservoirs (50M3),
Steel Tower and Plumbing Scheme at Yei
Town

Unit

Bill of Quantities Sub-Total


10% for physical contingencies
Bill of Quantities Total (excl. Taxes and duties)

Quantity

Cost (EUR)