Step 1: Install piles to required depth around perimeter of proposed

basement
Step 2: Excavate down to required level and cart away material
Step 3: Install anchor to restraint top of piles on three sides (Side A, B and
C) of excavations
Step 4: Excavate material until basement B1 reached
Step 5: Install Anchor to restrain piles at level B1.
Step 6: Carry out survey to check settlement of surrounding structures.