SCHEDULE OF QUANTITY

SUPPLY, ERECTION & COMMISSIONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Budhapal


(Firms shall quote the unit rate and total rates including all Taxes and Duties)
Sl.
No.

Particulars

Supply
Unit

Errection

Qty

Unit Rate
(Rs.)

Amount
(Rs.)

Unit Rate
(Rs.)

3=(1x2)

Part-A
(i) 33Kv Incoming
Supply, installation with foundation & painting as per approved drawing 1 RSJ 150 mm X 150 mm X 10 mtr long required for Pole Structure (34.6
kg/mtr)
2

Supply, installation with foundation as per approved drawing & painting RSJ 150 mm X 150 mm X 6 mtr long required for Pole Structure (34.6
kg/mtr)

Supply, installation with painting - MS Channel (100x50x5 mm) thickness


of flange 7.7 mm, (9.56 kg/mtr)
Supply, installation with painting - Bracing Angle (50 x 50 x 6 mm (4.5
4
kg/mtr)
5 Installation of 232 Sqmm AAAC for BUS arrangement
Supply, installation with civil works for foundation of - 33Kv Isolator with
6
earth switch
Supply, installation with civil works for foundation of - 33Kv Isolator without
7
earth switch
8 Supply, installation of - 33Kv LA
Supply, installation of - Disc Insulator (B & S) 70 KN sutable for 232 sq mm
9
AAAC
10 Supply, installation of - B&S Hard ware fittings
Installation & Commissioning of - 33Kv VCB with CT & Control Relay Panel
11
(Excluding Foundation)
(ii) 33Kv Bus
12 Supply, installation with foundation & painting as per approved drawing RSJ 150 mm X 150 mm X 10 mtr long required for Pole Structure (34.6
kg/mtr)
3

13 Supply, installation with painting - MS Channel (100 x 50 x 5 mm)


thickness of flange 7.7 mm, (9.56 kg/mtr)
14 Supply, installation with painting -Bracing Angle (50x50x6 mm) (4.5
kg/mtr)
15 Supply, installation of Disc Insulator (B & S)
16 Supply, installation of B&S Hard ware fittings
17 Installation & Commissioning of 33Kv VCB with CT & Control Relay Panel
(Excluding Foundation)
18 Installation & Commissioning of 33 Kv PT (single phase)
Installation & Commissioning of of 33/11 KV, 3.15MVA Power Transformer
19
(Excluding Foundation)
(iii) Mounting of 33Kv Post Insulator

No

0.00

No

0.00

Kg

1710

0.00

Kg

1080

0.00

Km

0.5

Set

0.00

Set

0.00

No

12

0.00

No

60

0.00

Set

15

0.00

Set

No

To be supplied by WESCO

To be supplied by WESCO

0.00
Kg

361

kg

1080

No
No

60
15

Set

To be supplied by WESCO

No

To be supplied by WESCO

No

To be supplied by WESCO

Page 1 of 34

0.00
0.00
0.00
0.00

SCHEDULE OF QUANTITY
SUPPLY, ERECTION & COMMISSIONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Budhapal
(Firms shall quote the unit rate and total rates including all Taxes and Duties)
Sl.
No.

Particulars

Supply

Supply, installation with foundation & painting as per approved drawing 20 RSJ 150 mm X 150 mm X 6.0 mtr long required for Pole Structure (34.6
kg/mtr)
21
22

Supply, installation with painting - MS Channel (100x50x5 mm) thickness


of flange 7.7 mm, (9.56 kg/mtr)
Supply, installation with painting Bracing Angle (50x50x6 mm) (4.5 kg/mtr)

23 Supply, installation 33Kv Post Insulator


(iv) Mounting of 11Kv Post Insulators
Supply, installation with foundation & painting as per approved drawing
24 RSJ 150 mm X 150 mm X 6 mtr long required for Pole Structure (34.6
kg/mtr)
Supply, installation with painting - MS Channel (100x50x5 mm) thickness
of flange 7.7 mm, (9.56 kg/mtr)
Supply, installation with painting - Bracing Angle (50x50x6)mm (4.5
26
kg/mtr)
27 Supply, installation 11Kv Post insulators
(v) 11 KV Bus with Feeder bay 4 Nos
Supply, installation with foundation & painting as per approved drawing 28 RSJ 150 mm X 150 mm X 10 mtr long required for Pole Structure (34.6
kg/mtr)
25

29
30
31
32
33
34
35
36
37
38
(vi)
39

Supply, installation with painting - MS Channel (100x50x5 mm) thickness


of flange 7.7 mm, (9.56 kg/mtr)
Supply, installation with painting -Bracing Angle (50x50x6 mm) (4.5
kg/mtr)
Supply, installation of Disc Insulator (B & S)
Supply, installation of B&S Hard ware fittings
Supply, installation with civil works for foundation of 11Kv AB Switch 630 A
(for Transformer Bay)
Supply, installation with civil works for foundation of 11Kv AB Switch 400 A
(For outgoing Feeder Bay)
Supply, installation with civil works for foundation of 11Kv HG fuse
Installation & Commissioning of 11Kv VCB (630 A) complete set with CT &
Control Relay Panel (Excluding Foundation)
Installation & Commissioning of 11 KV PT (single phase)
Installation & Commissioning of 11 KV LA
33/0.4 KV Station Transformer
Supply, installation with foundation & painting as per approved drawing
-RSJ 150 mm X 150 mm X 10 mtr long required for Pole Structure (34.6
kg/mtr)

Errection

Unit

Qty

No

0.00

Kg

103

0.00

Kg

135

0.00

No

12

0.00

No

0.00

Kg

103

0.00

Kg

135

0.00

No

0.00

No

18

0.00

Kg

1677

0.00

Kg

466

0.00

No
No

56
28

0.00
0.00

Set

0.00

Set

0.00

Set

0.00

Set

To be supplied by WESCO

No
No

6
18

To be supplied by WESCO
0.00

No

Page 2 of 34

Unit Rate
(Rs.)

Amount
(Rs.)

0.00

Unit Rate
(Rs.)

SCHEDULE OF QUANTITY
SUPPLY, ERECTION & COMMISSIONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Budhapal
(Firms shall quote the unit rate and total rates including all Taxes and Duties)
Sl.
No.

Particulars

Supply

Supply, installation with painting - MS Channel (100x50x5 mm) thickness


of flange 7.7 mm, (9.56 kg/mtr)
Supply, installation with painting - Bracing Angle (50x50x6 mm (4.5
41
kg/mtr)
Supply, installation with civil works for foundation of 33 KV AB Switch
42
40

Installation and Commissioning of 33/0.4 KV,100 KVA Station Transformer


with cable box
44 Supply, installation with civil works for foundation of 33 Kv HG Fuse
45 Supply, installation with civil works for foundation of 33 KV LA
(vii) Other Items
Supply, installation with civil works - Earthing Electrode with chamber
46
43

47
48
49
50
51
52
53

Supply, installation with civil works - GI flat 90X6 mm size under ground for
mat
Supply, installation -GI flat 50X6 mm size for riser
Supply, installation - GI flat 25X6 mm size for riser
Supply, installation - 8 swg GI wire
Supply & Fixing of Earth bond
Supply, installation with fabrication - Lightning Mast (spike ) with base
plate to be mounted on RSJ pole
Supply, installation & commissioning - Battery with Charger 2V X 12nos
including wooden stand plantee type battery of Exide Make & suitable
charger cum DCDB of Caldyne Make.

Supply, installation & commissioning - ACDB (indoor) as per specification &


approved drawing
Supply, installation & commissioning - SDB (out door) as per specification
54
& approved drawing
Supply, installation with civil works for foundation of poles - 1x400 Watt
HPSV outdoor Light fittings (Make PHILIPS / CGL) along with Tubular Poles
55 of 10 mtr height (410 SP 48) with Junction box as per IS 2713 / 1980.
53

Supply, Laying with civil works - 3.5 C X 185 sq mm LT, PVC, Al, Armoured
cable in the cable trench, cable termination at both ends should be done
56 by providing suitable lugs, cable glands pvc tape, ampere tapes etc

Errection

Unit

Qty

Kg

236

0.00

Kg

79

0.00

set

0.00

No

To be supplied by WESCO

set
No

1
3

0.00
0.00

No

35

0.00

Kg

2000

0.00

Kg
kg
kg
No

600
700
50
40

0.00
0.00
0.00
0.00

No

12

0.00

set

0.00

No

0.00

No

0.00

No

0.00

Mtr

50

0.00

Page 3 of 34

Unit Rate
(Rs.)

Amount
(Rs.)

Unit Rate
(Rs.)

SCHEDULE OF QUANTITY
SUPPLY, ERECTION & COMMISSIONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Budhapal
(Firms shall quote the unit rate and total rates including all Taxes and Duties)
Sl.
No.

Particulars

Supply

Errection

Unit

Qty

Mtr
Mtr
Mtr
Mtr

50
200
200
250

0.00
0.00
0.00
0.00

No
No
No

1
1
4

0.00
0.00
0.00

Unit Rate
(Rs.)

Amount
(Rs.)

Supply, Laying of following size control cable & Termination. This includes
Fixing of cable rack by full welding with two emboded GI flat, placing of
cable trays with supply of required jointing sleeve and GI bolt nuts, etc.,
57 laying of cable over the cable tray by providing cable markers cable
glands at both end with terminations by providing ferruls, cable lugs (ring
type) with dressing
a
b
c
d
58
a
b
c

3 C x 2.5 sq mm PVC, Cu, Armoured control cable


4C X 2.5 sq mm PVC, Cu, Armoured control cable
10 C X 2.5 sq mm PVC, Cu, Armoured control cable
2C X 4 sq mm LT, PVC, Al, Armoured cable for switchyard Lighting
Supply and placement of following Safety & Measuring Equipments
Earth Tester
2.5 KV Insulation Meggar
Fire Extinguisher

Page 4 of 34

Unit Rate
(Rs.)

SCHEDULE OF QUANTITY
SUPPLY, ERECTION & COMMISSIONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Budhapal
(Firms shall quote the unit rate and total rates including all Taxes and Duties)
Sl.
No.

d
e
f
g
h
i
j
k

1
2
3
4

Particulars

Supply

Fire Bucket & stand


Shock Treatment Chart
33kv Hand Gloves
H T Rubber Mat
Digital Clamp on Meter
T & P Box
Emergency Light
First Aid Box with Medicine
TOTAL of Part-A
Part-B
Contour Survey
Cutting & Levelling
Boundary Wall including gate pillar with supply of all required materials of
approved quality to complete the job
Steel gate for Boundary wall as per specification and approved drawing
including supply of all required materials of approved quality

Qty

No
No
Pair
Mtr
Pair
No
No
Set

4
2
4
10
1
1
2
1

Sq.mtr
Cum

2000
UR

Not applicable
Not applicable

RM

160

Not applicable

kg

250

Not applicable

108

Not applicable

set

Not applicable

Sq mtr

200

Not applicable

Construction of control room including PHD works, Electrical works, inside


cable trench, overhead water tank etc., complete in all respect excluding
bore well, but including supply of all required materials of approved quality Sq mtr
to complete the work

Deep Bore well with casing pipe, flexible pipe with 1.5 HP sub merged
pump connecting cable complete in all respect including supply of all
required materials of approved quality

Metal Spreading of 33/11Kv S/S including sand spreading as per


specification including supply of all required materials of approved quality

Errection

Unit

Unit Rate
(Rs.)

Amount
(Rs.)
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Foundation for Power Transformer with RRG massonary with guide rail as
per specification and approved drawing including supply of all required
materials of approved quality.

No

Not applicable

Foundation for 33 KV VCB with CT & CR Pannel as per specification and


approved drawing including supply of all required materials of approved
quality.

No

Not applicable

Foundation for 11 KV VCB with CT & CR Pannel as per specification and


10 approved drawing including supply of all required materials of approved
quality.

No

Not applicable

Mtr

10

Not applicable

Switch yard cable trench with cover as per specification and approved
11 drawing including supply of all required materials of approved quality
a) 300 mm width

Page 5 of 34

Unit Rate
(Rs.)

SCHEDULE OF QUANTITY
SUPPLY, ERECTION & COMMISSIONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Budhapal
(Firms shall quote the unit rate and total rates including all Taxes and Duties)
Sl.
No.

Particulars

Supply

b) 600 mm width
Approach road as per specification and approved drawing including supply
12
of all required materials of approved quality
EXTRA ITEMS (IF REQUIRED AS PER SITE CONDITION) including supply of all
13
required materials of approved quality
a Excavation in all type of soil
b PCC 1:3:6 including scafolding
c PCC 1:2:4 including scafolding
d RCC 1:2:4 including scafolding excluding supply of steel
e Reinforced steel
f Brick work 230 mm (full brick)
g Brick work 125 mm (Halfl brick)
h RRGH Masonary
TOTAL of Part-B
Grand Total (Part A + Part B)

Errection

Unit

Qty

Mtr

20

Not applicable

Mtr

30

Not applicable

Cum
Cum
Cum
Cum
Kg
Cum
Cum
Cum

1
1
1
1
1
1
1
1

Unit Rate
(Rs.)

Amount
(Rs.)

Unit Rate
(Rs.)

Not applicable
Not applicable
Not applicable
Not applicable
Not applicable
Not applicable
Not applicable
Not applicable
Not applicable
0.00

Amount in Words :
Name of the Bidder :
Signature :
Seal :

Note : (i) Bidders can enter figures only in the cells highlighted in "Yellow" colour.
(ii) In case of Part - B, no separate rate is required to be quoted against the supply of civil construction materials. All such rates should be include

Page 6 of 34

SCHEDULE OF QUANTITY

ONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Budhapal


it rate and total rates including all Taxes and Duties)
Errection
Amount
(Rs.)

Total Amount of
supply & installation
(Rs.)

5(4x1)

6=(3+5)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 7 of 34

SCHEDULE OF QUANTITY

ONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Budhapal


it rate and total rates including all Taxes and Duties)
Errection
Amount
(Rs.)

Total Amount of
supply & installation
(Rs.)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00

0.00

Page 8 of 34

SCHEDULE OF QUANTITY

ONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Budhapal


it rate and total rates including all Taxes and Duties)
Errection
Amount
(Rs.)

Total Amount of
supply & installation
(Rs.)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 9 of 34

SCHEDULE OF QUANTITY

ONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Budhapal


it rate and total rates including all Taxes and Duties)
Errection
Amount
(Rs.)

Total Amount of
supply & installation
(Rs.)

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

Page 10 of 34

SCHEDULE OF QUANTITY

ONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Budhapal


it rate and total rates including all Taxes and Duties)
Errection
Amount
(Rs.)

Total Amount of
supply & installation
(Rs.)

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
Page 11 of 34

SCHEDULE OF QUANTITY

ONING OF 2 X 3.15 MVA 33/11KV SUB-STATION at Budhapal


it rate and total rates including all Taxes and Duties)
Errection
Amount
(Rs.)

Total Amount of
supply & installation
(Rs.)

0.00

0.00

0.00

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

colour.
ainst the supply of civil construction materials. All such rates should be included in the installation rate.

Page 12 of 34

BOQ FOR 33KV LINE from 132/33 KV Rengali Grid Substation to Budhapal Substation (30 Km)
SUPPLY, ERECTION, TESTING & COMMISSIONING OF 33 KV LINE
(Firms shall quote the unit rate and total rates including all Taxes and Duties)
Sl.
No.

Particulars

Supply
Unit

Errection

Qty

Unit Rate
(Rs.)

Amount
(Rs.)

Unit Rate
(Rs.)

3=(1x2)

Intermediate Support with PSC Pole

Supply, Installation with brick batting of 9 M x 415 Kg PSC Poles (Excluding


foundation concreting) as per standard approved drawing/schedule & ISS/REC

Nos.

360

0.00

Stone Pad (450 mm x 450 mm x 90 mm) for PSC poles including supply of all
materials required as per standard approved drawing/schedule & ISS/REC

Nos.

360

0.00

Supply, installation of 33KV 'V' Cross Arm (GI Channel 100 mm x 50 mm x 6 mm),
(9.56 kg/mtr) as per standard approved drawing/schedule & ISS/REC

Nos.

360

0.00

Supply, installation of GI Cross Arm holding Clamps with bolts & nuts as per
standard approved drawing/schedule & ISS/REC

Nos.

360

0.00

Nos.

1080

0.00

Nos.

360

0.00

Nos.

360

0.00

Concreting of poles (Approx Qty.) including supply of all required civil construction
materials as per standard approved drawing/schedule & ISS/REC

Nos.

120

0.00

Supply, installation of GI Barbed Wire for each pole as anti climbing device as per
standard approved drawing/schedule & ISS/REC

Kg

720

0.00

Nos.

360

0.00

Nos.

360

0.00

Nos.

90

0.00

5
6
7

10

11
12

Supply, installation of 33 KV Pin Insulators with GI pin as per standard approved


drawing/schedule & ISS/REC
Supply, installation of GI F-Bracket with bolts & nuts as per standard approved
drawing/schedule & ISS/REC
Supply, installation of Pole Earthing complete with coil earthing & 8 SWG GI Wire
as per standard approved drawing/schedule & ISS/REC

Supply, installation of Danger plates & clamps with bolts & nuts as per standard
approved drawing/schedule & ISS/REC
Supply and fixing of Number plate as per standard approved drawing/schedule &
ISS/REC
Supply, installation of GI Stay Set (20 x 1800 mm) complete including Concreting,
stay wire etc as per standard approved drawing/schedule & ISS/REC

Page 13 of 34

BOQ FOR 33KV LINE from 132/33 KV Rengali Grid Substation to Budhapal Substation (30 Km)
SUPPLY, ERECTION, TESTING & COMMISSIONING OF 33 KV LINE
(Firms shall quote the unit rate and total rates including all Taxes and Duties)
Sl.
No.

Particulars

Supply
Unit

Errection

Qty

Unit Rate
(Rs.)

Amount
(Rs.)

Unit Rate
(Rs.)

3=(1x2)

0.00

Total of A

Page 14 of 34

BOQ FOR 33KV LINE from 132/33 KV Rengali Grid Substation to Budhapal Substation (30 Km)
SUPPLY, ERECTION, TESTING & COMMISSIONING OF 33 KV LINE
(Firms shall quote the unit rate and total rates including all Taxes and Duties)
Sl.
No.

Particulars

Supply
Unit

Errection

Qty

Unit Rate
(Rs.)

Amount
(Rs.)

Unit Rate
(Rs.)

3=(1x2)

Cut Point / Angle Point with Single pole support on 9.0 meter PSC POLE as
per standard approved drawing/schedule & ISS/REC

Supply, Installation with concreting of 9 M x 415 Kg PSC POLE as per standard


approved drawing/schedule & ISS/REC

Nos.

30

0.00

Stone Pad (450 x 450 x 90 mm) for PSC poles including supply of all materials
required as per standard approved drawing/schedule & ISS/REC

Nos.

30

0.00

Supply, installation of 33KV 'V' Cross Arm (GI channel 100 mm x 50 mm x 6 mm)
(9.56 kg/mtr) as per standard approved drawing/schedule & ISS/REC

Nos.

60

0.00

Supply,installation of GI Cross Arm holding Clamps with bolts& nuts as per


standard approved drawing/schedule & ISS/REC

Nos.

30

0.00

Nos.

540

0.00

Nos.

180

0.00

Nos.

60

0.00

Nos.

30

0.00

Kg

60

0.00

Supply, installation of Danger plates & clamps with bolts & nuts as per standard
approved drawing/schedule & ISS/REC

Nos.

30

0.00

Supply, installation of GI Stay Set (20 x 1800mm) complete including Concreting,


stay wire etc as per standard approved drawing/schedule & ISS/REC

Set

60

0.00

5
6
7
8

9
10

11

Supply, installation of 11 KV Disc insulators as per standard approved


drawing/schedule & ISS/REC
Supply, installation of 33 KV Hardware Fitting as per standard approved
drawing/schedule & ISS/REC
Supply, installation of GI F-Bracket with bolts & nuts as per standard approved
drawing/schedule & ISS/REC
Supply, installation of Pole Earthing complete with coil earthing & 8 SWG GI Wire
as per standard approved drawing/schedule & ISS/REC
Supply, installation of GI Barbed Wire for each pole as anti climbing device as per
standard approved drawing/schedule & ISS/REC

Page 15 of 34

BOQ FOR 33KV LINE from 132/33 KV Rengali Grid Substation to Budhapal Substation (30 Km)
SUPPLY, ERECTION, TESTING & COMMISSIONING OF 33 KV LINE
(Firms shall quote the unit rate and total rates including all Taxes and Duties)
Sl.
No.

Particulars

Supply
Unit

12
13

Supply and fixing of Number plate as per standard approved drawing/schedule &
ISS/REC
Stringing of AAA conductor (100 Sq.mm) as per Sag-Tension chart in 3 phases
including sag, binding, jumpering etc., required to complete the work as per
standard approved drawing/schedule & ISS/REC.

Errection

Qty

Unit Rate
(Rs.)

Amount
(Rs.)

Unit Rate
(Rs.)

3=(1x2)

Nos.

30

Km

30

0.00

To be supplied by WESCO
0.00

Total of B

Page 16 of 34

BOQ FOR 33KV LINE from 132/33 KV Rengali Grid Substation to Budhapal Substation (30 Km)
SUPPLY, ERECTION, TESTING & COMMISSIONING OF 33 KV LINE
(Firms shall quote the unit rate and total rates including all Taxes and Duties)
Sl.
No.

Particulars

Supply
Unit

C
1

Errection

Qty

Unit Rate
(Rs.)

Amount
(Rs.)

Unit Rate
(Rs.)

3=(1x2)

Extra Items as per site Requirement


Supply, installation with concreting of following Single pole structure including
fitting of all accessories (X-arm, insulator, fitting, earthing, grouting, danger board,
anticlimbing etc. complete) as per standard approved drawing/schedule &
ISS/REC.
No
No

1
1

0.00
0.00

a) 10 Mtr / 425 kg PSC Pole


b) 13 Mtr RS Joist Pole (150x150 mm, 34.6 kg/mtr)
Supply, installation with concreting of following Double Pole structure & its erection
including fitting of all accessories (X-arm, X-bracing, insulator, hardware fitting, coil
earthing, grouting, danger board, anti climbing etc. complete) as per standard
approved drawing/schedule & ISS /REC.

No.
No.

1
1

0.00
0.00

a) 9 Mtr / 300 kg PSC Pole


b) 13 Mtr R.S. Joist (150x150 mm, 34.6 kg/mtr)
Supply, installation with concreting of following Triple Pole structure & its erection
including fitting of all accessories (X-arm, X-bracing, insulator, hardware fitting, coil
earthing, grouting, danger board, anti climbing etc. complete) as per standard
approved drawing/schedule & ISS.

No.
No.
No.

1
1
1

0.00
0.00
0.00

a) 9 Mtr, 300 Kg PSC Pole


b) 10 Mtr, 425 kg PSC Pole
c) 13 Mtr R.S. Joist (150x150 mm, 34.6 kg/mtr)
Supply, installation with concreting of following Four Pole structure & its erection
including fitting of all accessories (X-arm, X-bracing insulator, hardware
fitting,clamps, coil earthing, grouting, danger board, anti climbing etc. complete) as
per standard approved drawing/schedule & ISS /REC.
a) 9 Mtr / 300 Kg PSC Pole
b) 10 Mtr / 425 kg PSC Pole
c) 13 Mtr R.S. Joist (150x150 mm, 34.6 kg/mtr)

No.

1
1
1

0.00
0.00
0.00

No.
No.

Page 17 of 34

BOQ FOR 33KV LINE from 132/33 KV Rengali Grid Substation to Budhapal Substation (30 Km)
SUPPLY, ERECTION, TESTING & COMMISSIONING OF 33 KV LINE
(Firms shall quote the unit rate and total rates including all Taxes and Duties)
Sl.
No.

Particulars

Supply
Unit

Errection

Qty

Unit Rate
(Rs.)

Amount
(Rs.)

Unit Rate
(Rs.)

3=(1x2)

Supply, installation of Guarding for Road/11 KV/L.T. Line etc. crossing with supply
of all materials and its installation as per standard approved drawing & ISS / REC
as below .
a) Upto span length of 50 Mtrs.
b) Upto span length of 100 Mtrs.
Supply, installation of strut pole of following size including supply & installation with
required clamps
a) 9 Mtr / 415 Kg PSC Pole
b) 10 Mtr / 425 kg PSC Pole
Total of C
Grand Total = (A) + (B) + ('C)

No.
No.

No.
No.

1
1

0.00
0.00

1
1

0.00
0.00
0.00
0.00

Amount in Words :
Name of the Bidder :
Signature :
Seal :
Note : Bidders can enter figures only in the cells highlighted in "Yellow" colour.

Page 18 of 34

on (30 Km)

Errection
Amount
(Rs.)

Total Amount of
supply &
installation
(Rs.)

5(4x1)

6=(3+5)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 19 of 34

on (30 Km)

Errection
Amount
(Rs.)

Total Amount of
supply &
installation
(Rs.)

5(4x1)

6=(3+5)

0.00

0.00

Page 20 of 34

on (30 Km)

Errection
Amount
(Rs.)

Total Amount of
supply &
installation
(Rs.)

5(4x1)

6=(3+5)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Page 21 of 34

on (30 Km)

Errection
Amount
(Rs.)

Total Amount of
supply &
installation
(Rs.)

5(4x1)

6=(3+5)

0.00

0.00

0.00

0.00

0.00

0.00

Page 22 of 34

on (30 Km)

Errection
Amount
(Rs.)

Total Amount of
supply &
installation
(Rs.)

5(4x1)

6=(3+5)

0.00

0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00
0.00

0.00
0.00

0.00

0.00

0.00
0.00

0.00
0.00

Page 23 of 34

on (30 Km)

Errection
Amount
(Rs.)

Total Amount of
supply &
installation
(Rs.)

5(4x1)

6=(3+5)

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

0.00
0.00

Page 24 of 34

BOQ FOR 11KV LINE from Budhapal (30 Km)


SUPPLY, ERECTION, TESTING & COMMISSIONING OF 11 KV LINE
(Firms shall quote the unit rate and total rates including all Taxes and Duties)
Sl.
No.

Particulars

Supply
Unit

Errection

Qty

Unit Rate
(Rs.)

Amount
(Rs.)

Unit Rate
(Rs.)

3=(1x2)

Intermediate Support with PSC Pole


Supply, Installation with brick batting of 8 M x 200 Kg PSC Poles (Excluding foundation
concreting) as per standard approved drawing/schedule & ISS/REC

Nos.

420

0.00

Stone Pad (450 x 450 x 90 mm) for PSC poles including supply of all materials required as
per standard approved drawing/schedule & ISS/REC

Nos.

420

0.00

Supply, installation of 11 KV 'V' Cross Arm (GI channel 75 x 40 x 6 of 7.14 kg/mtr) as per
standard approved drawing/schedule & ISS/REC

Nos.

420

0.00

420

0.00

1260

0.00

420

0.00

840

0.00

Supply, installation of GI cross arm holding clamps with bolts& nuts as per standard
Nos.
approved drawing/schedule & ISS/REC
Supply, installation of 11 KV Pin Insulators with GI Pin as per standard approved
Nos.
drawing/schedule & ISS/REC
Supply, installation of GI F-Bracket with bolts & nuts as per standard approved
Nos.
drawing/schedule & ISS/REC
Supply, installation of GI Barbed Wire for each pole as anti climbing device as per standard
approved drawing/schedule & ISS/REC
Kg

Supply, installation of Pole Earthing complete with coil earthing & 8 SWG GI Wire as per
standard approved drawing/schedule & ISS/REC

Nos.

420

0.00

Concreting of poles (Approx Qty.) including supply of all required civil construction
materials as per standard approved drawing/schedule & ISS/REC

Nos.

150

0.00

Nos.

420

0.00

420

0.00

90

0.00

4
5
6

10
11

Supply, installation of Danger plates & clamps with bolts & nuts as per standard approved
drawing/schedule & ISS/REC
Supply and fixing of Number plate as per standard approved drawing/schedule & ISS/REC

12 Supply, installation of GI Stay Set (20 x 1800mm) complete including Concreting, stay wire
etc as per standard approved drawing/schedule & ISS/REC

Nos.
Nos.

Total A
B

0.00

Cut Point / Angle Point with Single pole support on 8.0 meter PSC POLE as per
standard approved drawing/schedule & ISS/REC

Page 25 of 34

BOQ FOR 11KV LINE from Budhapal (30 Km)


SUPPLY, ERECTION, TESTING & COMMISSIONING OF 11 KV LINE
(Firms shall quote the unit rate and total rates including all Taxes and Duties)
Sl.
No.

Particulars

Supply
Unit

Supply, Installation with concreting of 8.0 x 200 Kg PSC POLE as per standard approved
drawing/schedule & ISS/REC
Stone Pad (450 x 450 x 90 mm) for PSC poles including supply of all materials required as
per standard approved drawing/schedule & ISS/REC

Supply, installation of 11 KV V Cross Arm (GI channel 75 x 40 x 6 of 7.14 kg/mtr) as per


standard approved drawing/schedule & ISS/REC

Supply,installation of GI cross arm holding clamps with bolts& nuts as per standard
approved drawing/schedule & ISS/REC
Supply, installation of 11 KV Disc insulators as per standard approved drawing/schedule &
ISS/REC
Supply, installation of 11 KV Hardware Fitting as per standard approved drawing/schedule
& ISS/REC
Supply, installation of GI F-Bracket with bolts & nuts as per standard approved
drawing/schedule & ISS/REC
Supply, installation of GI Barbed Wire for each pole as anti climbing device as per standard
approved drawing/schedule & ISS/REC

Supply, installation of Pole Earthing complete with coil earthing & 8 SWG GI Wire as per
standard approved drawing/schedule & ISS/REC

4
5
6
7

Supply, installation of Danger plates & clamps with bolts & nuts as per standard approved
drawing/schedule & ISS/REC
Supply, installation of GI Stay Set (20 x 1800mm) complete including Concreting, stay wire
11 etc as per standard approved drawing/schedule & ISS/REC
10

Unit Rate
(Rs.)

Amount
(Rs.)

Unit Rate
(Rs.)

3=(1x2)

Nos.

30

0.00

Nos.

30

0.00

Nos.

60

0.00

Nos.

30

0.00

Nos.

180

0.00

Nos.

180

0.00

Nos.

60

0.00

Kg

60

0.00

Nos.

30

0.00

Nos.

30

0.00

Nos.

60

0.00

30

0.00

12 Supply and fixing of Number plate as per standard approved drawing/schedule & ISS/REC

Nos.

13 Stringing of AAA conductor (55 Sq.mm) as per Sag-Tension chart in 3 phases including
sag, binding, jumpering etc., required to complete the work as per standard approved
drawing/schedule & ISS/REC.

Km

30

Total B
C

Errection

Qty

To be supplied by WESCO
0.00

Extra Items as per site Requirement

Page 26 of 34

BOQ FOR 11KV LINE from Budhapal (30 Km)


SUPPLY, ERECTION, TESTING & COMMISSIONING OF 11 KV LINE
(Firms shall quote the unit rate and total rates including all Taxes and Duties)
Sl.
No.

Particulars

Supply
Unit

Errection

Qty

Unit Rate
(Rs.)

Amount
(Rs.)

Unit Rate
(Rs.)

3=(1x2)

Supply, installation with concreting of following sizes Single pole structure & its erection
including fitting of all accessories (X-arm, insulator, fitting, coil earthing, grouting,danger
board,anticlimbing etc. complete) as per standard approved drawing/schedule & ISS/REC.

No.
No.

1
1

0.00
0.00

a) 9 Mtr / 300 Kg PSC Pole


b) 12 Mtr R.S Joist Pole (150x150 mm, 34.6 kg/mtr.)
Supply, installation with concreting of following sizes of Double Pole structure & its
erection including fitting of all accessories (straight X-arm, X-bracing, insulator, fitting, coil
earthing, grouting, danger board, anti climbing etc. complete) as per standard approved
drawing/schedule & ISS/REC.

No.
No.
No.

1
1
1

0.00
0.00
0.00

a) 9 Mtr / 300 Kg PSC Pole


b) 11 Mtr / 330 kg PSC Pole
c) 12 Mtr R.S.Joist (150x150 mm, 34.6 kg/mtr.)
Supply, installation with concreting of following Triple Pole structure & its erection including
fitting of all accessories (X-arm, X-bracing, insulator, fitting, coil earthing, grouting, danger
board, anti climbing etc. complete) as per standard approved drawing/schedule & ISS /
REC.

No.
No.
No.

1
1
1

0.00
0.00
0.00

a) 9 Mtr / 300 kg PSC Pole


b) 11 Mtr / 330 Kg PSC Pole
c) 12 Mtr R.S. Joist (150x150 mm, 34.6 kg/mtr)
Supply, installation with concreting of following Four Pole structure & its erection including
fitting of all accessories (X-arm, X-bracing insulator, fitting, coil earthing, grouting, danger
board, anti climbing etc. complete) as per standard approved drawing/schedule & ISS
/REC.
a) 9 Mtr / 300 kg PSC Pole
b) 11 Mtr / 330 Kg PSC Pole
c) 12 Mtr R.S. Joist (150x150 mm, 34.6 kg/mtr)
Supply, installation of Guarding for Road/11 KV/L.T. Line etc. crossing with supply of all
materials and its installation as per standard approved drawing & ISS / REC as below .

No.
No.
No.

1
1
1

0.00
0.00
0.00

a) Up to span length of 50 Mtrs.


b) Up to span length of 100 Mtrs.

No.
No.

1
1

0.00
0.00

Page 27 of 34

BOQ FOR 11KV LINE from Budhapal (30 Km)


SUPPLY, ERECTION, TESTING & COMMISSIONING OF 11 KV LINE
(Firms shall quote the unit rate and total rates including all Taxes and Duties)
Sl.
No.

Particulars

Supply
Unit

Supply, installation of following size strut pole including supply & installation with required
clamps
a) 8 Mtr , 200 Kg PSC Pole
b) 9 Mtr / 300 kg PSC Pole
Total C

Errection

Qty

Unit Rate
(Rs.)

Amount
(Rs.)

Unit Rate
(Rs.)

3=(1x2)

No.
No.

1
1

Grand Total = (A) + (B) + ('C)

0.00
0.00
0.00
0.00

Amount in Words :
Name of the Bidder :
Signature :
Seal :
Note : Bidders can enter figures only in the cells highlighted in "Yellow" colour.

Page 28 of 34

Amount
(Rs.)

Total Amount of
supply &
installation
(Rs.)

5(4x1)

6=(3+5)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Errection

Page 29 of 34

Amount
(Rs.)

Total Amount of
supply &
installation
(Rs.)

5(4x1)

6=(3+5)

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Errection

Page 30 of 34

Amount
(Rs.)

Total Amount of
supply &
installation
(Rs.)

5(4x1)

6=(3+5)

0.00
0.00

0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00

0.00
0.00

Errection

Page 31 of 34

Amount
(Rs.)

Total Amount of
supply &
installation
(Rs.)

5(4x1)

6=(3+5)

0.00
0.00

0.00
0.00

0.00

0.00

0.00

0.00

Errection

Page 32 of 34

Summery - Budhapal ( Package - A)


Quoted Value (in Rs.)

Sl.
No.

Description of Work

Supply,Erection & Commissioning of 2 x 3.15


MVA, New 33/11 KV Primary Substation at
Budhapal

0.00

Supply,Erection & Commissioning of 33 KV


Link Line from 132/33 KV Rengali Grid to
Budhapal Primary Substation

0.00

Supply,Erection & Commissioning of 11 KV


Link Line from Budhapal Primary Substation

0.00

Total Quoted value of Package - A


(Budhapal)

0.00

Supply

Package - A)
Quoted Value (in Rs.)
Installation

Total

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Potrebbero piacerti anche