CUADRO RESUMEN-BALANCE DE CANTERAS

Descripcion
Relleno Material propio
Over
Sub Base
Base
Bicapa
Concreto
Piedra 1/2"
Piedra Mediana de 4"
Hormigon
Arena Gruesa
Arena Fina
Relleno estructural Material propio
Afirmado

Volumen
Integral

Esponjamiento

Sub Total

Desperdicio

Rendimiento

11,435.39
16,020.00
25,591.80
23,333.70
2,622.01
4,743.59
2,907.54
14.53
25.16
2,463.13
51.58

1.25
1.25
1.25
1.25
1.20

14,294.23
20,025.00
31,989.75
29,167.13
3,146.41

1.20
1.00
1.20

0.94
0.90
0.90

1.25
1.25
1.25
1.25
1.25

3,634.43
18.16
31.45
3,078.92
64.47

1.10
1.10
1.10
1.10
1.10

0.90
0.90
0.90
0.90
0.90

377.90
54.64
84,897.37

1.25
1.25

472.38
68.30

1.20
1.20

0.90
0.90

Concreto
Alcantarillas
fc=210 kg/cm2
fc=100 kg/cm2
Cunetas
fc=175 kg/cm2
Muros de Contencion
fc=210 kg/cm2
Emboquillados
Tarrajeo
Junta asfaltica
Cama de apoyo

Unidad

Cantidad

Cemento
(bls)

Piedra 1/2"
(m3)

Arena Gruesa
(m3)

m3
m2

224.19
267.65

2,017.71
76.01

145.72

123.30

m3

4,214.35

33,714.80

2,739.33

2,317.89

m3
m2
m2
ml
m3

34.60
145.29
2.80
14,712.48

311.40
21.79
0.42

22.49

19.03
2.91

36,142.14

2,907.54

2,463.13

4,743.59
2,093.72

Volumen Total a
extraer(m3)

Canteras
Ambato

17,153.08
20,025.00
34,081.94
32,513.75
4,195.22

17,040.97
32,513.75
4,195.22

4,456.58
22.27
38.56
3,775.41
79.06

4,456.58
22.27
38.56
3,775.41
79.06

631.89
91.36
117,064.11

62,121.82

Naranjo
17,153.08
20,025.00
17,040.97

631.89
91.36
54,942.30

Hormigon

Piedra
(m3) Mediana de
4" (m3)

Arena Fina
(m3)

Afirmado
(m3)

25.16

14.53
0.08
51.49
25.16

14.53

51.58

54.64
54.64

117,064.11
58,532.06

MC-30
(glns)

3,383.87
3,383.87

Cuadro de Agregados
Descripcion

Und

Metrado Proyecto (m3)

Esponjamiento

Metrado a preparar
PA

m2

0.15
0.50
0.15

25,591.80
16,020.00
23,333.70

1.25
1.25
1.25

29,167.13

m2

137,995.00

0.02

2,621.91

1.40

3,670.67

m2
m2

Base Necesaria
Base Recuperable (40%)

31,989.75
20,025.00

29,167.13
TS1 (20 kg/m2)

0.77

TS2 (6 gk/m2)

0.23

Piedra 1/2"
Piedra Mediana de 4"

m3
m3

Arena Fina
Arena Gruesa
Relleno Estructural

m3
m3
m3

Hormign

m3

Afirmado para base


Descripcin

m3
und

Cantera Naranjos

m3

Cantera Ambato

m3

Total

Espesor

170,612.00
32,040.00
155,558.00

Sub Base
Over

Base a preparar
Bicapa

Metrado Proyecto

Desperdicio
1.00
1.00
1.00
1.20
1.20

Metrado extraer
Cantera

Cantera

31,989.75 50% rio + 50% cerro


20,025.00 Cerro
29,167.13 De ro

Uso
Pavimento
Mejoramiento
Pavimento
###

4,404.80 De ro

Pavimento

2,823.59
847.08

2,907.54
14.52
51.57
2,460.51
167.42
25.15

2,907.54
14.52
51.57
2,460.51
167.42
25.15

54.63
Pago Cantera

1.25
1.35
1.25
1.25
1.25
1.25

54.63
Transporte

36,019.88
58,090.55

36,019.88
58,090.55

94,110.43

94,110.43

Preparacin

1.25
TRAMO I

36,019.88
55,935.79

27,993.75
29,016.59

###
###

3,634.43
19.60
64.46
3,075.64
209.28
31.44

1.20
1.20
1.20
1.20
1.20
1.20

68.29

1.20

TRAMO II

8,026.13
29,073.96

4,361.31
23.52
77.36
3,690.77
251.13
37.73

De ro
De ro

Concreto
Concreto

De ro
De ro
De ro

Concreto
Concreto
Relleno

De ro

Concreto

81.95 De ro

Relleno

MATERIAL NECESARIO PARA OBRAS DE ARTE

DESCRIPCION
CEMENTO PORTLAND TIPO 1 (42.5 Kg)
ACERO FY`4200 1/2"
ACERO FY`4200 3/8"
ACERO FY`4200 3/4"
ACERO FY`4200 5/8"
MC-30
ALCANTARILLA TMC 36"

UNIDAD
BLS
KG
KG
KG
KG
GLNS
m

CANTIDAD
36,142.14
1,347.78
6,177.49
1,245.76
6,132.09
3,383.87
205.52

MATERIAL NECESARIO PARA OBRAS DE ARTE

DESCRIPCION
CEMENTO PORTLAND TIPO 1 (42.5 Kg)
ACERO FY`4200 1/2"
ACERO FY`4200 3/8"
ACERO FY`4200 3/4"
ACERO FY`4200 5/8"

UNIDAD
BLS
und
und
und
und

CANTIDAD
36,142.14
150.00
1,226.00
62.00
440.00

6,142.14

Metrado

PARTIDAS
OBRAS DE ARTE
ALCANTARILLAS TMC
TMC
Concreto 210 kg/cm2
Concreto 100kg/cm2
Emboquillado en salida de Alcantarilla
ALCANTARILLAS DE CONCRETO
Concreto 210 kg/cm2
CUNETAS
Concreto 175 kg/cm2
Tarrajeo de muros de concreto
MUROS DE CONTENCION
Concreto 210 kg/cm2
Solado
Acero

PARTIDAS
08.SEALIZACION
08.01.Postes Kilometricos
08.02.Seal Reglamentaria 0.60mx0.90m con poste
08.03.Seal preventiva 0.60mx0.60m
08.04.Seal Informativa 1.00mx2.20m
08.07.Guardavias(Incluye Terminales)

CALEN
2016
Unidad-Partida

m
m3
m2
m2

DICIEMBRE

30.92 278.28
38.58 10.96
10.73
1.61

ENERO

34.23
39.87
25.59

308.07
11.32
3.84

FEBRERO

30.92
36.01
23.11

278.28
10.23
3.47

MARZO

34.23
39.87
25.59

m3
m3
m2
m3
m2
290.85

323.23

291.97

2016
Unidad-Partida

Und
Und
Und
Und
m

DICIEMBRE

ENERO

FEBRERO

MARZO

CALENDARIO PREVISTO CEMENTO Y ACERO PARA OBRAS DE ARTE


2017
MARZO

308.07
11.32
3.84

ABRIL

33.13 298.17
38.58 10.96
24.77
3.72

MAYO

JUNIO

32.02 288.18
34.73
9.86
25.59
3.84

9.91

1.49

12.03

###

0.75
9.54
13.79
323.23

312.84

85.86
3.92
391.66

25.06
26.21

JULIO

AGOSTO

16.70 150.30

602.05
0.11
1.93

###
0.29

622.12
0.12

###
7.44
###

###

CALENDARIO DE MATERIALES-08.SEALIZ
2017
MARZO

ABRIL

MAYO

JUNIO

JULIO

AGOSTO

OBRAS DE ARTE
AGOSTO

SETIEMBRE

OCTUBRE

NOVIEMBRE

4976.96 602.05 4816.40 622.12 4976.96 602.05 4816.40


0.02

4976.98

4816.40

4976.96

DICIEMBRE

622.12 4976.96

4816.40

4976.96

LES-08.SEALIZACION
AGOSTO

SETIEMBRE

OCTUBRE

NOVIEMBRE

26.00
17.14

26.00
17.00

DICIEMBRE

6.86
92.00

7.00
92.00

1364.00 1364.00

2018
ENERO

541.85 4334.80

4334.80 36142.12

2018
ENERO

124.00

124.00

1922.00 1922.00

FEBRERO

MARZO

112.00 112.00
1736.00

###

16.00
21.00
1178.00

16.00
21.00
###