ASME- Section I Power Boilers Checklist

Tag # B____________

Owner: _____________________________________ User: ____________________________________


PO/Street: __________________________________ Street: ____________________________________
City: ______________St: _____ Zip: ____________ City: ___________________St:_____ Zip:_______
Boiler attributes
FT__WT__CI__EB__Other___
TYPE
HWH__PRO__StmHT__PWR__HtHW__OTH__

USE
MFGR
ID
YEAR
CAPACITY
FIRING
FUEL
MAWP
SRV

NB:

SERIAL:

Lbs/Hr:
Ht Surf:
Hand:___Auto:___Stkr:____Oth:_____
Ng__Oil__Elec__Wood__Coal__LP__Blk Lq__

Set:
Capacity:
Internal____ Hydro____ PSI______
Sum Code________
Code Section

Item Description

SPS 341.41
SPS 341.42

SBD-6314 SUBMITTED
ASME NAMEPLATE-NB REG.

PG 106 107 108


SPS 341.10 / 341.42
ASME PG 110
PG 67.1
PG 67.2.1
PG 71.2

SAFETY VALVE
1. V / VR NAMEPLATE w/SEAL
2. SET PRESSURE
3. CAPACITY
4. VERTICALLY MOUNTED

PG 71.3
PG 67.1
SPS 41.10 / 341.42
ASME PG 60.6

SPS 341.10/ 341.42


ASME PG 60.1.1
PG 60.3.6
PG 60.1.6 & 60.3.4
PG60.1.6 & 60.2.3
SPS 341.29
(2) a

SPS 341.30
341.30(1)a and b
341.30(2)
341.30(2)
341.30(1) c
Comm 341.16 (2) &
341.46
341.16(2)c
341.16(2)e
341.16 (2)d

5. DISCHARGE PIPING / DRAINAGE


6. TWO VALVES, IF > 500 SQ FT HS
STEAM PRESSURE GAGE
1. SIPHON
2. GRADUATED 1 1/2 TO 2 X SET P.
WATER LEVEL INDICATOR -COLUMN
1. ONE GAGE GLASS, (2) IF > 400 PSI
2. INSPECTION CROSSES / PLUGS
3. SIZE WATER COLUMN PIPING
4. DRAINS
PRESSURE CONTROLS (2 REQUIRED)
1. HIGH LIMIT
2. OPERATING LIMIT
3. SEPARATE CONNECTIONS
LOW WATER CUT-OFF
1. PIPING AT PROPER LEVEL
2. DRAINAGE / TESTING
3. TEST-SATISFACTORY OPERATION
4. FUSIBLE PLUG
NON-EXTERNAL POWER PIPING

Code Section

Item Description

SPS 341.46(2) &


Sect I PG 60
B31.1~122~105~
106~107~108
PG112.2.5
PG112.2.5
PG 58.3.2

B31.1~107
PG 104 & 109
PG 58.3.1

STOP VALVES & EXTERNAL PIPING

PG 58.3.3 &
58.3.4
PG 61.1
PG59.2
B31.1~122
PG 59.4~31.1~
/B31.1-122.1.7(c)
SPS 341
SPS 341.31(1)
SPS 341.31(4)
SPS 341.31(1)a
SPS 341.31(1)b
SPS 341.31(5)
SPS 341.35(5)
ASME Sect I
PG 44.1
PG 44.1
SPS 341.17(1)
SPS1.37(1)(2)

SPS 341.28(3)

1. INSPECTION NOTIFICATION
2. SHOP FABRICATED PIPING
3. SBD-5204 ON SITE &PREFAB DOCS

341.37(3)

341.46(1)

4. Sect IX WPS ~ PQR ~ WPQ & Cont.

341.38(3)

341.46(1)

Material & Design per B31.1

341.38(4)

High Pressure Boiler Checklist (R03/13) Industry Services Division


Department of Safety and Professional Services, State of Wisconsin

1. PRESSURE TEMPERATURE RATED


2. P-4A FORM (WELDED PIPING)
3. P-4B FORM (THRD PIPING
4. >TWO BOILERS w/MANHOLE
a. TWO VALVES- STEAM STOPS
b. FREE BLOW DRAIN BETWEEN
c. RISING STEM or OS & Y
d. PP STAMPING or MDR INCLUSION
5. SINGLE BOILER INSTALLATION
a. ONE STEAM SUPPLY VALVE
b. ONE RETURN VALVE
FEED WATER CONNECTION
1. STOP VALVE / CHECK VALVE
2. BACK-FLO PREVENTER
3. TWO FEED SOURCES
4. ACCEPTABLE INTRO. TO BOILER
BLOW DOWN AND DRAINS
1. PRESSURE TEMP RATED MTRLS
2. SIZED PROPERLY (QUICK / SLOW)
BLOWOFFS TANKS OR SEPERATORS
1. BLOW DOWN TANK
2. GENERAL REQUIREMENTS
3. TEMPERATURE (T=160 F MAX)
4. PRESSURE (P=5 PSI MAX)
5. a. FULL SIZE VENTING
b. TERMINATE AT SAFE LOCATION
INSPECTION OPENINGS
1. MANHOLE
2. HANDHOLE
INTERNAL INSPECTION
1. FIRE SIDE- SOOT, LEAKS, INSUL.
2. WATER SIDE-SCALE, PITTING
3. TUBES, KNUCKLES, STAYS, TS
4. MAN & HANDHOLES, CORROSION
MISCELLANEOUS
1. FOUNDATION / SETTINGS
2. MAINTENACE
3. REMOTE CONTROLS
4. BURNER & FUEL PIPING
5. BREECHING / EXHAUST VENTING
6. COMBUSTION AIR
MODIFICATION OF BOILER BURNER
ASSEMBLY REPORT ON SBD-6314
FUEL CONVERSIONS REPORTED ON
SBD-6314
CHANGE IN BURNER HEAT INPUT
REPORTED ON FORM SBD-6314

Potrebbero piacerti anche