DOP1000-PRC-003-0-02
Process Measure
Local/Project Variation
END End
Activity Steps
1.0
1.1
1.2
Mobilization.
1.3
2.0
PURPOSE,
PURPOSE, SCOPE,
SCOPE,
DEFINITIONS,
DEFINITIONS,
REVISION
REVISION HISTORY
HISTORY
Client
Business Risk
Construction
Project Controls
RIS
K
P.E.M. / T.E.M.
X X
Project Manager
Decision
Additional Note
ST
Involved in Activity
Start
QA/QC
Prepared by:
Nasser Iguertsira
Verified by:
Afif Abdo
Approved by:
Tewfik Ferhat
Revision Status:
03
Document Control
Department Manager
Responsible and
Accountable for Activity
ST
Responsible
for Activity
Legend
Personnel
Personnel Assignment
Assignment
Authority
Authority Form
Form PAAF
PAAF
DOP-FRM-001-01
DOP-FRM-001-01
Project
Project Execution
Execution Plan
Plan
PEP
PEP
2.1
2.2
2.3
Engineering
Engineering Document
Document and
and
Information
Information Management
Management
DOP3040-PRC-001-0-02
DOP3040-PRC-001-0-02
2.4
Identification
Identification of
of Engineering
Engineering
doc.
doc.
DOP1001-WMT-001-0-03
DOP1001-WMT-001-0-03
-Equipment
-Document
3.0
Page 1 of 6
Business Risk
Process Measure
Local/Project Variation
END End
Activity Steps
3.1
3.2
3.3
4.0
PURPOSE,
PURPOSE, SCOPE,
SCOPE,
DEFINITIONS,
DEFINITIONS,
REVISION
REVISION HISTORY
HISTORY
Client
Construction
RIS
K
Project Controls
X X
P.E.M. / T.E.M.
Decision
Additional Note
Project Manager
Involved in Activity
Start
QA/QC
Prepared by:
Nasser Iguertsira
Verified by:
Afif Abdo
Approved by:
Tewfik Ferhat
Revision Status:
03
Document Control
Department Manager
Responsible and
Accountable for Activity
ST
Responsible
for Activity
Legend
4.1
4.2
4.3
5.0
FOLLOW-UP ACTIVITIES
5.1
Client
Client Review
Review Requirements
Requirements
DOP1000-PRC-001-0-04
DOP1000-PRC-001-0-04
END
Paper copies of this Process Map are UNCONTROLLED. Please refer to the B&R-C website for the current version.
Page 2 of 6
Business Risk
Process Measure
Local/Project Variation
Activity Steps
END End
PURPOSE,
PURPOSE, SCOPE,
SCOPE,
DEFINITIONS,
DEFINITIONS,
REVISION
REVISION HISTORY
HISTORY
Client
Construction
RIS
K
Project Controls
X X
P.E.M. / T.E.M.
Decision
Additional Note
Project Manager
Involved in Activity
Start
QA/QC
Prepared by:
Nasser Iguertsira
Verified by:
Afif Abdo
Approved by:
Tewfik Ferhat
Revision Status:
03
Document Control
Department Manager
Responsible and
Accountable for Activity
ST
Responsible
for Activity
Legend
Author/Revised by:
Approved By :
Date:
Tewfik Ferhat
Mar-04
Printed names here confirm the document has been signed off and the original is held by the Quality Direction.
Paper copies of this Process Map are UNCONTROLLED. Please refer to the B&R-C website for the current version.
Page 3 of 6
Purpose
The purpose of this PRC is to define the requirements for developing the engineering work plan input to
support the Project Execution Plan (PEP).
Scope
An Engineering Work Plan will be developed for projects whose scope includes engineering. The plan
addresses engineering activities that are required to support project initiation and execution.The plan is
dynamic and must be kept current as the project progresses to reflect increasing definition and/or
significant changes. The method is the standard and applies to all business units.
Definitions
Prject Execution Plan : It defines the project goals, framework and direction and is based on the project
teams' strategies for executing the work. The plan is a brief, action-oriented communication tool used to
document a common basis of understanding and commitment by all project participants.
A Project Execution Plan is required for every project. The level of detail is always dictated by the scope
of work, complixity of the project, amount of risk and the amount of proposed execution details required
by the client. The Project Execution Plan is dynamic and kept current as the project progresses to reflect
increasing definition and/or significant changes.
P.E.M - Project Engineering Manager - the responsible for design and engineering on a hydrocarbon
project.
P.T.M. - Project Technical Manager - the responable for design and engineering on an infrastructure
project
Revision History
12-Sep-01 Rev 0 - Creation
3-Jul-02
Rev 1 - Logigramme Review
1-Sep-02
Rev 2 - Codfication modification
23-Mar-04 Rev 3 - Content review
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version.
Page 4 of 6
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version.
Page 5 of 6
Attachments Section
Develop Engineering Work Plan
DOP1000-PRC-003-0-02
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version.
Page 6 of 6