E
Electrical Construction
E.1
Plant Area
E.1.1
Building No
E.1.1.1
Substation Work and Feeder Cabling
E.1.1.1.1
Generator/substation work
Switchgear & Motor Control Centers Installation
E.1.1.1.1.2
Equipment & Panel Installation (Inter Posing Relay System)
E.1.1.1.1.3
New Panel installation
E.1.1.1.1.4
Panel Modification
E.1.1.1.1.5
Cable Tray Installation
E.1.1.1.1.6
Indoor Cable Laying
E.1.1.1.1.7
Sand Filling
E.1.1.1.1.8
Indoor Cable Termination
E.1.1.1.2
Feeder Cabling
E.1.1.1.2.1
Cable laying
E.1.1.1.2.2
Cable Termination
E.1.1.1.2.3
Cable Splice
E.1.1.1.2.4
Sand Filling
E.1.1.1.2.5
Cable Tray Installation
E.1.1.1.2.6
Conduit Installation
E.1.2
Area Detail
E.1.2 .1
Power Wiring
E1.2.1.1
Power wiring for equipments
E.1.2.1.2
Cable laying
E.1.2.1.3
Cable Termination
E.1.2.1.4
Sand Filling
E.1.2.1.5
Cable tray Installation
E.1.2.2
Lighting Work
E.1.2.2.1
Panel Installation and Termination
E.1.2.2.2
Lighting Fixture Installation and Termination
E.1.2.2.3
Street Lighting Installation and Termination
E.1.2.2.4
Cable Laying
E.1.2.2.5
Cable Tray Installation
E.1.2.2.6
Junction Box Installation and Termination
E.1.2.2.7
Conduit Installation
E.1.2.3
Grounding Work
E.1.2.3.1
Grounding Electrode Installation with Well
E.1.2.3.2
Grounding Wire Installation and Connection

E.1.2.3.3
E.1.2.4

Cathodic Protection
Demolishing Work (if applicable)