Sei sulla pagina 1di 6

Independent Engineer services for 4- laning of Biaora-Dewas section from Km 426.

100 to Km
566.450 of NH-3 (Package-III) in the State of Madhya Pradesh to be executed on BOT (Toll) on
DBFOT pattern under NHDP Phase-IV

Assistant Highway Engineer - Kamlesh Ahirwal


PROPOSED POSITION

Assistant Highway Engineer

NAME OF FIRM

Egis India Consulting Engineers Pvt. Ltd.

NAME OF STAFF

Kamlesh Ahirwal
Address: Plot No. 66, Sector 32, Gurgaon, Haryana-122 003, India
Contact No.: +91- 124 4249200

PROFESSION

Civil Engineering

DATE OF BIRTH

24 June 1986 (Age Proof Attached)

YEARS WITH FIRM/ENTITY

Available with Assignment

th

NATIONALITY: Indian

MEMBERSHIP OF PROFESSIONALS SOCIETIES:

Nil
DETAILED TASKS ASSIGNED

Assist Highway Engineer in checking all highway/ pavement designs being prepared by the
concessionaire.
Assist in supervision of highway/ pavement construction works.
Assist in ensuring execution of highway/ pavement on site as per specifications and standards.
Assist in supervision of remedial works during O&M.
Assist Team Leader in preparation of various reports.
Any other tasks as required.

S.
No.

1.

2.

3.

Name of
Employer

Ajad Jain &


Associate

Frischmann
Prabhu
(India) Pvt.
Ltd.

Marc
Technocrats
Pvt. Ltd

Period

Post
Held

Project Name

Assistant
Resident
Engineer

Consultancy
Services
for
Detailed Engineering Design for
Strengthening of ChainpuraChanranpura-Bhoura
Road
(From 0.000 to 9.447) in the
State of Madhya Pradesh.;
Project Length: 9.447 Km

Assistant
Highway
Engineer

Consultancy service of Four


laning of Delhi Yamunotri up
to Uttarakhand Border Section
of SH-57 from KM 10.911 to KM
217.000 on DBFOT basis in the
State of Uttar Pradesh; Client:
Uttar Pradesh State Highway
Authority.;
Lane-4;
Project
Length: 207.1 Km; Total Project
Cost: INR 2788.38 Crore.

Field
Engineer
(Road)

Supervision & Quality Control


Consultancy for Construction of
Roads for works Under PMGSY
(BW) Consultancy Package
Barwani Road Length 35 km., in
the state of Madhya Pradesh;
Total Project Length: 35 Km.
Total Project Cost: INR 126
Crore

in
Joint
Venture
with

Assignment
in the
Project

Client of the
Project

Remark

From

To

June
2016

till
date

Refer to
Activities
Performed of
Project S.
No. 1

M/s B.R.
Goyal
Infrastructure
Pvt. Ltd.

Length
of
Project
9.447
km

May
2016

Refer to
Activities
Performed of
Project S.
No. 2

Uttar
Pradesh
State
Highway
Authority

Length
of
Project
207.1
km

Dec.
2015

MPRRDA

May
2014

Dec.
2015

Refer to
Activities
Performed of
Project S.
No. 3

Length
of
Project
35 km

Independent Engineer services for 4- laning of Biaora-Dewas section from Km 426.100 to Km


566.450 of NH-3 (Package-III) in the State of Madhya Pradesh to be executed on BOT (Toll) on
DBFOT pattern under NHDP Phase-IV

Assistant Highway Engineer - Kamlesh Ahirwal


S.
No.

4.

5.

Name of
Employer
Rural
Engineering
Service
Division

SCC Projects
Pvt. Ltd.

Period

Post
Held

Technical
Assistant

Site
Engineer
(Highway)

Project Name
1104 Chief Minister Rural Link
Road in Janpad Panchayat
Jebera;
National
Rural
Employment Guarantee Service
Construction of Rehabilitation
and Up gradation of package 2
Gairatganj -Silwani -Gadarwara
(SH 44), NH-12 Junction to
Silwani (SH 15) and Bareli
Papaya Road (SH 19) Under
MPSRSP II ADB funded
(project length 138 KM); 2
Lane; Project length: 138 Km;
Project Cost: INR 96.14 Crore;
ADB Funded executed under
FIDIC Condition of Contract

From

July
2010

July
2008

Assignment
in the
Project

Client of the
Project

Feb
2014

Refer to
Activities
Performed of
Project S.
No. 4

Madhya
Pradesh
Rural
Engineering
Services

June
2010

Refer to
Activities
Performed of
Project S.
No. 5

To

MPRDC

Remark

Length
of
Project
138 km

EDUCATIONAL QUALIFICATIONS: (Qualification Proof Attached)

B. Tech in (Civil Engineering) from Chhatrapati Shahu Ji Maharaj University, Kanpur (U.P.) 2008.

Diploma in (Civil Engineering) from Chhatrapati Shahu ji Maharaj University, Kanpur (U.P.), 2005

OTHER TRAINING

Nil
KEY QUALIFICATIONS:
Mr. Kamlesh Ahirwal, Diploma & B. Tech in Civil Engineering has 8 years of experience in the field of Highway &
road projects mainly on construction supervision & Highway and Road related, planning & control, quantity surveying,
Documentation, Correspondence with client in the period of acting ARE & Project Engineer. Checking of structural
drawings & layout of culverts and highway work. Checking of bar-bending schedules for bridges and retaining walls;
Supervision and Execution of reinforcement and Formwork activities along with concrete work according to the
approved Design, Drawing and Specification; Co-ordinate with Contractor for checking and approval of the activities;
Planning of day-to-day works to optimum utilization the resources, introduce of quality assurance systems by
establishing field laboratories for conducting tests of materials including fields tests; The construction of works was
carried out and records maintained strictly as per the stipulations; Scheduling of Works, contractors Work
Programme, and Monitoring of Physical Progress using CPM/PERT Technique, Rescheduling and Financial Progress
Monitoring; Checking all safety measures during construction of road works to avoid accidents; Planning, monitoring
and supervision, measurement and billing.
Countries of work experience: India
Some of his relevant experience:

Consultancy Services for Detailed Engineering Design for Strengthening of Chainpura-Chanranpura-Bhoura


Road (From 0.000 to 9.447) in the State of Madhya Pradesh.; Project Length: 9.447 Km
Consultancy service of Four laning of Delhi Yamunotri up to Uttarakhand Border Section of SH-57 from KM
10.911 to KM 217.000 on DBFOT basis in the State of Uttar Pradesh; Client: Uttar Pradesh State Highway
Authority.; Lane-4; Project Length: 207.1 Km; Total Project Cost: INR 2788.38 Crore.
Supervision & Quality Control Consultancy for Construction of Roads for works Under PMGSY (BW)
Consultancy Package Barwani Road Length 35 km., in the state of Madhya Pradesh; Client: MPRRDA; Total
Project Length: 35 Km. Total Project Cost: INR 126 Crore.
1104 Chief Minister Rural Link Road in Janpad Panchayat Jebera; National Rural Employment Guarantee
Service
in
Joint
Venture
with

Independent Engineer services for 4- laning of Biaora-Dewas section from Km 426.100 to Km


566.450 of NH-3 (Package-III) in the State of Madhya Pradesh to be executed on BOT (Toll) on
DBFOT pattern under NHDP Phase-IV

Assistant Highway Engineer - Kamlesh Ahirwal

Construction of Rehabilitation and Up gradation of package 2 Gairatganj -Silwani -Gadarwara (SH 44), NH-12
Junction to Silwani (SH 15) and Bareli Papaya Road (SH 19) Under MPSRSP II ADB funded (project length 138
KM); 2 Lane; Project length: 138 Km; Project Cost: INR 96.14 Crore; ADB Funded executed under FIDIC
Condition of Contract

Employment Record:
June 2016 to till date
1.

Ajad Jain & Associate

Assistant Resident Engineer

Consultancy Services for Detailed Engineering Design for Strengthening of Chainpura-ChanranpuraBhoura Road (From 0.000 to 9.447) in the State of Madhya Pradesh.; Project Length: 9.447 Km

Duration: June 2016 to till date


Client: M/s B.R. Goyal Infrastructure Pvt. Ltd.
Location: Madhya Pradesh, India
Description of Duties: As Assistant Resident Engineer, Responsible for supervision of the work and carrying out
all the tests for the highway construction material of Soil aggregate, cement, and bitumen & C D work H.P.C. & Minor
culverts and testing of (BC CONCRETE, DBM, GSB, WMM) & Maintain the records for test reports property. SOIL
modified Projector, liquid limit & plastic limit test grain size analysis, free swell index, CBR test & water content test.
Road Alignment & for the Project. Consultancy services for providing quality assurance, Supervision of construction
work done on daily basis, Guidance and explaining the drawings Structure for the road construction, Recording of the
Measurement, Quality control and taken test. Preparation of contract completion reports. Assist seniors in conduct of
monthly progress meeting. Checking the quality of construction materials, testing materials at site and maintaining
test records. Checking of Layout, setting out, variation and all works required for estimating, measurement of each
component of work, Supervision of Earthwork, GSB, WMM, DBM and SDBC as per MOST specification.
Dec. 2015 to May 2016
2.

Frischmann Prabhu (India) Pvt. Ltd.

Assistant Highway Engineer

Consultancy service of Four laning of Delhi Yamunotri up to Uttarakhand Border Section of SH-57
from KM 10.911 to KM 217.000 on DBFOT basis in the State of Uttar Pradesh; Client: Uttar Pradesh State
Highway Authority.; Lane-4; Project Length: 207.1 Km; Total Project Cost: INR 2788.38 Crore.

Duration: Dec. 2015 to May 2016


Client: Uttar Pradesh State Highway Authority
Location: Uttar Pradesh, India
Description of Duties: As Assistant Highway Engineer, Responsible for Day-to-day supervision of the construction
as per laid down standards, supervision of embankment layers with borrow area materials and existing cutting soil,
Execution of Embankment, Sub grade WBM, BC, execution of Pipe culverts and Slab culverts, Responsible for
layout/ levels of works at various stages, to carry out works as per specifications and approved drawing. Responsible
for planning, organizing and monitoring of road works as per approved specification checking the line and grade of
the finished works, quantity calculation, to ensure Accurate level and layout checks of the structures, accurate pile
points, Site supervision and Quality assurance of all activities, Measurement of works and entering in the
Measurement Book Budget Preparation and monitoring. Responsibilities include maintaining frequency of testing, coordination with contractor, preparing daily monthly progress reports, monitoring of quality control tests for all
construction activities. Preparation of weekly and monthly progress reports etc.
May 2014 to Dec. 2015
3.

Marc Technocrats Pvt. Ltd

Field Engineer (Road)

Supervision & Quality Control Consultancy for Construction of Roads for works Under PMGSY (BW)
Consultancy Package Barwani Road Length 35 km., in the state of Madhya Pradesh; Total Project
Length: 35 Km. Total Project Cost: INR 126 Crore

Duration: May 2014 to Dec. 2015


Client: MPRRDA
Location: Madhya Pradesh, India
in
Joint
Venture
with

Independent Engineer services for 4- laning of Biaora-Dewas section from Km 426.100 to Km


566.450 of NH-3 (Package-III) in the State of Madhya Pradesh to be executed on BOT (Toll) on
DBFOT pattern under NHDP Phase-IV

Assistant Highway Engineer - Kamlesh Ahirwal

Description of Duties: As Field Engineer(Roads), Responsible for Supervision of Different daily construction
activities in construction of flexible pavement as per SSR-1 and IS code; Checking of layout of road W/S and Sewer
line and STP etc.; Checking of reinforcement & Concrete work in pile foundation of overhead water tank; Preparation
of daily, weekly &monthly progress report; Assist to Resident Engineer in association with contractual
correspondence. Help in preparation of revised project report and making revised estimate; Providing day to day
progress report to Resident Engineer.
July 2010 to Feb. 2014

4.

Rural Engineering Service Division

Technical Assistant

1104 Chief Minister Rural Link Road in Janpad Panchayat Jebera; National Rural Employment
Guarantee Service

Duration: July 2010 to Feb. 2014


Client: Madhya Pradesh Rural Engineering Services
Location: Madhya Pradesh, India
Description of Duties: As a Technical Assistant, Responsible for supervision of execution of Earth work and
Laying of Subgrade GSB CBR Testing Camber provided Responsible for Quality control Monitoring Master Rool
Record maintain Measurement book Record Level Checking for Layer wise and Labour Attendance Record, also
Responsible for the Various Record and testing Required as Site as well work
July 2008 to Jun. 2010

5.

SCC Projects Pvt. Ltd.

Site Engineer (Highway)

Construction of Rehabilitation and Up gradation of package 2 Gairatganj -Silwani -Gadarwara (SH 44),
NH-12 Junction to Silwani (SH 15) and Bareli Papaya Road (SH 19) Under MPSRSP II ADB funded
(project length 138 KM); 2 Lane; Project length: 138 Km; Project Cost: INR 96.14 Crore; ADB Funded
executed under FIDIC Condition of Contract

Duration: July 2008 to Jun. 2010


Client: MPRDC
Location: Madhya Pradesh, India
Description of Duties: As a Site Engineer (Highway), Responsible for execution of each and every activities work
as per contract and guide line in the specification MORTH and IS codes. Quality Control and quantity checking of the
work done. Conducting various testes required for earth work, GSB, WMM, DBM, and BC as per specification.
Recording of measurement of the work done at site and checking of bill. Checking the cross section, Embankment
layer chart etc. Preparation an
Languages:
Speaking
Excellent
Excellent

English
Hindi

Reading
Excellent
Excellent

Writing
Excellent
Excellent

Summary of qualification & Experience vis--vis the requirements as per TOR:


Break-up of experience
Requirements as per
TOR (Enclosure-B)

Possessed by the Staff


Member

The Candidate should


be Graduate in Civil
Engineering
with
3
years experience.

B.
Tech
in
(Civil
Engineering)
from
Chhatrapati
Shahu
Ji
Maharaj
University,
Kanpur (U.P.) 2008.

Brief Description of Project

in
Joint
Venture
with

Man-months
provided

Independent Engineer services for 4- laning of Biaora-Dewas section from Km 426.100 to Km


566.450 of NH-3 (Package-III) in the State of Madhya Pradesh to be executed on BOT (Toll) on
DBFOT pattern under NHDP Phase-IV

Assistant Highway Engineer - Kamlesh Ahirwal


Break-up of experience
Requirements as per
TOR (Enclosure-B)

Possessed by the Staff


Member

Professional Experience
of
3 years in Road
Projects

He has 8 years of
professional experience.

He should have handled


at least 1 road project.

He has 8 years of
experience
in
similar
capacity in road Projects.

Brief Description of Project

1.

2.

3.

4.

5.

Man-months
provided

Consultancy Services for Detailed Engineering


Design
for
Strengthening
of
ChainpuraChanranpura-Bhoura Road (From 0.000 to 9.447)
in the State of Madhya Pradesh.; Project Length:
9.447 Km

6 months

Consultancy service of Four laning of Delhi


Yamunotri up to Uttarakhand Border Section of
SH-57 from KM 10.911 to KM 217.000 on DBFOT
basis in the State of Uttar Pradesh; Client: Uttar
Pradesh State Highway Authority.; Lane-4; Project
Length: 207.1 Km; Total Project Cost: INR
2788.38 Crore.

6 months

Supervision & Quality Control Consultancy for


Construction of Roads for works Under PMGSY
(BW) Consultancy Package Barwani Road Length
35 km., in the state of Madhya Pradesh; Total
Project Length: 35 Km. Total Project Cost: INR
126 Crore

20 months

1104 Chief Minister Rural Link Road in Janpad


Panchayat Jebera; National Rural Employment
Guarantee Service

44 months

Construction of Rehabilitation and Up gradation of


package 2 Gairatganj -Silwani -Gadarwara (SH
44), NH-12 Junction to Silwani (SH 15) and Bareli
Papaya Road (SH 19) Under MPSRSP II ADB
funded (project length 138 KM); 2 Lane; Project
length: 138 Km; Project Cost: INR 96.14 Crore;
ADB Funded executed under FIDIC Condition of
Contract

24 months

CERTIFICATION BY THE CANDIDATE


I, the undersigned, (Kamlesh Ahirwal, Plot No. 66, Sector-32, Gurgaon, Haryana-122 003, India, Phone: +91-124
4249200) undertake that this CV correctly describes myself, my qualifications and my experience and NHAI would be
at liberty to debar me if any information given in the CV, in particular the Summary of Qualification & Experience vis-vis the requirements as per TOR is found incorrect. I further undertake that I have neither been debarred by NHAI
nor left any assignment with the consultants engaged by NHAI / contracting firm (firm to be supervised now) for any
continuing work of NHAI without completing my assignment. I will be available for the entire duration of the current
project (Independent Engineer services for 4- laning of Biaora-Dewas section from Km 426.100 to Km 566.450
of NH-3 (Package-III) in the State of Madhya Pradesh to be executed on BOT (Toll) on DBFOT pattern under
NHDP Phase-IV). If I leave this assignment in the middle of the work, NHAI would be at liberty to debar me from
taking any assignment in any of the NHAI works for an appropriate period of time to be decided by NHAI. I have no
objection if my services are extended by NHAI for this work in future.
I further undertake that if due to my inability to work on this project due to unavoidable circumstances, due to which
consultants firm is forced to seek replacement. In such unavoidable circumstances, I shall not undertake any
employment in NHAI projects during the period of assignment of this project and NHAI shall consider my CV invalid
till such time.
I further certify that I am associated with the following assignments as on date (as on 7 days prior to due date for
in
Joint
Venture
with

Independent Engineer services for 4- laning of Biaora-Dewas section from Km 426.100 to Km


566.450 of NH-3 (Package-III) in the State of Madhya Pradesh to be executed on BOT (Toll) on
DBFOT pattern under NHDP Phase-IV

Assistant Highway Engineer - Kamlesh Ahirwal


submission of proposal) including those for which LOA has been received by the firm and the inputs in these
assignments shall not effect the work of the current assignment.

Name of Assignment

Client

Date of
LOA

Likely start
(Month/Ye
ar)

Likely end
(Month/Ye
ar)

Total input
of the
person
(manmonths)

____________________________________________________________________ Date: 15/11/2016


(Signature of Key personnel)
(Day/Month/Year)
CERTIFICATION BY THE FIRM
The undersigned on behalf of Egis India Consulting Engineers Pvt. Ltd. certify that the qualification and
experience details of Mr. Kamlesh Ahirwal, Plot No. 66, Sector 32, Gurgaon, Haryana-122 003, India, Phone: +91124 4249200 as described in the CV has been checked and found to be correct. It is also certified that
Mr. Kamlesh Ahirwal to the best of our knowledge has neither been debarred by NHAI nor left his assignment with
any other consulting firm engaged by NHAI / Contracting firm (firm to be supervised now) for the ongoing projects.
We understand that if the information about leaving the past assignment is known to NHAI, NHAI would be at liberty
to remove the personnel from the present assignment and debar him for an appropriate period to be decided by
NHAI.

__________________________________________________________________
[Signature of staff member or authorized representative of the Firm]

in
Joint
Venture
with

Date: 15/11/2016
(Day/Month/Year)

Potrebbero piacerti anche