Compilation of MTB for the Month of November 2014

Sl. No.
1)

Name of Project/ Status


DJB Master Plan for Sewerage System of un-sewered Area of Delhi
Revison of Samalka and Salhapur estimate is under progress.

Revision of Sainik Nagar Group of Colonies (GOC) is under progress.

2)

Consultancy for Irrigation Service Provider for Horticulture in MozambiquePROIRRI


Preliminary design of Santa Isabel has been presented before association
members
Detailed design of Santa Isabel is under preparation
Training for Cost Sharing Grant has been given to 3 associations in Sofala and
2 associations in Manica Provinces
Social Report for Tsetsera is under preparation
Quarterly progress report has been prepared and presented in the review
meeting in Sofala
Implementation of Piscina Scheme has been started

3)

Consultancy Services for Design and construction supervision of


Rehabiltation of Road N280/281 between Tica, Buzi and Nova Sofala in
Sofala Province.
Alignment survey for the proposed route of road has been started.
Geotechnical investigations has been started and is in progress.
Traffic Count Surveys has been started.
Works related to detailed design report has been started.
Consultancy Services for Detailed Design Review, Pre Contract Services
and Supervision of Civil Works Contract for Multi National Nacala Road,
Corridor Project- Phase 1, Nampulla Cuamba Road Project, Lot-B: RibaueMalema (Km 131-Km 234), Upgrading.

4)

The works completed for this month are given below:


i)
ii)
iii)
iv)
v)
vi)
vii)
viii)

5)

HIV/AIDS awareness activities are being carried out.


3.0 km of G9 layer construction is completed
3.5 km of G7 layer construction is completed
7.5 km of Cement Stabilized Sub Base C4 layer is completed
12.5 km of Crushed Stone Base G3 layer is completed
10.0 km of Bottom seal (19mm aggregate) of DBST is completed.
10.5 km of Top seal (9.5 mm aggregate) of DBST is completed.
Loading of precast beams has been completed in Monapo. Transverse and
edge beams casting is completed.
ix)
Transverse and edge beams casting is completed inn Lalaua and deck slab
reinforcement is also done.
x)
Foundation works of Abutment A1 is completed in Nataleia.
xi)
Side Drains works has been started and is going on.
xii)
Quarry works is in progress.
xiii) Rock-filling in swamp and marshy areas is completed for the total section.
xiv) Borrow pits are finalized and material investigation report has submitted
for approval
xv)
Monthly Environment Monitoring Report is submitted along with Monthly
Progress Report.
Consultancy Services for Construction of 400 Housing Units in Quelimane,
Zambezia Province, Mozambique.
Addendum-3 for the Tender Documents are published.
Queries regarding Tender Documents were received from the contractor and

6)

given replies.
Consultancy Services for Rehabilitation and Expansion of Cuamba City
water Supply (Contract No. FIPAG/NPTWSSP/W-02/12).
The works completed for this Month are given below:
i.

4.128 km DN 500 Pipe laying for Raw water Pipeline have been completed ;

ii.

198mts DN 500 Pipe laying for Transmission Pipeline have been completed

iii.

4% pressure testing of pipeline has been completed;

iv.

17 Nos. air valve chambers of

Raw water transmission main have been

completed;
v.
7)

8)

15% concrete work of Slow Sand Filters walls have been completed;

vi.
20% concrete work of Grade Level Reservoir 1&2 has been completed;
Techno Economical Appraisal of Detailed Project Reports of Infrastructure
projects submitted by State government of NE Region under NLCPR
scheme.
Total invoice of 48 lakh have been raised and submitted to the client.
Meeting held with the client regarding the realization of the pending payment.
Project Monitoring and Supervision of Quality Works Under RGGVY 11th
Scheme for MPPKVVCL In 7 Districts: Shahdol, Rewa, Mandla, Satna,
Dindori, Annuppur & Sidhi.

client.

5 Districts Mandla, Dindori, Satna, Annupur & Sidhi works completed.


Weekly, Fortnightly and Monthly Progress reports submitted to client.
Inspection reports for all the Villages district wise has been submitted to
Total 25 villages pole erection works completed.
Re-inspection
st

Oct2014
Nov2014
Progr
ess
Oct2014
Nov2014
Progr
ess
Total Progress in
November-2014

I ReInspect
ion

2nd ReInspect
ion

280

251

280

251

1065

500

404

1090

500

404

25

25

Total 25
villages pole
erection
completed

9)

Project Monitoring, Supervision Of Quality Work And Preparation Of BOQ


Under Supplementary RGGVY 11th Scheme For MPPKVVCL In 3 Districts:
Satna, Chhatarpur & Sidhi.
Survey Completed in all districts.
58 Villages BOQ of Chhatarpur has been submitted to client.
94 BOQ of Satna has been submitted to client.
259 BOQ of Sidhi has been submitted to client.
Chargin
Pole
g
S.
Total
erecti
BOQ
Comple
Project
Villag
Progress
on
Submit
Remarks
ted
N
es
(Villag
ted
(Village
es)
s)
Oct94
108
0
2014
06 villages pole
Nov94
erection done
1.
Satna
384
114
0
2014
Slow progress by
contractor
Progr
0
06
0
ess
Oct259
08 Villages Pole
280
185
2014
erections done.
Nov259
During Re2.
Sidhi
301
288
260
2014
Inspection 75
village has been
Progr
0
08
75
done.
ess
Oct58
02 villages pole
78
0
2014
erection done
Chhatar
Nov58
Slow progress by
3.
542
80
0
pur
2014
contractor and
compliance not
Progr
0
02
0
received
ess
16 Villages Pole
Total Progress in
erection done &
16
0
75
November-2014
75 villages has
been done

10)

Project Name: Consultancy Services on Contract For Preparation Of Half


Yearly Environmental Monitoring
Report for ADB against Loan No. 3066 for MPPKVVCL.

11)

HYEMR for next Half Year duration July-2014 to December-2014 is under

process.
Project Monitoring And Construction Supervision Along With Quality
Control Of Sewerage Project In Jabalpur City Under JNNURM:
Day wise Monthly progress report of the work executed during month of Oct
2014 submitted to the client.

The Inspection report and status of road restoration has been submitted to
client.

During Month 0.84 Km sewer laid, 25 Manhole completed, Road


Restoration No work, Hydraulic Testing No work.

IMPORTANT MEETINGS AND VISIT:


A meeting held on 02th and 11th November 2014 with CE & SE (RGGVY) and
WAPCOS officials for discussion and meeting the Financial as well as Physical
Targets and the progress under RGGVY Supplementary ongoing projects. The
Superintending Engineer asked to speed up the progress and submit the BOQ

12)

13)

14)

15)

at an earliest time. During the meeting Rewa & Shahdol District progress has
been discussed. Also the Contractor of Rewa District has been directed to
carry out the compliance works at the earliest.
A time limit meeting held on every Saturday along with SE, Nodal Officers,
Contractor and Site Engineers WAPCOS Ltd. for progress and maintaining the
Quality Standards at Site. In Satna & Chhatarpur District the progress is too
slow. SE RGGVY has directed the Contractor to carry out the Quality works in
rapid speed.
PROJECT MANAGEMENT CONSULTANCY SERVICES- DESIGN & SUPERVISION
FOR AUGMENTATION OF WATER SUPPLY SCHEME IN DAR ES SALAAM AND
CHALINZE.
Manufacturing of the two vertical pumps for the raw water pumping station is
in progress. The inspection of pumps was carried during November 2014 and
delivered soon.
Manufacturing of prelift pumps is in progress after the approval of drawings
on 23rd September. The inspection of pumps was carried during November
2014 and delivered soon.
PROVISION OF CONSULTANCY SERVICES ON WATER SUPPLY SYSTEM AT
IGURUSI TRAINING INSTITUTE
Contract agreement was signed on 10th Nov 2014.
Meeting held with the client in the second week on November and data
to be collected was discussed.
Preparation of Feasibility Report and Detailed Project Report on Sewerage
and Sewage Treatment for Bhopal City
Detailed design and cost estimate of Lift stations are under Progress.
Detailed design and cost estimate of Pumping stations are under Progress.
Detailed design of 8 WWTPs are under Progress.
Detailed Project Report is under Preparation.
A Comprehensive Development Plan (CDP) for Majuli Cultural Landscape
Region (MCLR) in the state of Assam, India
Meeting was held with the Commissioner Upper Assam Division and other
committee members. Also pervious raised queries were clarified point wise.
Some of the observations have been carried out in revised concept report.
CDP draft final report is under process.

16)

Consulting Services for preparation of Master Plan for Restoration and


Protection of Water bodies & Waterways in Chennai Metropolitan Area.
Meeting and site visit along with client on 29.11.14 regarding the way forward
in the project.
NIT for Topographic survey of 38 approved water bodies got approved and
advertised in newspaper on 30.11.14.

17)

Consultancy Services for Preparation of Detailed Project Reports for


Rehabilitation of Minor Irrigation Tanks and Other Water Bodies in
Madurantakam
and
Vandavasi
blocks
of
Kancheepuram
and
Thiruvannamalai Districts Respectively under Zone II.
Meeting with Adl. Director, SE, EE & AEE of DRD & PR regarding the project
duration and way forward.
Agreement was signed by client on 10.11.14.
Orientation meeting held in DRD&PR office in Chennai on 18.11.14.
Collected the memoir for Vandavasi Block.
Meeting with Tahsildar and Revenue Inspectors for collecting the FMB sketch
and Village maps.

18)

JALANIDHI - Study on Domestic Water Supply & Sanitation service levels in


Kerala

Modified questionnaire has been submitted to the client for approval.

19)

JALANIDHI - Consultancy services for Independent Construction Quality &


Surveillance Batch I, II and Tribal Grama panchayaths of Jalanidhi phase
II under RPMU Malappuram.

20)

Inspection of around 150 water supply schemes in progress.


JALANIDHI - Consultancy services for Independent Construction Quality &
Surveillance Batch I, II and Tribal Grama panchayaths of Jalanidhi phase
II under RPMU Kannur.

21)

Inspection of around 200 water supply schemes in progress.


JALANIDHI - Consultancy services for Independent Construction Quality &
Surveillance Batch I, II and Tribal Grama panchayaths of Jalanidhi phase
II under RPMU Idukki

22)

Inspection of around 200 water supply schemes in progress.


RAY- SFCPoA- Kannur Municipality

23)

Inception report submitted.


Interim report submitted.

Project Management Consultancy for Sri Lanka Housing Project


Construction of 4,000 Housing Units in Central and UVA Provinces

Inception report submitted.


Progress report submitted.