NO
OBSERVATION
BOILER
Unit#01
PA Fan 1A Plummer block & voith oil level checked found ok
PA Fan 1B Plummer block & voith oil level checked observed Water mixed
with DE Side plumber block oil
2
3
4
5
SA FAN 1A & 1B Plummer block & voith oil level checked found ok
ID FAN 1A & 1B Plummer block & voith oil level checked found ok
J-SEAL BLOWER 1A ,1B, & 1C Oil level checked found ok
UNIT #02
PA Fan 2A & 2B Plummer block & voith oil level checked found ok
SA FAN 2A & 2B Plummer block & voith oil level checked and observed
DE&NDE Bearing oil mixed with Water
2
3
4
ID FAN 2A & 2B Plummer block & voith oil level checked found ok
J-SEAL BLOWER 2A ,2B, & 1C Oil level checked found ok
1
2
3
4
5
TURBINE
UNIT #01
HWP 1A & 1B Oil level checked and found ok
CEP 1A,1B,1C Oil level checked and found ok
OIL CENTRIFUGE checked and running normal
JOP 1A & 1B Checked and running normal
DC EOP trial was taken found normal
1
2
3
UNIT #02
HWP 2A & 2B Oil level checked and found ok
CEP 2A,2B,2C Oil level checked and found ok
OIL CENTRIFUGE checked and running normal
1
2
3
4
REMARK
S.NO
OBSERVATION
BOILER
Unit#01
PA FAN-1B Drive side bearing housing oil replacing work
completed. Non drive side oil level and quality found satisfactory.
After replacing the oil trail has been noticed and found
satisfactory
BOILER
Unit#02
unit-1 & Unit-2 Boiler side all HT Motors Trail run observing work
completed.
REMARK
S.NO
BOILER
Unit#01
1
2
Unit#02
4
CHP
5
6
DM palnt
7
Pump house
8
9
Earth moving equipments
10
Boiler -1 feed pump BFP#1 A,BFP#1B,BFP#1C Trail taken, Running Normal and Vibration monitored
SA fan#02 A,SA fan#02 b casing manual door opened for inspection and observed, normal no wate
accumulation
CHP
REMARK
S.NO
4
5
6
7
REMARK
S.NO
Pump House
1
TURBINE
ACW & GCW Pump Unit -#1 Trial Run Was taken found running normal, vibration monitored
ACW & GCW Pump Unit -#2 Trial Run Was taken found running normal, vibration monitored
Pump House
Raw Water Pump - 1 Gland packing replacement work completed Trial run to be taken
REMARK
Sl.NO
BOILER Unit#01 & Unit#02
1
TURBINE
2
3
AHP
4
5
ASH handling System vessel#09 Slave #01 seal Pressure Found low and seal replaced with and assembled trail ta
normal
TURBINE
Unit 1 Oil centrifuge bowl cleaning work carried and Trail taken found normal
Instrument compressor #01,#02,#03 Trail taken, found normal and vibration reading monitored
AHP
Service air compressor#01,#02,#03,#04 Trail taken, found normal and vibration reading monitored
Fluidising blower #01,#03 and Unit#02 ash conditioner Trail taken, found normal and vibration reading monitored
REMARK
Sl.NO
Unit#01 & Unit#02
TURBINE
1
2
CHP
REMARK
Sl.NO
Unit#01 & Unit#02
BOILER
1
CHP
2
3
4
Boiler#01 and Boiler#02 water filling done for preservation process and initial filling pump 1and 2 trail taken vibr
monitored
CHP
Primary crusher DE system blower and Primary crusher DE system blower trail taken and vibration reading monit
Belt Conveyor BC#02 discharge chute choke removed
Chp control room entrance door lock handle provided
REMARK
Sl.NO
Unit#01 & Unit#02
BOILER
1
TURBINE
2
3
4
5
PUMP HOUSE
6
CHP
7
Raw water-1,2,3; Desalination water pump, Fire fighting Jockey pump-1,2; Service water pump-1,2;
fighting main pump Condition monitoring and trail run observing work completed.
CHP
Roller screen-1,2,3 and Bed material conveyor Condition monitoring and trail run observing work c
REMARK
Sl.NO
Unit#01 & Unit#02
BOILER
1
2
3
TURBINE
4
LDO STATION
5
CHP
6
unit-1 Bed ash cooler-3 cooling water isolation valve servicing work completed. After servicing assembly has bee
trail has been observed and found satisfactory.
UNIT-1 & UNIT-2 all J-seal blowers , coal feeders and coal feeder cleaning chain motor trail run observing and co
monitoring work completed.
UNIT-1 & UNIT-2 all RSB's and LRSB's Trail run observing work and condition monitoring work completed.
TURBINE
Unit-1 all CEP's and Hotwell pump's trail run observed and condition monitoring work completed.
LDO STATION
LDO Transfer pump-1,2,3 trail run observing and condition monitoring work completed.
CHP
Protection slings arranging work for dozzer which has been sent for power Gencom completed.
REMARK
Sl.NO
Unit#01 & Unit#02
TURBINE
1
2
LDO STATION
3
DMP
4
Unit-1 & Unit-2 Cep's-1,2,3; GSVC Blower-1 & 2, ACW & GCW pump's, hotwell pump's and fin cleaning pump
monitoring and trail run observing work completed.
LDO STATION
Dummy providing work for both LDO tamks top side completed.
DMP
DM Transferspumps, Initial filling pump's, Degasser blower's , De-salination pump's, MGF Blower's c
monitoring and trail run observing work completed.
REMARK
Sl.NO
Unit#01 & Unit#02
TURBINE
1
2
LDO STATION
3
DMP
4
Unit-1 & Unit-2 Cep's-1,2,3; GSVC Blower-1 & 2, ACW & GCW pump's, hotwell pump's and fin cleaning pump
monitoring and trail run observing work completed.
LDO STATION
Dummy providing work for both LDO tamks top side completed.
DMP
DM Transferspumps, Initial filling pump's, Degasser blower's , De-salination pump's, MGF Blower's c
monitoring and trail run observing work completed.
REMARK