Sei sulla pagina 1di 36

S.

NO

OBSERVATION
BOILER
Unit#01
PA Fan 1A Plummer block & voith oil level checked found ok

PA Fan 1B Plummer block & voith oil level checked observed Water mixed
with DE Side plumber block oil

2
3
4
5

SA FAN 1A & 1B Plummer block & voith oil level checked found ok
ID FAN 1A & 1B Plummer block & voith oil level checked found ok
J-SEAL BLOWER 1A ,1B, & 1C Oil level checked found ok

UNIT #02
PA Fan 2A & 2B Plummer block & voith oil level checked found ok

SA FAN 2A & 2B Plummer block & voith oil level checked and observed
DE&NDE Bearing oil mixed with Water

2
3
4

ID FAN 2A & 2B Plummer block & voith oil level checked found ok
J-SEAL BLOWER 2A ,2B, & 1C Oil level checked found ok

1
2
3
4
5

TURBINE
UNIT #01
HWP 1A & 1B Oil level checked and found ok
CEP 1A,1B,1C Oil level checked and found ok
OIL CENTRIFUGE checked and running normal
JOP 1A & 1B Checked and running normal
DC EOP trial was taken found normal

1
2
3

UNIT #02
HWP 2A & 2B Oil level checked and found ok
CEP 2A,2B,2C Oil level checked and found ok
OIL CENTRIFUGE checked and running normal

JOP 2A & 2B Checked found ok running normal


CHP

BC1,BC2,BC3,BC5 Conveyor water stagnant over the belt

1
2
3
4

RAW WATER A,B & C trial taken and found normal


INITIAL FILLING PUMP 1 & 2 trial taken and found normal

REMARK

S.NO

OBSERVATION
BOILER
Unit#01
PA FAN-1B Drive side bearing housing oil replacing work
completed. Non drive side oil level and quality found satisfactory.
After replacing the oil trail has been noticed and found
satisfactory
BOILER
Unit#02

UNIT-2 SA FAN-2A DE AND NDE side bearing housing oil replacing


work completed.After replacing the oil trail has been noticed and
found satisfactory

UNIT-2 SA FAN-2B DE AND NDE side bearing housing oil replacing


work completed.After replacing the oil trail has been noticed and
found satisfactory

unit-1 & Unit-2 Boiler side all HT Motors Trail run observing work
completed.

REMARK

SERVO SYSTEM-68 OIL

SERVO SYSTEM-68 OIL

SERVO SYSTEM-68 OIL

S.NO
BOILER
Unit#01

1
2
Unit#02

4
CHP

5
6
DM palnt
7
Pump house
8
9
Earth moving equipments
10

OBSERVATION & DAILY ACTIVITIES


BOILER
Unit#01

Boiler -1 feed pump BFP#1 A,BFP#1B,BFP#1C Trail taken, Running Normal and Vibration monitored

PA fan # 1B Trail taken, Running Normal and Vibration monitored


Unit#02
Boiler -2 feed pump BFP#2A,BFP#2B,BFP#2C Trail taken, Running Normal and Vibration monitored

SA fan#02 A,SA fan#02 b casing manual door opened for inspection and observed, normal no wate
accumulation
CHP

Secondary Crusher#01,Secondary Crusher#02,Secondary Crusher#03 Trail taken, Running Normal an


Vibration monitored
Primary Crusher#01,Primary Crusher#02 Trail taken, Running Normal and Vibration monitored
DM palnt
Initial filling pump A&B lubrication work completed
Pump house
Raw water pump priming chamber make water line isolation valves checked for any passing and
observed its normal
Primimg chamber makeup Tank level gauage tapping welding done and new arrangement done
Earth moving equipments
Tractor trailer tyre left side dismantled for air filling at primary crusher compressor, again it has
assembled

REMARK

S.NO

BOILER Unit#01 & Unit#02


1
2

4
5
6
7

OBSERVATION & DAILY ACTIVITIES

BOILER Unit#01 & Unit#02


Boiler#01 and Boiler #02 Coal feeders manual door opened and water drained
Boiler Funrance damaged bed nozzles 17 No's disamntled work carried
ACC
ACC fan 24 No's oil level checked,Trail run completed and found running normal, vibration monitored
Pump House
Raw water Pump#01,02,03 Trail run completed and found running normal, vibration monitored
Fire fighting main pump and Jockey pump#01 and 02 Trail run completed and found running normal, vibration
monitored
Desalination pump 01 and 02 , Service water pump Trail run completed and found running normal, vibration
monitored
Diesel pump Trail run completed and found running normal, vibration monitored

REMARK

S.NO

BOILER Unit#01 & Unit#02


1
2
TURBINE
1
2

Pump House
1

OBSERVATION & DAILY ACTIVITIES

BOILER Unit#01 & Unit#02


Boiler-1 Furnace damaged bed nozzles 23 No's replacement work completed.
Initial filling pump piping near 9 Meter Elevation (Boiler) welding leakage arresting work completed

TURBINE
ACW & GCW Pump Unit -#1 Trial Run Was taken found running normal, vibration monitored
ACW & GCW Pump Unit -#2 Trial Run Was taken found running normal, vibration monitored

Pump House
Raw Water Pump - 1 Gland packing replacement work completed Trial run to be taken

REMARK

Sl.NO
BOILER Unit#01 & Unit#02
1
TURBINE
2
3
AHP
4
5

OBSERVATION & DAILY ACTIVITIES (12.11.2016)


BOILER Unit#01 & Unit#02

ASH handling System vessel#09 Slave #01 seal Pressure Found low and seal replaced with and assembled trail ta
normal
TURBINE
Unit 1 Oil centrifuge bowl cleaning work carried and Trail taken found normal
Instrument compressor #01,#02,#03 Trail taken, found normal and vibration reading monitored
AHP
Service air compressor#01,#02,#03,#04 Trail taken, found normal and vibration reading monitored

Fluidising blower #01,#03 and Unit#02 ash conditioner Trail taken, found normal and vibration reading monitored

REMARK

Sl.NO
Unit#01 & Unit#02
TURBINE
1
2
CHP

OBSERVATION & DAILY ACTIVITIES (14.11.2016)


Unit#01 & Unit#02
TURBINE
Unit #01 AOP,JOP and Barring Gear Trail taken found normal and vibration reading monitored
Unit #02 AOP,JOP and Barring Gear Trail taken found normal and vibration reading monitored
CHP

Belt Conveyor BC#01,BC#02,Boom conveyor,Bucket wheel,BC#03,BC#04A,BC#04B,BC#05,BC#06A,BC#06B


BC#07A, BC#07B, Trail taken found normal and vibration reading monitored

REMARK

Sl.NO
Unit#01 & Unit#02
BOILER
1
CHP
2
3
4

OBSERVATION & DAILY ACTIVITIES (15.11.2016)


Unit#01 & Unit#02
BOILER

Boiler#01 and Boiler#02 water filling done for preservation process and initial filling pump 1and 2 trail taken vibr
monitored
CHP

Primary crusher DE system blower and Primary crusher DE system blower trail taken and vibration reading monit
Belt Conveyor BC#02 discharge chute choke removed
Chp control room entrance door lock handle provided

REMARK

Sl.NO
Unit#01 & Unit#02
BOILER
1
TURBINE
2
3
4
5
PUMP HOUSE
6

CHP
7

OBSERVATION & DAILY ACTIVITIES (16.11.2016)


Unit#01 & Unit#02
BOILER
unit-1 Bed ash cooler-3 cooling water isolation valve maintenance work under progress.
TURBINE
Unit-1 & UNIT-2 CST Tank Top line dummy removing work for adding chemical Completed.
UNIT-2 ACC fan's 1 to 24 condition monitoring and trail run observing work completed.
Dummy arranging for air line which was arranged for preservation of unit-2 turbine completed.
UNIT-2 Package AC Fan belt replacing work completed. (4 no's of belts were replaced with new one)
PUMP HOUSE

Raw water-1,2,3; Desalination water pump, Fire fighting Jockey pump-1,2; Service water pump-1,2;
fighting main pump Condition monitoring and trail run observing work completed.

CHP

Roller screen-1,2,3 and Bed material conveyor Condition monitoring and trail run observing work c

REMARK

Sl.NO
Unit#01 & Unit#02
BOILER
1
2
3
TURBINE
4
LDO STATION
5
CHP
6

OBSERVATION & DAILY ACTIVITIES (17.11.2016)


Unit#01 & Unit#02
BOILER

unit-1 Bed ash cooler-3 cooling water isolation valve servicing work completed. After servicing assembly has bee
trail has been observed and found satisfactory.

UNIT-1 & UNIT-2 all J-seal blowers , coal feeders and coal feeder cleaning chain motor trail run observing and co
monitoring work completed.
UNIT-1 & UNIT-2 all RSB's and LRSB's Trail run observing work and condition monitoring work completed.
TURBINE
Unit-1 all CEP's and Hotwell pump's trail run observed and condition monitoring work completed.
LDO STATION
LDO Transfer pump-1,2,3 trail run observing and condition monitoring work completed.
CHP
Protection slings arranging work for dozzer which has been sent for power Gencom completed.

REMARK

Sl.NO
Unit#01 & Unit#02
TURBINE
1
2
LDO STATION
3
DMP
4

OBSERVATION & DAILY ACTIVITIES (18.11.2016)


Unit#01 & Unit#02
TURBINE
Dummy providing work for air line which was arranged for preservation of turbine completed.

Unit-1 & Unit-2 Cep's-1,2,3; GSVC Blower-1 & 2, ACW & GCW pump's, hotwell pump's and fin cleaning pump
monitoring and trail run observing work completed.
LDO STATION
Dummy providing work for both LDO tamks top side completed.
DMP

DM Transferspumps, Initial filling pump's, Degasser blower's , De-salination pump's, MGF Blower's c
monitoring and trail run observing work completed.

REMARK

Sl.NO
Unit#01 & Unit#02
TURBINE
1
2
LDO STATION
3
DMP
4

OBSERVATION & DAILY ACTIVITIES (18.11.2016)


Unit#01 & Unit#02
TURBINE
Dummy providing work for air line which was arranged for preservation of turbine completed.

Unit-1 & Unit-2 Cep's-1,2,3; GSVC Blower-1 & 2, ACW & GCW pump's, hotwell pump's and fin cleaning pump
monitoring and trail run observing work completed.
LDO STATION
Dummy providing work for both LDO tamks top side completed.
DMP

DM Transferspumps, Initial filling pump's, Degasser blower's , De-salination pump's, MGF Blower's c
monitoring and trail run observing work completed.

REMARK

Potrebbero piacerti anche