SECTION 31 32 13.19
LIME SOIL STABILIZATION
PART 1
GENERAL
1.01
SECTION INCLUDES
A. Construction of a lime modified soil layer.
1.02
RELATED SECTIONS
A. Section 01 31 19 Project Meetings.
B. Section 01 33 01 - Submittals.
C. Section 01 45 16 Field Quality Control.
D. Section 01 45 29 - Testing Laboratory Services.
E. Section 01 77 19 Closeout Requirements.
F. Section 31 22 00 - Grading.
G. Section 31 23 00 Excavation and Fill
H. Section 31 23 33 Trenching and Backfilling.
I. Section 02 41 13.23 - Utility Line Removal.
1.03
REFERENCES
A. ANSI/ASTM C977-02 - Quicklime
Stabilization.
31 32 13.19-1
Master Specification
E. ASTM D1140 - Method of Test for Amount of Material in Soils Finer than
the No. 200 Sieve.
F.
ASTM D3017 - Test Method for Moisture Content of Soil and Soil
Aggregate in Place by Nuclear Methods (Shallow Depth).
G. ASTM D4318 - Test Method for Liquid Limit, Plastic Limit, and Plasticity
Index of Soils.
H. ASTM D1883 - Bearing Ratio of Laboratory Compacted Soils.
1.04
I.
J.
1.05
C. Bulk lime may be used with delivery and direct application using bottom
dump trucks. Delivery tickets shall state source of lime and chemical
content or other suitable specification designation to verify compliance
with specifications and product submittals.
D. Only hydrated lime shall be used. The use of quicklime is prohibited.
Hydrated lime can be dangerous; exercise appropriate caution if used for
31 32 13.19-2
Master Specification
the Work. Contractor shall become informed about recommended
precautions in the handling, storage and use of hydrated lime material.
1.06
1.07
PAYMENT
A. Payment for Lime Modified Subgrade Stabilization shall be included in the
lump sum contract price for all locations where lime stabilization is
indicated on the Drawings and/or in the Specifications. At other locations
where the Project Manager geotechnical engineer determines by field
observation and/or testing that lime stabilization is needed, payment shall
be per square yard for each of the thicknesses required based on a
negotiated, mutually agreeable price per square yard between the
Construction Manager and Contractor for the specified thickness(es)
required..
PART 2
PRODUCTS
2.01
MATERIALS
A. Lime for subgrade stabilization shall be as specified in Section 306,
Missouri Department of Transportation Standard Specifications for
Highway Construction, 1999 edition.
PART 3
EXECUTION
3.01
EXAMINATION
A. Verify site conditions under provisions of Section 01 31 19.
B. Verify that survey benchmark and intended elevations for the Work are as
indicated.
3.02
PREPARATION
A. Identify required lines, levels, contours, and datum.
31 32 13.19-3
C.
Master Specification
B. Identify known underground, above ground, and aerial utilities. Stake and
flag locations.
Notify Construction Manager concerning identified utilities.
3.03
CONSTRUCTION
A. Construct a lime modified soil layer of 12 to 16 inch compacted thickness
as specified on the Drawings in accordance with Section 306, Missouri
Department of Transportation Standard Specifications for Highway
Construction, 1999 edition.
B. Compact the lime modified layers to the required compacted depth to 90
percent of the modified dry density in accordance with ANSI/ASTM
D1557. See Section 02223.
C. Develop a minimum CBR of 8 to 10. Measurement of the CBR shall be
by the method prescribed in the ASTM D1883 specification. If immediate
CBR of soil-lime mixture obtained in the field is less than 8 to 10, the
following options are available to the Construction Manager:
1.
TOLERANCES
A. Top Surface of Subgrade: Plus or minus 1/10 foot.
3.05
31 32 13.19-4
Master Specification
C. In accordance with Section 306, Missouri Department of Transportation
Standard Specifications for Highway Construction, 1999 edition, carry
out all required inspection and testing.
D. If tests indicate Work does not meet specified requirements, remove
Work, replace and retest at no cost to Agency.
END OF SECTION 31 32 13.19