Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
VOL =
Q=
Sheet 2
Q#1
4.5*10^10
((250/1000)*8500000*356)
Time = (VOL/Q)
#VALUE! = 58
Q#2
P=
A=
years
a)
Q#3
1
2
0.25
0.6
2500
4800
22 cm/year
=
Cons. Use
Area
R=
Quantity Of Irrigation =
3
0.46
3200
4
5
0.3
1.2
1200
2085
0.22 m/year
4806.3 Ha.m/year
b)
E=
Pnet =
Vol Of Pnet =
Q#4
1
34.5
6.3
Pi
Ai
a)
2
57.5
7.2
4
60
8
5 Total
72
19
266.5
46.3
Arthmatic method
Pav =
b)
3
42.5
5.8
Pi total / N
53.3 mm/week
58.87365011 mm/week
7.614285714 mm/day
8.410521444 mm/day
40 mm
2100 km^2
VOL Of P=
8400 ha.m
8400*10^4
m^3
10 mm
30 mm
Of Pnet =
6300 Ha.m
6300*10^4
m^3
Q#5
Location
k=R/P
Rank
B
0.5
4
C
0.05
2
D
0.045
1
E
0.68
5
F
0.289
3
0.5
4
A,F =
B,c =
D,E =
Sheet # 3
Q#1
Distance Astrip
0
1
2
3
4
5
6
7
Total
V0.2
0
0.3
0.9
2
1.8
1
0.5
0
V0.8
0
0.4
0.6
1
0.9
0.7
0.5
0
Qstrip =
Vav
0
0.25
0.5
0.8
0.7
0.4
0.3
0
Qstrip
0
0.325
0.55
0.9
0.8
0.55
0.4
0
0
0.0975
0.495
1.8
1.44
0.55
0.2
0
4.5825
4.5825 m^3/sec
Q#3
Vav
1
0.8
0.6
0.4
0.2
0
5
Vav
wet,clay
Sand,Dry
Moderate,Clay
Vav
5
Vav
Q#2
Co=
C2=
Qtracer=
Qstream=
Inflow = Outflow + S
Eact = 0.7* Epan
Epan=
6000
Eact =
4200 Ha.m/year
0 mg/l
0.1 mg/l
0.1 m^3/sec
20 m^3/sec
Qout=
Qout=
300 L/Day/capita
5475 ha.m
Qin =
5000 ha.m
Qstream=Qtracer*(C1-C2)/(C2-Co)
C1=
20.1 mg/l
S=
New capacity S =
Q#4
Qin=
Qout=
Area=
P=
P=
Qin=
Qout=
S
1.6 m^3/sec
1.2 m^3/sec
800000 M^2
0.008 M
6400 M^3
4285440 M^3
3214080 M^3
900000 M^3
E=Qin+P-Qout-S
E=
177760 M^3
0.2222 m
22.22 cm/Aug
P=
-1675 Ha.m/year
18325 Ha.m/year
Capita=
500000
3000 Ha.m
Sheet # 4
Q#1
Qpeak= (T/Tc) C* A *i
Tc=
30 min
C=
0.85
Area=
2000000
a)
i=
Qpeak=
120 mm/hr
81600 m^3/hr
t=
12 min
b)
i=
Qpeak=
40 mm/hr
68000 M^3/Hr
t=
30 min
From Case (a) we will have a larger Qpeak because it has a larger I
Q#2
C=
Area=
Qpeak=
Q#3
0.88 T=
20000
352 M^3/hr
6 min
i=
Tc=
60 mm/hr
18 min
CN1=
CN2=
CN3=
Cnavg=
81
58
70
A1%=
A2%=
A3%=
0.35
0.3
0.35
Tc=
D=
0.88
0.264
70.25
S=
P=
4.234875 =
101.6 mm
107.5658363 mm
R=
34.17964 mm
Qpeak=
52.80277 M^3/sec
Q#4
Column1 Column2
Time
1
Q(M^3/Sec
150
Column3
2
130
3
1140
Column4
Column5
4
950
Column6
5
630
Column7
6
530
Hydrograph
1200
1000
800
600
400
200
Column8
7
430
Column9
8
350
9
285
Column10
10
235
Column11
Column12
11
185
Column13
12
160
13
150
800
600
400
200
0
Q DR=
Vol DR=
DR=
Sheet #1
3485 M^3/Day
301104000 m^3
0.150552 m
Time
7
8Q(M^3/Sec)
9
10
11
12
13
14
15
13
14
15
Q#3
gama=
P=gama*h
x=
1.025 t/m^3
8.2 t/m^2
h=
8m
L=
20 m
9.237875
Q#4
3.079292 m
110+0+0+16.5=80+0+0+hf
hf=
f=
L=
D=
hf=(8*f*L*Q^2)/(Pai^2*D^5*g)
Q=
Q#5
VbAb=VcAc+VdAd
Vc=
2.258 m/sec
Va=
Vb=
1.4 m/sec
2.85 m/sec
Aa=
Ab=
0.196349541 M^2
0.096211275 m^2
ply bernouli eq
0+0+0+16.5=80+0+0+hf
46.5 m
0.02
4500 ft
10 inch
=(8*f*L*Q^2)/(Pai^2*D^5*g)
0.147 m^3/sec
1371.6 m
0.254 m
Qbc=
Qbd=
0.11 m^3/sec
0.16 m^3/sec
44.6 t/m^2
44.8 t/m^2