Sei sulla pagina 1di 16

Name :

mohammed sabri kandeel


Reg . No. : 14101887

VOL =
Q=

Sheet 2
Q#1
4.5*10^10
((250/1000)*8500000*356)
Time = (VOL/Q)

#VALUE! = 58

Q#2
P=
A=

years

a)

Q#3

1
2
0.25
0.6
2500
4800
22 cm/year
=

Cons. Use
Area
R=
Quantity Of Irrigation =

3
0.46
3200

4
5
0.3
1.2
1200
2085
0.22 m/year
4806.3 Ha.m/year

b)
E=
Pnet =
Vol Of Pnet =

Q#4
1
34.5
6.3

Pi
Ai

a)

2
57.5
7.2

4
60
8

5 Total
72
19

266.5
46.3

Arthmatic method
Pav =

b)

3
42.5
5.8

Pi total / N

Thiessen network method


Pav =
(total Pi * Ai)/ Atotal

53.3 mm/week

58.87365011 mm/week

7.614285714 mm/day

8.410521444 mm/day

40 mm
2100 km^2
VOL Of P=

8400 ha.m
8400*10^4
m^3

10 mm
30 mm
Of Pnet =

6300 Ha.m
6300*10^4
m^3

Q#5
Location
k=R/P
Rank

B
0.5
4

C
0.05
2

D
0.045
1

E
0.68
5

F
0.289
3

0.5
4
A,F =
B,c =
D,E =

Sheet # 3
Q#1
Distance Astrip
0
1
2
3
4
5
6
7
Total

V0.2
0
0.3
0.9
2
1.8
1
0.5
0

V0.8
0
0.4
0.6
1
0.9
0.7
0.5
0

Qstrip =

Vav
0
0.25
0.5
0.8
0.7
0.4
0.3
0

Qstrip
0
0.325
0.55
0.9
0.8
0.55
0.4
0

0
0.0975
0.495
1.8
1.44
0.55
0.2
0
4.5825

4.5825 m^3/sec

Q#3

Vav
1
0.8
0.6
0.4
0.2
0

5
Vav

wet,clay
Sand,Dry
Moderate,Clay

Vav

5
Vav

Q#2
Co=
C2=
Qtracer=
Qstream=

Inflow = Outflow + S
Eact = 0.7* Epan
Epan=
6000
Eact =
4200 Ha.m/year

0 mg/l
0.1 mg/l
0.1 m^3/sec
20 m^3/sec

Qout=
Qout=

300 L/Day/capita
5475 ha.m

Qin =

5000 ha.m

Qstream=Qtracer*(C1-C2)/(C2-Co)
C1=

20.1 mg/l

S=
New capacity S =
Q#4
Qin=
Qout=
Area=
P=
P=
Qin=
Qout=
S

1.6 m^3/sec
1.2 m^3/sec
800000 M^2
0.008 M
6400 M^3
4285440 M^3
3214080 M^3
900000 M^3

E=Qin+P-Qout-S
E=
177760 M^3

0.2222 m

22.22 cm/Aug

P=

-1675 Ha.m/year
18325 Ha.m/year

Capita=

500000

3000 Ha.m

Sheet # 4
Q#1
Qpeak= (T/Tc) C* A *i
Tc=
30 min
C=
0.85
Area=
2000000
a)

i=
Qpeak=

120 mm/hr
81600 m^3/hr

t=

12 min

b)

i=
Qpeak=

40 mm/hr
68000 M^3/Hr

t=

30 min

From Case (a) we will have a larger Qpeak because it has a larger I

Q#2
C=
Area=
Qpeak=

Q#3

0.88 T=
20000
352 M^3/hr

6 min

i=
Tc=

60 mm/hr
18 min

CN1=
CN2=
CN3=
Cnavg=

81
58
70

A1%=
A2%=
A3%=

0.35
0.3
0.35

Tc=
D=

0.88
0.264

70.25

S=
P=

4.234875 =
101.6 mm

107.5658363 mm

R=

34.17964 mm

Qpeak=

52.80277 M^3/sec

Q#4

Column1 Column2
Time
1
Q(M^3/Sec
150

Column3
2
130

3
1140

Column4

Column5
4
950

Column6
5
630

Column7
6
530

Hydrograph
1200
1000
800
600
400
200

Column8
7
430

Column9
8
350

9
285

Column10
10
235

Column11

Column12
11
185

Column13
12
160

13
150

800
600
400
200
0

Q DR=
Vol DR=
DR=

Sheet #1

3485 M^3/Day
301104000 m^3
0.150552 m

Time
7

8Q(M^3/Sec)
9

10

11

12

13

14

15

13

14

15

Q#3
gama=
P=gama*h
x=

1.025 t/m^3
8.2 t/m^2

h=

8m

L=

20 m

9.237875
Q#4

F=P*x*L*0. 757.5058 Ton


Apply bernouli eq
Z=

3.079292 m
110+0+0+16.5=80+0+0+hf
hf=
f=
L=
D=

hf=(8*f*L*Q^2)/(Pai^2*D^5*g)
Q=
Q#5

Apply Continuity Eq:


Q=V1A1=V2A2
Qab=VaAa
0.27 m^3/sec

VbAb=VcAc+VdAd
Vc=
2.258 m/sec

Va=
Vb=

1.4 m/sec
2.85 m/sec

Aa=
Ab=

0.196349541 M^2
0.096211275 m^2

ply bernouli eq

0+0+0+16.5=80+0+0+hf
46.5 m
0.02
4500 ft
10 inch

=(8*f*L*Q^2)/(Pai^2*D^5*g)
0.147 m^3/sec

1371.6 m
0.254 m

Qbc=
Qbd=

0.11 m^3/sec
0.16 m^3/sec

Apply Bernoulis Eq Twice


Pb=
Pc=

44.6 t/m^2
44.8 t/m^2

Potrebbero piacerti anche