Sei sulla pagina 1di 4

METHOD STATEMENT

FOR
INSTALLATION OF MV SWITCH GREAR PANEL

KING ABDULLAH FINANCIAL DISTRICT


Parcel 5.07 & 5.08

AL FANAR CO-MEP

TABLE OF CONTENTS

TABLE OF CONTENTS
1.
2.
3.
4.
5.

Materials to be used..........................................................................................................1
Tools & Equipment to be used..........................................................................................1
Site Preparation................................................................................................................ 1
Installation......................................................................................................................... 2
Inspection......................................................................................................................... 2

INSTALLATION OF MV SWITCH GREAR PANEL

Table of Contents i

AL FANAR CO-MEP
1. Materials to be used
1.1.

MV panels- assembled as per section 16310 clause 2.02.

1.2.

Miscellaneous materials such as metal fishers, bolts, nuts and cables ties.

2. Tools & Equipment to be used


2.1.

Spanner sets

2.2.

Grinder

2.3.

Spirit level

2.4.

Screw driver set

2.5.

Measuring steel tape

2.6.

Megger tester

2.7.

Cable tie

2.8.

Wire marker

2.9.

Hole saw

2.10. Ratchet set


2.11. Drill Machine
2.12. Knockout punch
2.13. D shackle
2.14. Slings and lifting belts
2.15. Chain block pulley
2.16. Fork lift

3. Site Preparation
3.1.

Location where to install the panel is free from any obstruction.

3.2.

Foundation where to install the MV panel is ready as per panel dimensions


and approved drawing.

3.3.

Availability of the panels at site.

3.4.

All tools available to use in installation of panel.

INSTALLATION OF MV SWITCH GREAR PANEL

AL FANAR CO-MEP
4. Installation
4.1.

Coordinate installation of MV panels with cable and race way installation


and shall be installed accordance with the manufacturer instruction,
applicable requirements of SASO, NEC and NEMA and the accordance
with the recognized industry project to ensure that products serve the
intended function.

4.2.

Joint the MV cubical sections with each other on the foundation


accordance with the manufacturer Instruction.

4.3.

Align, level and securely fasten the MV cubicle sections on the foundation.

4.4.

After leveling of the MV cubicle, couple the internal busbar with nuts and
bolts.

4.5.

Closed properly all unused opening of the MV cubicle sections.

4.6.

Install equipment grounding connection for MV panel with the earthing bar
and earthing bar shall be connected to the grounding system.

4.7.

Tighten electrical connections and termination of MV panel according to


the manufacturers recommendation.

5. Inspection
5.1.

MV Panel Nameplates: Each MV panel with engraved metal or laminated


plastic nameplate mounted with corrosion -resistant screws.

5.2.

Prior to energization, check MV panel for electrical continuity of circuits and or


short circuit. (This shall be done during megger testing).

5.3.

Check all out going cables are connected as per MV panel schedule.

5.4.

Grounding of MV panel in connected and tested.

END