INSTALLATION OF MV SWITCH GREAR PANEL
AL FANAR CO-MEP
TABLE OF CONTENTS
TABLE OF CONTENTS
1.
2.
3.
4.
5.
Materials to be used..........................................................................................................1
Tools & Equipment to be used..........................................................................................1
Site Preparation................................................................................................................ 1
Installation......................................................................................................................... 2
Inspection......................................................................................................................... 2
Table of Contents i
AL FANAR CO-MEP
1. Materials to be used
1.1.
1.2.
Miscellaneous materials such as metal fishers, bolts, nuts and cables ties.
Spanner sets
2.2.
Grinder
2.3.
Spirit level
2.4.
2.5.
2.6.
Megger tester
2.7.
Cable tie
2.8.
Wire marker
2.9.
Hole saw
3. Site Preparation
3.1.
3.2.
3.3.
3.4.
AL FANAR CO-MEP
4. Installation
4.1.
4.2.
4.3.
Align, level and securely fasten the MV cubicle sections on the foundation.
4.4.
After leveling of the MV cubicle, couple the internal busbar with nuts and
bolts.
4.5.
4.6.
Install equipment grounding connection for MV panel with the earthing bar
and earthing bar shall be connected to the grounding system.
4.7.
5. Inspection
5.1.
5.2.
5.3.
Check all out going cables are connected as per MV panel schedule.
5.4.
END