BACKGROUND (WHY)
Editor
Version
OBJECTIVE (WHAT)
VLD
C
C
R
C
C
R
PLANT
C
C
R
I
I
C
SIGN OFF
PLANT PERFORMANCE BEFORE JOB1
LEAD PLANT
AME
R
C
R
R
I
C
NMP
I
R
R
C
I
C
MP&L
C
C
R
C
R
C
L. Vara
Site:
Project:
Solihull
L460
Version:
Update:
Owner:
Update:
dander48
Validation
6/30/2016
VLD
N.Miller
Ops. Dir
N.Bllenkinsop
PROJECT TEAM
COSTS
AME Dir
G.Jones
B1
draft
AND QUALITY
MP&L Dir
D.Dyke
NMP Dir
A.Angerstorfer
LEAD PLANT
BACK TO A3
Complete
Workshop notes
Product scaleability requires buy-in
Manufacturing scaleability?
in line with stadard VPP / timing s
T&PPG scaleability
PCDS timing
BACK TO A3
Year
18/19
19/20
20/21
21/22
22/23
Vehicle
L405
L462
L494
L405
L494
L460
L405
L494
L460
L461
L494
L460
L461
L460
L461
jph
vh
jph
line
Shifts
NR
32
32
32/40*
40
40 / 41*
NR
Volume
62,050
29,930
77,101
57,184
68,952
500
6,108
61,091
55,075
300
14,056
71,067
71,326
66,096
103,662
Comments:
* switch from 32 to 40jph in Feb 21 -and- 40 to 41jph
in May 2022
- PHEV / SPHEV volumes predicted to rise to c.45% of
total D7u volume
Capacity constraints more relevant - e.g. BIW Stud cell capacity / framing, etc
Subs vs Mainline
Volumes to align with the TDV's / Programme assumptions
Peak year vs Cycle average
Workshop notes
Reflect Body + nett or gross
jph vh - need Body Paint & assembly
Nameplate vs code
No of weeks per year
BACK TO A3
KEY ASSUMPTIONS
Solihull Plant with L462 switched to Nitra. Job1
Jun20. Body Shop 2 & FA1
All facilities available at HTFB
Stamping: A-surface pressings sourced from
HWD
Body : New UN area required for turnaround in
B63/64. UP ass'y in BS2
T&F: Max facility re-use in FA1
Paint: L460 contrast roof take rate as per curent
L405 within Solihull Total capped capacity of
62K per annum. LWB capped at 25k upa
MP&L: Freight Increase from L405 due to resourcing of A-surface panels to Halewood WCE
requriement). Reduced floorspace available in
Block 63/64 due to new UN BIW facility
Rob Lambert
ob Lambert
BACK TO A3
Resources:
BODY
DCBI
PAINT
T&F Prc.
T&F Fac.
VCATS
T&PPG
MP&L
NMP
MPP
Plant Launch
Other Launch
GO/FC
G1/PS
G2/PSC
Target
In place Target
In place Target
1
1
1
1
11
1
1
1
1
1
1
1
2
1
1
1
3
3
3
1
0
1
1
1
1
1
1
1
16
2
2
2
2
2
1
1
1
TBC
NB: Not all identified above are full time. E.g. D7u SME's als
Comments / Observations
Comments: do we need all of these details?
G2/PSC
G3/PTC
G4/FDJ
G5
G6
In place Target
In place Target
In place Target
In place Target
In place
11
11
11
11
1
14
2
1
18
2
1
9
1
4
G7
Target
In place
11
2
1
3
BACK TO A3
YEAR:
2020
Body
Paint
T&F
Total
HPC
Target Status
TBC
TBC
TBC
TBC
TBC
TBC
32.61 36.00
HPU
Target Status
TBC
TBC
TBC
TBC
TBC
TBC
43.20
TBC
Nick Whitten
Dave Green
Jamie Cartwright
David Carruthers
Paul Longford
Add 2 columns - i) L405, ii) Benchmark + Rename 3rd column specifically for L460
Fill in L405 column prior to NM meeting
ick Whitten
ave Green
amie Cartwright
avid Carruthers
LV guidance
Solicit HPU info from M
aul Longford
Comments / Observations
Further work with Graham Dixon's team to confirm HPC to CPU calc / multiplication factor
V guidance
olicit HPU info from Manf Fin
Use ration / current assumption
Make point of Launch robustness (O/T inc. in HPU)
cation factor
BACK TO A3
Target Status
(m)
(m)
78.2
126.56
2.9
4.22
3.7
0.51
16.5
43.91
0.12
0.12
9.6
19.22
1.2
3.95
0.8
1.76
60
84.68
41
48.55
214.02 333.48
Comments:
- No target relief granted for additional
'Unconstrained' content
- L460 PMS included in Infrastructure
Comments / Observations
How do we mesure performance to compare with cost? (original L663 comment)
LV guidance
Add line for PMS
Add comment box for Target source
Body
Paint
TFA
BACK TO A3
DESIGN FOR MANUFACTURING
BODY CONSTRUCTION
Target Status
PD
Number of parts
Number of rivets (or weld.)
PD
% auto welding/rivet
100%
Meters of sealing
PD
Body variants
8
Total Body variants (other vhs)
??
Underbody commonality (%)
PD
BMV
176
187.89
N.Pitchford to lead / a
PAINT
Meters of sealing
Number of colours
Contrast roof capacity (% max)
BMV
Target
48
12
30%
46
Status
48
12
30%
60
Contact R.Lambert
Also confirm current
T&F ASSEMBLY
Number of parts
Number of fixations
Utilisation
BMV Total
Target
Status
Contact R.Lambert
Also confirm current
95%
803
581
889.16
620.14
BMV Assembly
BMV OTA
% Assembly "Golden Rules"
Complexity (Total BOM)
Comments:
PD / Joe Hordyk
ontact R.Lambert
lso confirm current L405 data
ontact R.Lambert
lso confirm current L405 data
ectional target
ess L460 target
LV guidance
(Most important sheet & most difficult)
Add comment box for Target source
BACK TO
A3
Wayne Killick
Job1 Year -3
Target
Status
Job1 Year -2
Target
Status
HPU
CPU (/unit)
Divert Free Vehicles
Production Achievemnt
Build to sequence
ABS on time
Wayne Killick
Job1 Year -1
Target
Status
6th June
Job1 Year
Target
Status
Should we include:
Purely L460
All D7u
All Solihull ??
urely L460
ll Solihull ??
BACK TO
A3
LEAD PLANT KEY ASSUMPTIONS
Sole Manufacture in Solihull - no plans to internationalize L460
Complete
BACK TO
A3
List of items under discussion
FTT targets by phase
WCPA targets by phase
0 MIS warranty Launch budget
Functional and Warranty QFA
VP Parts readiness
L.Vara guide
Develop list with NMP, but not regurgitate LQOS
Add specific s / key metrics which must be achieved
Bop/BoD
BACK TO A3
DESIGN FOR LOGISTICS
Volume (m3)
Nber Assembly Stations
Assembly stations pitch
Nbre Door Line Stations
Door Line Station pitch
Engine&axels nber stations
Engine&axels stations pitch
Full BOM
MP&L BOM
Comments:
Target
17.2
Status
19.11
TBC
2501
TBC
2793
sed on current L405 m3 per car for Inbound Freight. Target is based on our current LEAP cost reduction targets.
rent L405 BOM part count and target is MP&L LEAP target for L460.
BACK TO A3
SOURCING
Avrg distance to plant for m3
m3 source UK
m3 source EU
m3 source RoW
Number of suppliers
of which JIT suppliers
Comments:
Target
TBC
13.7
Status
TBC
13.4
3.5
5.7
TBC
TBC
TBC
TBC
Comments / Observations
VLD authorising on behalf of Purchasing / Engineering, etc
Awaiting comment from MP&L regarding TBC's
Poss need to discuss with LV for guidance on TBC's
BACK TO
A3
STEEL / ALUMINUM
All aluminium as per L405, inc Tailgate
lower. Mixed metals now under review
BODY PROTECTION
- Body bags assumed for 90% of vehs.
Awaiting G.Sivalingham re
LV guide
Generic headings included
7th June
General
A3
Indicate the key areas / departments from which the info can be sour
Guidance would be beneficial - e.g. brief user guide, with key contact
ok
Timing
ok
Volumes
ok
Assumptions
ok
Project team
Cost
Investments
DFMA
Plant performance
Should this include o/all Plant / overall architecture / for each assemb
Lead plant
ok
DFLO
Sourcing
Cost drivers
Yes
L Variable target
ecture / for each assembly hall / single model entries only -or- all ?