S. No.
1
Particular
% Payable area
100%
Refuge area
70%
100%
100%
100%
100%
0%
Paving up to 20
0%
100%
10
Servants toilet
100%
11
100%
12
Lift Wells
50%
13
Balcony
50%
14
Flower beds
50%
15
Voids/Chajja/Elevation features
0%
16
Owner
(Sign & Stamp)
Page 32 of 36
150%
Contractor
(Sign & Stamp)
Annexure II
Payment Stages
Sr. No.
Stages
% break up
9%
56%
Retaining wall
3%
5%
UG Tank
5%
7%
6%
External Plaster
6%
3%
Total
100%
Owner
(Sign & Stamp)
Page 33 of 36
Contractor
(Sign & Stamp)
Annexure III
Item
No.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
Cement
Consumption
9 bags
12 bags
Brief Description
P.C.C. 1:4:8
P.C.C. 1:3:6
Concrete (for reference only)
Per
100 cft
100 cft
M15
6.2Bags
M20
6.8Bags
M25
7.0Bags
Or as per Cum
design
Cum
Mix.
Cum
M30
7.4Bags
Cum
M35
8.0Bags
Cum
M40
8.2Bags
Cum
0.9 bags
3 bags
3.75 bags
4.5 bags
2.5 bags
1.70 bags
1.70 bags
0.60 bag
0.75 bag
1.1 bag
1.5 bag
0.75 bag
0.75 bag
1.00 bags
1.5 bags
Rmt
100 sft
100 sft
100 sft
100 sft
100 sft
100 sft
100 sft
100 sft
100 sft
100 sft
100 sft
100 sft
100 sft
100 sft
1.5 bags
3.5 bags
2.0 bags
3.5 bags
100 sft
100 sft
100 sft
100 sft
Note: - Cement consumption for all concrete items shall be considered on the basis of Mix design
based on IS 456: 2000.
Owner
(Sign & Stamp)
Page 34 of 36
Contractor
(Sign & Stamp)