Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Client
Independent Engineer
Concessionaire
EPC Contractor
Description of Material
Source / Location
Date of Sampling
Date of Testing
Sampled by
Tested by
Wt. of
Wt. Passing
Wt. Retained on
Aggregate
Flakiness gauge, Flakiness gauge, gm
Retained, gm
gm (B)
(A-B)
(A)
Passing IS Sieve
Retained IS
Sieve mm
63.0
50.0
50.0
40.0
40.0
31.5
31.5
25.0
25.0
20.0
799
103
20.0
16.0
654
82
16.0
12.5
262
68
12.5
10.0
250
46
10.0
6.3
130
28
2095
327
Total
Flakiness Index
Column 4
Column 3
X 100
Elongation Index
Column 6
Column 5
X 100
FI + EI
Specification Limit
Max.
Sign
Date
:
:
Concessionaire Representative
Name
:
Sign
Date
:
:
9+000 to Km 418+750 in the state of Karnataka under National Highways Development Project
e III on DBFOT (Toll ) basis.
&ELONGATION INDEX
Wt. Retained on
Elongation gauge
gm
15.61
Remarks
Sign
Date
:
:
Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the sta
under National Highways Development Project (NHDP) Phase III on DBFOT(Toll)basis.
Client
Independent Engineer
Concessionaire
EPC Contractor
Bellary
Date of Sampling
Source
SMPL Crusher
Date of Testing
Proposed Use
Concrete Works
Size of Aggregate
20 mm
Sieve Size(mm)
% Retained
Cum %Retained
% Passing
40.00
0.00
0.00
100.00
20.00
261
2.61
2.61
97.39
10.00
8670
86.70
89.31
10.69
4.75
859
8.59
97.90
2.10
Sample No.
Sample No.
40.00
0.00
0.00
100.00
20.00
154
2.57
2.57
97.43
10.00
5103
85.05
87.62
12.38
4.75
609
10.15
97.77
2.23
Sample No.
40.00
0.00
0.00
100.00
20.00
1055
8.27
8.27
91.73
10.00
11005
86.28
94.55
5.45
4.75
650
5.10
99.65
0.35
Concessionarie Rep
IE Representative
Name :
Name :
Name :
Sign:
Sign:
Sign:
Date :
Date :
Date :
Method : IS 383
08.02.16
08.02.16
20 mm
10000
Remarks
6000
12755
Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the state of K
National Highways Development Project (NHDP) Phase III on DBFOT(Toll)basis.
Client
Independent Engineer
Concessionaire
EPC Contractor
Bellary
Date of Sampling
08.02.16
Source
SMPL,Crusher
Date of Testing
08.02.16
Proposed Use
Concrete Works
Size of Aggregate
10 mm aggregates
10 MM
Sieve Size(mm)
% Retained
Cum %Retained
% Passing
12.50
0.00
100.00
10.00
459
4.59
4.59
95.41
4.75
8480
84.8
89.39
10.61
2.36
760
7.6
96.99
3.01
Sample No.
Sample No.
12.50
0.00
0.00
100.00
10.00
234
2.60
2.60
97.40
4.75
7907
87.86
90.46
9.54
2.36
589
6.54
97.00
3.00
Sample No.
12.50
0.00
0.00
100.00
10.00
215
2.88
2.88
97.12
4.75
6525
87.51
90.40
9.60
2.36
545
7.31
97.71
2.29
Concessionarie Rep
IE Representative
Name :
Name :
Name :
Sign:
Sign:
Sign:
Date :
Date :
Date :
Method : IS 383
10000
Remarks
9000
7456
Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the state of Ka
Highways Development Project (NHDP) Phase III on DBFOT(Toll)basis.
Client
Independent Engineer
Concessionaire
EPC Contractor
: Larsen & Toubro Limited
SIEVE ANALYSIS OF FINE AGGREGATES
Location
Bellary
Date of Sampling
Source
SMPL Crusher
Date of Testing
Proposed Use
Concrete Works
Types of Aggregate
Sample No.
Sieve Size(mm)
% Retained
Cum % Retained
10.00
0.0
0.0
0.00
4.75
5.0
1.0
1.0
2.36
45.0
9.0
10.0
1.18
59.0
11.8
21.8
0.600
128.0
25.6
47.4
0.300
135.0
27.0
74.4
0.150
45.0
9.0
83.4
0.075
23.0
4.6
88.0
Sample No.
10.00
0.0
0.0
0.00
4.75
12.0
1.2
1.2
2.36
84.0
8.4
9.6
1.18
165.0
16.5
26.1
0.600
250.0
25.0
51.1
0.300
235.0
23.5
74.6
0.150
68.0
6.8
81.4
0.075
75.0
7.5
88.9
Sample No.
10.00
0.0
0.0
0.00
4.75
8.0
1.1
1.1
2.36
63.0
8.4
9.5
1.18
140.0
18.7
28.1
0.600
158.0
21.1
49.2
0.300
180.0
24.0
73.2
0.150
58.0
7.7
80.9
0.075
45.0
6.0
86.9
Concessionarie Representative
Name :
Name :
Sign:
Sign:
Date :
Date :
mpling
12.02.16
ting
12.02.16
gregate
M Sand
Total weight (gms): 500
Cum % Passing
100.00
99.00
90.00
78.20
52.60
25.60
16.60
12.00
Total weight (gms): 1000
100.00
98.80
90.40
73.90
48.90
25.40
18.60
11.10
Total weight (gms): 750
100.00
98.93
90.53
71.87
50.80
Remarks
26.80
19.07
13.07
IE Representative
Name :
Sign:
Date :
652.0
750
98.0
Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the state of K
National Highways Development Project (NHDP) Phase III on DBFOT(Toll)basis.
Client
Independent Engineer
Concessionaire
EPC Contractor
: Larsen & Toubro Limited
SIEVE ANALYSIS OF FINE AGGREGATES
Location
Bellary
Date of Sampling
Source
SMPL Crusher
Date of Testing
Proposed Use
Concrete Works
Types of Aggregate
Sample No.
Sieve Size(mm)
% Retained
Cum % Retained
Cum % Passing
10.00
0.0
0.0
0.00
100.00
4.75
31.0
6.2
6.2
93.80
2.36
32.0
6.4
12.6
87.40
1.18
35.0
7.0
19.6
80.40
0.600
163.0
32.6
52.2
47.80
0.300
101.0
20.2
72.4
27.60
0.150
109.0
21.8
94.2
5.80
Sample No.
10.00
0.0
0.0
0.00
100.00
4.75
25.0
5.0
5.0
95.00
2.36
36.0
7.2
12.2
87.80
1.18
37.0
7.4
19.6
80.40
0.600
172.0
34.4
54.0
46.00
0.300
105.0
21.0
75.0
25.00
0.150
109.0
21.8
96.8
3.20
Sample No.
10.00
0.0
0.0
0.00
100.00
4.75
33.0
6.6
6.6
93.40
2.36
45.0
9.0
15.6
84.40
1.18
42.0
8.4
24.0
76.00
0.600
158.0
31.6
55.6
44.40
0.300
97.0
19.4
75.0
25.00
0.150
98.0
19.6
94.6
5.40
Concessionarie Representative
IE Representative
Name :
Name :
Name :
Sign:
Sign:
Sign:
Date :
Date :
Date :
13.02.16
13.02.16
R Sand
500
Remarks
500
500
Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the state o
National Highways Development Project (NHDP) Phase III on DBFOT(Toll)basis.
Client
Independent Engineer
Concessionaire
EPC Contractor
Sample - 1
Sample - 2
Sample - 3
40.00
100.00
100.00
100.00
20.00
97.39
97.43
91.73
10.00
10.69
12.38
5.45
4.75
2.10
2.23
0.35
10 mm Aggregates
IS Sieve (mm)
Sample - 1
Sample - 2
Sample - 3
12.50
100.00
100.00
100.00
10.00
95.41
97.40
97.12
4.75
10.61
9.54
9.60
2.36
3.01
3.00
2.29
Sample - 1
Sample - 2
Sample - 3
10.00
100.00
100.00
100.00
4.75
99.00
98.80
98.93
2.36
90.00
90.40
90.53
1.18
78.20
73.90
71.87
0.600
52.60
48.90
50.80
0.300
25.60
25.40
26.80
0.150
16.60
18.60
19.07
Sample - 1
Sample - 2
Sample - 3
10.00
100.00
100.00
100.00
4.75
93.80
95.00
93.40
2.36
87.40
87.80
84.40
1.18
80.40
80.40
76.00
0.600
47.80
46.00
44.40
0.300
27.60
25.00
25.00
0.150
5.80
3.20
5.40
Concessionarie Representative
Name :
Name :
Sign:
Sign:
Date :
Date :
10 mm Aggregates
Average
100.00
96.64
9.92
2.77
ne Aggregates (M Sand)
Average
100.00
98.91
90.31
74.66
50.77
25.93
18.09
ne Aggregates (R Sand)
Average
100.00
94.07
86.53
78.93
46.07
25.87
4.80
IE Representative
Name :
Sign:
Date :
Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the state o
National Highways Development Project (NHDP) Phase III on DBFOT(Toll)basis.
Client
Independent Engineer
Concessionaire
EPC Contractor
20 mm
10 mm
40.00
100.00
100.0
20.00
95.52
100.0
10.00
9.51
96.64
4.75
1.56
9.92
Blending Proportion in %
IS Sieve (mm)
Achieved Gradation
60
40
100
40.00
60.00
40.00
100.00
20.00
57.31
40.00
97.31
10.00
5.70
38.66
44.36
4.75
0.94
3.97
4.90
110
100
90
80
70
% of Passing
60
50
40
30
20
10
0
1.00
10.00
IS Sieve in mm
Lower Limit.
Upper Limits
Centre Limit
Remarks :
Concessionarie Representative
Name :
Name :
Sign:
Sign:
Achiev ed L
Date :
Date :
AGGREGATES
83 Table-2
Specification Limit
100
100.0
100.0
100.0
95-100
95.0
100.0
97.5
25 - 55
25.0
55.0
40.0
0 - 10
0.0
10.0
5.0
GATE BLENDING
100.00
m
Centre Limit
Achiev ed Limit
IE Representative
Name :
Sign:
Date :
Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the stat
National Highways Development Project (NHDP) Phase III on DBFOT(Toll)basis.
Client
Independent Engineer
Concessionaire
EPC Contractor
M Sand
R Sand
10.00
100.00
100.00
4.75
98.91
94.07
2.36
90.31
86.53
1.18
74.66
78.93
0.600
50.77
46.07
0.300
25.93
25.87
0.150
18.09
4.80
IS Sieve (mm)
Blending Proportion in %
70
30
10.00
70.00
30.00
4.75
69.24
28.22
2.36
63.22
25.96
1.18
52.26
23.68
0.600
35.54
13.82
0.300
18.15
7.76
0.150
12.66
1.44
110
100
90
80
70
% of Passing
60
50
40
30
20
10
0
0.01
0.10
1.00
10.00
60
50
40
30
20
10
0
0.01
0.10
1.00
10.00
IS Sieve in mm
Lower Limit.
Upper Limits
Centre Limit
Concessionarie Representative
Name :
Name :
Sign:
Sign:
Date :
Date :
Achiev
AGGREGATES
:383 Table-2
Achieved Gradation
Specification Limit
100
100.00
100
97.46
90-100
89.18
75-100
75.94
55-90
49.36
35-59
25.91
8-30
14.10
0-20
TE BLENDING
10.00
100.00
10.00
100.00
mm
Centre Limit
presentative
Achiev ed Limit
IE Representative
Name :
Sign:
Date :
Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the state of
Karnataka under National Highways Development Project (NHDP) Phase III on DBFOT(Toll)basis.
Client
Independent Engineer
Concessionaire
EPC Contractor
IS Sieve (mm)
C Agg
F Agg
40.00
100.00
100.0
20.00
97.31
100.0
4.75
4.90
97.46
0.600
0.00
49.36
0.150
0.00
14.10
IS Sieve (mm)
Blending Proportion in %
Achieved Gradation
Specification Limit
60
40
100
40.00
60.00
40.00
100.00
100
20.00
58.39
40.00
98.39
95-100
4.75
2.94
38.98
41.93
30-50
0.600
0.00
19.74
19.74
10-35
0.150
0.00
5.64
5.64
0-6
110
100
90
80
70
% of Passing
60
50
40
30
20
10
0
0.10
1.00
Lower Limit.
IS Sieve in mm
Upper Limits
10.00
Centre Limit
100.00
Achiev ed Limit
Remarks :
Concessionarie Representative
IE Representative
Name :
Name :
Name :
Sign:
Sign:
Sign:
Date :
Date :
Date :
Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the
Development Project (NHDP) Phase III on DBFOT(Toll)basis
Client
Independent Engineer
Concessionaire
EPC Contractor
: 33
A. DESIGN STIPULATION:
1. Grade of Concrete
M 30
30 Mpa
20 mm
75 mm (MoRT&H Table:1700-4)
6. Exposure Condition
: Moderate
: Direct
: Very Good
: 0.45
(MoRT&H Table
B. SOURCE OF MATERIAL:
Cement
: ACC-OPC 53 Grade
Coarse Aggregates
: SMPL,Bellary.
: SMPL,Bellary.
: HB Halli
Admixture
Water
: 3.15
b. R Sand (RS)
: 2.480
c. M Sand (CS)
: 2.509
: 2.672
10mm
e. Admixture
: 2.669
: 1.24
: 2.58%
b.M Sand
: 3.10%
: 0.20%
10mm
Aggregate Impact Value (%)
: 0.22%
: 18.57%
: 24.89%
Water
: 161.0
Kg/Cum.
: 375.0
Kg/Cum.
Cement Content
: 375
Kg/Cum.
: 0.43
: 60%
: 40%
: 60%
: 40%
: 70%
: 30%
Chemical Admixture
: 3.8
Kg/Cum.
Dosage :
Description of Materials
Cement
375
Water
161
M Sand
504
R Sand
213
20mm aggregates
690
10mm aggregates
459
Chemical Admixture
3.75
Batch No-1
Batch No
Initial
Collapse
Collapse
30min
180
170
60min
160
160
90min
130
140
120min
100
110
Concessionarie Representative
Name :
Name :
Sign :
Sign:
Date :
Date :
M30 RCC
Date : 07.04.16
mm (MoRT&H Table:1700-4)
(Conforming to IS 12269)
1.00
m3
0.119
m3
0.161
m3
0.003
m3
0.717
m3
0.430
m3
0.287
m3
689.7
Kg
459.3
Kg
503.7
Kg
213.4
Kg
375
13.67
183.0
6.67
490.7
17.89
206.8
7.54
688.3
25.09
458.3
16.70
3.75
0.137
Batch No-2
Average
Remarks
Collapse
Collapse
170
175
Cohesive
160
160
Cohesive
140
135
Cohesive
110
105
Cohesive
IE Representative
Name :
Sign:
Date :
Four Laning of Hospet-Chitradurg Section of NH-13 (New NH-50)from Km 299+000 to Km 418+750 in the state of K
Client
Independent Engineer
Concessionaire
EPC Contractor
Source of Material :
Source of Cement
: ACC-OPC 53 Grade
Source of Water
: SMPL Aggregates
: SMPL Aggregates
: HB Halli
: Fosroc-Conplat KRM-6
375
161
504
213
690
459
3.75
1.0%
10mm
07.04.16
20mm
33
CA Ratio
Admix (Kg) Admix (%)
10 mm
M30 RCC
Trial
Trial Date
Mix No
R'Sand
Grade of
Concrete
M'Sand
Sl.No
60%
40%
Concessionarie Representative
Name :
Name :
Sign :
Sign:
Date :
Date :
he state of Karnataka under National Highways Development Project (NHDP) Phase III on DBFOT(Toll)basis.
Compressive Strength
(N/mm2)
M Sand
R Sand
CA
FA
Initial
30 Min
60 Min
90 Min
120 Min
7 Days
28 Days
Remarks
70%
30%
60%
40%
Collapse
175
160
135
105
31.05
Awaiting
Cohesive Mix
IE Representative
Name :
Sign:
Date :