" Four Laning of Hospet - Chitradurg Section of NH-13 (New NH-50) from Km 299+000 to Km 418+750 in the state of Karnataka u

BORROW AREAS IN SECTIO

Chainage

Side

Offset from Existing


Approved Qty (m3)
road

Borrow Area No

Date of Sampling

Present Status

S3/BA-10A

27/09/2016

394+600 RHS

6 km

8125

In Use

S3/BA-10B

21/10/2016

394+600 RHS

6 km

9750

In Use

S3/BA-10C

23/11/2016

394+600 RHS

6.2 km

S3/BA-11

23/01/2016

403+400 LHS

3 km

4062

In Use

S3/BA-12

5/2/2016

402+400 RHS

12 Km

4875

Not Used

S3/BA-13

5/2/2016

402+400 RHS

12 Km

4875

Not Used

S3/BA-14

5/2/2016

401+250 LHS

0.05

3750

S3/BA-15

18/07/2016

408+600 RHS

0.5

9750

Exhausted

S3/BA-15A

20/08/2016

408+600 RHS

0.5

9375

Exhausted

S3/BA-16

22/07/2016

389+300 LHS

4 km

S3/BA-17

23/07/2016

389+300 LHS

3 km

7500

Exhausted

S3/BA-17A

31/08/2016

389+300 LHS

3 km

9375

Exhausted

S3/BA-18

27/07/2016

413+410 LHS

0.8 km

4690

Not Used

Not Used

Chainage

Side

Offset from Existing


Approved Qty (m3)
road

Borrow Area No

Date of Sampling

Present Status

S3/BA-19

6/8/2016

383+700 RHS

0.5 Km

S3/BA-20

11/082016

408+600 RHS

0.2 Km

9375

In Use

S3/BA-21

11/8/2016

409+600 RHS

0.1 Km

5622

Not Used

S3/BA-22

26/08/2016

394+000 LHS

1 Km

S3/BA-23

31/08/2016

402+300 LHS

0.5 Km

9375

In Use

Chainage

Side

Offset from Existing


Approved Qty (m3)
road

Borrow Area No

Date of Sampling

S3/BA-24

10/9/2016

407+500 LHS

0.8 Km

8125

In Use

S3/BA-25

16/09/2016

402+300 LHS

1.5 Km

5688

Not Used

S3/BA-26

3/10/2016

409+600 RHS

0.2 Km

9750

In Use

S3/BA-26B

28/10/16

409+600 RHS

0.2 Km

9375

S3/BA-27

8/10/2016

409+700 RHS

0.2 Km

9375

Not Used

S3/BA-28

4/10/2016

389+400 RHS

3 Km

8438

Not Used

S3/BA-29

14/10/16

394+600 RHS

5 Km

2813

Filter Media

S3/BA-30

20/10/16

394+600 RHS

5.2 Km

9375

Not Used

S3/BA-31

22/10/16

417+200 RHS

1.8 Km

3750

S3/BA-32

19/10/16

386+600 RHS

0.02 Km

2813

Not Used

S3/BA-33

19/10/16

385+500 LHS

0.5 Km

3750

Not Used

S3/BA-34

22/11/16

383+300

0.4 Km

Not Used

S3/BA-35

26/10/16

383+400 LHS

1 Km

7500

Not Used

S3/BA-36

3/11/2016

383+250 LHS

1 km

8438

Not Used

S3/BA-37

7/11/2016

413+180

LHS

4 km

4688

Not Used

S3/BA-38

8/11/2016

405+800

LHS

1 km

9375

Not Used

S3/BA-39

9/11/2016

412+280

LHS

0.3 Km

5625

Not Used

S3/BA-40

14/11/2016

391+600 RHS

0.8 Km

Not Used

LHS

Present Status

Offset from Existing


Approved Qty (m3)
road

Borrow Area No

Date of Sampling

Chainage

Side

Present Status

S3/BA-41

14/11/2016

391+600

LHS

1.0 Km

3750

Not Used

S3/BA-42

15/11/2016

391+600

LHS

0.5 Km

Not Used

S3/BA-43

15/11/2016

407+500

LHS

0.3 Km

9375

Not Used

S3/BA-44

18/11/2016

413+000

LHS

2 km

3750

Not Used

S3/BA-45

21/11/2016

397+000 RHS

1 Km

7500

Not Used

S3/BA-46

22/11/2016

408+200 RHS

0.1 Km

5625

Not Used

S3/BA-47

28/11/2016

408+700 RHS

1.0 Km

3750

Not Used

S3/BA-48

28/11/2016

408+450

LHS

1.4 Km

3750

Not Used

S3/BA-49

25/11/2016

385+500

LHS

4.0 KM

5625

Not Used

0 in the state of Karnataka under National Highways Development Project (NHDP) Phase III on DBFOT (Toll ) basis.

REAS IN SECTION-III

Proposed to be used

Govt Land/
Pvt Land

No. of Pits

EMBK

Pvt Land

10

EMBK

Pvt Land

12

Testing in Progress

Pvt Land

EMBK

Govt Land

EMBK/SG

Govt Land

EMBK/SG

Govt Land

EMBK

Govt. Land

12

EMBK

Govt. Land

10

EMBK/SG

Pvt Land

EMBK/SG

Pvt Land

10

EMBK/SG

EMBK/SG

Remarks

DOT - 30.11.16

Proposed to be used

Govt Land/
Pvt Land

No. of Pits

EMBK

Pvt Land

10

EMBK/SG

Not suitable for EMBK

12

500mm below EMBK Top

10

Remarks

Proposed to be used

Govt Land/
Pvt Land

No. of Pits

EMBK/SG

Govt Land

10

500mm below EMBK Top

Remarks

EMBK

Pvt Land

10

Testing in Progress

Pvt Land

10

EMBK

Pvt Land

10

EMBK

Pvt Land

EMBK/SG

Pvt Land

EMBK

Pvt Land

10

Rejected

Govt Land

EMBK/SG

Pvt Land

Rejected

Pvt Land

Rejected

Pvt Land

EMBK/SG

Pvt Land

EMB

Pvt Land

EMBK/SG

Pvt Land

EMBK/SG

Pvt Land

10

CBR Pending

Pvt Land

Rejected

Pvt Land

Legal issue

Proposed to be used

Govt Land/
Pvt Land

No. of Pits

500mm below EMBK Top

Pvt Land

Rejected

Pvt Land

CBR Pending

Pvt Land

10

EMBK/SG

Pvt Land

CBR Pending

Govt Land

CBR Pending

Pvt Land

Sampling done

Pvt Land

Sampling done

Pvt Land

CBR Pending

Pvt Land

Remarks

" Four Laning of Hospet - Chitradurg Section of NH-13 (New NH-50) from Km 299+000 to Km 418+750 in the state of Karnataka under National H

Client

: NATIONAL HIGHWAYS AUTHORITY OF INDIA

Independent Engineer

: AARVEE ASSOCIATES

Concessionaire

: HAMPI EXPRESSWAYS PRIVATE LIMITED

EPC Contractor

: LARSEN & TOUBRO LIMITED

SUMMARY OF BORROW SOILTEST RESULTS


Borrow Area
No

Date of
Sampling

Chainage

Side

Offset from
Existing road

Deleterious
Content Test

S2/BA-01

4-Jan-16

385+450

RHS

4 km

Done

S2/BA-02

4/1/2016

389+300

LHS

2 km

Not required

S2/BA-03

5/1/2016

402+000

RHS

7 km

Done

S2/BA-04

5/1/2016

396+930

RHS

1 km

To be done

S2/BA-05

7/1/2016

412+950

RHS

1 km

Done

S2/BA-06

21/01/2016

405+900

LHS

0.8 km

Done

S2/BA-07

21/01/2016

405+900

LHS

0.9 km

Done

S2/BA-08

21/01/2016

401+200

LHS

1 km

Done

CBR Test

NOC

S2/BA-09

22/01/2016

404+100

RHS

1 km

Done

S2/BA-10

22/01/2016

394+600

RHS

6 km

Done

S2/BA-11

23/01/2016

403+400

LHS

3 km

Done

S2/BA-12

5/2/2016

402+400

RHS

12 Km

Done

S2/BA-13

5/2/2016

402+400

RHS

12 Km

Done

S2/BA-14

5/2/2016

401+250

LHS

0.05

Done

S2/BA-15

18/07/2016

408+600

RHS

0.5

S2/BA-16

22/07/2016

389+300

LHS

4 km

S2/BA-17

23/07/2016

389+300

LHS

3 km

S2/BA-18

27/07/2016

413+410

LHS

0.8 km

te of Karnataka under National Highways Development Project (NHDP) Phase III on DBFOT (Toll ) basis.

SOILTEST RESULTS
ADMINES

Proposed to be used

Present Status

Remarks

EMBK/SG

Submitted for approval.

Not suitable for EMBK

Submitted but results are


failed.

EMBK

Submitted for approval.

EMBK

Submitted for
approval.

EMBK

Submitted for approval.

EMBK/SG

In Use

Submitted for approval.

EMBK

In Use

Submitted for approval.

EMBK/SG

In Use

Submitted for approval.

EMBK

Submitted for approval.

EMBK/SG

Submitted for approval.

EMBK

Submitted for approval.

EMBK/SG

Submitted for approval.

EMBK/SG

Submitted for approval.

EMBK/SG

Submitted for approval.

EMBK

In Use

Ready to submit
Sample not collected due
to over size.

EMBK/SG
Testing In Progress

Ready to submit

" Four Laning of Hospet - Chitradurg Section of NH-13 (New NH-50) from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Developm

Client
Independent Engineer
Concessionaire
EPC Contractor

: NATIONAL HIGHWAYS AUTHORITY OF INDIA


: AARVEE ASSOCIATES
: HAMPI EXPRESSWAYS PRIVATE LIMITED
: LARSEN & TOUBRO LIMITED

SUMMARY OF BORROW SOILTEST RESUL

Borrow Area
No

S2/BA-01

S2/BA-02

S2/BA-03

S2/BA-04

Date of
Sampling

4-Jan-16

4/1/2016

5/1/2016

5/1/2016

Chainage

385+450

389+300

402+000

396+930

Side

RHS

LHS

RHS

RHS

Offset from
Existing road

4 km

2 km

7 km

1 km

FSI%

MDD (g/cc)

OMC %

LL, %

PL, %

22.22

2.11

7.4

29.4

15.95

11.11

2.06

26

NP

22.22

2.06

7.4

33.3

15.84

5.26

2.09

25.0

NP

10

2.06

29.6

17.78

56.25

27.6

13.97

13.63

2.1

4.54

30.8

NP

NP

14

80

54.2

20.95

33.25

10.4

10

1.94

8.00

27.6

15.29

20

2.05

9.60

29.1

16.83

10

2.08

8.90

24.9

NP

15.78

2.11

8.2

34

20.4

20.22

2.05

8.4

35.7

23.91

15

2.12

31.7

21.89

S2/BA-04

S2/BA-05

S2/BA-06

S2/BA-07

S2/BA-08

5/1/2016

7/1/2016

21/01/2016

21/01/2016

21/01/2016

396+930

412+950

405+900

405+900

401+200

RHS

RHS

LHS

LHS

LHS

1 km

1 km

0.8 km

0.9 km

1 km

20

2.10

7.3

35.6

21.74

13.64

2.03

9.4

36.2

22.9

14.29

2.12

37.8

22.97

13.64

2.07

6.1

38.2

24.68

19.05

2.09

11

36.2

23.11

18.18

1.98

9.4

35

22.53

20

2.067

33.8

21.23

18.18

2.01

8.2

34.6

21.07

13.64

2.07

32.2

22.93

15

2.11

6.6

32.8

24.97

10

2.14

8.2

34.5

22.69

10

2.08

8.5

35

21.52

13.64

2.09

8.2

37

22.58

15

2.11

5.8

38.2

22.61

12.5

2.05

39

25.34

15

2.04

7.1

39.6

25.26

14.29

2.09

8.6

39.9

23.25

13.64

2.07

10

40

24.5

14.29

2.07

9.4

39

23.25

20

2.097

40.2

24.14

14.29

2.08

9.2

42.2

24.85

20

2.06

8.6

41.5

23.88

36.36

1.94

42

22.79

S2/BA-08

S2/BA-09

S2/BA-10

S2/BA-11

S2/BA-12

S2/BA-13

21/01/2016

22/01/2016

22/01/2016

23/01/2016

5/2/2016

5/2/2016

401+200

404+100

394+600

403+400

402+400

402+400

LHS

RHS

RHS

LHS

RHS

RHS

1 km

1 km

6 km

3 km

12 Km

12 Km

8.33

2.01

7.2

30.9

21.52

9.09

2.08

6.8

31.8

21.57

18.18

2.108

10

40.4

24.27

23.81

2.308

8.4

40.8

25.49

25

2.3

9.2

36.4

25.44

10

2.15

28.7

18.56

9.52

2.12

8.2

30.6

16.31

10

2.12

8.2

34.3

21.31

15

2.105

34

19.96

15.79

2.28

30.2

17.25

10

2.23

6.6

35

18.98

20

2.065

8.8

29.4

19.94

14.29

2.07

8.2

31.2

21.84

20

1.846

7.8

30.6

22.93

15.38

1.94

9.6

30.6

22.91

20

1.99

8.7

34.8

24.63

2.07

7.4

28.8

NP

15.78

2.06

28.1

NP

20

2.09

8.6

30.3

17.61

16.66

2.09

8.9

28.4

NP

25

2.07

7.2

26.8

NP

22.22

2.13

6.9

25.9

NP

10

2.07

6.9

26.8

NP

S2/BA-13

5/2/2016

402+400

RHS

12 Km

15.79

10.6

32.4

17.5

15

2.6

8.5

25.8

NP

12.5

2.055

25.4

NP

15

9.8

29

12.76

20

2.01

33.9

17.15

tional Highways Development Project (NHDP) Phase III on DBFOT (Toll ) basis.

OW SOILTEST RESULTS

PI, %

Gravel, %

Sand, %

Silt & Clay,


%

CBR (%)

13.45

25.5

52.5

22

27.59

NP

32.2

46.9

20.9

46.86

17.46

32.9

46.5

20.6

55.63

NP

33.4

55.8

10.8

51.87

11.82

18.2

55.5

26.3

32.72

48.1

49.8

1.945

10.8

68.5

17.5

2.07

22.8

66.8

1.91

8.5

12.31

1.8

35.8

62.4

3.17

12.27

0.2

56.6

43.2

11.15

NP

0.4

68.9

30.7

16.96

13.6

46.1

35.7

18.2

11.79

31.4

45.1

23.5

9.81

29.1

50.4

20.5

To be done

To be done

Remarks

Submitted for approval.

Submitted but results are


failed.

Submitted for approval.

Submitted for approval.

Suitable for EMBK/SG

To be done
13.86

18.6

54.9

26.5

13.3

24.6

39.2

36.2

14.83

11.1

41.3

47.6

13.52

27

35.3

37.7

13.09

28.2

42.7

29.1

12.47

13.1

45.8

41.1

12.57

16.5

54.3

29.2

13.53

55.2

22

22.8

9.27

72.3

9.9

17.8

7.83

58.8

22.5

18.7

11.81

55.2

29.1

15.7

13.48

34.2

39.3

26.5

14.42

43.8

31.5

24.7

27.88

15.59

2.3

30.4

46.6

10.07

13.66

72.3

9.9

17.8

14.34

58.8

22.5

18.7

16.65

37.5

29.7

32.8

15.5

52.6

22.5

24.9

15.75

43.8

31.5

24.7

16.06

47.9

30.7

21.4

17.35

32.8

31.6

35.6

17.62

50.6

75.5

24.9

19.21

8.1

18.4

73.5

9.62

Submitted for approval.

Submitted for approval.

Suitable for EMBK

Submitted for approval.

Suitable for EMBK/SG

Submitted for approval.

Suitable for EMBK

Submitted for approval.

Suitable for EMBK/SG

10.95
16.15

40.55

34.06
35.33

25.38

Submitted for approval.


9.38

10.8

12.2

77

10.23

52.6

26.6

20.8

16.13

63.3

27.4

9.3

15.31

60.1

21

18.9

10.96

60.9

18.7

20.4

21.82

10.14

47.8

30.7

21.5

46.96

14.29

42.2

32

25.8

12.99

47

32.2

20.8

14.04

47.5

34

18.5

12.95

58.5

22.6

18.9

16.02

52.3

31.3

16.4

9.46

38.4

30.2

31.4

9.36

56

24.3

19.7

7.67

53.9

18

28.1

7.69

20.5

30.3

49.2

10.17

13.8

39.1

47.1

9.02

NP

32.4

56.6

11

44.6

NP

20.3

62.8

16.9

12.69

19.2

57.9

22.9

Suitable for EMBK/SG

28.79
25
15.39

32.89

12.5
Submitted for approval.

Suitable for EMBK

Submitted for approval.

Suitable for EMBK/SG

Submitted for approval.

Suitable for EMBK

Submitted for approval.

Suitable for EMBK/SG

Submitted for approval.

Suitable for EMBK/SG

8.98
9.71

19.71

NP

19

70.1

10.9

NP

38.6

54.5

6.9

NP

39.7

46.7

13.6

22.99

NP

36.2

54.1

9.7

34.47

14.9

0.2

52.9

46.9

NP

0.7

59.8

39.5

NP

0.7

71

28.3

12.76

36.2

54.1

9.7

17.15

1.5

66

32.5

44.44
37.14

Submitted for approval.

Suitable for EMBK/SG

" Four Laning of Hospet - Chitradurg Section of NH-13 (New NH-50) from Km 299+000 to Km 418+750

in the state of Karnataka under National Highways Development Project (NHDP) Phase III on DBFOT (Toll ) basis.
Client
Independent Engineer
Concessionaire
EPC Contractor

: NATIONAL HIGHWAYS AUTHORITY OF INDIA


:
: HAMPI EXPRESSWAYS PRIVATE LIMITED
: LARSEN & TOUBRO LIMITED

Status of Third party test results


Sl.No

Item

submitted letter
Submitted date
reference for third
for third party
party lab

Cement
1

a. Ultratech opc 53 Grade

TPT/2016/005

27.1.2016

b. ACC opc 53 grade

TPT/2016/006

27.1.2016

Admixture ( Fosroc)

TPT/2016/011

7.4.2016

Flyash (BMM & SMIORE)

TPT/2016/007

10.3.2016

Pond Ash

TPT/2016/012

7.4.2016

SMPL Aggregates

Not found

20.2.2016

River Sand

TPT/2016/008

10.3.2016

a. Camp 1 (KM 330+400)

TPT/2016/003

27.1.2016

b. Camp 2 (KM 361+000)

TPT/2016/004

27.1.2016

361 Quarry aggregates

TPT/2016/001

27.1.2016

Water Samples
7

299+000 to Km 418+750

NHDP) Phase III on DBFOT (Toll ) basis.

UTHORITY OF INDIA

IVATE LIMITED

test results
Status

Ready to Submit
Sumitted with Mix Design
Test results Awaited
Chemical Test results submitted with
Mix Design and physical results awaited
Test results Awaited
Sumitted with Mix Design
Sumitted with Mix Design

Sumitted with Mix Design


Sumitted with Mix Design
Test results Awaited