Chainage
Side
Borrow Area No
Date of Sampling
Present Status
S3/BA-10A
27/09/2016
394+600 RHS
6 km
8125
In Use
S3/BA-10B
21/10/2016
394+600 RHS
6 km
9750
In Use
S3/BA-10C
23/11/2016
394+600 RHS
6.2 km
S3/BA-11
23/01/2016
403+400 LHS
3 km
4062
In Use
S3/BA-12
5/2/2016
402+400 RHS
12 Km
4875
Not Used
S3/BA-13
5/2/2016
402+400 RHS
12 Km
4875
Not Used
S3/BA-14
5/2/2016
401+250 LHS
0.05
3750
S3/BA-15
18/07/2016
408+600 RHS
0.5
9750
Exhausted
S3/BA-15A
20/08/2016
408+600 RHS
0.5
9375
Exhausted
S3/BA-16
22/07/2016
389+300 LHS
4 km
S3/BA-17
23/07/2016
389+300 LHS
3 km
7500
Exhausted
S3/BA-17A
31/08/2016
389+300 LHS
3 km
9375
Exhausted
S3/BA-18
27/07/2016
413+410 LHS
0.8 km
4690
Not Used
Not Used
Chainage
Side
Borrow Area No
Date of Sampling
Present Status
S3/BA-19
6/8/2016
383+700 RHS
0.5 Km
S3/BA-20
11/082016
408+600 RHS
0.2 Km
9375
In Use
S3/BA-21
11/8/2016
409+600 RHS
0.1 Km
5622
Not Used
S3/BA-22
26/08/2016
394+000 LHS
1 Km
S3/BA-23
31/08/2016
402+300 LHS
0.5 Km
9375
In Use
Chainage
Side
Borrow Area No
Date of Sampling
S3/BA-24
10/9/2016
407+500 LHS
0.8 Km
8125
In Use
S3/BA-25
16/09/2016
402+300 LHS
1.5 Km
5688
Not Used
S3/BA-26
3/10/2016
409+600 RHS
0.2 Km
9750
In Use
S3/BA-26B
28/10/16
409+600 RHS
0.2 Km
9375
S3/BA-27
8/10/2016
409+700 RHS
0.2 Km
9375
Not Used
S3/BA-28
4/10/2016
389+400 RHS
3 Km
8438
Not Used
S3/BA-29
14/10/16
394+600 RHS
5 Km
2813
Filter Media
S3/BA-30
20/10/16
394+600 RHS
5.2 Km
9375
Not Used
S3/BA-31
22/10/16
417+200 RHS
1.8 Km
3750
S3/BA-32
19/10/16
386+600 RHS
0.02 Km
2813
Not Used
S3/BA-33
19/10/16
385+500 LHS
0.5 Km
3750
Not Used
S3/BA-34
22/11/16
383+300
0.4 Km
Not Used
S3/BA-35
26/10/16
383+400 LHS
1 Km
7500
Not Used
S3/BA-36
3/11/2016
383+250 LHS
1 km
8438
Not Used
S3/BA-37
7/11/2016
413+180
LHS
4 km
4688
Not Used
S3/BA-38
8/11/2016
405+800
LHS
1 km
9375
Not Used
S3/BA-39
9/11/2016
412+280
LHS
0.3 Km
5625
Not Used
S3/BA-40
14/11/2016
391+600 RHS
0.8 Km
Not Used
LHS
Present Status
Borrow Area No
Date of Sampling
Chainage
Side
Present Status
S3/BA-41
14/11/2016
391+600
LHS
1.0 Km
3750
Not Used
S3/BA-42
15/11/2016
391+600
LHS
0.5 Km
Not Used
S3/BA-43
15/11/2016
407+500
LHS
0.3 Km
9375
Not Used
S3/BA-44
18/11/2016
413+000
LHS
2 km
3750
Not Used
S3/BA-45
21/11/2016
397+000 RHS
1 Km
7500
Not Used
S3/BA-46
22/11/2016
408+200 RHS
0.1 Km
5625
Not Used
S3/BA-47
28/11/2016
408+700 RHS
1.0 Km
3750
Not Used
S3/BA-48
28/11/2016
408+450
LHS
1.4 Km
3750
Not Used
S3/BA-49
25/11/2016
385+500
LHS
4.0 KM
5625
Not Used
0 in the state of Karnataka under National Highways Development Project (NHDP) Phase III on DBFOT (Toll ) basis.
REAS IN SECTION-III
Proposed to be used
Govt Land/
Pvt Land
No. of Pits
EMBK
Pvt Land
10
EMBK
Pvt Land
12
Testing in Progress
Pvt Land
EMBK
Govt Land
EMBK/SG
Govt Land
EMBK/SG
Govt Land
EMBK
Govt. Land
12
EMBK
Govt. Land
10
EMBK/SG
Pvt Land
EMBK/SG
Pvt Land
10
EMBK/SG
EMBK/SG
Remarks
DOT - 30.11.16
Proposed to be used
Govt Land/
Pvt Land
No. of Pits
EMBK
Pvt Land
10
EMBK/SG
12
10
Remarks
Proposed to be used
Govt Land/
Pvt Land
No. of Pits
EMBK/SG
Govt Land
10
Remarks
EMBK
Pvt Land
10
Testing in Progress
Pvt Land
10
EMBK
Pvt Land
10
EMBK
Pvt Land
EMBK/SG
Pvt Land
EMBK
Pvt Land
10
Rejected
Govt Land
EMBK/SG
Pvt Land
Rejected
Pvt Land
Rejected
Pvt Land
EMBK/SG
Pvt Land
EMB
Pvt Land
EMBK/SG
Pvt Land
EMBK/SG
Pvt Land
10
CBR Pending
Pvt Land
Rejected
Pvt Land
Legal issue
Proposed to be used
Govt Land/
Pvt Land
No. of Pits
Pvt Land
Rejected
Pvt Land
CBR Pending
Pvt Land
10
EMBK/SG
Pvt Land
CBR Pending
Govt Land
CBR Pending
Pvt Land
Sampling done
Pvt Land
Sampling done
Pvt Land
CBR Pending
Pvt Land
Remarks
" Four Laning of Hospet - Chitradurg Section of NH-13 (New NH-50) from Km 299+000 to Km 418+750 in the state of Karnataka under National H
Client
Independent Engineer
: AARVEE ASSOCIATES
Concessionaire
EPC Contractor
Date of
Sampling
Chainage
Side
Offset from
Existing road
Deleterious
Content Test
S2/BA-01
4-Jan-16
385+450
RHS
4 km
Done
S2/BA-02
4/1/2016
389+300
LHS
2 km
Not required
S2/BA-03
5/1/2016
402+000
RHS
7 km
Done
S2/BA-04
5/1/2016
396+930
RHS
1 km
To be done
S2/BA-05
7/1/2016
412+950
RHS
1 km
Done
S2/BA-06
21/01/2016
405+900
LHS
0.8 km
Done
S2/BA-07
21/01/2016
405+900
LHS
0.9 km
Done
S2/BA-08
21/01/2016
401+200
LHS
1 km
Done
CBR Test
NOC
S2/BA-09
22/01/2016
404+100
RHS
1 km
Done
S2/BA-10
22/01/2016
394+600
RHS
6 km
Done
S2/BA-11
23/01/2016
403+400
LHS
3 km
Done
S2/BA-12
5/2/2016
402+400
RHS
12 Km
Done
S2/BA-13
5/2/2016
402+400
RHS
12 Km
Done
S2/BA-14
5/2/2016
401+250
LHS
0.05
Done
S2/BA-15
18/07/2016
408+600
RHS
0.5
S2/BA-16
22/07/2016
389+300
LHS
4 km
S2/BA-17
23/07/2016
389+300
LHS
3 km
S2/BA-18
27/07/2016
413+410
LHS
0.8 km
te of Karnataka under National Highways Development Project (NHDP) Phase III on DBFOT (Toll ) basis.
SOILTEST RESULTS
ADMINES
Proposed to be used
Present Status
Remarks
EMBK/SG
EMBK
EMBK
Submitted for
approval.
EMBK
EMBK/SG
In Use
EMBK
In Use
EMBK/SG
In Use
EMBK
EMBK/SG
EMBK
EMBK/SG
EMBK/SG
EMBK/SG
EMBK
In Use
Ready to submit
Sample not collected due
to over size.
EMBK/SG
Testing In Progress
Ready to submit
" Four Laning of Hospet - Chitradurg Section of NH-13 (New NH-50) from Km 299+000 to Km 418+750 in the state of Karnataka under National Highways Developm
Client
Independent Engineer
Concessionaire
EPC Contractor
Borrow Area
No
S2/BA-01
S2/BA-02
S2/BA-03
S2/BA-04
Date of
Sampling
4-Jan-16
4/1/2016
5/1/2016
5/1/2016
Chainage
385+450
389+300
402+000
396+930
Side
RHS
LHS
RHS
RHS
Offset from
Existing road
4 km
2 km
7 km
1 km
FSI%
MDD (g/cc)
OMC %
LL, %
PL, %
22.22
2.11
7.4
29.4
15.95
11.11
2.06
26
NP
22.22
2.06
7.4
33.3
15.84
5.26
2.09
25.0
NP
10
2.06
29.6
17.78
56.25
27.6
13.97
13.63
2.1
4.54
30.8
NP
NP
14
80
54.2
20.95
33.25
10.4
10
1.94
8.00
27.6
15.29
20
2.05
9.60
29.1
16.83
10
2.08
8.90
24.9
NP
15.78
2.11
8.2
34
20.4
20.22
2.05
8.4
35.7
23.91
15
2.12
31.7
21.89
S2/BA-04
S2/BA-05
S2/BA-06
S2/BA-07
S2/BA-08
5/1/2016
7/1/2016
21/01/2016
21/01/2016
21/01/2016
396+930
412+950
405+900
405+900
401+200
RHS
RHS
LHS
LHS
LHS
1 km
1 km
0.8 km
0.9 km
1 km
20
2.10
7.3
35.6
21.74
13.64
2.03
9.4
36.2
22.9
14.29
2.12
37.8
22.97
13.64
2.07
6.1
38.2
24.68
19.05
2.09
11
36.2
23.11
18.18
1.98
9.4
35
22.53
20
2.067
33.8
21.23
18.18
2.01
8.2
34.6
21.07
13.64
2.07
32.2
22.93
15
2.11
6.6
32.8
24.97
10
2.14
8.2
34.5
22.69
10
2.08
8.5
35
21.52
13.64
2.09
8.2
37
22.58
15
2.11
5.8
38.2
22.61
12.5
2.05
39
25.34
15
2.04
7.1
39.6
25.26
14.29
2.09
8.6
39.9
23.25
13.64
2.07
10
40
24.5
14.29
2.07
9.4
39
23.25
20
2.097
40.2
24.14
14.29
2.08
9.2
42.2
24.85
20
2.06
8.6
41.5
23.88
36.36
1.94
42
22.79
S2/BA-08
S2/BA-09
S2/BA-10
S2/BA-11
S2/BA-12
S2/BA-13
21/01/2016
22/01/2016
22/01/2016
23/01/2016
5/2/2016
5/2/2016
401+200
404+100
394+600
403+400
402+400
402+400
LHS
RHS
RHS
LHS
RHS
RHS
1 km
1 km
6 km
3 km
12 Km
12 Km
8.33
2.01
7.2
30.9
21.52
9.09
2.08
6.8
31.8
21.57
18.18
2.108
10
40.4
24.27
23.81
2.308
8.4
40.8
25.49
25
2.3
9.2
36.4
25.44
10
2.15
28.7
18.56
9.52
2.12
8.2
30.6
16.31
10
2.12
8.2
34.3
21.31
15
2.105
34
19.96
15.79
2.28
30.2
17.25
10
2.23
6.6
35
18.98
20
2.065
8.8
29.4
19.94
14.29
2.07
8.2
31.2
21.84
20
1.846
7.8
30.6
22.93
15.38
1.94
9.6
30.6
22.91
20
1.99
8.7
34.8
24.63
2.07
7.4
28.8
NP
15.78
2.06
28.1
NP
20
2.09
8.6
30.3
17.61
16.66
2.09
8.9
28.4
NP
25
2.07
7.2
26.8
NP
22.22
2.13
6.9
25.9
NP
10
2.07
6.9
26.8
NP
S2/BA-13
5/2/2016
402+400
RHS
12 Km
15.79
10.6
32.4
17.5
15
2.6
8.5
25.8
NP
12.5
2.055
25.4
NP
15
9.8
29
12.76
20
2.01
33.9
17.15
tional Highways Development Project (NHDP) Phase III on DBFOT (Toll ) basis.
OW SOILTEST RESULTS
PI, %
Gravel, %
Sand, %
CBR (%)
13.45
25.5
52.5
22
27.59
NP
32.2
46.9
20.9
46.86
17.46
32.9
46.5
20.6
55.63
NP
33.4
55.8
10.8
51.87
11.82
18.2
55.5
26.3
32.72
48.1
49.8
1.945
10.8
68.5
17.5
2.07
22.8
66.8
1.91
8.5
12.31
1.8
35.8
62.4
3.17
12.27
0.2
56.6
43.2
11.15
NP
0.4
68.9
30.7
16.96
13.6
46.1
35.7
18.2
11.79
31.4
45.1
23.5
9.81
29.1
50.4
20.5
To be done
To be done
Remarks
To be done
13.86
18.6
54.9
26.5
13.3
24.6
39.2
36.2
14.83
11.1
41.3
47.6
13.52
27
35.3
37.7
13.09
28.2
42.7
29.1
12.47
13.1
45.8
41.1
12.57
16.5
54.3
29.2
13.53
55.2
22
22.8
9.27
72.3
9.9
17.8
7.83
58.8
22.5
18.7
11.81
55.2
29.1
15.7
13.48
34.2
39.3
26.5
14.42
43.8
31.5
24.7
27.88
15.59
2.3
30.4
46.6
10.07
13.66
72.3
9.9
17.8
14.34
58.8
22.5
18.7
16.65
37.5
29.7
32.8
15.5
52.6
22.5
24.9
15.75
43.8
31.5
24.7
16.06
47.9
30.7
21.4
17.35
32.8
31.6
35.6
17.62
50.6
75.5
24.9
19.21
8.1
18.4
73.5
9.62
10.95
16.15
40.55
34.06
35.33
25.38
10.8
12.2
77
10.23
52.6
26.6
20.8
16.13
63.3
27.4
9.3
15.31
60.1
21
18.9
10.96
60.9
18.7
20.4
21.82
10.14
47.8
30.7
21.5
46.96
14.29
42.2
32
25.8
12.99
47
32.2
20.8
14.04
47.5
34
18.5
12.95
58.5
22.6
18.9
16.02
52.3
31.3
16.4
9.46
38.4
30.2
31.4
9.36
56
24.3
19.7
7.67
53.9
18
28.1
7.69
20.5
30.3
49.2
10.17
13.8
39.1
47.1
9.02
NP
32.4
56.6
11
44.6
NP
20.3
62.8
16.9
12.69
19.2
57.9
22.9
28.79
25
15.39
32.89
12.5
Submitted for approval.
8.98
9.71
19.71
NP
19
70.1
10.9
NP
38.6
54.5
6.9
NP
39.7
46.7
13.6
22.99
NP
36.2
54.1
9.7
34.47
14.9
0.2
52.9
46.9
NP
0.7
59.8
39.5
NP
0.7
71
28.3
12.76
36.2
54.1
9.7
17.15
1.5
66
32.5
44.44
37.14
" Four Laning of Hospet - Chitradurg Section of NH-13 (New NH-50) from Km 299+000 to Km 418+750
in the state of Karnataka under National Highways Development Project (NHDP) Phase III on DBFOT (Toll ) basis.
Client
Independent Engineer
Concessionaire
EPC Contractor
Item
submitted letter
Submitted date
reference for third
for third party
party lab
Cement
1
TPT/2016/005
27.1.2016
TPT/2016/006
27.1.2016
Admixture ( Fosroc)
TPT/2016/011
7.4.2016
TPT/2016/007
10.3.2016
Pond Ash
TPT/2016/012
7.4.2016
SMPL Aggregates
Not found
20.2.2016
River Sand
TPT/2016/008
10.3.2016
TPT/2016/003
27.1.2016
TPT/2016/004
27.1.2016
TPT/2016/001
27.1.2016
Water Samples
7
299+000 to Km 418+750
UTHORITY OF INDIA
IVATE LIMITED
test results
Status
Ready to Submit
Sumitted with Mix Design
Test results Awaited
Chemical Test results submitted with
Mix Design and physical results awaited
Test results Awaited
Sumitted with Mix Design
Sumitted with Mix Design