Sei sulla pagina 1di 25

0

PUSAT
AIR BLAST

GAMBAR RANGKAIAN

9
25

13
F2
10 A

F4
10 A

F5
6A

S6a Emegency

NORMAL

MANUAL

1, 3, 5
K8M
2, 4, 6

1, 3, 5
K7M
2, 4, 6

1, 3, 5
K6M
2, 4, 6

1, 3, 5
K13M
2, 4, 6

1
S7
2

7
S7
8

S7

13
K22
14

F6M

55
K14T
56

F13M

S8a
Fan OFF

13
K6M
14

S6b
Normal ON

53
K6M
54

S8b
Fan ON

h
10
1-3

7-9

4-6

67
K9T
68

55
K9T
56

95
F6M
96

61
K8M
62

61
K7M
62

A1 K6M

A1 K7M

A1 K8M

A1 K9T

A2

A2

A2

A2

VOLT
:
AMPERE :
Hz
:

380/660 V
2,4/1,4 A
50 Hz

M4
3

NO NC
33
7
9
28 6

VIBRATOR

FAN

SUPPLY

NO NC
31 7
17

220/380 V
4,2/2,4 A
50 Hz

NO NC
32 8
11
18

DIAGRAM DAYA DAN KONTROL AIR BLAST


POLITEKNIK NEGERI UJUNG PANDANG

DELTA

M2
3

MAIN CONTACTOR

R, S, T, N, PE

NO NC
7 8

STAR-DELTA CHANGE OVER

52,5 mm2

STAR

16 Oktober 2016

Dig. Nurul Ilmi

A4

Dip. Asriyadi, S.ST.,M.Eng

3B Listrik/421 14 041

00

0
a

22

8
53
K22
54

83
K22
84

S14a
Vibrator OFF
13

K13M

S14b
14

Vibrator ON

e
10

61
K22
62

Flow
Control

41
K22
42

S13

11

g
67

Normal OFF

12
S14

K11T

S16

68

9
53
K7M
54

21

13

K14T

K14T

22

14

K22

72

A2

NO NC
34
13
19
26 13

87
K7M
88

53
K13M
54

17

Green

A1 K16

K14T

H17

H19

A2
NO NC
14 7
13

NO NC
15
25

DIAGRAM KONTROL AIR BLAST


POLITEKNIK NEGERI UJUNG PANDANG

ON
VIBRATOR

FAN

OVERLOAD VIBRATOR

FAN
VIBRATOR

VIBRATOR

FLOW INDICATOR

A1 K13M
A2

NO NC
13

TIME DELAY FAN

16

Green

H12

TIME DELAY VIBRATOR

Green

A1 K11T

83
K8M
84

95
F13M
96

15

13

1
K16
3

1
K26
3

71

14

FULL INDICATOR

16 Oktober 2016

Dig. Nurul Ilmi

A4

Dip. Asriyadi, S.ST.,M.Eng

3B Listrik/421 14 041

01

0
a

6
19

c
5
K16
7

97
F13M
98

5
K26
7

97
F6M
98

NO NC
15
27

MANUAL OPERATION

POLITEKNIK NEGERI UJUNG PANDANG

Red

Red

DIAGRAM KONTROL AIR BLAST

H28

OVERLOAD FAN

NO NC
8 10
13 13
19 15

H27

OVERLOAD VIBRATOR

Red

A1 K26
A2

MANUAL OPERATION

H25

A2

H24

OVERLOAD VIBRATOR

H23

FULL INDICATOR

A1 K22

BUZZER MANUAL OPERATION

Red

16 Oktober 2016

Dig. Nurul Ilmi

A4

Dip. Asriyadi, S.ST.,M.Eng

3B Listrik/421 14 041

02

S16
SILO

Light
Barrier

SILO

Motor
Penggetar

Fan Motor

Flow Switch S13

M4

M2
S16

SISTEM KERJA AIR BLAST


POLITEKNIK NEGERI UJUNG PANDANG

16 Oktober 2016

Dig. Nurul Ilmi

A4

Dip. Asriyadi, S.ST.,M.Eng

3B Listrik/421 14 041

03

DIAGRAM LADDER AIR BLAST


POLITEKNIK NEGERI UJUNG PANDANG

16 Oktober 2016

Dig. Nurul Ilmi

A4

Dip. Asriyadi, S.ST.,M.Eng

3B Listrik/421 14 041

04

DIAGRAM LADDER AIR BLAST


POLITEKNIK NEGERI UJUNG PANDANG

16 Oktober 2016

Dig. Nurul Ilmi

A4

Dip. Asriyadi, S.ST.,M.Eng

3B Listrik/421 14 041

05

L1

L2/N
NC

POWER
RUN
ERR/ALM
INH
PRHL
BKUP

SYSMAC
CP1E

COM

00

01

02

03

06

07

08

S16

S14 Normal OFF

S14 Vibr ator ON

S13 Flow Kontrol

05

04

S14a Vibrator OFF

S8b Fan ON

S8a Fan OFF

S7a Selector Manual

24 Volt

S6b Normal ON

S6a Emergensi

S7a Selector Normal

L 220 Volt

09

10

11

IN 00CH
OUT 100CH
00

00

COM

COM

01

02

01

NC

03 04

02

05

06

COM

03

07

NC

08

10

04

11

COM

05

06

07

PERIPHERAL

A1

A1

A1

A1

A2

A2

A2

A2

K8M

K13M

N
K6M

K7M

WIRING PLC AIR BLAST


POLITEKNIK NEGERI UJUNG PANDANG

16 Oktober 2016

Dig. Nurul Ilmi

A4

Dip. Asriyadi, S.ST.,M.Eng

3B Listrik/421 14 041

05

PUSAT
TANUR

GAMBAR RANGKAIAN

F1

S8

9
S9

a
F7
10 A

F5
10 A

F6
10 A

1, 3, 5

1, 3, 5

1, 3, 5

1, 3, 5

K11M

K18M

K19M

K20M

2, 4, 6

2, 4, 6

2, 4, 6

2, 4, 6

f
F11M

h
1-3

4-6

7-9

M5
3

E6
n

DIAGRAM DAYA DAN KONTROL TANUR


POLITEKNIK NEGERI UJUNG PANDANG

1/3 LOAD

FULL LOAD

10-30 kW

CONVEYOR BELT 1 kW

16 Oktober 2016

Dig. Nurul Ilmi

A4

Dip. Asriyadi, S.ST.,M.Eng

3B Listrik/421 14 041

00

10

0
a

9
21

23

21

S12AE

S11

53
K11M

54

1
S12AE

22

1
K14

K13

6
K22

K22

K22

24

20

11
K17

g
6

6
11
K14
K22

K13
5

29

33

S16
LS1
30

S17
LS2
34

21
53
K17 K18M K20M

54

22

S17AE2
Th2-820

35

K17

K11M

25
S12AE

K13

K14M

27

31

Y15

Y16

28

32

S17AE1
Th1-800
36

K16

K17

K18M

K19M

NO NC
14
15

NO NC
20
21

NO NC
18 16
19 20

AUXILIARY RELAY HEATER


3/3 X P

NO NC
11
14

AUXILIARY RELAY
1/3 X P

NO NC
13

AUXILIARY RELAY
CONTACT HOLDER

NO NC
35 21
11

AUXILIARY RELAY
LIGHT BARRIER 1

LIGHT BARRIER 1

26

NO NC
36
18

NO NC
37 20

DIAGRAM KONTROL TANUR


POLITEKNIK NEGERI UJUNG PANDANG

HEATER MAIN CONTACTOR


3/3 P

VALVE 2

VALVE 1

CONVEYOR BELT

HEATER MAIN CONTACTOR

16 Oktober 2016

Dig. Nurul Ilmi

A4

Dip. Asriyadi, S.ST.,M.Eng

3B Listrik/421 14 041

01

0
a

18

c
61
K11M

62

19

11
K17

37

3
K16

K16

13
K21T

83
K11M

97

S23
LS3

K11M

14

84

98
38

h
67

55

K21T

K19M

K23T

68

56

K22

K23T

Y24

H26

H27

Green

K21T

White

K20M

9
S25AE

Red

k
H28

l
10

DIAGRAM KONTROL TANUR


POLITEKNIK NEGERI UJUNG PANDANG

CONVEYOR BELT RUN

PLANT READY

LIGHT BARRIER 1

HEATER TIMER

HEATER
KONTAKTOR 1/3 P

NO NC
10

NO NC
24

OVERLOAD CONVEYOR BELT

NO NC
14
15
16
18

LIGHT BARRIER 2

NO NC
21
22

VALVE DISCHARGE

NO NC
37 19

S23/LS3
DISCHARGE CONTROL RELAY

16 Oktober 2016

Dig. Nurul Ilmi

A4

Dip. Asriyadi,S.ST.,M.Eng

3B Listrik/421 14 041

02

th1

th2

Heater
Light Barrier 1

Selenoid 2

Valve 2

M5

LS1

Door 2
LS3

Selenoid 3
Valve 3

Door 1

LS2

Selenoid 1

Valve 1

Light Barrier 2

CONTAINER

DIAGRAM BLOK PROSES KERJA TANUR


POLITEKNIK NEGERI UJUNG PANDANG

15 APRIL 2016

Dig. Nurul Ilmi

A4

Dip. H. Ruslan L, ST.,MT

2B Listrik/421 14 041

03

DIAGRAM LADDER TANUR


POLITEKNIK NEGERI UJUNG PANDANG

16 Oktober 2016

Dig. Nurul Ilmi

A4

Dip. Asriyadi, S.ST.,M.Eng

3B Listrik/421 14 041

04

DIAGRAM LADDER AIR TANUR


POLITEKNIK NEGERI UJUNG PANDANG

16 Oktober 2016

Dig. Nurul Ilmi

A4

Dip. Asriyadi, S.ST.,M.Eng

3B Listrik/421 14 041

05

L1

L2/N
NC

POWER
RUN
ERR/ALM
INH
PRHL
BKUP

SYSMAC
CP1E

COM

00

01

02

03

05

04

06

07

S12 AE

S23 LS 3

S17 AE1

S17 AE2

S17 LS 2

S16 LS 1

S11

S9 STOP

24 Volt

S25 AE

L 220 Volt

09

08

10

11

IN 00CH
OUT 100CH
00

COM

00

COM

01

02

01

NC

03 04

02

05

06

COM

03

07

NC

08

10

04

11

COM

05

06

07

PERIPHERAL

A1
A2

A1

A1

A1

A1

A1

A1

A2

A2

A2

A2

A2

A2

Y16

K18M

K19M

K20M

N
K11M

Y15

WIRING PLC TANUR


POLITEKNIK NEGERI UJUNG PANDANG

Y23

16 Oktober 2016

Dig. Nurul Ilmi

A4

Dip. Asriyadi, S.ST.,M.Eng

3B Listrik/421 14 041

06

PUSAT
PUMP STATION

GAMBAR RANGKAIAN

10

F4
10 A

F6
10 A

1, 3, 5
c21
2, 4, 6

1, 3, 5
c23
2, 4, 6

c21

c23

F7
6A

S1
16 A
Badan Panel

Pintu Panel
j
Rangka Panel
k

S N PE

SUPPLY

POMPA 4

n
N

POMPA 6

DIAGRAM KONTROL PUMP STATION


POLITEKNIK NEGERI UJUNG PANDANG

16 Oktober 2016

Dig. Nurul Ilmi

A4

Dip. Asriyadi,S.ST.,M.Eng

3B Listrik/421 14 041

00

25

SW

SW

b16

b11
4

61

53

71

d15

72,8
4

54,62

g
3 S10

83

d15

Impuls
Tangan

Impuls
Tangan

Otomatis

S16 1

Otomatis

i
5

Aliran

b10.1

55,67
d11
56 68

Aliran

b15.1
6

55,67
d16
56 68

61

l
1

d11
2

Path 21

A1

A2 d11

A2 d12

61

13

61

d27

d12

d14

d16

d30

d17

62

14

62

A1 Path 23 A1

A1

H13

A2 d14 A2 d15

NO NC
10 12
12

A1

H18

A2 d17

A2 d16

Pompa 4

Pompa 2

NO NC
13
33

NO NC NO NC
15
11
16

Kontak
yang komplit

A1

72

Pompa 4 tak
ada aliran

c23

62

Bergantian
P4 < > P6

71

c21

NO NC
15 16
16

NO NC
18
34

DIAGRAM KONTROL PUMP STATION


POLITEKNIK NEGERI UJUNG PANDANG

Pompa 4 tak
ada aliran

16 Oktober 2016

Dig. Nurul Ilmi

A4

Dip. Asriyadi,S.ST.,M.Eng

3B Listrik/421 14 041

01

30

18

Path 11

Path 16

d
95

95

c21

97

c23
96

c21

96

98

53

83

83

c21

c23

c21

54

84

53

d27
84

c23
3

d30
54

m
A1

g24

H25

H26

H29

NO NC
26 12

DIAGRAM KONTROL PUMP STATION


POLITEKNIK NEGERI UJUNG PANDANG

H28

34

Pompa 6

NO NC
3X6 17
24
28
30 23

A2 d27

Pompa 6
overload

NO NC
34 12
22
25
27 21

A2 c23

Pompa 6 kerja

Pompa 4

g22

Pompa 4
overload

A2 c21

Pompa 4
overload

A1

Pompa 4 kerja

A1

16 Oktober 2016

Dig. Nurul Ilmi

A4

Dip. Asriyadi,S.ST.,M.Eng

3B Listrik/421 14 041

02

29

c
Alarm
off
d

S38
2

11

97

b37

c23
98

d37

d37

12

k
3

d12 d17 d27 d30

A1

A1

A1

A2 d30

A2 d35

A2 d37

H39

NO NC
38
39

DIAGRAM KONTROL PUMP STATION


POLITEKNIK NEGERI UJUNG PANDANG

Level tertinggi

NO NC

Alarm
Level
tertinggi

POMPA 6
overload

NO NC
29 17
35

Pemilih
Alarm

16 Oktober 2016

Dig. Nurul Ilmi

A4

Dip. Asriyadi,S.ST.,M.Eng

3B Listrik/421 14 041

03

b16

b11

BAK 2
Level 4

Level 3

b15.1

Level 2

P6
Level 1
b10.1

BAK 1

P4

DIAGRAM BLOK PROSES KERJA


PUMP STATION
POLITEKNIK NEGERI UJUNG PANDANG

16 Oktober 2015

Dig. Nurul Ilmi

A4

Dip. Asriyadi,S.ST.,M.Eng

3B Listrik/421 14 041

04

DIAGRAM LADDER SIMULASI POMPA


POLITEKNIK NEGERI UJUNG PANDANG

16 Oktober 2016

Dig. Nurul Ilmi

A4

Dip. Asriyadi, S.ST.,M.Eng

3B Listrik/421 14 041

05

DIAGRAM LADDER SIMULASI POMPA


POLITEKNIK NEGERI UJUNG PANDANG

16 Oktober 2016

Dig. Nurul Ilmi

A4

Dip. Asriyadi, S.ST.,M.Eng

3B Listrik/421 14 041

06

L1

L2/N
NC

POWER
RUN
ERR/ALM
INH
PRHL
BKUP

SYSMAC
CP1E

COM

00

02

b10 Alian

b11

01

b16

S16

S10

24 Volt

b15 Aliran

L 220 Volt

03

04

05

06

07

08

09

10

11

IN 00CH
OUT 100CH
00

00

COM

COM

01

02

01

NC

03 04

02

05

COM

06

03

07

NC

08

10

04

11

COM

05

06

07

PERIPHERAL

A1

A1

A2

A2

N
C21

C23

WIRING PLC SIMULASI POMPA


POLITEKNIK NEGERI UJUNG PANDANG

16 Oktober 2016

Dig. Nurul Ilmi

A4

Dip. Asriyadi, S.ST.,M.Eng

3B Listrik/421 14 041

07

Potrebbero piacerti anche