Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Establishment
: July 1994
Banker
- Management
- Engineer
30
- Foreman
25
- Technician
45
- Administrative
12
- Skill Worker
180
TOTAL
300
SCOPE OF SERVICES
Construction on Turnkey Basis
Project Management
Engineering
Supply Electrical Equipment
Electrical Installation
Testing & Commissioning
Preventive Maintenance
FILED OF ACTIVITIES
High Voltage Transmission Line
High Voltage Substation
Low and Medium Voltage Distribution Network
Lighting System
Standby Power System
Energy Management System
Power Plant
Resident Engineers
No
1 Mr. Watana
Name
Sindhuprama
Position
Managing Director
Engineer Registration
Category
Experience Joined
(Years)
PES
Education
Degree
Year
Charter Electrical
Fachhochschule Karlsruhe,
Dipl.-Ing
1982
27
Engineer (Power)
West Germany
MBA
2005
1994
Kasetsart University
2 Mr. Pasil
Sirichakwal
Civil Project
Fellow Civil
Chiangmai University
B.Eng.
1975
34
Engineer
Ramkhamheang University
MBA
2000
Senior Project
Charter Electrical
B.Eng.
1982
27
1994
Manager
Engineer (Power)
Senior Project
Fellow Electrical
B.Eng.
1982
27
2007
Manager
Engineer (Power)
1987
22
2004
MBA
2004
B.Eng.
1987
22
1994
B.Eng.
2000
21
2001
1998
Manager
3 Mr. Sathian
4 Mr. Sompob
5 Mr. Narin
Pornputtasri
Meechoovet
Klowvutisatian
Engineer (Power)
2007
6 Mr. Prapon
7 Mr.Promwan
8 Mr. Wisutr
9 Mr. Narin
10 Mr. Phichit
11 Mr. Kriangsak
12 Mr. Weerasak
13 Mr. Panya
14 Mr. Somsak
Darayon
Manakaew
Wongkhumsin
Eaknipitasari
Khongkhangam
Pianchob
Luksameekarnkar
Pijitham
Homnual
Operation Manager
Charter Electrical
Engineer (Power)
Senior Electrical
Associate Electrical
Engineer
Engineer (Power)
Project Manager
Fellow Electrical
B.Eng.
1993
16
Engineer (Power)
M.Eng.
1998
11
Associate Electrical
B.Eng.
1990
19
2001
Engineer (Power)
Senior Electrical
Associate Electrical
Kasetsart University
B.Eng.
1993
16
2001
Engineer
Engineer (Power)
Senior Electrical
Associate Electrical
B.Eng.
2006
16
1994
Engineer
Engineer (Power)
Sales Manager
Associate Electrical
B.Eng.
1996
13
1996
Engineer (Power)
Senior Electrical
Associate Electrical
Siam University
B.Eng.
1996
13
1996
Engineer
Engineer (Power)
Senior Electrical
Associate Electrical
B.Eng.
1996
13
1996
Engineer
Engineer (Power)
Project Manager
Resident Engineers
No
15 Mr. Payungsak
16 Mr. Somsak
17 Mr.Theerapat
18 Mr. Sukree
Name
Srihiran
Nuchnoy
Pimpakan
Machumsang
Position
Engineer Registration
Category
Year
B.Eng.
1996
13
1997
B.Eng.
1996
13
1997
Associate Civil
B.Eng.
1997
12
2005
Engineer
Isan
Associate Electrical
B.Eng.
2000
2000
Sripatum University
B.Eng.
2000
2001
Associate Electrical
B.Eng.
2002
2004
Engineer (Power)
Technology Ladkrabang
Fellow Electrical
Engineer
Engineer (Power)
Senior Electrical
Associate Electrical
Engineer
Engineer (Power)
Civil Engineering
Electrical Engineer
Experience Joined
(Years)
PES
Degree
Senior Electrical
Education
Engineer (Power)
19 Mr. Chaiyos
Boonwan
Electrical Engineer
Associate Electrical
Engineer (Power)
20 Mr. Damnoen
Sittichainarong
Electrical Engineer
115/22kV. Substation
Metallic Section Steel Co., Ltd. , Thailand
Project
Project
PROJECT
PROJECT DESCRIPTION
CUSTOMER
CONTRACT COMPLETION
DATE
DATE
ASIA CEMENT
Mar.1995
Oct. 1995
ITALTHAI
Oct. 1995
Dec.19 95
SAHA UNION
Jan. 1996
Jun. 1996
B. GRIMM
Jan. 1996
Oct. 1996
AEG
Jul.1996
Dec. 1996
B. GRIMM
Dec. 1996
May. 1997
SIEMENS
Aug.1997
June. 1998
SIEMENS
Sep. 1997
July. 1998
SIEMENS
Oct. 1997
Aug. 1998
10
B. GRIMM
Nov. 1997
Dec. 1999
11
POWER LINE
ENGINEERING
Feb. 1998
May. 1999
12
B. GRIMM
Nov. 1998
June. 2000
13
PEA-PMD-IDS-DRI SUBSTATION
- PHUKET 1 & PHUKET 2
SIEMENS
Mar. 1999
June. 2000
14
PEA-BNG-BEA-NPL
POWER LINE
Jun.1999
Dec. 1999
15
230kV. SUBSTATION
- SAN LORENZO,
PHILIPPINES POWER PLANT
(500 MW)
- ELECTRICAL ENGINEERING
SERVICES
VATECH
ELIN
GERMANY
Nov. 2000
Sep.2001
PROJECT
PROJECT DESCRIPTION
CUSTOMER
CONTRACT COMPLETION
DATE
DATE
16
ELCO
Mar. 2001
Oct.2001
17
VATECH
ELIN
Apr. 2001
Apr.2003
18
115kV. SUBSTATION
- SAHA UNION SUBSTATION
PES/EKARAT
Oct. 2001
Aug.2002
19
SIEMENS
Apr.2002
Sep.2002
20
- ELECTRICAL ENGINEERING
SERVICES
TMT&D
JAPAN
Aug.2003
Aug.2004
21
- ELECTRICAL ENGINEERING
SERVICES
TMT&D
JAPAN
Aug.2003
Dec.2004
22
NONG KHAE
Oct.2003
Apr.2004
PICNIC GAS
Sep.2003
Jun.2005
COGENERATION
PLANT
23
24
MEA-MP6-8949-WBX AND
MEA-MP7-8935-WBX PROJECT
VA TECH
T&D
May. 2004
Oct. 2004
25
LOXLEY
Aug.2004
Dec.2004
26
GFPT PUBLIC
CO., LTD.
Aug.2004
Aug.2005
27
LOXLEY
Jul.2004
Apr.2005
28
VATECH
Sep.2004
Jul.2005
29
VATECH
Sep.2004
Aug.2005
30
DEMCO
Sep.2004
Aug.2005
PROJECT
PROJECT DESCRIPTION
CUSTOMER
CONTRACT COMPLETION
DATE
DATE
31
DEMCO
Dec.2004
May.2005
32
DEMCO
Dec.2004
Aug.2005
33
115/22 kV EXTENTION
- KULTHORN CONTROL SUBSTATION
DEMCO
Dec.2004
Sep.2005
34
DEMCO
Dec.2004
Sep.2005
35
DEMCO
Dec.2004
Sep.2005
36
DEMCO
Dec.2004
Oct.2005
37
VATECH
ELIN
Jan.2005
Sep.2005
38
DEMCO
Feb. 2005
Oct.2005
39
ZENITH
Mar.2005
June.2005
40
PICNIC
May.2005
Jul.2006
41
PICNIC
May. 2005
Jul.2006
42
VACHIRA
Jul.2005
Feb.2006
43
ESSO
Aug.2005
Jul.2006
44
DEMCO
Sep.2005
May.2006
45
METALLIC
SECTION
STELL CO.,LTD
Nov.2005
May.2005
46
500 kV SUBSTATION
- RATCHARURI POWER PLANT
MELCO
Dec.2005
Apr.2007
PROJECT
PROJECT DESCRIPTION
CUSTOMER
CONTRACT COMPLETION
DATE
DATE
47
DEMCO
Dec. 2005
May. 2006
48
CPTL-PROJECT , CAMBODIA
COMBODIA POWER TRANSMISSION LINE PROJECT
- 115 kV INDUSTRIAL ESTATE SUBSTATION
- 115 kV BANTEAY MEANCHEY SUBSTATION
- 115 kV BATTAMBANG SUBSTATION
- 115 kV SIEMREAR SUBSTATION
CAMBODIA
POWER
TRANSMISSION
LINE
CO.,LTD.
Dec.2005
Apr.2007
49
DEMCO
Jan.2006
Dec.2006
50
BANGKOK
KOMUTSU
INDUSTRIES
CO.,LTD.
Feb.2006
Nov.2006
51
115/22 kV SUBSTATION
- KIRIU CO.,LTD.
DEMCO
Apr. 2006
Sep. 2006
52
DEMCO
Aug. 2006
Dec. 2006
53
115/22 kV SUBSTATION
- ABSOLUTE DENIM SUBSTATION
ABSOLUTE
DENIM
May.2006
Nov.2007
54
230 kV SUBSTATION
- SOUTH BANGKOK POWER PLANT
MELCO
May.2006
Jul.2007
55
DEMCO
Jul. 2006
May. 2007
56
POWER LINE
ENGINEERING
PUBLIC CO.,LTD
Oct. 2006
Feb.2007
57
BELERSDORF
(THAILAND)
May. 2007
Jul.2007
58
115/22 kV SUBSTATION
- ABSOLUTE DENIM SUBSTATION
ABSOLUTE
DENIM
May.2006
Nov.2007
PROJECT
PROJECT DESCRIPTION
CUSTOMER
CONTRACT COMPLETION
DATE
DATE
59
115 kV SUBSTATION
- ROJANA SUBSTATION (PHASE 7)
ROJANA POWER CO.,LTD.
DEMCO
Nov. 2006
Apr.2008
60
DEMCO
Aug.2007
Jun. 2008
61
DEMCO
Aug. 2007
Apr. 2008
Aug. 2007
Feb. 2008
DEMCO
Dct. 2007
Jul. 2008
EKARAT
PUBLIC
May. 2007
Nov.2008
ELIN
Jan.2008
Dec.2008
SAG GMBH
Jun.2008
Aug.2009
62
WORK IN PROGRESS
1
- GERMANY
2
- LAO
3
PRAXAIR
(THAILAND)
CO.,LTD.
Oct.2008
Oct.2009
3x 115/22 PEA-TSD.8.1.P-3.7/2551SUBSTATION
- THA WUNG SUBSTATION
- PHROMBURI SUBSTATION
- OM YAI 3 SUBSTATION
LOXLEY PUBLIC
CO.,LTD.
Dec.2008
Dec.2009
ELECTRIC
MITSUBISHI
ASIA PTE LTD.
Dec.2008
Dec-09
PROJECT
UPPER KOTMALE HYDRO-POWER PROJECT OF CEG
IN SRI LANGKA
- 33 KV NUWARA ELIYA GRID SUBSTATION
- 230 KV UPPER KOTMALE SUBSTATION
- EXPANSION OF 230/115 KV KOTMALE SUBSTATION
- INTAKE DAM 33 KV TRANSMISSION LINE
PROJECT DESCRIPTION
CUSTOMER
ELECTRIC
MITSUBISHI
ASIA PTE LTD.
CONTRACT COMPLETION
DATE
DATE
Jan.2009
Dec.2009
PROJECT
115 kV. GIS PEA SUBSTATION
PROJECT DESCRIPTION
- TESTING AND COMMISSIONING
CUSTOMER
CONTRACT COMPLETION
DATE
DATE
ITALTHAI
Jul.1994
Nov. 1994
HOYA
Oct.1994
Nov.1994
ABB
Nov. 1994
Feb. 1995
DEMCO
Nov. 1994
Jul. 1995
ABB
Jan. 1995
Mar.1995
ITALTHAI
Jan. 1995
Oct. 1995
DEMCO
Jan. 1995
Oct. 1995
DEMCO
Jan. 1995
Nov. 1995
DESICON
Mar. 1995
Jun. 1995
ITALTHAI
Arp.1995
Nov.1995
DEMCO
Oct. 1995
Dec. 1995
ASIA
Oct. 1995
Dec.1995
10
11
13
CEMENT
AEG
Oct. 1995
Mar. 1996
DEMCO
Jan. 1996
May. 1996
- MAPTHAPHUT, RAYONG
14
PROJECT
MONTEREY CABLE INDUSTRY
PROJECT DESCRIPTION
CUSTOMER
AEG
- BANKHAI, RAYONG.
CONTRACT COMPLETION
DATE
DATE
Jan. 1996
May. 1996
MONTEREY
Jan. 1996
May. 1996
DEMCO
Jan. 1996
Jun.1996
SAHA UNION
Jan. 1996
Jul.1996
B. GRIMM
Jan. 1996
May. 1997
DEMCO
May. 1996
Jun.1996
DEMCO
Jun. 1996
Jul.1996
AEG
Jul. 1996
Dec.1997
DEMCO
Jul.1996
Oct.1996
DEMCO
Jul. 1996
Feb. 1997
DEMCO
Jul.1996
Feb. 1997
DEMCO
Sep. 1996
Nov. 1996
SCHNEIDER
Nov. 1996
Feb.1997
GERMANY
18
19
20
21
22
23
24
25
26
27
PROJECT
115 kV. AMATA POWER PLANT TERMINAL STATION
- BANGPAKONG CHACHUENGSAO
29
30
31
32
THASCO
- CHEMICAL PLANT
MAP THA PHUT, RAYONG
33
34
35
36
37
38
Nov. 1996
Apr. 1997
SIEMENS
Dec. 1996
Mar. 1997
SIEMENS
Jan. 1997
Apr. 1997
DEMCO
Jan. 1997
Apr. 1997
DEMCO
Feb.1997
Aug.1997
DEMCO
Mar. 1997
May. 1997
DEMCO
Mar.1997
Sep.1997
DEMCO
Jul. 1997
Oct. 1997
DEMCO
Jul.1997
Dec. 1997
DEMCO
Sep. 1997
Nov. 1997
DEMCO
Sep. 1997
May. 1998
DEMCO
Sep.1997
Jun.1998
SIEMENS
Sep. 1997
Feb. 1999
B. GRIMM
- KANOM,NAKHORNSIRTHAMMARACH
CONTRACT COMPLETION
DATE
DATE
INSTALLATION,TESTING &
CUSTOMER
SUBSTATION
- PLUKDAENG, RAYONG
39
PROJECT DESCRIPTION
BANKHAI, RAYONG
40
PROJECT
115 kV. TPI-COM 1 POWER PLANT AREA SUB.
- RAYONG
42
PROJECT DESCRIPTION
- ELECTRICAL EQUIPMENT INSTALLATION,
CUSTOMER
CONTRACT COMPLETION
DATE
DATE
SIEMENS
Oct. 1997
Feb. 1998
ELIN
Jan. 1998
Apr. 1999
B. GRIMM
Jan. 1998
May.2000
DEMCO
Jan. 1998
Nov. 2000
SIEMENS
Feb. 1998
Apr. 1998
DEMCO
Mar.1998
Oct. 1998
DEMCO
Mar. 1998
Oct.1998
HYUNDAI
Oct.1998
Mar.2000
POWER
Feb.1999
Dec. 1999
- SARABURI 5
- LEAM NGOB
44
- PHITSANULOK
- TAPHANHIN
- NONGCHANG
- UTHAI THANI
- KHOK SAMRONG
- LATYAO
45
46
47
48
49
LINE
PROJECT
115 kV. PEA SUBSTATION
- NONG PLING
51
PROJECT DESCRIPTION
- ELECTRICAL EQUIPMENT INSTALLATION,
TESTING & COMMISSIONING
- ELECTRICAL EQUIPMENT INSTALLATION,
TESTING & COMMISSIONING
52
53
CUSTOMER
POWER
CONTRACT COMPLETION
DATE
DATE
Jun. 1999
Apr.2000
Jun.1999
Jun.2000
Jun.1999
Nov. 2000
ELCO
Mar.2000
Dec. 2000
DEMCO
Oct. 2000
May 2001
VA TECH
Nov. 2000
Nov. 2001
DEMCO
Nov. 2000
Jan. 2001
HYOSUNG
Nov. 2000
Apr. 2002
SIEMENS
Nov. 2000
Aug. 2002
DEMCO
Dec. 2000
May 2001
DEMCO
Dec. 2000
May 2001
LINE
POWER
LINE
POWER
LINE
- WARIN CHAMRAP
- NONG KI
- SARONG THAP
- RASISALAI
- KHEMARAY
54
55
ELIN
57
- CHUN
58
- ELECTRICAL EQUIPMENT
INSTALLATION, TESTING &
COMMISSIONING
59
60
PROJECT
275 kV. PANGLIMA
- PANGLIMA, MALAYSIA
PROJECT DESCRIPTION
- ELECTRICAL EQUIPMENT
INSTALLATION,TESTING & COMMISSIONING
CUSTOMER
VA TECH
CONTRACT COMPLETION
DATE
DATE
Mar. 2001
Oct. 2001
DEMCO
Apr. 2001
Jul. 2001
ELCO
Apr. 2001
Aug. 2001
DEMCO
Apr. 2001
Sep. 2001
VA TECH
Apr. 2001
Aug. 2002
Jun. 2001
Aug. 2002
ELIN
63
64
65
66
67
ELIN
VA TECH
REYROLLE
DEMCO
Jul. 2001
Dec. 2001
DEMCO
Aug. 2001
Dec. 2001
PES/EKARAT
Oct. 2001
Jul. 2002
MEA
Dec. 2001
Jan. 2002
DEMCO
Jan. 2002
Feb. 2002
MEA
Jan. 2002
Feb. 2002
MEA
Jan. 2002
Feb. 2002
- SARABURI PROVINCE
68
69
70
71
115/6.6kV SUBSTATION
- SIAM MITSUI (SMPC-2)
72
73
PROJECT
DISTRIBUTION MANAGEMENT SYSTEM,
PEA DISTRIBUTION AUTOMATION AND
PROJECT DESCRIPTION
- ELECTRICAL EQUIPMENT
CUSTOMER
CONTRACT COMPLETION
DATE
DATE
PRECISE
Mar. 2002
Dec. 2003
TOSPLANT
May. 2002
Jun. 2002
LOXLEY
May. 2002
Jul. 2002
LOXLEY
May. 2002
Sep. 2002
TKIC
Jun. 2002
Aug. 2002
SIEMENS
Jul. 2002
Sep. 2002
DEMCO
Jul. 2002
Oct. 2002
MEA
Jul. 2002
Sep. 2002
LOXLEY
Jul. 2002
Oct. 2002
DEMCO
Jul. 2002
Aug.2003
ALSTOM
Sep. 2002
Jul.2003
MEA
Oct. 2002
Mar.2003
SIEMENS
Oct. 2002
Dec. 2002
TMT & D
Nov. 2002
Dec.2004
RELIABILITY IMPROVEMENT
75
115kV. SUBSTATION
- AJINOMOTO
76
22 kV PEA SUBSTATION
- RAYONG
77
78
79
80
81
82
83
115 kV SUBSTATION
- ROJANA POWER PLANT
84
85
- ELECTRICAL EQUIPMENT
- SAPHANDAM
- ELECTRICAL EQUIPMENT
- PHRANNOK
86
87
JAPAN
PROJECT
230 kV. SUBSTATION
PROJECT DESCRIPTION
- COMMISSIONING SERVICE
VATECH
CONTRACT COMPLETION
DATE
DATE
Dec. 2002
Dec. 2002
DEMCO
Dec.2002
Apr.2003
SAHA UION
Jan.2003
Jul.2003
TOSPLANT
Jan.2003
Feb.2003
MEA
Jan.2003
May.2003
SIEMENS
Jan.2003
Feb.2003
MEA
Feb.2003
May.2003
UNION
Feb.2003
Apr.2003
SIEMENS
Feb.2003
Mar.2003
DEMCO
Feb.2003
Apr.2003
MEA
Jul.2003
Dec.2003
LOXLEY
Jul.2003
Aug.2003
MEA
Aug.2003
Dec.2003
CUSTOMER
AUSTRIA
- CABLE INSTALLATION & TESTING
- ROJANA
90
91
92
SWITCHGEAR
- ELECTRICAL EQUIPMENT
INSTALLATION TESTING & COMMISSIONING
93
94
- ELECTRICAL EQUIPMENT
- NORTH BANGKOK
95
TEXTILE
96
97
22 kV. SUBSTATION
- ROJANA POWER PLANT
98
99
100
- ELECTRICAL EQUIPMENT
INSTALLATION , TESTING & COMMISSIONING
- UNDERGROUND CABLE CONSTRUCTION
PROJECT
115 kV MEA SUBSTATION
PROJECT DESCRIPTION
- UNDERGROUND CABLE CONSTRUCTION
CUSTOMER
CONTRACT COMPLETION
DATE
DATE
MEA
Oct. 2003
Dec. 2003
LEPSO
Aug.2003
Oct.2003
TMT & D
Aug.2003
Jun.2005
Aug.2003
May.2004
Aug.2003
Dec.2005
SIEMENS
Nov. 2003
May.2004
PICNIC GAS
Jan.2004
May.2005
TIG
Feb.2004
Oct.2004
THAI
Mar.2004
Dec.2004
Apr. 2004
May. 2004
STAR BRIDGE
Apr.2004
Apr.2004
VANCHAI
Apr.2004
Aug..2004
Jun. 2004
Sep. 2004
103
JAPAN
NONGKAE
PRACHUABPKHIRIKHAN
104
115 kV.SUBSTATION
COGEN
- NONGKAE CO-GENNARATION
105
106
POWER LINE
MV SUBSTATION CONSTRUCTION
ENGINEERING
107
HYCO PLANT
109
- SUPPLY,INSTALLATION,TESTING&COMMISSIONING
POWER
SUPPLY
110
111
EVERBRIGHT
FACTORY
- A JINMOTO
112
PANEL
BEIERSDORF
(THAILAND)
CO.,LTD.
PROJECT
PROJECT DESCRIPTION
114
115
CUSTOMER
CONTRACT COMPLETION
DATE
DATE
MANTRA
Jun.2004
Jul.2004
SSI
Jul.2004
Sep.2004
LOXLEY
Jul.2004
May.2006
GFPT PUBLIC
Aug.2004
Aug.2005
LOXLEY
Aug.2004
May.2006
TSC
Sep.2004
Nov.2004
EMCO
Sep.2004
Jan. 2005
DEMCO
Sep.2004
Feb.2006
IDEAL
Nov.2004
Dec.2004
DEMCO
Nov.2004
May.2005
DEMCO
Nov.2004
Nov.2005
MOKKASAK
Nov.2004
Apr.2005
DEMCO
Dec.2004
Apr.2005
MITSUBISHI
Dec.2004
Dec.2005
TEST COMMISSIONING
-INSTALLATION, TEST & COMMISSIONING
- SAMPHAN, BANGSAEN
117
118
22 kV. PMD-IDS-PSR
CO., LTD
- SAMUT SAKHON
119
22 kV. SUBSTATION
- RENEVATION OF 22 kV SWITCHGEAR
- HONDAR CAR
120
121
TESTING&COMMISSIONING
123
124
115/33 kV SUBSTATION
ENGINEERING
INSTALLATION,TESTING&COMM
- INSTALLATION,TESTING AND COMMISSIONING
- SONGKLA UNIVERSITY
125
126
127
PROJECT
3X115/22 kV SUBSTATION,PEA-TSD6.2P-3.1/2004
- CHA-AM2 , CHOM BUNG, LA-NGU
129
115/22 kV SUBSTATION
- EASTERN INDUSTRIES
130
PROJECT DESCRIPTION
- ELECTRICAL EQUIPMENT INSTALLATION,
CUSTOMER
CONTRACT COMPLETION
DATE
DATE
DEMCO
Dec.2004
Feb.2006
DEMCO
Jan.2005
Aug.2005
DEMCO
Apr.2005
Sep.2005
DEMCO
Apr.2005
Dec.2005
EKARAT
Apr.2005
Jan.2006
VATECH
Jun.2005
Dec.2005
VATECH
Jun.2005
Aug.2006
METALLIC
Nov.2005
May.2006
TESTING&COMMISSIONING
- ELECTRICAL EQUIPMENT ENGINEERING SERVICE,
INSTALLATION,TESTING&COMMISSIONING
132
133
134
- TAVEEWATANA
135
SECTION
STELL CO.,LTD
136
115/22 kV SUBSTATION
- PHANTHONG PAPER CO.,LTD.
DEMCO
Nov. 2005
Feb. 2006
137
115/22 kV SUBSTATION
- SIAM FIBRE -CEMENT CO.,LTD.
DEMCO
Nov. 2005
May. 2006
138
115/22 kV SUBSTATION
DEMCO
Nov. 2005
Feb. 2006
TESTING&COMMISSIONING
139
DEMCO
Dec. 2005
May. 2006
140
MEA
Dec.2005
Dec.2006
PROJECT
CPTL-PROJECT , CAMBODIA
PROJECT DESCRIPTION
- EPC CONTRACT
CUSTOMER
CONTRACT COMPLETION
DATE
DATE
Dec.2005
Jul.2007
DEMCO
Jan.2006
Dec.2006
BANGKOK
Feb.2006
Nov.2006
DEMCO
Apr. 2006
Sep. 2006
ABSOLUTE
May.2006
Nov.2007
DEMCO
Jul. 2006
Apr. 2007
POWER LINE
Oct. 2006
Feb.2007
Dec.2006
Dec.2007
Dec.2006
Dec.2007
CAMBODIA
POWER
TRANSMISSION
LINE
CO.,LTD.
142
KOMATSU
INDUSTRIES
CO.,LTD.
144
115/22 kV SUBSTATION
- KIRIU CO.,LTD.
145
DENIM
CO.,LTD.
146
ENGINEERING
PUBLIC CO.,LTD
148
CGC COGENERATION
C.GIGANTIC
CARBON
CO.,LTD.
149
500 kV SUBSTATION
- RATCHARURI POWER PLANT
MELCO
PROJECT
5x115 kV PEA-TSD.8.1P-3.2/2549 SUBSTATION
- NLA , KPO, BBB 2 , BKI 2, PLW 3
151
PROJECT DESCRIPTION
- ELECTRICAL EQUIPMENT INSTALLATION
CUSTOMER
CONTRACT COMPLETION
DATE
DATE
DEMCO
Jan. 2007
Aug. 2007
BELERSDORF
May. 2007
Jul. 2007
(THAILAND)
CO.,LTD.
152
STECON
Aug.2007
Dec.2007
MITSUBISHI
Nov. 2007
Feb. 2008
STECON
Dec. 2007
Jan.2008
DEMCO
Nov. 2006
Apr. 2008
HYDROTECK
May. 2007
Jul. 2007
CORPORATION
- CHONBURI
155
115 kV SUBSTATION
- ROJANA SUBSTATION (PHASE 7)
CO.,LTD.
- ELECTRICAL AND INSTRUMENT INSTALLATION
STECON
Jun. 2007
Apr. 2008
DEMCO
Aug.2007
Jun. 2008
DEMCO
Aug. 2007
Apr. 2008
Aug. 2007
Feb. 2008
Dct. 2007
Jul. 2008
22 kV PEA-PSR.6.P-3.1A/2550 SUBSTATION
- PYA , CRA , CMA
22 kV PEA-PSR.6.P-3.1B/2550 SUBSTATION
- PIA , KPA
160
DEMCO
PROJECT
.
162
CUSTOMER
Dec. 2007
Apr.2008
May. 2007
Nov.2008
Dec.2007
Oct.2008
Mar.2008
Oct.2008
Mar.2008
Feb.2009
LOXLY
May.2008
Jan.2009
SAG GMBH
Jun.2008
Aug.2009
PRAXAIR
Oct.2008
Oct.2009
PEA
Oct.2008
Oct.2009
EGAT
Mar. 2009
Jul.2010
COMMUNICATION SYSTEM
- PROJECT MANAGER & SITE MANAGER
EKARAT
- CIVIL WORK
PUBLIC
CONTRACT COMPLETION
DATE
DATE
EGAT
PROJECT DESCRIPTION
COMPANY LTD.
CPT
Drives and Power
Co.,Ltd.
164
- LAO
MITR LAO
SUGAR
CO.,LTD.
WORK IN PROGRESS
1
PATHUMTANY UNIVERSITY
- CIVIL WORK
- TURNKEY 2X RESIDENT BUILDINGS 10,000 Sq. m
22 kV PEA-PSR.6.P-3.4B/2549 SUBSTATION
- PRACHUAP KHIRI KHAN SUBSTATION
PATHUMTANY
UNIVERSITY
- PHRANBURI SUBSTATION
- CHUMPHON SUBSTATION
3
- LAO
4
- BANG-PA-IN , AYUTTHAYA
(THAILAND)
CO.,LTD.
- ADDITIONAL BAY
- KABINBURI SUBSTATION
- SAKAEW SUBSTATION
PROJECT
PROJECT DESCRIPTION
EGAT - (-.)-.1/2552
500 kV GIS,
CUSTOMER
EGAT
CONTRACT COMPLETION
DATE
DATE
Apr. 2009
Feb.2010
PREVENTIVE MAINTENANCES
CUSTOMER LIST
CUSTOMER NAME
NO.
LOCATION
CHONBURI PROVINCE
BANGKOK TELECOM
BANGKOK UNIVERSITY
BANGKOK
BANGKOK PROVINCE
CHASHUENGSAO PROVINCE
10
AYUTTHAYA PROVINCE
11
12
RAYONG PROVINCE
13
CHACHOUENGSAO PROVINCE
14
SIRACHA,CHONBURI PROVINCE
15
RAYONG PROVINCE
16
PATUMTANE PROVINCE
17
CHONBURI PROVINCE
18
PAECHABURE PROVINCE
19
NAWALOHA
SARABURI PROVINCE
20
AYUTTHAYA PROVINCE
21
22
PTT CO.,LTD.
CHONBURI PROVINCE
23
24
SANLORENZO , PHILIPPINES
25
26
27
CHONBURI PROVICE
28
SOSUCO CO.,LTD.
29
SAMUTSAKORN PROVINCE
30
AYUTTHAYA PROVINCE
32
TGI FACTORY
PREVENTIVE MAINTENANCES
CUSTOMER LIST
CUSTOMER NAME
NO.
LOCATION
33
RAYONG PROVINCE
34
RAYONG PROVINCE
35
CHASHUENGSAO PROVINCE
36
PRACHINBURI PROVINCE
37
ANGTHONG PROVINCE
38
RAYONG PROVINCE
39
NAKKON RATCHASIMA
40
PATUMTANE PROVINCE
41
TOSHIBA FACTORY
42
RACHABURI PROVINCE
43
CHONBURI PROVINCE
44
SARABURI PROVINCE
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Description
Protection relay test set 0-150 A. (Single Phase)
Protection relay test set 0-150 A. (Single Phase)
Protection relay test set 0-250 A. (Single Phase)
Protection relay test set (Three Phase)
Protection relay test set (Three Phase)
Protection relay test set (Three Phase)
Primary Injection 0-2,000 A.
Primary Injection 0-2,000 A.
Micro- Ohmmeter 600 A.
Transformer turn ratio test set
CVT Adapter
Insulation power factor test set
AC- Hi-pot test set 100 kVAC
DC. -Dielectric test set 0-120 kV
Oil tester 0-60 kV
Memory Hi Corder (Breaker Timing) Test Set
Portable Breaker analyser
Portable Breaker analyser
Insulation resistance tester 5 kV
Insulation tester 1 kV
Earth tester
Earth tester
SF6-volume percentage measuring device
Electronic moisture measuring device
Gas Leak Detector
Variac 3 phase 0-400 V 10 kVA
Battery load Bank 0-20 A
Clamp on ammeter
Phase sequence indicator
Digital Multimeter
Infrared camera
AC Clamp on ammeter 0.1-1000A
Turn ratio test
Contact resistance
Portable double bridge
Manufacturer
Programma
SMC
GE
Red Phase
Omicron
Omicron
Foster
Omicron
Programma
Multiamp
Multiamp
Doble
HI-Potronics
Biddle
Foster
Hioki
KoCoS
KoCoS
Metrel
Kyoritsu
Megger
Megger
Dilo
Dilo
Dilo
Voltac
PES
Chauvin Arnoux
Hioki
Fluke
SAT
Chauvin Arnoux
Multi-Amp.
Omicron
Yokogawa
Type / Model
Harald
100 C
Sverker760
703
CMC 156
CMC 256
PCITS 2000
CPC100
MOM 600 A
TR 800
820118-1
M2HD
100 HVT-B
220123-47
OTS 60 AF
8830
ACTAS P8
PBA2000/8
Tera ohm 5 kV
3111
ET5
DET3TD
3-027-R002
3-031-R002
3-033-12001
K 410
P01120755
8031
87IV
S120
C112
TR800
CPM500
2769
Intrument
Manufacture
Serial No.
OMICRON
AJ258C
Model/type
Rate/Capacity
CMC256-6
CMC256-6 NET1
OMICRON
CB415C
CMC156
GE
4501023
Sverker 760
Ammiter Internal
range: 0.00 - 250 A.
Voltmiter
Range: 0.00 - 600 V.
OMICRON
CPC100
FLUKE
75370477
87 IV
DC Voltage 0 -1000 V
AC Voltage,true RMS
15 mV 1000 V - 100 KHz bandwidth
CHAUVIN ARNOUX
Resistance
0 - 30 M
Conductance
0 - 50 ns
150991
C112
Output 1000 A /1 A
CHAUVIN ARNOUX
110376
C112
Output 100 A /1 A
METREL
14012305
Picture
Intrument
Control Instrument Test Set
Insulation resistance Tester 5 kV.
Manufacture
Serial No.
Model/type
METREL
14102984
Rate/Capacity
Any within 250 V - 5000V
Measuring range Riso: 0.12 M
up to 5.00 T*
10
YOKOGAWA
42750
2769
Measuring Range:0.1 m
to 110
11
Earth Tester
MEGGER
DET3TD
12
DILO
790
3-027-R002
13
DILO
311
3-031-R002
14
DOBLE
1539, 1537
M2HD
15
AC High Pot
HIPOTRONIC
M9904109
100HVT-B
input 220/230
output 0 -100 KV. AC
16
DC high pot
BIDDLE
220123-47
120 kV.
Input 220/230
Output 0 -120 KV. DC
Picture
Manufacture
Serial No.
Model/type
17
Intrument
Multi-Amp.
820130-1
TR800
18
Contact resistance
OMICRON
AK198N
CPM 500
Rate/Capacity
Output 12 and 120 V.AC
19
KOCOS
301052901
PBA 2000/8
20
21
Infrared camera
FOSTER
OTS 60 AF/2
SAT
S120
Picture
Description
Hiab Truck 6 Wheels with Mobile Crane
Unit 5 Tons
Pick Up Car
Oil Purification Plant
Capacity : 4,000 LTS/H.
Vacuum Pump
Capacity : 180 M**3/H
Hydraulic Compression Tools for cable up to
dia 800 Sq.mm.
Hydraulic Compression Tools for cable up to
dia 400 Sq.mm.
Hydraulic Puncher
Cable pulling set tension up to 2,000 kg.
Cable pulling set tension up to 1,600 kg.
Hand Hydraulic Cable Cutter
Argon Welding Machine
Hydraulic jacking machine
Threding Machine
Hydraulic Tube Bender
Tube bender
Steel cutting machine
Electronic Lettering Machine
Hand lift 2 tons
SF6 gas filling set
Chain hoist 2 tons
Sling jack 1.5 tons
Sling jack 3 tons
Soft sling
High Pressure Cleaner
SF6 - gas refilling and evacuating device
Electro-Magnetic Drilling Machine
Manufacturer
Type / Model
Hino
Toyota
Micafil
VH 040
Leybold
SV 200
Isumi
EP 100 W
Cembre
HT 130 C
TAE
Greenlee
Thaler
Isumi
Regency
Hitachi
REX
Rigid
Hitachi, Makita
MAX
Dilo
Laver
Dilo
Atli Kohki
CC-104II
GRE 06001-2
KE1600/400 m
S-40B
250 CY 50
N80A
LM-300AII
Eagle 21
3-001-2-R002
TC-25