Abstract. Every day we meet new challenges that interfere in the workflow of different projects. Resources are scarce,
therefore we need to carefully allocate them in order to obtain the desired results. The best way to deal with change in
modern organizations involves project management. Therefore the question is which tools are best used to support structure,
automation and efficiency of complex business processes.
This paper is intended to study a real life business process that can deliver different results accordingly to its allocation of
resources. Creating different outputs for a certain system, hopefully, the best solution would be found an implemented in
order to increase operational productivity.
Furthermore, based on the studied results, a complete analysis can be provided so that future mistakes can be avoided, and
certain allocations to be classified as not feasible. Anyway, the project activities are subject to considerable uncertainty
which can lead to schedule disruptions. Hopefully, in this paper a model can be developed that cannot provide with a proper
resource allocation with approximate formulations that can lead to maximum results of the studied project.
Key words: project management, business process, resource allocation, Gantt diagram
JEL classification: M10, O22
1 Introduction
schedule, subsequently referred to as the preschedule, serves as the baseline for executing
the project.
During project execution, however, project
activities are subject to considerable uncertainty
which may lead to numerous schedule
disruptions. This uncertainty stems from a
number of possible sources: activities may take
more or less time than originally estimated,
resources may become unavailable, material
may arrive behind schedule, new activities may
have to be incorporated or activities may have
to be dropped due to changes in the project
scope, ready times and due dates may be
modified, etc. As a result, the validity of static
deterministic scheduling has been questioned
and/ or heavily criticized (Goldratt, 1997) and
issues of project management under uncertainty
and risk management have received growing
attention (Meredith and Mantel, 2000; Chapman
and Ward, 1997).
Given the presence of both random activity
durations and resource constraints, some
authors do not start from a pre-schedule but
construct the project schedule through the
application of so-called scheduling policies or
scheduling strategies as time progresses
(Igelmund and Radermacher, 1983). In this
274
International Journal of Economic Practices and Theories, Vol. 2, No. 4, 2012 (October), e-ISSN 22477225
www.ijept.org
275
Phase
Initiation
Analysis
Design
Implementation
Integration
Test
Test
International Journal of Economic Practices and Theories, Vol. 2, No. 4, 2012 (October), e-ISSN 22477225
www.ijept.org
276
International Journal of Economic Practices and Theories, Vol. 2, No. 4, 2012 (October), e-ISSN 22477225
www.ijept.org
277
International Journal of Economic Practices and Theories, Vol. 2, No. 4, 2012 (October), e-ISSN 22477225
www.ijept.org
278
Code
D
A
OSS
DA
LE
DL
TA
T
Preceding activities
D
D
D
D,DA
DA
DA, DL
A,TA
International Journal of Economic Practices and Theories, Vol. 2, No. 4, 2012 (October), e-ISSN 22477225
www.ijept.org
Activity
Code
D
A
OSS
Duration in
days
14
2
5
279
EST
EFT
LST
LFT
0
14
14
14
16
19
0
92
14
14
94
19
Total
reserve
0
78
0
International Journal of Economic Practices and Theories, Vol. 2, No. 4, 2012 (October), e-ISSN 22477225
www.ijept.org
Design application
Link application with external documents
Design checking logic
Test the application
Train the users
DA
LE
DL
TA
T
40
9
10
35
16
DAS
DASel
CL
TA
L
TU
U
TS
AD
US
19
59
59
69
94
59
68
69
94
110
19
60
59
69
94
59
69
69
94
110
0
1
0
0
0
Units of
measure
24h/day
24h/day
8h/day
8h/day
8h/day
8h/day
8h/day
Resources
Bogdan, Sorin
Sorin
Cristina, Raluca
Raluca, Cristina, PHP database,
Server
Raluca, Cristina, PHP database,
Server
Raluca, Cristina
Server, Bogdan, Raluca, Cristina
Alex, Cristina, Server, PHP
database
Presentation Flyers, Sorin, Bogdan
Cristina
Cristina, Bogdan
Cristina
Cristina, Raluca, Bogdan
280
14-May-12
14-May-12
01-Jun-12
08-Jun-12
05-Jun-12
Labor
Units(h)
0
20
10
0
3
Nonlabor
Units(h)
0
0
0
0
0
12-Jun-12
5
10
10
14-Jun-12
12-Jun-12
15-Jun-12
4
6
24
5
0
24
5
1
0
1
30
1
1
29-Jun-12
06-Jul-12
09-Jul-12
09-Jul-12
10-Jul-12
20-Aug-12
21-Aug-12
20
10
0
8
20
2
2
20
50
0
0
0
0
0
Days
Start
0
14
2
0
5
International Journal of Economic Practices and Theories, Vol. 2, No. 4, 2012 (October), e-ISSN 22477225
www.ijept.org
4 Conclusions
The appearance and development of the project
management has occurred as a consequence of
the need to adapt the theory and practice of
management to the projects specific. In practice,
the application of the tools and techniques of
project management is facilitated by the use of
specialized software for project management.
The things presented and explained here give a
rough overview of what is a project
management in a software development area
281
International Journal of Economic Practices and Theories, Vol. 2, No. 4, 2012 (October), e-ISSN 22477225
www.ijept.org
scheduling: notation, classification, models and methods.
European Journal of Operational Research, 112, 3-41.
Acknowledgment
pm
baseline,
Project
References
Brucker, P., Drexel, A., Moring, R., Neumann, K. and
Peach, E. (1999). Resource constrained project
Author description
Cristina Selaru is affiliated to Bucharest University of Economic Studies, Department of Economic
Informatics and Cybernetics, and she has studied Cybernetics and Qualitative Economy. The first
studies were made on the game theory, concerning the cement market, and now, this paper is focused on
project management, resource allocation.