PROJECT
LOCATION
CONSTRUCT
GENER
G.1
PROJECT DESCRIPTION
G.1.1
G.2
THE WORK SPECIFIED HEREIN IS FOR THE COMPLETION OF THE PROPOSED HB1 MANDUG LOCAT
PROJECT INFORMATION
G.2.1
THE WORK SHALL CONFORM TO THE FOLLOWING CONTRACT DRAWINGS, DETAILS AND MAPS, AL
G.2.2
THE CONTRACTOR SHALL CHECK ALL DRAWINGS FURNISHED UPON RECEIPT AND SHALL PROMPL
SHALL COMPARE ALL DRAWINGS AND VERIFY THE FIGURES BEFORE LAYING OUT THE WORK AND
G.2.3
PHYSICAL DATA:
THE PHYSICAL CONDITIONS INDICATED ON THE DRAWINGS AND IN THE SPECIFICATIONS ARE THE
IT IS EXPRESSLY UNDERSTOOD THAT THE DESIGNER WILL NOT BE RESPONSIBLE FOR ANY INTERP
G.3
EXISTING WORK
G.3.1
INJURY OR DAMAGE TO ALL PORTIONS OF EXISTING WORK, WHETHER THEY ARE TO REMAIN IN P
G.3.2
ALL PORTIONS OF EXISTING WORK WHICH HAVE BEEN CUT, DAMAGED OR ALTERED IN ANY WAY D
WITH KIND TO MATCH THE EXISTING OR THE ADJOINING WORK. ALL WORK OF THIS NATURE SH
AND SHALL BE AS DIRECTED. EXISTING WORK SHALL, AT THE COMPLETION OF ALL OPERATIONS,
G.4
SHOP DRAWINGS
G.4.1
BEFORE STARTING THE FABRICATION OR INSTALLATION OF ANY OF THIS WORK, THE CONTRACT
TECHNICAL SECTIONS OF THIS SPECIFICATIONS
G.4.2
THE CONTRACTOR SHALL PREPARE AND SUBMIT WITH SUCH PROMPTNESS AS TO CAUSE NO DEL
THE SAME BUILDING, IN THREE(3) COPIES IN A3 SIZE OF ALL SHOP DRAWINGS, AS WELL AS SCHE
A.
A.1
MASONRY WORKS
A.1.1
TILES INSTALLATION
A.1.1.1
MATERIALS
A.1.1.1.1 USING 0.30X0.30 NON GLAZED FLOOR TILE IN MARIWASA BRAND WITH
A.1.1.1.2 USING BOSTIK TILE ADHESIVE
A.1.1.1.3 PLEASE SEE ATTACHED PLAN FOR DETAILS AND VERIFICATION
A.2 CARPENTRY WORKS
A.2.1
DOUBLE DRYWALL FOR OFFICE AND STOCKROOM, DROPWALL WORKS FOR PHARMACY AREA
A.2.1.1
MATERIALS
MATERIALS
A.2.2.1.1 FOR STOCKROOM: PRETTY DOOR WITH LOUVER CODE VG-A
A.3
GLASS WORKS
A.3.1
A.4
MATERIALS
A.3.1.1
A.3.1.2
A.3.1.3
A.3.1.4
A.3.1.5
A.3.1.6
SAFETY FILM
A.3.1.7
A.3.1.8
PAINTING WORKS
A.4.1
MATERIALS
A.4.1.1.1 USE BOYSEN PAINTS ON ALL PAINTING WORKS. ALL COLOR PAINTS FOR
A.4.1.123 OTHER ACCESSORIES
A.4.1.2
PAINT SYSTEM
A.4.1.2.1 1st COAT 100% ACRYLIC LATEX, FLAT UNDERCOAT/PRIMER
A.4.1.2.2 2nd COAT 100% ACRYLIC LATEX, FLAT
A.4.1.2.3 3rd COAT 100% ACRYLIC LATEX, FLAT
A.4.2
MATERIALS
A.4.2.1.1 USE BOYSEN PAINTS ON ALL PAINTING WORKS. ALL COLOR PAINTS FOR
A.4.2.1.2 OTHER ACCESSORIES
A.4.2.2
PAINT SYSTEM
B.ELEC
B.1
WORK INCLUDED: PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL THE WORK NECESSARY FO
OF THE FOREGOING, SHALL INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING PRINCIPAL ITEMS OF WOR
B.1.1
LOW VOLTAGE POWER DISTRIBUTION EQUIPMENT, INCLUDING NORMAL AND EMERGENCY PANEL
B.1.2
A SYSTEM OF LIGHTING AND POWER WIRING, INCLUDING ALL FEEDERS, BRANCH CIRCUITS AND
B.1.3
B.1.4
B.1.5.
B.1.6.
B.1.7.
B.1.8.
GROUTING OF OPENINGS IN FLOORS AND WALLS AFTER ALL CONDUITS OR PIPES, OR DUCTS ARE
B.1.9.
THE CONTRACTOR SHALL RECEIVE, UNLOAD, HANDLE TRANSPORT, ASSEMBLE, AND INSTALL THE
RESPONSIBLE FOR BREAKAGES, PILFERAGE, ETC. OF SUCH EQUIPMENT FROM THE TIME HE ACC
WORK NOT INCLUDED:THE FOLLOWING PRINCIPAL ITEMS OF WORK WILL BE SUPPLIED AND INSTALLED BY
B.2.1. ALL MOTORS, PUMPS AND THEIR ASSOCIATED CENTRAL EQUIPMENT INCLUDING THE FOLLOWING :
B.2.1.1
B.2.1.2
B.3
B.2.2.
B.2.3.
B.3.2
B.3.1. 2
B.3.1. 3
DAVAO LIGHT
B.3.1. 4
ALL CONSTRUCTION PERMITS REQUIRED FOR THIS WORK SHALL BE OBTAINED BY THE CONTRAC
FURNISH THE ARCHITECT, THE ENGINEERS AND THE OWNER FOR FINAL CERTIFICATES OF INSPEC
AFTER THE COMPLETION OF THE WORK. THE CONTRACTOR SHALL PREPARE ALL SHOP OR WORK
REQUIRED BY THE APPROVING AUTHORITIES.
B.3.3
APPROVAL FROM AUTHORITIES OF ALL PLANS FOR CONSTRUCTION SHALL BE SECURED BY THE
B.3.4
ALL DRAWINGS SHOULD BE SIGNED AND DRY SEALED BY THE CONTRACTOR'S REGISTERED PROFE
B.3.5
ALL DRAWINGS, ETC. SHALL BE SUBMITTED SUFFICIENTLY ONE MONTH IN ADVANCE OF FIELD RE
EXTENSIONS OF THE CONTRACT TIME WILL BE GRANTED THIS CONTRACTOR, BY REASON OF HIS
AND SHALL CONTAIN ALL REQUIRED AND DETAILED INFORMATION.
B.4
FURNISH ALL CONDUITS, CABLE TROUGHS, WIREWAY, JOINT AND OUTLET BOXES,
SPECIFIED AND SHOWN ON DRAWINGS.
B.4.1.3
B.4.2
B.4.3
B.4.2.2
B.4.2.3
B.4.2.4
B.4.2.5
USE LIMITATIONS ; METER CENTERS, FEEDER RUNS AND RISERS LARGER THAN 50M
B.4.2.6
B.4.2.7
PAINT FIELD CUTS AND REPAIR DAMAGED PROTECTIVE COATING WITH LEAD OR ZI
B.4.3.2
B.4.3.3
B.4.3.4
B.4.3.5
LIMITATION ;
B.6.3.5.1 - SHALL BE USED FOR ALL BRANCH CIRCUIT HORIZONTAL RUNS, ALL FE
B.6.3.5.2 - FOR CIRCUITS SPECIFIED IN THE PLANS OR AS APPROVED
B.4.4
B.4.3.6
B.4.3.7
B.4.4.2
B.4.4.3
B.4.4.4
B.4.4.5
USE LIMITATIONS ;
PULLING HARDWARES ; FLAT FISH TAPE WITH A BALL FLEXIBLE LEADER OR POLYEH
B.4.5.1
B.4.5.2
B.4.5.3
B.4.5.4
FITTINGS ; STANDARD.
B.4.5.5
USE LIMITATIONS ;
B.4.6.2
B.4.6.3
B.4.6.4
FITTINGS ; LIQUID-TIGHT.
B.4.6.5
USE LIMITATIONS ;
B.4.8
WIREWAY/CABLE TRAY :
B.4.7.1.1
B.4.7.1.2
B.4.7.1.3
B.4.7.1.4
B.4.7.1.5
GENERAL ; PROVIDE JUNCTION BOXES FOR PULLING AND SPLICING WIRES AND OU
OR AS SHOWN DRAWINGS.AS A RULE, PROVIDE JUNCTION BOXES IN ALL RUNS OF
B.4.8.3
B.4.9
B.4.8.4
B.4.8.5
B.4.9
B.4.9.2
B.4.9.3
B.4.9.4
B.4.9.5
CONTINUITY TEST.
B.4.9.6
PHASE RELATIONSHIP
B.4.9.7
B.4.9.8
CORRECTION OF DEFECTS.
GROUNDING
B.4.9.1
MATERIALS
B.4.9.1.1 20MM X 3M COPPER-CLAD GROUND RODS.
B.4.9.1.2 STRANDED SOFT-DRAWN BARE COPPER GROUND BUS AND TAPS.
B.4.9.2
INSTALLATION
B.4.9.2.1 GROUND ALL CONDUIT SYSTEM; USE DOUBLE LOCKNUTS AT ALL PANEL
B.4.9.2.3 BOND GROUNDING SYSTEM TO WATER MAIN PIPE WITH 100MM2 BARE C
B.4.9.2.5 INSTALL GROUND ROD IN FIRM SOIL AND DRIVE TOP OF ROD TO DEPTH
B.4.9.2.6 GROUND RESISTANCE SHALL NOT BE MORE THAN 5 OHMS.
C. MEC
SAN
A.1
PRODUCTS
A.1.1 MATERIALS
ALL MATERIALS TO BE USED SHALL CONFORM WITH THE STANDARDS SPECIFIED. ALL CLASSES LI
ONLY THOSE SPECIFICALLY CALLED FOR UNDER SECTIONS OF THIS DIVISION OR SHOWN SHALL B
B.
ASTM D2729
PVC ORANGE PIPE AND FITTINGS, SERIES 1000, HIGH IMPACT (EMERALD, MOLDEX,
C.
ASTM D2564
SOLVENT CEMENT OR RUBBER 0-RING JOINTING OF uPVC PIPES
D.
DIN 8077/8078
POLYPROPYLENE RANDOM COPOLYMER PIPES (ALFAIDRO)
PROVIDE 19mm (3/4) THICK RUBBER TYPE INSULATION FOR ALL CONDENSATE DRAIN PIPES EX
A.1.5 FITTING SEALANT
A.1.5.1 PVC FITTINGS PVC COMPOUND
A.1.5.2 THREADED PIPE TEFLON SEAL TAPE
A.2
EXECUTION
A.2.1 GENERAL
FORMING RIGHT ANGLES OR PARALLEL LINES WITH BUILDING WALLS AND OTHER PIPES AND NEA
A.
A MANNER TO PERMIT PIPE FREE FROM EXPANSION AND CONTRACTION WHILE MIN
B.
DO NOT INSTALL PIPES IN A MANNER WHICH INTERFERES WITH OTHER PIPES, DUC
C.
D.
THE RESPONSIBILTY FOR ACCURATELY LAYING OUT THE WORK AND COORDINATION
F.
G.
ROUGHING-IN FOR PIPES AND FIXTURES SHALL BE CARRIED ALONG WITH THE BUI
WHERE REQUIRED IN THE WALLS AND FLOORS FOR THE PASSAGE OF PIPES. ALL IT
ALL RUST, SCALE, AND PAINT.
H.
PIPES SHALL NOT PASS THROUGH COLUMNS, FOOTINGS, BEAM OR RIBS, EXCEPT W
A.2.2.2 CAULKING OF THREADED JOINTS TO STOP OR PREVENT LEAKS WILL NOT BE PERMITTED. USE 3M
THREADED JOINTS.
A.2.3 PIPING GRADES AND SLOPES
A.2.3.1 KEEP ALL HORIZONTAL RUNS OF PIPING, EXCEPT WHERE CONCEALED IN PARTITIONS, AS HIGH A
A.2.3.2 PIPING SHALL BE PROPERLY GRADED OR PITCHED TO INSURE EASY CIRCULATION, DRAINAGE AN
A.2.3.3 COLD WATER SHALL PITCH UP IN THE DIRECTION OF FLOW AT 1 INCH IN 60 FEET HORIZONTAL R
A.2.3.4 MAINTAIN A MINIMUM OF 1% OR 1 INCH IN 8'4 HORIZONTAL RUN FOR ALL SANITARY SOIL, WAST
A.2.4 CLEANING AND PAINTING
A.2.4.1 ALL EXPOSED METAL SURFACES SHALL BE RID OF GREASE, DIRT, OR OTHER FOREIGN MATERIALS
A.2.4.2 CHROME OR NICKEL PLATED PIPINGS, FITTINGS, AND TRIMMINGS SHALL BE POLISHED UPON CO
A.2.4.3 ALL EQUIPMENTS, FIXTURES, VALVES, AND FITTINGS SHALL BE CLEANED OF GREASE AND SLUDG
DAMAGE TO PARTS OF THE BUILDING, ITS FINISH OR FURNISHINGS DUE TO THE SYSTEM SHALL B
A.2.4.4 ALL EXTERIOR SURFACES OF PIPINGS TO BE INSTALLED IN OR THROUGH CONCRETE FLOOR, FILL
PAINT HAVING A BITUMINOUS BASE.
A.2.4.5 PIPE HANGER SUPPORTS AND ALL OTHER IRON WORKS IN CONCEALED SPACES SHALL BE THORO
NOTE: ALL OTHER MATERIALS SHALL BE PROVIDED BY THE OWNER
D. SAFETY G
D.1
WORKERS SHALL WEAR LONG-SLEEVED T-SHIRTS WITH PRINTED COMPANY NAME/ LOGO
D.1.2
WORKING PANTS SHALL NOT INCLUDE SWEAT PANTS, JOGGING PANTS, SHORT PANTS & TORN PA
D.2
D.1.3
UNIFORMS SHALL BE CHECKED BY THE P.I.C UPON ENTRY INTO WORK PLACE
D.1.4
LAY DOWN AREAS FOR THE MATERIALS SHALL BE AT THE DESIGNATED LOCATION OF THE WORKS
D.2.2
D.2.3
IMPLEMENT GOOD HOUSEKEEPING AT WORKSITE, NOT ONLY AFTER WORK OR UPON COMPLETIO
PROJECT, BUT ALWAYS WHILE WORK IS GOING ON.
D.2.4
D.3
HOT WORKS
D.3.1
HOT WORKS SUCH AS WELDING AND ACETYLENE WORKS SHALL PROVIDE SUITABLE SIZE OF
FIRE EXTINGUISHER. STRICLY NO FIRE EXTINGUISHER NO HOT WORKS.
D.4
OTHERS
D.4.1
D.4.2
NO SPITTING, URINATING, ETC., IN THE AREA. USE DESIGNATED COMFORT ROOMS WHEN NEEDE
BOARD UP THE WORK AREA PROPERLY (EITHER BY PLYBOARD OR BLUE SACK)
D.4.3
CONSTRUCTION BOARD UP
D.4.3.1
IF APPLICABLE, ALL OPENINGS IN THE BASEMENT, FIRST FLOOR DOORS AND WINDO
ACCESSIBLE
FROM
IF APPLICABLE, OPENINGS THAT ARE AT LEAST 10' FROM GROUND LEVEL WHICH A
PORCH, FIRE ESCAPE, ROOF, OR OTHER CLIMBING POINT CAN BE SECURED WITH
BRACE, AND EVERY 12" AROUND THE PERIMETER. FOR ALL OPENINGS, THE PLYWO
ON WOOD FRAME BUILDINGS AND UP TO THE BRICK MOLDING EDGE ON BRICK BUI
D.4.3.3
E
E.1
E.2
PREPARED BY:
D HB1 MANDUG
VAO CITY
CONSTRUCTION SPECIFICATIONS
GENERAL PARAGRAPHS
OR THE COMPLETION OF THE PROPOSED HB1 MANDUG LOCATED IN MANDUG ROAD, DAVAO CITY
HE FOLLOWING CONTRACT DRAWINGS, DETAILS AND MAPS, ALL OF WHICH FORM A PART OF THIS SPECIFICATIONS.
ALL DRAWINGS FURNISHED UPON RECEIPT AND SHALL PROMPLY NOTIFY THE PROJECT MANAGER OF ANY DISCREPANC
ND VERIFY THE FIGURES BEFORE LAYING OUT THE WORK AND WILL BE RESPONSIBLE FOR ANY ERRORS WHICH MAY BE
ATED ON THE DRAWINGS AND IN THE SPECIFICATIONS ARE THE RESULT OF SITE INVESTIGATIONS BY SURVEYS CONDUC
AT THE DESIGNER WILL NOT BE RESPONSIBLE FOR ANY INTERPRETATION OR CONCLUSION DRAWN THERE FROM.
TING, CUTTING, REMOVAL OR ALTERING IN ANY WAY OF EXISTING WORK SHALL BE CARRIED ON IN SUCH A MANNER AS
ONS OF EXISTING WORK, WHETHER THEY ARE TO REMAIN IN PLACE, REUSED IN THE NEW WORK, OR SALVAGED AND S
WHICH HAVE BEEN CUT, DAMAGED OR ALTERED IN ANY WAY DURING CONSTRUCTION OPERATIONS SHALL BE REPAIRE
NG OR THE ADJOINING WORK. ALL WORK OF THIS NATURE SHALL BE PERFORMED BY THE CONTRACTOR AT NO COST T
TING WORK SHALL, AT THE COMPLETION OF ALL OPERATIONS, BE LEFT IN CONDITION AS GOOD AS EXISTED BEFORE
ON OR INSTALLATION OF ANY OF THIS WORK, THE CONTRACTOR SHALL SUBMIT DRAWINGS AS MAY BE REQUIRED AND
ECIFICATIONS
E AND SUBMIT WITH SUCH PROMPTNESS AS TO CAUSE NO DELAY IN HIS OWN WORK OR IN THAT OF ANY OTHER CONT
COPIES IN A3 SIZE OF ALL SHOP DRAWINGS, AS WELL AS SCHEDULES, REQUIRED CORRECTIONS.
A. CIVIL WORKS
30X0.30 NON GLAZED FLOOR TILE IN MARIWASA BRAND WITH TILE TRIM
CKROOM
ET IN MAX BRAND
M TUBULAR
ON SEALANT
NEEDED
SEN PAINTS ON ALL PAINTING WORKS. ALL COLOR PAINTS FOR ANY ONE COLOR MUST BE MANUFACTURED IN ONE LOT
CCESSORIES
SEN PAINTS ON ALL PAINTING WORKS. ALL COLOR PAINTS FOR ANY ONE COLOR MUST BE MANUFACTURED IN ONE LOT
CCESSORIES
ED BY THE OWNER
B.ELECTRICAL WORKS
AND EQUIPMENT AND PERFORM ALL THE WORK NECESSARY FOR THE COMPLETE EXECUTION OF ALL ELECTRICAL WOR
ENERAL CONSTRUCTION DRAWINGS EXCEPT AS OTHERWISE EXCLUDED, AND WHICH WITHOUT EXCLUDING THE GENER
ER WIRING, INCLUDING ALL FEEDERS, BRANCH CIRCUITS AND CONNECTIONS TO ALL LIGHTING AND POWER OUTLETS.
SYSTEM.
NG SYSTEM.
RICAL SYSTEMS.
AND EQUIPMENT.
RS AND WALLS AFTER ALL CONDUITS OR PIPES, OR DUCTS ARE IN PLACE AND SEALING OF ALL SUCH OPENINGS IF NOT
, UNLOAD, HANDLE TRANSPORT, ASSEMBLE, AND INSTALL THE OWNER SUPPLIED MATERIALS. THIS CONTRACTOR SHA
LFERAGE, ETC. OF SUCH EQUIPMENT FROM THE TIME HE ACCEPTS DELIVERY UNTIL THE OWNER ACCEPTS THE INSTAL
/OFFICES INCLUDING HANDLING OF ALL MATTERS RELATED TO POWER SERVICE, TELEPHONE SERVICES AND PERMITS.
RKS BEYOND THE PULLBOXES OR ENCLOSED CIRCUIT BREAKER OF POWER SUPPLY TO THE ACCU AND OTHER MECHAN
ND VENTILATION EQUIPMENT.
L BUILDING CODE
CAL CODE
STANCE COMPANY
UIRED FOR THIS WORK SHALL BE OBTAINED BY THE CONTRACTOR. FEES SHALL BE FOR OWNER'S ACCOUNT. THE CON
GINEERS AND THE OWNER FOR FINAL CERTIFICATES OF INSPECTION AND APPROVAL FROM THE PROPER GOVERNMENT
WORK. THE CONTRACTOR SHALL PREPARE ALL SHOP OR WORKING DRAWINGS, AS-BUILT PLANS, AND ALL OTHER PAPE
THORITIES.
BMITTED SUFFICIENTLY ONE MONTH IN ADVANCE OF FIELD REQUIREMENTS TO ALLOW AMPLE TIME FOR CHECKING AN
IME WILL BE GRANTED THIS CONTRACTOR, BY REASON OF HIS FAILURE IN THIS RESPECT. ALL SUBMITTALS SHALL BE C
UITS, CABLE TROUGHS, WIREWAY, JOINT AND OUTLET BOXES, CONDUCTOR AND MISCELLANEOUS MATERIALS REQUIRE
WN ON DRAWINGS.
BE USED FOR ALL BRANCH CIRCUIT HORIZONTAL RUNS, ALL FEEDERS AND SUBFEEDERS 50MM AND SMALLER
UIT :
D TRADE SIZES, HEAVY WALL, MANUFACTURED TO NEMA TC-2 TYPE 40-RATED FOR 90 DEGREE CELCIUS CABLE. ATLAN
ED EQUAL.
YLCHLORIDE, EXTRUDED.
M MINIMUM
S ; FLAT FISH TAPE WITH A BALL FLEXIBLE LEADER OR POLYEHTYLENE OR MANILA ROPE. USE OF STEEL PULLING CAB
DUIT :
GALVANIZED.
UID-TIGHT) :
IGHT.
LENGTHS TO VIBRATIONS PRODUCING DEVICES SITUATED IN WET, POTENTIALLY WET LOCATIONS AND OUTDOORS
NIMUM 16 GAUGE FORMED SHEET STEEL AND REINFORCED SHEET STEEL, WITH SCREW FASTENED COVER. PROVIDE W
JUNCTION BOXES FOR PULLING AND SPLICING WIRES AND OUTLET BOXES FOR INSTALLATION OF WIRING DEVICES, A
INGS.AS A RULE, PROVIDE JUNCTION BOXES IN ALL RUNS OF GREATER THAN 30 METERS LENGTH. FOR OTHER LENGT
EEL, GALVANIZED FINISH. PROVIDE REMOVABLE COVERS ATTACHED WITH ROUND HEAD MACHINE SCREWS.
BOXES INDEPENDENTLY OF CONDUITS ENTERING, BY MEANS OF BOLTS, ROD HANGERS, OR OTHER SUITABLE MEANS.
E ELECTRICALLY GROUNDED.
MPUTERIZE, LISTING EQUIPMENT USED, PERSON OR PERSONS PERFORMING THE TESTS, DATE TESTED, CIRCUITS TEST
RESISTANCE TEST.
TANCE TEST.
FECTS.
ROUNDING SYSTEM TO WATER MAIN PIPE WITH 100MM2 BARE COPPER WIRE.
GROUND ROD IN FIRM SOIL AND DRIVE TOP OF ROD TO DEPTH BELOW GRADE.
RESISTANCE SHALL NOT BE MORE THAN 5 OHMS.
ED BY THE OWNER
C. MECHANICAL WORKS
SANITARY WORKS
CONFORM WITH THE STANDARDS SPECIFIED. ALL CLASSES LISTED ARE NOT NECESSARILY REQUIRED FOR THIS PROJE
D FOR UNDER SECTIONS OF THIS DIVISION OR SHOWN SHALL BE PROVIDED. USE OF MATERIALS SHALL FURTHER BE GO
ER SECTIONS OF THIS SPECIFICATION. MATERIALS SHALL BE SUBJECT TO TEST NECESSARY TO ASCERTAIN THEIR FITNE
AND EQUIPMENT
MENT TYPE;
BER TYPE INSULATION FOR ALL CONDENSATE DRAIN PIPES EXPOSED INSIDE THE CEILING AND PIPE CHASE (ARMAFLEX
PE
OWN ON THE DRAWINGS, AS RECOMMENDED BY THE MANUFACTURER AND AS DIRECTED DURING INSTALLATION, STRA
LLEL LINES WITH BUILDING WALLS AND OTHER PIPES AND NEARLY SPACED.
OPERLY SUPPORTED OR SUSPENDED ON STANDS, CLAMPS, HANGERS, OR EQUIVALENT OF APPROVED DESIGN. SUPPOR
ES IN A MANNER WHICH INTERFERES WITH OTHER PIPES, DUCTS, CONDUITS, EQUIPMENT AND ADJACENT STRUCTURE
POSITIONS AND CONNECTIONS OF PIPES, DRAINS, VALVES, AND THE LIKE, INDICATED ON THE DRAWING SHALL BE FO
FOR ACCURATELY LAYING OUT THE WORK AND COORDINATION OF INSTALLATION WITH OTHER CONTRACTS REST WIT
CUT ACCURATELY TO MEASUREMENTS AND SHALL BE WORKED INTO PLACE WITHOUT SPRINGING OR FORCING. CHAN
IPES AND FIXTURES SHALL BE CARRIED ALONG WITH THE BUILDING CONSTRUCTION. CORRECTLY LOCATED OPENING
N THE WALLS AND FLOORS FOR THE PASSAGE OF PIPES. ALL ITEMS TO BE EMBEDDED IN THE CONCRETE SHALL BE THO
ND PAINT.
SS THROUGH COLUMNS, FOOTINGS, BEAM OR RIBS, EXCEPT WHERE NOTED ON THE DRAWINGS.
L BE REAMED BEFORE THREADING. ALL SCREW JOINTS SHALL BE MADE WITH GRAPHITE AND OIL OR WITH AN APPROV
S SHALL BE FULL OUT AND NOT MORE THAN THREE THREADS ON THE PIPE SHALL REMAIN EXPOSED.
TO STOP OR PREVENT LEAKS WILL NOT BE PERMITTED. USE 3M PIPE THREAD SEALANT OR EQUIVALENT ON ALL G.I. O
IPING, EXCEPT WHERE CONCEALED IN PARTITIONS, AS HIGH AS POSSIBLE AND CLOSE TO THE WALL.
ED OR PITCHED TO INSURE EASY CIRCULATION, DRAINAGE AND PREVENT WATER HAMMER AND NOISE. SLOPES AS FOL
NCH IN 8'4 HORIZONTAL RUN FOR ALL SANITARY SOIL, WASTERS AND LEADER LINES.
ES, AND FITTINGS SHALL BE CLEANED OF GREASE AND SLUDGE IN WHICH MAY HAVE ACCUMULATED. ANY STOPPAGE O
NG, ITS FINISH OR FURNISHINGS DUE TO THE SYSTEM SHALL BE REPLACED BY THE CONTRACTOR.
GS TO BE INSTALLED IN OR THROUGH CONCRETE FLOOR, FILL OR TILED FLOOR AND UNDERGROUND SHALL BE GIVEN
E.
OTHER IRON WORKS IN CONCEALED SPACES SHALL BE THOROUGH CLEANED AND PAINTED WITH ONE COAT OR PRIME
ED BY THE OWNER
D. SAFETY GEARS & EQUIPMENTS
UDE SWEAT PANTS, JOGGING PANTS, SHORT PANTS & TORN PANTS
OHIBITED
OPENINGS IN THE BASEMENT, FIRST FLOOR DOORS AND WINDOWS, AND ANY POINT OF ENTRY
A PORCH, FIRE ESCAPE OR OTHER POTENTIAL CLIMBING
POINT SHALL BE
PLYWOOD, 2X4 BRACES, CARRIAGE BOLT SETS, AND NAILS. PARTICLE BOARD,
LDING.
NINGS THAT ARE AT LEAST 10' FROM GROUND LEVEL WHICH ARE NOT ACCESSIBLE FROM A
12" AROUND THE PERIMETER. FOR ALL OPENINGS, THE PLYWOOD SHOULD
E. OTHERS
DATE
PROJECT
LOCATION
CONSTRUCTION SPECIFI
GENERAL PARAGRAP
G.1 PROJECT DESCRIPTION
G.1.1
THE WORK SPECIFIED HEREIN IS FOR THE COMPLETION OF THE PROPOSED DEL FIERRO MAUS
THE WORK SHALL CONFORM TO THE FOLLOWING CONTRACT DRAWINGS, DETAILS AND MAPS
G.2.2
PHYSICAL DATA:
THE PHYSICAL CONDITIONS INDICATED ON THE DRAWINGS AND IN THE SPECIFICATIONS ARE T
IT IS EXPRESSLY UNDERSTOOD THAT THE DESIGNER WILL NOT BE RESPONSIBLE FOR ANY INTE
A. CIVIL WORKS
A.1 MASONRY WORKS
A.1.1
A.1.2
TILE INSTALLATION
A.1.1.1
A.1.1.2
A.1.1.3
A.1.1.4
A.1.1.5
A.1.1.6
A.1.2.2
USE 10mm DIAMETER FOR VERTICAL BAR SPLICED USING #16 GI TIE WIRE
A.1.2.3
A.1.3
A.1.4
A.1.5
A.1.6
A.1.7
A.1.2.4
USING CLASS B CONCRETE MIX FOR PLASTERING. PLASTER IN BOTH SIDE @ 12MM T
A.1.2.5
A.1.3.2
A.1.3.3
USE 10mm DIAMETER FOR HORIZONTAL BARS SPACED AT EVERY THREE LAYERS OF
A.1.3.4
A.1.3.5
USE 16mm DIAMETER FOR VERTICAL BARS WITH 10mm TIES SPACED
A.1.4.2
A.1.4.3
A.1.4.4
USE 16mm DIAMETER FOR VERTICAL BARS WITH 10mm TIES SPACED AS SHOWN
A.1.5.2
A.1.5.3
A.1.5.4
A.1.6.2
A.1.6.3
A.1.6.4
A.1.7.2
A.1.7.3
A.1.7.4
A.1.8
A.1.9
A.1.10
CONCRETE SLAB
A.1.8.1
A.1.8.2
A.1.8.3
A.1.8.4
A.1.9.2
A.1.9.3
A.1.9.4
A.1.9.5
A.1.11
A.1.11.1.2
A.1.11.1.3
A.1.11.1.4
A.1.11.2 RAILINGS
A.1.11.2.1
A.1.11.2.2
A.1.11.2.3
A.1.12
A.1.13
CONCRETE LEDGE
A.1.13.1 USE 10mm DIAMETER REINFORCEMENT BARS
A.1.13.2 USING BOSTIK TILE ADHESIVE
A.1.13.3 PLEASE SEE ATTACHED PLAN FOR DETAILS AND VERIFICATION
A.3.2
A.3.3
CEILING INSTALLATION
A.3.2.1
A.3.2.2
A.3.2.3
A.3.3.2
A.3.3.3
CANOPY
A.4.1.1.1
A.4.1.1.2
A.4.1.1.3
A.4.1.1.4
A.4.1.1.5
A.4.1.2
A.4.2
A.4.1.1.6
A.4.1.1.7
RAILINGS
A.4.1.2.1
A.4.1.2.2
A.4.1.2.3
VERTICAL TRELLIS
A.4.2.1
A.4.2.2
A.5.2
A.5.3
A.5.1.2
A.5.1.3
A.5.1.4
A.5.1.5
A.5.2.2
A.5.2.3
A.5.2.4
A.5.2.5
A.5.2.6
A.5.3.2
A.5.3.3
A.5.3.4
A.5.3.5
A.5.3.6
A.6.2
A.6.3
A.6.1.2
USE BOYSEN SEMI-GLOSS LATEX PAINT BASIC BEIGE COLOR IN SMOOTH PAINT FINIS
A.6.1.3
A.6.2.2
USE BOYSEN SEMI-GLOSS LATEX PAINT ICY GREEN COLOR IN SMOOTH PAINT FINISH
A.6.2.3
CONCRETE MOULDING
A.6.3.1
A.6.3.2
USE BOYSEN SEMI-GLOSS LATEX PAINT SHADY GRAY COLOR IN SMOOTH PAINT FINIS
A.6.3.3
B. ELECTRICAL WO
B.1 LIGHTING & POWER LAYOUT
B.1.1
B.1.2
WIRING INSTALLTION FOR LIGHTING AND POWER LINE (SEE PLANS FOR DETAILS AND VERIFIC
B.1.3
B.1.4
B.1.3.1
B.1.3.2
B.1.4.2
B.1.5
TAPPING OF CIRCUIT TO EXISTING POWER LINE (SEE PLANS FOR DETAILS, LOCATION AND VER
B.1.6
C. MICHANICAL WO
C.1 AIRCON INDOOR UNIT DRAIN LINE
C.1.1
C.1.1.2
C.1.1.3
C.1.1.4
C.2 STEEL BRACKET FABRICATIONS AND INSTALLATION FOR WINDOW TYPE AIRCON
C.1.1
USING 1-1/2" x 1-1/2" x 3/16" THK. ANGLE BAR FOR BRACKET IN EPOXY PRIMER GRAY PAINT
C.1.3.2
C.1.3.3
D.1.2
WORKING PANTS SHALL NOT INCLUDE SWEAT PANTS, JOGGING PANTS,SHORTS PANTS AND TORN PANT
D.1.3
WORKERS SHALL WEAR STANDARD PPE SUCH AS HARD HAT, GLOVES, GOOGLES, SAFETY SHOES ETC.
LAY DOWN AREAS FOR THE MATERIALS SHALL BE AT THE DESIGNATED LOCATION OF THE WORKSITE
D.2.2
D.2.3
IMPLEMENT GOOD HOUSKEEPING AT WORKSITE, NOT ONLY AFTER WORK OR UPON COMLPETION OF P
D.2.4
HOT WORKS SUCH AS WELDING AND ACETYLENE WORKS SHALL PROVIDE SUITABLE SIZE OF FIRE EXTI
E. OTHERS
E.1 BILLING AS PER ACTUAL MEASUREMENT
E.2 LIQUIDATED DAMAGE IS APPLICABLE
CONSTRUCTION SPECIFICATIONS
GENERAL PARAGRAPHS
REIN IS FOR THE COMPLETION OF THE PROPOSED DEL FIERRO MAUSOLEUM IN CALINAN MEMORIAL PARK, CALINAN, DA
RM TO THE FOLLOWING CONTRACT DRAWINGS, DETAILS AND MAPS, ALL OF WHICH FORM A PART OF THIS SPECIFICAT
NS INDICATED ON THE DRAWINGS AND IN THE SPECIFICATIONS ARE THE RESULT OF SITE INVESTIGATIONS BY SURVEYS
OOD THAT THE DESIGNER WILL NOT BE RESPONSIBLE FOR ANY INTERPRETATION OR CONCLUSION DRAWN THERE FRO
A. CIVIL WORKS
CONCRETE MORTAR
CONCRETE MIX FOR PLASTERING. PLASTER IN BOTH SIDE @ 12MM THK TO SEMI-SMOOTH FINISH
0x200 mm)
0x300 mm)
0mmx1000mm)
BLACK GRANITE
AILINGS
NE WALL CLADDING
ILE ADHESIVE
ILE ADHESIVE
D LUMBER
D LUMBER
RAILINGS
E EPOXY PRIMER
WINDOW
LANT
LANT
LANT
G (EXTERIOR)
MI-GLOSS LATEX PAINT BASIC BEIGE COLOR IN SMOOTH PAINT FINISH @ 2 COATS
G (INTERIOR)
MI-GLOSS LATEX PAINT ICY GREEN COLOR IN SMOOTH PAINT FINISH @ 2 COATS
MI-GLOSS LATEX PAINT SHADY GRAY COLOR IN SMOOTH PAINT FINISH @ 2 COATS
B. ELECTRICAL WORKS
NG FIXTURES
(STRIP LIGHTS & PHILIPS PINLIGHTS)
TS AND SWITCHES
XISTING POWER LINE (SEE PLANS FOR DETAILS, LOCATION AND VERIFICATION
C. MICHANICAL WORKS
/16" THK. ANGLE BAR FOR BRACKET IN EPOXY PRIMER GRAY PAINT FINISH
M AIR DIFFUSER
G SLEEVED T-SHIRTS
NDARD PPE SUCH AS HARD HAT, GLOVES, GOOGLES, SAFETY SHOES ETC.
PING AT WORKSITE, NOT ONLY AFTER WORK OR UPON COMLPETION OF PROJECT, BUT ALWAYS WHILE WORK IS GONG ON
E & PAINTING MATERIALS SHALL BE STORED IN AN ENCLOSED LOCATION WITH BOLD WARNING SIGN AGAINST OPEN FLAME & OTH
E. OTHERS
PROJECT
LOCATION
BILL OF QUANTITIES
DESCRIPTION
A. CIVIL WORKS
A.1 CLEANING AND GRUBBING
A.2 EXCAVATION
A.3 BACKFILL
A.4 MASONRY WORKS
A.4.1
A.4.2
TILES INSTALLATION
A.4.1.1
A.4.1.2
A.4.1.3
A.4.1.4
A.4.1.5
A.4.1.6
A.4.2.2
A.4.2.3
A.4.3
A.4.4
A.4.5
A.4.2.4
A.4.2.5
SAND
A.4.3.2
A.4.3.3
A.4.3.4
A.4.3.5
SAND
A.4.4.2
A.4.4.3
A.4.4.4
SAND
A.4.4.5
GRAVEL
A.4.4.6
A.4.5.2
A.4.6
A.4.7
A.4.8
A.4.5.3
A.4.5.4
SAND
A.4.5.5
GRAVEL
A.4.5.6
COLUMN FOOTING
A.4.6.1
A.4.6.2
A.4.6.3
SAND
A.4.6.4
GRAVEL
A.4.6.5
A.4.7.2
A.4.7.3
A.4.7.4
SAND
A.4.7.5
GRAVEL
A.4.7.6
A.4.9
A.4.8.1
A.4.8.2
A.4.8.3
A.4.8.4
A.4.8.5
SAND
A.4.9.2
A.4.9.3
A.4.9.4
A.4.9.5
SAND
A.3.2
CEILING INSTALLATION
A.3.3
A.4 STEEL WORKS
A.4.1
A.4.2
VERTICAL TRELLIS
A.5.2
A.6.2
A.6.3
CONCRETE MOULDING
B. ELECTRICAL WORKS
B.1.2
WIRING INSTALLTION FOR LIGHTING AND POWER LINE (SEE PLANS FOR DETAILS AND VERIFICA
B.1.3
B.1.4
B.1.5
TAPPING OF CIRCUIT TO EXISTING POWER LINE (SEE PLANS FOR DETAILS, LOCATION AND
VERIFICATION
B.1.6
C.2 STEEL BRACKET FABRICATIONS AND INSTALLATION FOR WINDOW TYPE AIRCON
C.3 AIRCON DUCTING
C.1.3
BILL OF QUANTITIES
DESCRIPTION
QUANTITY
UNIT
201
PCS
213
PCS
140
PCS
55
PCS
10
BAGS
11
BAGS
A. CIVIL WORKS
CONTINGENC
LABOR C
TOTAL C
208
PCS
13
PCS
1.5
KG
ORTLAND CEMENT
26
BAGS
CU.M
CONTINGENC
LABOR C
TOTAL C
ORTLAND CEMENT
1091
PCS
66
PCS
KG
111
BAGS
11
CU.M
CONTINGENC
LABOR C
TOTAL C
0x200 mm)
ORTLAND CEMENT
17
BAGS
258
KG
122
KG
CU.M
CU.M
10
KG
CONTINGENC
LABOR C
TOTAL C
0x300 mm)
ORTLAND CEMENT
BAGS
75
KG
45
KG
0.5
CU.M
CU.M
KG
CONTINGENC
LABOR C
TOTAL C
ORTLAND CEMENT
25
BAGS
100
KG
1.4
CU.M
2.76
CU.M
2.6
KG
CONTINGENC
LABOR C
TOTAL C
ORTLAND CEMENT
18
BAGS
KG
KG
1
CU.M
CU.M
KG
CONTINGENC
LABOR C
TOTAL C
ORTLAND CEMENT
111
PCS
12
PCS
KG
14
BAGS
1.2
CU.M
CONTINGENC
LABOR C
TOTAL C
ORTLAND CEMENT
158
PCS
10
PCS
KG
BAGS
CU.M
CONTINGENC
LABOR C
TOTAL C
AILINGS
ORTLAND CEMENT
BAGS
KG
KG
CU.M
CU.M
KG
CONTINGENC
LABOR C
TOTAL C
KG
CONTINGENC
LABOR C
TOTAL C
ORTLAND CEMENT
10mm x 6m (GRADE 40)
BAGS
KG
CU.M
CU.M
KG
CONTINGENC
LABOR C
TOTAL C
RAILINGS
WINDOW
DOOR
G (EXTERIOR)
G (INTERIOR)
B. ELECTRICAL WORKS
NG FIXTURES
TS AND SWITCHES
C. MICHANICAL WORKS
UNIT COST
TOTAL UNIT
COST
150
30150
70
14910
40
5600
40
2200
275
2750
0
CONTINGENCIES
1112.2
LABOR COST
17016.66
TOTAL COST
73738.86
17.5
3640
174
2262
35
52.5
260
6760
500
1500
CONTINGENCIES
284.29
LABOR COST
4349.637
TOTAL COST
18848.427
17.5
19092.5
174
11484
35
245
260
28860
500
5500
CONTINGENCIES
1303.63
LABOR COST
19945.539
TOTAL COST
86430.669
0
0
0
0
0
CONTINGENCIES
LABOR COST
TOTAL COST
0
0
0
0
0
0
CONTINGENCIES
LABOR COST
TOTAL COST
0
0
0
0
0
CONTINGENCIES
LABOR COST
TOTAL COST
0
0
0
0
0
0
CONTINGENCIES
LABOR COST
TOTAL COST
0
0
0
0
0
CONTINGENCIES
LABOR COST
TOTAL COST
17.5
2765
174
1740
35
35
260
2340
500
500
CONTINGENCIES
147.6
LABOR COST
2258.28
TOTAL COST
9785.88
0
0
0
0
0
0
CONTINGENCIES
LABOR COST
TOTAL COST
0
CONTINGENCIES
LABOR COST
TOTAL COST
0
0
0
0
0
CONTINGENCIES
LABOR COST
TOTAL COST
NUMBER
OF DAYS
QTY
45
UNIT
COST
DAYS
COST
250
500
LABOR COST
500
CONTINGENCIES
150
TOTAL COST
650
A.2 EXCAVATION
CARPENTER
300
300
LABOR
250
750
LABOR COST
1050
CONTINGENCIES
315
TOTAL COST
1365
A.3 BACKFILL
CARPENTER
300
300
LABOR
250
500
LABOR COST
800
CONTINGENCIES
240
TOTAL COST
1040