Sei sulla pagina 1di 5

Small questions

1.What is ISO rating of alstom tempest turbine with steam injection ?


Ans: 8.2 MW
2.Which type of cooling is used in alstom generator?
Ans: closed Air-cooling water.
3.Write down sequential steps for opening turbine enclosure when GT
is running?
Ans: - -Open CO2 valve
-Switch OFF ventilation
-Open turbine enclosure
4.In turbine air intake filtration system how many type of filters are
used? Give name and mesh size of each filter?
Ans: M 80: 10 micron
Rm-90: 3 micron
Hepa-0.3 micron
5.Upto what temp. (T op) , GT can be loaded?
Ans: 533 deg.c
6.Name the fuel control valve in GT skid. Who gives command to
actuate this fuel valve?
Ans: Name of fuel valve: Star valve, Value of fuel demand of GT gives
command to actuate this valve. (Pt 2 Given through ECU)
7.What is compression ratio of compressor installed on GT shaft? How
many stages are there in this compressor? Also mention the type of
compressor?
Ans: Axial flow compressor, Comp. Ratio: -1:12, 10stages.
8.What are the lub oil tank reservoir capacities for NG comp. And for
Gas Turbine?
Ans: Reservoir: NG -7 gallons GT-515.4 gallons (1 gallon = 3.7 Lt)
9.What is our HRSG registration number given by IBR?
Ans: GT-4162
10.What is surface area of HRSG?
Ans: 6709 m3
11.Give NG pressure & temp. trip settings for NG comps. For both 1 st
stage and 1st stage suction & discharge?
Ans:
Alarm
trip
`
1st stage suc.pres.low
2.0
1st stage dis, temp.high
120
2nd stage dis, temp.high
130
2nd stage dis.pres.high
25
12. Where cooling water is used in NG comp. Shed?
Ans: Use of cooling water in NG comp. Shed for to remove heat of
comp. And lubrication and friction heat from the cylinder.
13.What is safety valve pres. Setting of GNFC line & NG volume bottle?
Ans: gnfc: 21 bars after PC56585
NG volume bottle: 24.0 bar
14.at what up-stream pres. NG is received from GNFC and GGCl?

Ans: GGCL 6 bar GNFC 30 bar


15.What is height of main stack and bypass stack?
Ans: 30 mt
16.which type of fire extinguisher is used for gas turbine fire
extinguishing system?
Ans: CO2 type
17.How many detectors are installed inside GT skid? List down type of
the same.
Ans: Ultra violet Flame detector (4)
Heat detector (2)
Gas detector (1)
18.Give safety valve setting of steam drum, saturated steam line and
superheated steam line.
Ans: Steam drum safety valve: 34.5 bar
Saturated steam line valve: 34.5 bar
Superheated steam line valve: 34 bars
19.What is the use of Medium Pressure Air & High Pressure Air in GT?
Ans: medium pressure air is used for sealing of gen. bearing housing &
cool high-pressure nozzle assembly & rotor blades.
20.Mention, at what lube oil temperature, Thermostatic Control Valve
gets Partly & fully opened?
Ans: Thermostatic control valve partly open at above 41 deg. C. (106
deg. F) and fully open at 49 deg, c. (120 deg. F)
21.Give definition of pinch temperature with its normal value range.
Ans: Exhaust gas temp. After evaporators saturated stem temp. is
called pinch temp. Normal value range is 8.33 to 16.6.deg.c
22.Give definition of approach temperature with its normal value
range.
Ans: Saturated steam temp. Economizer outlet BFW temp. is called
approach temp. Normal value range is 5.5 to 22.2. Deg.c
23.List down the assembly points of NCPL complex.
Ans: 1.Near technical building
2.warehouse
3.main gate
4.Near control room
5.ETP
24.Who is the ISO standard accreditation body for NCPL?
Ans: LRQA
25.What are the present flow settings of Lube Oil for Generation DE
Bearing & NDE Bearing?
Ans: DE-5 bar
NDE-7 bar
26.Lube Oil Flow rate of Hydraulic VGV Pump?
Ans: 17.27 ltr. /minute
27.HRSG Trip value for low level of Steam Drum?
Ans: 30%
28.HRSG Trip value for high pressure of steam drum?
Ans: > 35 bar
29.HRSG Trip value for Low Pressure of BFW inlet?
Ans: < 29 bar

30.Designed Heat rate of tempest turbine at full Load?


Ans: 3225
31.In GT, Number of HP stator blades?
Ans:
32. In GT, Number of HP rotor blades?
Ans: 61
33.In GT, Number of LP stator blades?
Ans: 52
34. In GT, Number of LP rotor blades?
Ans:
35.Rating of GT start-up motor?
Ans: 110 KW
36.Rating of NG-Compressor Motor?
Ans: 110 KW
37.At what suction pressure of 1st stage, NG compressor trips?
Ans:2 bar
38.At what discharge temperature of 1st & 2nd stage, NG compressor
trips?
Ans: 1st stage - 120 deg. C.
2nd stage 130 deg. C.
39.At what 2nd stage di9scharge pressure the NG Compressor gets
unloaded?
Ans: 22.5 bar
40.Present trip values (with unit) of UD 39VL & UD-49VL?
Ans: 8mm / second, 6mm / second
41.Present trip values (with unit) of UD 39AC & UD-49AC?
Ans: 300mm /second, 300mm / second
42.What is the present Variable cost of power generated through CPP,
at around 5.0 MW plant load?
Ans: 3.35 rs./kwh
43.What is Steam Generation Capacity of HRSG at full load of 6.7 MW?
Ans: 19 MT / Hr
44.What is the Compression Capacity (SM3/Hr) of NG Compressor?
Ans: 2100 SM3 / Hr
45.In GT, Hydraulic VGV motor develops > 5.9 Bar Pressure.
46.Lube oil Flow Rate & Pressure developed by Hydrostatic Boost pump
is 344 Liters/ minute & 40 Barg respectively.
47.Lube oil Flow Rate & Pressure developed by Hydrostatic pump is
344 Liters/ minute & 450 Barg respectively.
48.GT trips if lube oil supply pressure teaches below 1.38 bar.
49.GT trips if lube oil supply temperature reaches above 34 deg. C.
50.NOx level in exhaust flue gas from main Stack remains around
___<10_ PPM against GPCB permissible limit of __50___ PPM.
51.GT trips, if difference between VGV position feedback & VGV
position demand is more than 10 %.
52.GT Air inlet Flow Rate is _______ M3 / Sec at 15C.
53.GT Ventilation Air Flow Rate is ________ M3 / Sec at 15C.
54.Probe Types for UD 39 & UD 10X vibration measurements are
_______ & _______.

55.Full load capacity of Generator is 584 A.


56.GT Trips if turbine speed reach up to 15443.5 RPM.
57.In Flue Gas approximately levels of O2, CO2, & CO remains as __20
%, _______ % & _________ ppm respectively.
58.GT trips, if Generator NDE side vibration reach above 3.6mm / Sec.
59.GT trips, if GT inlet bearings X-axis (UD 10X) vibrations reach above
99 m.
60.GT trips, if HRSG back pressure towards GT reaches above 400
mmwc.
61.GT trips, if Generator U-V-W winding temperature reaches above
131deg. C.
62.Type of lubrication for HRSG dosing pump is _HP80W (LUB OIL).
63.Type of lubrication for Electrical Actuator of Diverter Damper is
_SERVO GEM EP2_.
64.Capacity of Turbine at 45 deg. C. with & without Steam injection is
6.7 & 6.06 MW
65.Mention alarm & Trip value in %, in case of Gas Leakage sensed by
Gas Detector.
Ans: alarm 10% LEL & trip 20% LEL
1.Mentioin primary and secondary CT ratio for grid transformer
differential scheme.
Ans: primary 150/1 A & secondary 900 / 0.577 A
2.Mention CT ratio of 1MVA, 1.5 MVA, 2MVA, 4MVA transformers at
11KV panel.
Ans: 1 MVA 60 / 1 A
1.5 MVA 100 / 1 A
2.0 MVA 125 / 1 A
4 MVA 250 / 1 A
3.Mention CT ratio of GEB, generator, GNFC & TIE feeders incomer.
Ans: GEB 1000 / 1A
GENERATOR 600 / 1 A
GNFC 1000 / 1 A
TIE-1 1000 / 1 A
TIE-2 1000 / 1 A
4.Mention CT ratio of NCPL breaker at HALDARWA end.
Ans: 100/1
5.Present MRN2 setting for df/dt is 1.6 / 25 cycles
6.present reverse power setting of 7UM611 relay is 0.8 MW
7.Present directional over current setting (both stage) of GEB 7SJ531
relay is 0.2 & 0.5 for 0.5 & 0.1 ms respectively
8.Present CT ratio for GEB metering and for 66 KV line protection is 4060 / 1 & 150 /1 A respectively
9.Reverse power setting of LGPG11 is 27 KW for 3 ms
10.Short circuit fault withstand capacity of SF6 & 11KV VCBs are 31.5
KA for 3 sec
11.Mention full load current capacity of SF6 & 11KV VCBs (SIEMENS
AND JYOTI)
Ans: 1180A, 1000A

12.Mention NGR rating of grid transformer generator and generator


transformer
Ans: 8, 8, 10.5
13.Mention percentage impedance of grid, generator and station
transformer.
Ans: 8.53, 10.28, and 8.27
14.Mention full load current capacity of each module of 2 x 25 KVA
UPS.
Ans: 60 A.

Potrebbero piacerti anche