Sei sulla pagina 1di 1

LIST OF PROJECTS

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

Technical evaluation of LRT and BRT.


Effect of clays on stability of Barrages, A case study of New Khanki and/or Sulemanki Barrage.
Environmental Degradation of Historical Places, A case study of Katas Raj
Technical and socioeconomic evaluation of CPEC route.
Infrastructure planning in terrorist effected areas, A case study of South Waziristan Agency.
New trends in zero slump concrete.
Guidelines for making wining proposals.
Road design and planning.
BOQ, Engineers Estimate and Planning a Building.
Subgrade CBR evaluation for a city, A case study of Multan.
Developing correlations on the basis of SPT and CPT data of Ravi River Front Project.

Potrebbero piacerti anche