RESUME

MOHAMED AFSAL
ELECTRICAL & INSTRUMENTATION ENGINEER
EXPERIENCE- 6 YEARS
(LNG CONSTRUCTION / COMMISSIONING / SHUTDOWN/
BROWN & GREEN FIELD EXPERIENCED)

Contact Details:
China: +86-13701676845 (Active)
Qatar: +974 77685800
India (Land Line): +91 4872554873
India (Mobile): +91 9995150106
Mail ID: afsalkvis@gmail.com
Skype ID: afsalkvis

Objective
.
To secure a challenging and growth oriented position in a reputed LNG Project that utilizes and further
improves my administrative and technical skills facilitating me to be a competent and pragmatic individual.
Educational Qualification
..
B-Tech degree in Applied Electronics and Instrumentation Engineering.
Name of Examination
Name of School/College
Name of
Major
Board/University
IES College of Engineering,
B-Tech
Oil & Gas,
Chittilappilly,
University of Calicut,
(Bachelor of Technology/
Instrumentation,
Thrissur, Kerala, India
India
Engineering)
Electrical, Electronics,
Power Plant,
Experience Overview
.
Sr.
Project
Designation
Company
Client
Experience
No
1 Chuandongbei Gas Project Lead E&I
SEPAM China
3 Months
Sichuan Province, China
Engineer
Engineering &
Chevron China
(Green Field) Consulting Ltd.
2 Qatar Gas Plateau Maintenance
Lead E&I
19 Months
SEPAM Qatar
Technip Chiyoda
(PMP) Project - Qatar
Engineer
W.L.L
Joint Venture (TCJV)
(Brown Field)
3 Hamad International Airport: CP E&I - T&C
SEPAM Middle CDC- Tekenaka
18 Months
19 Project - Qatar
Engineer
East W.L.L
Joint Venture
4 Qatar Gas PMP Project:
SEPAM Qatar
Technip Chiyoda
Shutdown 2012 - Train 1, 2 & 3 E&I Engineer
3 Months
W.L.L
Joint Venture (TCJV)
- Qatar
5 Qatar Gas PMP Project:
SEPAM Qatar
Technip Chiyoda
4 Months
E&I Engineer
Shutdown 2011 - Train 1 - Qatar
W.L.L
Joint Venture TCJV)
6 Qatar Gas Train 6&7- QCS
E&I - Site
SEPAM Middle Chiyoda Technip
9 Months
Project - Qatar
Engineer
East W.L.L
Joint Venture (CTJV)
7 SEPAM Qatar Head Office
SEPAM Qatar
On Call
E&I Engineer
NA
Projects Estimation - Qatar
W.L.L
Basis
Experience Keywords
.
LNG, Petrochemical, Oil & Gas, P&ID, Instrument, Electrical, Hook Up, System Completion, System Turn
Over, Handover, Transmitters, Valve, Substation, Operations & Maintenance, Shutdown, Process Control,
Transformer, Distribution Panel, Fiber Optic, Analyzer, Construction, Testing & Commissioning, Switch Gear,
Calibration.
Detailed Work Experience

Page 1 of 7


1.

Chuandongbei (CDB) Gas Project - Sichuan Province, China

Project Description: Construction of 3 Nos of LNG Process Trains and related Utilities
Company: SEPAM China Engineering & Consulting Ltd.
Client: Chevron China
Designation: Lead Electrical & Instrumentation Engineer (System Completions Engineer)
Scope: E&I Works / System Completion & Handover
Reporting to: Project Manager
Duration: 03 Months (January 2015 Till Date)
Responsibilities:
Handle and Lead the entire Construction Completion Matrix for the entire project.
Coordinate & Attend Meetings with Clients Mechanical Handover/ System Turnover Departments and deliver the
Construction, Inspection and Handover Status.
Leading a Team of 8 Nos of Construction Engineers and collects status and progress of each instrument and report to client.
Review and forward Construction Technical Query (CTQ) raises by Site Engineers and forward to client.
Review and monitor all Work Permits for all the Construction Activities.
Coordination with other disciplines like Piping, Mechanical & Insulation for the smooth flow of construction activities.
Coordinate with Client Material Warehouse for releasing of materials for Installation & Calibration.
Various Coordinations with Subcontractors and Third Parties.
Monitoring the Zenator software and raising Inspections for all E&I activities.
Giving weekly targets to Construction Engineers & monitor the Construction Progress.
Deliver the daily/weekly/monthly progress reports to Project Controls Department.
2.

Qatar Gas - Plateau Maintenance Project (PMP)

Project Description: Construction of new SRU unit & AGRU unit and upgrading of existing Process
Train-1, 2 & 3.
Company: SEPAM Qatar W.L.L
Client: Technip Chiyoda Joint Venture (TCJV) & Qatar Gas
Designation: Electrical & Instrumentation Engineer
Scope: E&I Works
Reporting to: Project Manager
Duration: 19 Months (September 2012 November 2014)
Responsibilities:
Handle and Lead the entire Construction Completion Matrix for the Brown Field Activities.
Coordinate & Attend Meetings with Clients Mechanical Handover/ System Turnover Departments and deliver the
Construction, Inspection and Handover Status.
Leading a Team of 3 Nos of Construction Supervisors & 12 Nos of Foremen, more than 200 direct manpower including
Electricians, Pipe/Tube Fitters, Technicians & PTW (Permit to Work) receivers.
Raising Construction Technical Query (CTQ) to client.
Raising & Managing all Work Permits/ PTW (Permit to Work) for all the Construction Activities.

Manage & Monitor all the Construction Materials flow including;


- All Process Transmitters & Installation Accessories
- Control Valves
- LV/Fiber Optic Cable Drums
- GI Pipes, SS Tubes, Flanges, Gaskets & all other fitting Accessories
- Junction Boxes & Cable Glands
- Speakers, Beacon & Telephone Acoustic hoods & Telephones
Monitor, Supervise & Raise Inspections for all the Electrical & Instrumentation scope.
- Primary & Secondary Cable pulling Direct Buried / Above Ground / Indoor Cables
- Panel, Cabinet & Console Installations
- Field Instrument, Control valves & Junction Box Installation.
- All Instrument Calibration Inspections
- Glanding & Termination of Cables
- Impulse Tubing, Airline Tubing, Leak Testing & Steam Tracing
- Heat Tracing & Bundle Tube Inspections
- Cable Tray, Cable Ladder & Stub Up installation
- Analyzer Cabinet Installation & all related Inspections
- All Inspections in ITR (Instrument Technical Room) Rooms.
- Fiber Optic Cables & all related inspections including OTDR & Power Meter tests.
- All Telecom, Public Address & Voice Alarm related Inspections.

Page 2 of 7

Coordination with other disciplines like Piping, Mechanical & Insulation for the smooth flow of execution.
Coordinate with Client Material Warehouse for releasing of materials for Installation & Calibration.
Various Coordinations with Subcontractors and Third Parties.
Monitoring the Winpcs software and raising Inspections for all E&I activities.
Giving weekly work fronts to Supervisors and Foreman & monitor the Construction Progress.
Deliver the daily/weekly/monthly progress reports to Project Controls Department.
Preparing the red lines drawings from Site & Coordinate with Clients Engineering Department & Preparation of As-Built
Drawings.

3.

Hamad International Airport Doha : CP 19 Project:

Project Description: Emiri Terminal, Public Mosque & Parking Structure MEP & Special System Project
Company: SEPAM Qatar W.L.L
Client: CDC- Takenaka Joint Venture / Overseas Bechtel Inc
Designation: Testing & Commissioning Engineer / System Turn Over Engineer
Scope: MEP & ELV System
Reporting to: Testing & Commissioning Manager
Duration: 18 Months
January 2011 to February 2012
May 2012 to August 2012
Responsibilities:
Pre Commissioning & Commissioning of ELVSS / LVSS Substation & Panels;
- MV Switch Gear (Schneider)
- 6.6 KV/415V Transformer (Schneider - France Transfo)
- LV Switch Gear (Schneider)
- Normal & Emergency Power Panels (Schneider)
- Automatic Transfer Switch (Emerson- ASCO)
- Switching & Dimming Panels (Lutron)
- Lighting Transfer Panels (Stage Craft)
- CRAC Units (Emerson- Liebert Data Mate) & Fan Coil Units (Dunham Bush)
Conduct the following tests in various Electrical Equipments
- Contact resistance test
- Insulation Resistance test
- Current transformer ratio test
- Potential transformer turns ratio test
- Torque test for busbar & busduct
- Alarm test for Transformer
Preparation of Operation & Maintenance Manual for all Electrical & Mechanical Services in the Project.
- MV Switch Gear
- 6.6 KV/415V Transformer
- LV Switch Gear
- Normal & Emergency Power Panels
- Automatic Transfer Switch
- Switching & Dimming Panels
- Lighting Transfer Panels
- CRAC Units & Fan Coil Units
Co-ordinate, Attended & Supported following manufacturers for the NDIA AirportEnd User Training Programs;
- Schneider (MV Switch Gear, 6.6 KV/415V Transformer, LV Switch Gear & Distribution Panels)
- Emerson- ASCO (Automatic Transfer Switch)
- Lutron (Switching & Dimming Panels)
- Stage Craft (Lighting Transfer Panel)
- Danfoss(Variable Frequency Drives)
- Myers (Lighting Inverter/UPS)
- Thomas & Betts / Furse (Earthing& Lightning Protection)
- Emerson-Liebert DataMate (Computer Room Air Conditioning (CRAC) Units)
- Dunham Bush (Fan Coil Units)
- Taco (Chilled Water Pumps)
- Naffco (Fire Protection)
- Grundfos (Plumbing System & Pumps)
- Titus (Variable Air Volume / Air Terminal Units)
System Turn Over Documentation
Coordinate with other construction packages in New Doha International Airport for interface activities.
Monitor the work flow

Page 3 of 7

4.

Qatar Gas - Plateau Maintenance Project (PMP) Plant Shut Down 2012 :

Project Description: Shut Down for Qatar Gas Process Train-1,2 & 3 for up gradation.
Company: SEPAM Group
Client: Technip Chiyoda Joint Venture (TCJV) / Qatar Gas
Designation: Electrical & Instrumentation Engineer
Scope: E&I Tie-Ins (Pre-Shut Down & Shut Down)
Reporting to: Project Manager
Duration: 03 Months (March - May 2012)
Responsibilities:
Preparation of Method statements (MS) & Job Safety Analysis (JSA) for all the shutdown & Pre-shutdown Tie-ins
Monitoring the Winpcs software and raising all shut down & Pre shut down Inspections for all E&I activities.
Attend Meetings with Clients Mechanical Handover/ System Turnover Departments and deliver the Tie-in Status.
Manages the Work Permits/ PTW (Permit to Work) for all the Construction Tie-Ins.
Quality documentation for Pre-shut down & Shutdown
In charge for handover of the approved test packs to client.
Close Coordination with other disciplines like piping and mechanical for avoiding any kind of delays to start the E&I Tie-In
Activities.
5.

Qatar Gas - Plateau Maintenance Project (PMP) Plant Shut Down 2011 :

Project Description: Shut Down for Qatar Gas Process Train-1 for up gradation.
Company: SEPAM Qatar W.L.L
Client: Technip Chiyoda Joint Venture (TCJV) & Qatar Gas
Designation: Electrical & Instrumentation Engineer
Scope: E&I Tie-Ins (Pre-Shut Down & Shut Down)
Reporting to: Project Manager
Duration: 04 Months (September 2010 December 2010, April 2011)
Responsibilities:
Preparation of Inspection and Test Plan (ITP) for entire Instrumentation Activities, which includes,
- Instrument Installation
- Instrument Calibration
- Instrument Cable Glanding & Termination
- Junction Boxes
- Fiber Optic Cables
- Panel Installation
- Telecom Equipment Installation
- Public Address Equipment Installation
Preparation of Inspection & Test Reports (ITR) for all the Instrument ITPs
Preparation of Method statements (MS) & Job Safety Analysis (JSA) for all the shutdown & Pre-shutdown Tie-ins
Monitoring the Winpcs software and raising all shut down & Pre shut down Inspections for all E&I activities.
Quality documentation for Pre-shut down & Shutdown
In charge for handover of the approved test packs to client.
6.

Qatar Gas - QCS Project:

Project Description: Qatar Gas-3 &4 Construction Project (Train 6 & 7)


Company: SEPAM Qatar W.L.L
Client: Chiyoda Technip Joint Venture (CTJV) / Qatar Gas
Designation: Electrical & Instrumentation Site Engineer
Scope: E&I Works
Reporting to: Construction Manager
Duration: 09 Months (November 2009 to July 2010)
Responsibilities:
Deliver Task Instruction.
Manages and Update the Construction Completion Matrix on Daily Basis.
Leading a Team of 4 Nos of Foremen, more than 50 direct manpower including Electricians, Pipe/Tube Fitters, Technicians &
PTW (Permit to Work) receivers.
Coordination and supervision of expatriate and national workers.
Coordination with other disciplines like piping and mechanical for the smooth flow of execution.
Coordinate with client and other subcontractors to align the activities.

Page 4 of 7

Attend Meetings with Clients Mechanical Handover/ System Turnover Departments and deliver the Construction Status.
Raising Construction Technical Query (CTQ).
Manages all Work Permits/ PTW (Permit to Work) for all the Construction Activities.
Responsible for installation of instruments including;
- All Process Transmitters
- Control Valves
- LV/Fiber Optic Cable Drums
- Airline/ Impulse piping & Tubing
- Junction Boxes
- Glanding & Termination
- Speakers, Beacon & Telephone Acoustic hoods & Telephones
Supervises the construction Progress of the following;
- Primary & Secondary Cable pulling Direct Buried / Above Ground / Indoor Cables
- Panel, Cabinet & Console Installations
- Field Instrument, Control valves & Junction Box Installation.
- All Instrument Calibration Inspections
- Glanding & Termination of Cables
- Impulse Tubing, Airline Tubing, Leak Testing & Steam Tracing
- Heat Tracing & Bundle Tube Inspections
- Cable Tray, Cable Ladder & Stub Up installation
- Analyzer Cabinet Installation & all related Inspections
- All Inspections in ITR (Instrument Technical Room) Rooms.
- Fiber Optic Cables & all related inspections including OTDR & Power Meter tests.
- All Telecom, Public Address & Voice Alarm related Inspections.
Coordinate with Client Material Warehouse for releasing of materials for Installation & Calibration.
Giving weekly work fronts to Foreman & monitor the Construction Progress.
Marking up the red lines drawings from Site.

7.

SEPAM Qatar Head Office

Company: SEPAM Group


Designation: Electrical & Instrumentation Engineer
Reporting to: Estimation Manager
Duration: On Call Basis
Responsibilities:
Estimation, Take off quantities, Site Survey and Tender Document Preparation for the following project, as a part of Project
Bidding;
- Oil & Gas / Petrochemical Projects
- Airport Projects
- Hi-tech & Iconic Building Projects
Take off & Estimation includes following facilities;
- Instrumentation Systems
- P&ID System
- Small Power
- Lighting Services
- Fire Alarm
- Public Address
- Video Surveillance System
- Telephone Distribution System
- Building Management System
8.

Technocrat Automations Solutions

Project Description: Home Automation Projects


Company: Technocrat Automation Solutions
Designation: Application Engineer
Reporting to: General Manager
Duration: November 2008 to October 2009
Responsibilities:
Progress Monitoring of all the Company Projects
Act as a coordinator between the company & Clients
Monitor performance of the work
Monitor overall progress of the projects against Schedule and milestones, as well as providing early warning of potential
slippage

Page 5 of 7

In charge of providing daily, monthly and weakly reports


Provide support to Cost & Contract department

Trainings

Factory Trained Stagecraft Certified Engineer for Lighting Transfer panels.


Co-ordinate Hamad International Airport- Doha End User Training for various disciplines.
Qatar Gas & RasGas Permit to Work Training
Qatar Gas & Qatar Hamad International Airport Defensive Driving Training.
Qatar Gas/ RasGas H2S/BA Training.
Qatar Gas Task instruction (TI) & Hazard Identification Training.
Other Qualification
.
ADVANCED TRAINING IN INDUSTRIAL AUTOMATION [ISO 9001-2000 CERTIFICATION].
- PLC (Programmable Logic Controller)
- DCS (Distributed Control System)
- SCADA (Supervisory Control & Data Acquisition)
- VFD (Variable Frequency Drive)
- Pneumatic & Field Instruments (Transmitters & Valves)
ELECTRONIC CORPORATION OF INDIA LIMITED [ECIT] CERTIFICATION IN OFFICE AUTOMATION.
- MS Word
- MS Excel
- MS Power Point
Professional Skills
..............................
Good Management Skills and capable of handling projects of any magnitude
Good in Crisis Management and have sound Technical Knowledge.
Good Interpersonal Skills.
Quick to learn & employ new knowledge and skills.
Lead and motivate others.
Work well in a Group
Work well under pressure.
Personal Details
.

Fathers Name
Age & Date of Birth
Gender
Nationality
Marital Status
Passport No.
Driving License

ABDUL KAYYOOM KV
28 & 16-11-1986
Male
:
Indian
:
Married
:
Z2948105 (Old Passport Reference:F4806160)
:
1. Indian
2. Qatar
Hobbies
:
Driving, Listening Music.
Personal Trait
:
Confident, Dedicated, Hardworking
Visa Status
: 1. Transferable Qatar Work Visa (Profession: Engineer)
2. Chinese Z - Category Employment Visa
Languages known
:
LANGUAGE
READ
WRITE
ENGLISH
ARABIC
HINDI
MALAYALAM
TAMIL

:
:
:

SPEAK

Declaration:

Page 6 of 7

I, hereby, declare that the personal, academic & Professional details furnished above are true and correct to the best of my knowledge
and belief.
Place: Sichuan, China
Date: 27-Nov-16

MOHAMED AFSAL KV

Page 7 of 7

Potrebbero piacerti anche