Sei sulla pagina 1di 13

INFORMACION DEPARTAMENTALIZADA

Area
ocupada
Mts. 2
55,000
45,000
15,000
15,000
20,000
10,000
160,000

DEPARTAMENTO
Corte
Ensamble
M. Maquinaria
M. Edificios
Almacen Materiales
Admn. Y Ventas
TOTALES

96

Personal
30
32
4
8
5
11
90

Sueldos y
Inversion
Salarios
Maq. Mob y
Indirctos Q. Equipo (1)
4,000
180,000
3,200
160,000
3,600
60,000
4,800
12,000
3,500
3,600
11,000
26,400
30,100
442,000

Energia
Materiales
Electrica
indirectos
12,000
5,960.00
8,000
9,040.00
2,000.00
1,389.00
254.00
3,000.00
20,000
21,643.00

Diversos
Gastos de
(3)
Fabricacion
350
1,618
250
374
30
391
40
10
20
20
114
700
2,517

DEPARTAMENTOS
Corte
Ensamble
M. Maquinaria
M. Edificio
Almacen Materiales
Admn y Ventas
TOTAL
total combustibles
Corte y Ensamble 70%
Corte c/H.MAQ.
Ensamble c/HMAQ:
Total HMAQ Corte
Total HMAQ Ensamble

Cdula No. 1
Combustibles y Lubricantes

70%
3,432.00
2,168.00

5,600.00
8000
5600
3.575
3.3875
960
640

30%

600.00
600.00
600.00
600.00
2,400.00

Total
3,432.00
2,168.00
600.00
600.00
600.00
600.00
8,000.00

Cedula No. 2
Seguros contra
Incendios
Inversion
Maq. Mob y
Equipo
180,000.00
160,000.00
60,000.00
282,000.00
3,600.00
26,400.00
712,000.00
Totalseguro
18%/activos/
factor

SOLUCION EJERCICI

FABRICA DE CAJAS M

EL ULTIMO ADI

dula No. 2
Seguros contra
Incendios

Factor 0.015
2,700.00
2,400.00
900.00
4,230.00
54.00
396.00
10,680.00

10,680.00
0.01500

Cedulas de Distribuci

Cedula No. 3
Prestaciones
Laborales
Sueldos y
Salarios
Indirectos
4,000.00
3,200.00
3,600.00
4,800.00
3,500.00
11,000.00
30,100.00

Sueldos y
Salarios
Directos
43,200.00
63,000.00

106,200.00

Total
47,200.00
66,200.00
3,600.00
4,800.00
3,500.00
11,000.00
136,300.00

Prestaciones Laborales
Factor

Factor
0.41104
19,401.09
27,210.85
1,479.74
1,972.99
1,438.64
4,521.44
56,024.75

Cedula No. 4
Terrenos y Ed
Depreciacion
Area
ocupada
Mts2
55,000
45,000
15,000
15,000
20,000
10,000
160,000.00

v/edificio
0.41104 Dep. mensual 0. 833%
Factor

SOLUCION EJERCICIO No. 5

BRICA DE CAJAS MORTUORIAS


EL ULTIMO ADIOS

edulas de Distribucion Primaria


Cedula No. 5

dula No. 4
Terrenos y Edificios
Depreciacion

Total
Factor
Depreciacion
0.01405688
773.13
0.01405688
632.56
0.01405688
210.85
0.01405688
210.85
0.01405688
281.14
0.01405688
140.57
2,249.10

. mensual 0. 833%

270000
2249.1
0.01405688

Viticos y Gastos de
Transporte

Personal
30
32
4
8
5
11
90

Factor
20
20
20
20
20
20

Total Q.
600.00
640.00
80.00
160.00
100.00
220.00
1,800.00

Cedula No 6

Energia Electri

400
300
150
448.8
1298.8
TOTAL E.E.
TOTAL DEPTOS
DIF A DIST.
1901.2/E.E Corte y ensamb

dula No 6
Energia Electrica

Factor 0.095
1140.72
760.48

1901.2

AL DEPTOS

1.2/E.E Corte y ensamb

Total
1,140.72
760.48
400.00
300.00
150.00
448.80
3,200.00

Cedula No. 7 Cedula No. 8


IUSI
Alquileres

Factor 0.025
0.025
0.025
0.025
900.00
0.025
0.025
0.025
900.00

3,200.00 900,000 X 12%/12


1,298.80
1,901.20
0.09506

Total
1,375.00
1,125.00
375.00
375.00
500.00
250.00
4,000.00

Cedula No. 9
Dep. Mob. Mq. Y

Inversion
180,000
160,000
60,000
12,000
3,600
26,400
442,000
442,000 x12
mensual
4420/442,000

dula No. 9
Dep. Mob. Mq. Y Equipo

Factor
0.01
0.01
0.01
0.01
0.01
0.01

53040
4420
0.01

Total
1,800.00
1,600.00
600.00
120.00
36.00
264.00
4,420.00

FABRICA DE CAJAS MORTUORIAS


HOJA TECNICA DE DISTRIBUCION PRIMARIA Y SECUNDARIA
GASTOS DE FABRICACION
960

7776

20
1
8
160
30
4800
43200
9.00

Ensamble
20
1
8
160
32
5120
63000
12.30

4,000.00
5,960.00
1,618.00
3,432.00
2,700.00
19,401.09
773.13
600.00
1,140.72

3,200.00
9,040.00
374.00
2,168.00
2,400.00
27,210.85
632.56
640.00
760.48

3,600.00
2,000.00
391.00
600.00
900.00
1,479.74
210.85
80.00
400.00

1,375.00
1,800.00
42,799.94

1,125.00
1,600.00
49,150.89

375.00
600.00
10,636.60

5,270.25
4,544.44
7776

5,270.25
3,246.03

1,505.78
389.52
12,531.91

Corte
Dias Trabajados
Jornada de Trabajo
Horas Diarias
Horas Fabrica
No. De Obreros
Horas Hombre
Mano de Obra
CHH MO
GASTOS DE FABRICACION
DISTRIBUCION PRIMARIA
Sueldos Indirectos
Materiales Indirectos
Diversos Gastos de Fabricacion
Combustibles y Lubricantes
Seguros contra Incendios
Prestaciones Laborales
Depreciacion Edificios
Viaticos y Gastos de Transp.
Energia Electrica
IUSI
Alquileres
Dep. Maq. Mob y Equipo
TOTAL DIST. PRIMARIA
DISTRIBUCION SECUNDARIA
Mantenimiento Edificios
Almacen de Materiales
Mantenimiento de Maquinaria

M. Maq.
20
1
8
160
4
640

corte c/HM
Ensamble c/HH
Total HM Corte
Total HH Ensamble

Almacen
Material
20
1
8
160
5
800

Admn. Y
Ventas
20
1
8
160
11
1760

4,800.00
1,389.00
0.00
600.00
4,230.00
1,972.99
210.85
160.00
300.00
900.00
375.00
120.00
15,057.85

3,500.00
254.00
20.00
600.00
54.00
1,438.64
281.14
100.00
150.00

11,000.00
3,000.00
114.00
600.00
396.00
4,521.44
140.57
220.00
448.80

500.00
36.00
6,933.78

250.00
264.00
20,954.81

(15,057.85)

1,505.78
8,439.68

1,505.78
259.68

M. Edif.
20
1
8
160
8
1280

8.1
6.7
960
5120

Total

hh

14400

30,100.00
21,643.00
2,517.00
8,000.00
10,680.00
56,024.75
2,249.10
1,800.00
3,200.00
900.00
4,000.00
4,420.00
145,533.85
-

Almacen Materiales
Admn. Y Ven
5120

20
20
6.7

34304

700

Corte
Ensamble
M. Maquinaria
M. Edificios
Almacen Materiales
Admn. Y Ventas

350 12.9841231
250 12.9841231
30 12.9841231
12.9841231
12.9841231
20 12.9841231
650

4,544.44
3,246.03
389.52
259.68
8,439.68

Potrebbero piacerti anche