VALORIZACIN N 18 a AGOST.2016
OBRA
UBICACIN
ENTIDAD CONTRATANTE
COORDINADOR DE OBRA
SISTEMA DE CONTRATACION
A PRECIOS UNITARIOS
284,833.18
(C/IGV)
284,833.18
(C/IGV)
284,833.18 GENERAL
PLAZO CONTRATADO
90 DIAS CALENDARIO
18-Aug-2016
10-Dec-2016
RESUMEN DE VALORIZACION
PROCESO
OBRA
: 0
: Mejoramiento de la I.E. N 101118 C. P La Libertad I Etapa
MONTO CONTRATO
VALORIZACION N
: 284,833.18
: 18 a AGOST.2016
(C/IGV)
CONCEPTO
A)
MONTO
VALORIZACIONES
- Valorizacin
- Reajustes
- Otros
6,296.67
157.42
0.00
-------------------------6,454.09
B)
AMORTIZACIONES
- Adelanto Directo
- Adelanto por Materiales
- Otros
- Fiel Cumplimiento
AMORTIZACION (D)
6,453.79
(VBD)
(VN)
(0.18xVN)
D)
S/.
S/.
6,453.79
1,161.68
--------------------------
S/.
7,615.47
- EJECUTADO
- RESPECTO AL PROGRAMADO
J. A. V.
(d+e+f+g)
8/31/2016
18.00%
23.09%
128.28%
(a+b+c)
0.10
0.20
0.00
0.00
-------------------------0.30
C)
E)
(a)
(b)
(c)
(d)
(e)
(f)
(g)
VALO R I ZAC I O N
OBRA
CAPITULO
CONTRATISTA
SUPERVISOR
VALORIZACION N
ITEM
1
1.01
1.02
2
2.01
2.02
3
3.01
3.02
3.03
3.04
3.05
3.06
3.07
3.08
4
4.01
4.02
4.03
4.04
5
5.01
5.01.01
5.01.02
5.02
5.02.01
5.02.02
5.02.03
5.03
5.03.01
5.03.02
5.03.03
5.04
5.04.01
5.04.02
5.04.03
5.05
5.05.01
5.05.02
5.05.03
5.06
5.06.01
5.06.02
5.06.03
5.06.04
5.07
5.07.01
5.07.02
5.07.03
6
6.01
6.02
7.00
7.01
7.02
7.03
7.04
7.05
8
8.01
9
9.01
9.02
9.03
9.04
10
10.01
10.02
11
11.01
11.02
11.03
12
12.01
12.02
13
13.01
14
14.01
15
15.01
16
J.A.V.
UND.
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE OBRA DE 2.40X4.80 M
und
ALMACEN DE MATERIALES Y HERRAMIENTAS
mes
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
m2
TRAZO Y REPLANTEO
m2
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL PARA ESTRUCTURAS+
m3
NIVELACION INTERIOR APISONADO MANUAL
m2
RELLENO CON MATERIAL PROPIO
m3
RELLENO CON AFIRMADO Y/O MATERIAL GRANULAR INC. COMPACT C/ EQUIPO LIV m3
RELLENO CON GRAVA
m3
RELLENO CON PIEDRA MEDIANA
m3
RELLENO CON HORMIGON INC. COMPACT. C/EQUIPO
m3
ELIMINACION DE MATERIAL DMT=5 KM +
m3
OBRAS DE CONCRETO SIMPLE
SOLADO PARA ZAPATAS DE 3" MEZCLA 1:12 CEMENTO-HORMIGON
m2
CIMIENTOS CORRIDOS
m3
ENCOFRADO Y DESENCOF.PARA SOBRECIMIENTO DE 0.30 A 0.60 MT +
m2
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS +
m3
OBRAS DE CONCRETO ARMADO
ZAPATAS
CONCRETO FC=175 KG/CM2 PARA ZAPATAS +
m3
ACERO DE REFUERZO GRADO 60
kg
VIGAS DE CONEXION
CONCRETO EN VIGAS DE CONEXION FC=210 KG/CM2 +
m3
ENCOFRADO Y DESENCOFRADO EN VIGAS DE CONEXION
m2
ACERO DE REFUERZO GRADO 60
kg
COLUMNAS DE AMARRE
CONCRETO EN COLUMNAS F'C=175 KG/CM2 +
m3
ENCOFRADO Y DESENCOFRADO EN COLUMNAS +
m2
ACERO DE REFUERZO GRADO 60
kg
COLUMNAS
CONCRETO EN COLUMNAS F'C=210 KG/CM2 +
m3
ENCOFRADO Y DESENCOFRADO EN COLUMNAS +
m2
ACERO DE REFUERZO GRADO 60
kg
VIGAS
CONCRETO EN VIGAS F'C=210 KG/CM2+
m3
ENCOFRADO Y DESENCOFRADO EN VIGAS (TIPICAS) +
m2
ACERO DE REFUERZO GRADO 60
kg
LOSAS ALIGERADAS
ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS +
m2
ACERO DE REFUERZO GRADO 60
kg
CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2 +
m3
LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO
und
ESCALERAS
CONCRETO EN ESCALERAS F'C=210 KG/CM2+
m3
ACERO DE REFUERZO GRADO 60 kg
kg
ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS+
m2
ALBAILERIA
MURO DE CABEZA LADRILLO KING KONG CON CEMENTO ARENA 1:5
m2
MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA 1:5
m2
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO DE MUROS INTERIORES Y EXTERIORES C:A, 1:5
m2
TARRAJEO DE SUPERFICIE DE VIGAS CON CEMENTO-ARENA
m2
TARRAJEO EN SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA+
m2
VESTIDURA DE DERRAMES+
m
BRUAS
m
CIELORASOS
CIELORRASOS CON MEZCLA DE CEMENTO-ARENA+
m2
PISOS Y PAVIMENTOS
FALSO PISO DE C:H 1:8 e=10 CM
m2
CONTRAPISO DE MORTERO DE 40MM. PARA PISOS+
m2
PISO DE CEMENTO PULIDO (e= 2") F'C= 140 KG/CM2 ACABADO 1CM, MEZCLA 1:2+
m2
PISO DE CERAMICO 30x30 CM.
m2
VEREDAS
VEREDA DE CONCRETO f'c=140kg/cm2, E=4", base 8.5cm, acabado 1.5cm, pasta 1:2+
m2
ENCOFRADO Y DESENCOFRADO DE VEREDAS+
m2
DRENAJE PLUVIAL
ENCOFRADO Y DESENCOFRADO DE CUNETAS+
m2
CONCRETO FC=140 KG/CM2 PARA CANALETAS+
m3
REJILLA METALICA PARA CANALETA DE PISO
m
ZOCALOS
CONTRAZOCALO DE CEMENTO SIN COLOREAR H= 0.30M.
m2
ZOCALO DE CERAMICA DE COLOR+
m2
CARPINTERIA DE MADERA
PUERTA DE MADERA PTA EN OBRA
und
CARPINTERIA METALICA
VENTANA METALICA INCLUYE REJILLA DE SEGURIDAD Y COLOCACION
m2
VIDRIOS, CRISTALES Y SIMILARES
VIDRIOS SEMIDOBLE INCOLORO CRUDO+
p2
PINTURA
METRADO
PRECIO
UNITARIO
1.00
3.00
829.94
200.00
324.76
324.76
6.18
1.46
181.45
149.55
50.80
22.76
45.52
14.34
61.32
143.71
12.36
1.03
6.62
79.85
67.75
77.92
90.37
17.31
119.48
23.62
114.16
13.31
21.05
157.18
20.56
199.97
35.42
938.00
291.40
4.42
12.92
104.37
1,889.00
312.53
31.00
4.42
0.37
7.06
111.00
314.36
40.17
4.42
5.03
68.86
1,549.00
350.65
40.17
4.42
13.21
103.99
2,126.00
309.88
43.22
4.42
208.08
1,116.00
13.27
1,584.48
29.16
4.42
316.83
3.13
4.91
273.00
29.63
312.48
4.42
42.53
79.74
86.55
61.59
37.00
332.59
116.08
55.39
194.70
159.46
11.15
19.49
17.66
11.74
3.38
208.08
25.51
167.99
148.81
169.99
148.81
29.85
22.05
20.38
44.05
105.90
31.22
38.09
10.44
58.24
9.71
97.06
15.36
299.82
57.06
110.43
85.20
6.20
45.54
3.00
338.98
39.38
125.03
418.46
5.96
PRESUP.
PARCIAL
829.94
600.00
0.00
2,007.02
474.15
0.00
2,242.72
154.04
336.30
1,817.39
3,083.98
1,117.37
5,541.49
2,487.62
0.00
2,515.05
3,712.59
2,347.13
2,661.60
0.00
0.00
10,321.39
4,145.96
0.00
4,037.89
3,235.47
8,349.38
0.00
116.31
283.60
490.62
0.00
1,763.77
2,766.11
6,846.58
0.00
4,093.51
4,494.45
9,396.92
0.00
6,067.61
4,932.72
4,204.33
4,959.42
0.00
1,534.28
1,206.66
1,260.16
0.00
4,911.19
3,202.35
0.00
3,708.38
2,262.40
978.19
2,285.78
538.97
0.00
5,308.12
0.00
5,014.50
3,281.26
3,464.40
6,555.08
0.00
4,033.73
325.94
0.00
894.57
2,911.25
5,538.24
0.00
684.67
3,880.01
0.00
1,016.94
0.00
4,923.68
0.00
2,494.02
0.00
ACUMULADO ANTERIOR
METRADO
MONTO
VALO R I ZAC I O N
OBRA
CAPITULO
CONTRATISTA
SUPERVISOR
VALORIZACION N
ITEM
16.01
16.02
16.03
16.04
17
17.01
17.02
17.03
17.04
17.05
17.06
17.07
18
18.01
18.02
18.03
18.04
18.05
UND.
COSTO DIRECTO
METRADO
PRECIO
UNITARIO
m2
m2
m2
m
332.59
171.46
208.08
110.43
5.11
5.40
6.21
1.78
pto
und
pto
pto
und
pza
und
19.00
19.00
12.00
5.00
1.00
1.00
1.00
58.68
43.74
49.42
78.79
184.32
56.13
438.86
und
m
glb
mes
m2
3.00
5.40
1.00
3.00
324.76
296.61
736.46
10,859.33
532.05
0.62
PRESUP.
PARCIAL
ACUMULADO ANTERIOR
METRADO
MONTO
1,699.53
925.88
1,292.18
196.57
0.00
1,114.92
831.06
593.04
393.95
184.32
56.13
438.86
0.00
889.83
3,976.88
10,859.33
1,596.15
201.35
209,899.18
GASTOS GENERALES
8.00%
16,791.93
UTILIDAD
7.00%
14,692.94
241,384.05
241,384.05
COSTO PARCIAL
FACTOR DE RELACION
1.00000
J.A.V.
0.00%
VALO R I ZAC I O N
VALOR REFERENCIAL
MONTO CONTRATADO
FACTOR DE RELACION
VALORIZACION ACTUAL
METRADO
VALORIZACION ACUMULADA
MONTO
1.00
1.00
829.94
600.00
324.76
324.76
2,007.02
474.15
181.45
149.55
50.80
45.52
14.34
143.71
2,242.72
154.04
336.30
3,083.98
1,117.37
2,487.62
119.48
15.12
2,515.05
2,376.56
-
35.42
938.00
10,321.39
4,145.96
1,889.00
8,349.38
-
1,549.00
130.00
J.A.V.
6,846.58
574.60
-
METRADO
1.00
1.00
324.76
324.76
181.45
149.55
50.80
45.52
14.34
143.71
119.48
15.12
35.42
938.00
1,889.00
1,549.00
130.00
-
MONTO
829.94
600.00
2,007.02
474.15
2,242.72
154.04
336.30
3,083.98
1,117.37
2,487.62
2,515.05
2,376.56
10,321.39
4,145.96
8,349.38
6,846.58
574.60
-
284,833.18
284,833.18
1.00000
SALDO POR VALORIZAR
METRADO
MONTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,817.39
0.00
0.00
5,541.49
0.00
0.00
0.00
1,336.03
2,347.13
2,661.60
0.00
0.00
0.00
0.00
0.00
4,037.89
3,235.47
0.00
0.00
116.31
283.60
490.62
0.00
1,763.77
2,766.11
0.00
0.00
4,093.51
4,494.45
9,396.92
0.00
6,067.61
4,932.72
4,204.33
4,959.42
0.00
1,534.28
632.06
1,260.16
0.00
4,911.19
3,202.35
0.00
3,708.38
2,262.40
978.19
2,285.78
538.97
0.00
5,308.12
0.00
5,014.50
3,281.26
3,464.40
6,555.08
0.00
4,033.73
325.94
0.00
894.57
2,911.25
5,538.24
0.00
684.67
3,880.01
0.00
1,016.94
0.00
4,923.68
0.00
2,494.02
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
22.76
0.00
0.00
61.32
0.00
0.00
0.00
8.50
114.16
13.31
0.00
0.00
0.00
0.00
0.00
12.92
104.37
0.00
0.00
0.37
7.06
111.00
0.00
5.03
68.86
0.00
0.00
13.21
103.99
2,126.00
0.00
208.08
1,116.00
13.27
1,584.48
0.00
4.91
143.00
29.63
0.00
79.74
86.55
0.00
332.59
116.08
55.39
194.70
159.46
0.00
208.08
0.00
167.99
148.81
169.99
148.81
0.00
105.90
31.22
0.00
58.24
9.71
97.06
0.00
110.43
85.20
0.00
3.00
0.00
39.38
0.00
418.46
0.00
VALO R I ZAC I O N
VALOR REFERENCIAL
MONTO CONTRATADO
FACTOR DE RELACION
VALORIZACION ACTUAL
METRADO
284,833.18
284,833.18
1.00000
VALORIZACION ACUMULADA
MONTO
METRADO
MONTO
METRADO
MONTO
332.59
171.46
208.08
110.43
0.00
19.00
19.00
12.00
5.00
1.00
1.00
1.00
0.00
3.00
5.40
1.00
3.00
324.76
0.00
1,699.53
925.88
1,292.18
196.57
0.00
1,114.92
831.06
593.04
393.95
184.32
56.13
438.86
0.00
889.83
3,976.88
10,859.33
1,596.15
201.35
0.00
48,462.66
48,462.66
161,436.52
3,877.01
3,877.01
12,914.92
3,392.39
3,392.39
11,300.55
55,732.06
55,732.06
185,651.99
55,732.06
55,732.06
185,651.99
23.09%
76.91%
55,732.06
23.09%
J.A.V.
:
0
: Mejoramiento de la I.E. N 101118 C. P La Libertad I Etapa
ENTIDAD
CONTRATISTA
SUPERVISION
FECHA
100.00%
100.00%
90.00%
80.00%
70.00%
60.00%
50.00%
40.00%
33.00%
30.00%
20.00%
23.09%
18.00%
10.00%
0.00%
JUL
1 - 12
AGO - 12
OCT - 12
SET - 12
EJECUTADO ACUMULADO
NOV - 12
DIC - 12
ENE - 13
FEB - 13
PROGRAMADO ACUMULADO
JUL - 12
AGO - 12
SET - 12
AVANCE
PROGRAMADO S/.
43,449.13
36,207.61
161,727.31
42,724.98
190,838.23
15.00%
67.00%
RESPECTO AL PROGRAMADO
33.00%
100.00%
SIN IGV
EJECUTADO S/.
55,732.06
AVANCE
PROGRAMADO S/.
51,269.97
CON IGV
EJECUTADO S/.
65,763.83
AVANCE
MENSUAL
AVANCE
ACUMULADO
J.A.V.
PROGRAMADO %
18.00%
EJECUTADO %
23.09%
PROGRAMADO
18.00%
EJECUTADO
23.09%
128.28%
MAR - 13
:
:
:
:
284,833.18
241,384.05
18-Aug-2016
10-Dec-2016
VAL.
FECHA
01
02
03
04
05
06
07
08
09
31.AGO.12
30.SET12
31.OCT.12
30.NOV.12
31.DIC.12
31.ENE.13
28.FEB.13
13.MAR.13
31.AGO.12
30.SET12
31.OCT.12
VALO R I ZAC I O N
PARCIAL
ACUMULADA
(V)
43,449.13
43,449.13
36,207.61
79,656.74
161,727.31
241,384.05
0.00
241,384.05
0.00
241,384.05
0.00
241,384.05
0.00
241,384.05
0.00
241,384.05
0.00
241,384.05
18.00%
15.00%
67.00%
100.00%
0.18
0.15
0.67
1
284,833.18
S/IGV
241,384.05
IGV
0.00
0.00