Sei sulla pagina 1di 36

Date Over-due

Dont need to submit


Revise & Resubmit
M&E Shop Drawing Register
Combine Service Drawing & Structural Electrical and Mechanical Drawing ( CSD & SEM )
Item

Dwg No.

Dwg Title

QJI-SS-M&E-CSD-B1-PLAN-01

CSD Plan Drawing @ Basement 1 Under Slab

QJI-SS-M&E-CSD-B1-PLAN-02

CSD Plan Drawing @ Basement 1 High Level Part 1

Updated date:
Target
Submission
Date

3-Oct-14

17-Mar-15
2

QJI-SS-M&E-CSD-B1-PLAN-02

CSD Plan Drawing @ Basement 1 High Level Part 2

QJI-SS-M&E-CSD-B1-SEC-01

CSD Section Drawing @ Basement Section-01 (High Level)

QJI-SS-M&E-CSD-B1-SEC-02

CSD Section Drawing @ Basement Section-02 (High Level)

QJI-SS-M&E-CSD-B1-SEC-03

CSD Section Drawing @ Basement Section-03 (High Level)

QJI-SS-M&E-CSD-B1-SEC-04

CSD Section Drawing @ Basement Section-04 (High Level)

QJI-SS-M&E-CSD-B1-SEC-05

CSD Section Drawing @ Basement Section-05 (High Level)

QJI-SS-M&E-CSD-B1-SEC-06

CSD Section Drawing @ Basement Section-06 (High Level)

QJI-SS-M&E-CSD-B1-SEC-07

CSD Section Drawing @ Basement Section-07 (High Level)

10

QJI-SS-M&E-CSD-B1-SEC-08

CSD Section Drawing @ Basement Section-08 (High Level)

11

QJI-SS-M&E-CSD-B1-SEC-09

CSD Section Drawing @ Basement Section-09 (High Level)

Target
Approval
Date

17-Oct-14

1-Apr-15

1st Submission
Date
Submitted

17-Mar-15

17-Mar-15

17-Mar-15
17-Mar-15
17-Mar-15
17-Mar-15
17-Mar-15

1-Apr-15
1-Apr-15

1-Apr-15

1-Apr-15
1-Apr-15

12

QJI-SS-M&E-CSD-B1-SEC-10

CSD Section Drawing @ Basement Section-10 (High Level)

12

QJI-TS-BM-CB-SEM-01

SEM Drawing Submission (Penetration for M&E sevices


at Building Paramenter)

13

QJI-SS-M&E-SEM-B1PLAN-01

Structural Mechanical & Electrical Plan


and Section Drawings for Basement 1 (Under Slab)

15

QJI-SS-M&E-SEM-B1Sec-01(P-1)

Structural, Electrical & Mechanical Drawing for Basement


Section 1 (Under Slab )part1 of 2

13-Jan-15

16

QJI-SS-M&E-SEM-B1Sec-01(P-2)

Structural, Electrical & Mechanical Drawing for Basement


Section 1 (Under Slab )part2 of 2

17

QJI-SS-M&E-SEM-B1Sec-02(P-1)

18

QJI-SS-M&E-SEM-B1Sec-02(P-2)

Date
Commented

23May14

19Jun14

11-Jul-14

20-May-14

23May14
3Feb15
23May14
3Feb15

11-Jul-14

3rd Submission
Date
Submitted

Date
Commented

Submission
Ref.

Status
Revise & Resubmit
Revision 0 (Plan Only) is
referred to
(QJI-SS-SFA-M&E-001)

19Jun14

11-Jul-14

10-Mar-15

Supersede

19Jun14
10Mar15
19Jun14
10Mar15
3Oct14
17Mar15
3Oct14
17Mar15

19Jun14

11-Jul-14

3Oct14

16-Oct-14

5-Jan-15

3Feb15

10-Mar-15

2-Apr-15

19Jun14

11-Jul-14

3Oct14

16-Oct-14

5-Jan-15

3Feb15

10-Mar-15

2-Apr-15

19Jun14

11-Jul-14

3Oct14

16-Oct-14

5-Jan-15

3Feb15

10-Mar-15

2-Apr-15

Revise No-Resubmission
Required

3Oct14

16-Oct-14

5-Jan-15

3Feb15

10-Mar-15

2-Apr-15

Revise No-Resubmission
Required

5-Jan-15

3Feb15

Supersede

3Oct14
17Mar15
3Oct14
17Mar15

16-Oct-14

10-Mar-15

Revise No-Resubmission
Required

5-Jan-15

3Feb15

Revise No-Resubmission
Required

3Oct14

16-Oct-14

5-Jan-15

3Feb15

5-Jan-15
20-May-14

19Jun14

11-Jul-14

10-Mar-15

Supersede

1-Apr-15
1-Apr-15
1-Apr-15
10-Mar-15

17-Mar-15

Date
Submitted

20-May-14

5-Jan-15
17-Mar-15

Date
Commented

2nd Submission

25-Jul-15

Supersede

1-Apr-15

16-Oct-14

Supersede

3Oct14
17Mar15
3Oct14
17Mar15

16-Oct-14

5-Jan-15

3Feb15

Revise No-Resubmission
Required

5-Jan-15

3Feb15

Revise No-Resubmission
Required
Revise No-Resubmission
Required

Supersede
11-Jul-14

Revise No-Resubmission
Required

2-Apr-15
16-Oct-14

Revise No-Resubmission
Required

2-Apr-15

2-Apr-15
16-Oct-14
2-Apr-15

QJI-SS-SFA-M&E-001(REV-4)

2-Apr-15
16-Oct-14
2-Apr-15

10-Mar-15

Supersede

17Mar15

2-Apr-15

17Mar15

2-Apr-15

Revise No-Resubmission
Required

Revise No-Resubmission
Required

17-Mar-15

1-Apr-15

10-Mar-15

Supersede

5-Apr-14

9-Apr-14

5-Apr-14

15Apr14

13-Jan-14

28-Jan-15

19-Jun-14

11Jul14

13-Jan-14

5Feb15

28-Jan-15

19-Jun-14

11Jul14

2Sep14

3-Dec-14

2-Sep-14

5-Oct-14

19-Jun-14

11Jul14

2Sep14

3-Dec-14

Structural, Electrical & Mechanical Drawing for Basement


Section 2(Under Slab )part1 of 3

13-Jan-15

28-Jan-15

19-Jun-14

11Jul14

2Sep14

3-Dec-14

13-Jan-15

Structural, Electrical & Mechanical Drawing for Basement


Section 2(Under Slab )part2 of 3

13-Jan-15

28-Jan-15

19-Jun-14

11Jul14

2Sep14

3-Dec-14

13-Jan-15

QJI-TS-SFA-M&E-002

20May14

23-May-14

Revise No-Resubmission
Required

2Sep14

To incorporate FH pipe
sleve and new telephone
lead-in pipes

3-Dec-14
Revise & Resubmit

1/38

13-Jan-15

5Feb15

QJI-SS-SFA-M&E-002 ( Rev-3 )

Revise & Resubmit


Revise No-Resubmission
Required

5Feb15

Revise & Resubmit


Revise No-Resubmission
Required

19

QJI-SS-M&E-SEM-B1Sec-02(P-3)

Structural, Electrical & Mechanical Drawing for Basement


Section 2(Under Slab )part3 of 3

20

QJI-SS-M&E-SEM-B1PLAN-02

Structural Electrical and Mechanical Plan


and Section Drawings for Basement 1 Plan(High Level)

13-Jan-15

28-Jan-15

9-Jul-15

23-Jul-15

19-Jun-14

11Jul14

2Sep14

3-Dec-14

13-Jan-15

11-Nov-14

23-Dec-14

5-Feb-15

Revise No-Resubmission
Required

27-Feb-15

QJI-SS-M&E-SEM-B1PLAN-02
21

QJI-SS-M&E-SEM-B1Sec-03

22

QJI-SS-M&E-SEM-B1Sec-03a

23

QJI-SS-M&E-SEM-B1Sec-03b

Structural Electrical and Mechanical Plan


and Section Drawings for Basement 1
( Under Slab & High Level )Section
Structural Electrical and Mechanical Plan
and Section Drawings for Basement 1

19-Jun-14
9-Jul-15

11Jul14

23-Jul-15

QJI-SS-SFA-M&E-002
( Rev-5 )

11Nov14

23-Dec-14

5-Feb-15

27-Feb-15

11Nov14

23-Dec-14

5-Feb-15

27-Feb-15

Revise & Resubmit

9-Jul-15
Structural Electrical and Mechanical Plan
and Section Drawings for Basement 1
( Under Slab & High Level )

9-Jul-15

23-Jul-15
9-Jul-15

24

QJI-SS-M&E-SEM-B1Sec-03c

25

QJI-SS-M&E-SEM-B1Sec-03d

26

QJI-SS-M&E-CSD-L1-FCC

27

QJI-SS-M&E-CSD-L1-SEC-03

Structural Electrical and Mechanical Plan


and Section Drawings for Basement 1
( Under Slab & High Level )
Structural Electrical and Mechanical Plan
and Section Drawings for Basement 1
( Under Slab & High Level )
Combined Services Drawing For Level 1 Plan
( FCC/CCTV Room )
Combined Services Section Drawing For
Level 1 ( Section-3 )( FCC/CCTV Room )

11-Nov-14

25-Nov-14

11Nov14

23-Dec-14

Revise & Resubmit

11-Nov-14

25-Nov-14

11Nov14

23-Dec-14

Revise & Resubmit

24-Jul-14

14-Aug-14

24Jul14

Supersede

24-Dec-14

29-May-15

QJI-SS-SFA-M&E-003
(Rev-1)

Revise-No Resubmission
Required

24-Jul-14

14-Aug-14

24Jul14

Supersede

24-Dec-14

29-May-15

QJI-SS-SFA-M&E-004(Rev-1)

Revise-No Resubmission
Required

20-Jan-15

3-Feb-15

20-Jan-15

20-Jan-15

11-Feb-15

20-Jan-15

3-Feb-15

20-Jan-15

20-Jan-15

11-Feb-15

20-Jan-15

3-Feb-15

20-Jan-15

20-Jan-15

11-Feb-15

20-Jan-15

11-Feb-15

QJI-SS-M&E-SEM-L1-PLAN
(Part Print)GL XA-XD/Y1-Y4
QJI-SS-M&E-SEM-L1-SEC
(Part Print-1)
QJI-SS-M&E-SEM-L1-SEC
(Part Print-2)
QJI-SS-M&E-CSD-L1-PLAN
(Part Print)GL XA-XD/Y1-Y4

Structural, Electrical & Mechanical Drawing For Level 1 Plan(Part


Print) Grid Line-XA-XD/Y1-Y4
Structural, Electrical & Mechanical Drawing For Level 1 SectionAA(Part Print) Grid Line-XC-XD/Y3
Structural, Electrical & Mechanical Drawing For Level 1 SectionAA(Part Print) Grid Line-XA-XB/Y3
Part Print of Combined Service Drawing Plan(GL XA-XD/Y1-Y4)

20-Jan-15

3-Feb-15

20-Jan-15

32

QJI-SS-M&E-SEM-FO-01

Structural, Electrical and Mechanical Floor Opening @ Level 1

3-Mar-15

17-Mar-15

24-Nov-14

27-Nov-14

27-Jan-15

25-Feb-15

33

QJI-SS-M&E-SEM-L1-PLAN
(P-1)

Structural, Mechanical & Electrical Drawing @ Level 1


(Part-1)

24-Mar-15

7-Apr-15

11-Feb-15

11-Mar-15

24-Mar-15

25-Mar-15

34

QJI-SS-M&E-SEM-L1-PLAN
(P-2)

Structural, Mechanical & Electrical Drawing @ Level 1


(Part-2)

11-Feb-15

25-Feb-15

11-Feb-15

11-Mar-15

35

QJI-SS-M&E-SEM-L1-Sec-01

Structural, Mechanical & Electrical Drawing @ Level 1


Section 01

24-Mar-15

7-Apr-15

11-Feb-15

11-Mar-15

28
29
30
31

Revise & Resubmit

QJI-SS-SFA-M&E-005

Revise & Resubmit


Revise & Resubmit

3-Mar-15

23-Mar-15

QJI-SS-SFA-M&E-006

Revise & Resubmit

QJI-SS-SFA-M&E-007(Rev-1)

Revise-No Resubmission
Required
Revise No-Resubmission
Required
Revise No-Resubmission
Required

24-Mar-15

25-Mar-15

Rejected

QJI-SS-SFA-M&E-008(Rev-1)

36

QJI-SS-M&E-SEM-L1-Sec-02

Structural, Mechanical & Electrical Drawing @ Level 1


Section 02

11-Feb-15

25-Feb-15

11-Feb-15

11-Mar-15

No Exeption Taken

37

QJI-SS-M&E-SEM-L1-Sec-03

Structural, Mechanical & Electrical Drawing @ Level 1


Section 03

11-Feb-15

25-Feb-15

11-Feb-15

11-Mar-15

Revise No-Resubmission
Required

38

QJI-SS-M&E-SEM-L1-Sec-04

Structural, Mechanical & Electrical Drawing @ Level 1


Section 04

11-Feb-15

25-Feb-15

11-Feb-15

11-Mar-15

Revise & Resubmit

39

QJI-SS-M&E-CSD-L1
(Part Print-1)

Combined Service Drawing for L1(Part Print-1)

19-Mar-15

2-Apr-15

19-Mar-15

20-Mar-15

Revise-No Resubmission
Required

40

QJI-SS-M&E-SEM-L1
(Part Print-1)

Structural, Mechanical & Electrical Drawing For L1


(Part Part-1)

19-Mar-15

2-Apr-15

19-Mar-15

20-Mar-15

41

QJI-SS-M&E-SEM-B1-HIGHLEVEL(PART PRINT-2)

Structural, Mechanical & Electrical Drawing For Basement High


Level(Part Print-2)

20-Mar-15

3-Apr-15

20-Mar-15

21-Mar-15

QJI-SS-SFA-M&E-010

No Exeption Taken

42

QJI-SS-M&E-SEM-B1-HIGHLEVEL(PART PRINT-3)

Structural, Mechanical & Electrical Drawing For Basement High


Level(Part Print-3)

21-Mar-15

3-Apr-15

21-Mar-15

25-Mar-15

QJI-SS-SFA-M&E-011

Revise No-Resubmission
Required

QJI-SS-SFA-M&E-009

2/38

Revise-No Resubmission
Required

43

QJI-SS-M&E-SEM-FO-02

SEM Drawing (Floor Opening) At Level 2

44

QJI-SS-M&E-B1-PROPOSEDLOWER HEAD ROOM-01

45

QJI-SS-SFA-M&E-012

Revise No-Resubmission
Required

QJI-SS-SFA-M&E-013(Rev-1)

Revise No-Resubmission
Required

QJI-SS-SFA-M&E-014

Revise No-Resubmission
Required

30-Mar-15

13-Apr-15

30-Mar-15

2-Apr-15

Proposed M&E Services Lower Head Room For Basement High


Level

8-Apr-15

23-Apr-15

7-Apr-15

Supersede

QJI-SS-M&E-SEM-FO-03

SEM Drawing (Floor Opening) At Level 3

10-Apr-15

24-Apr-15

10-Apr-15

13-May-15

46

QJI-SS-M&E-CSD-L1-PLAN (P-1)

Combined Services Drawing For Level 1 Plan (Part-1)

17-Jun-15

2-Jul-15

13-Apr-15

13-May-15

17-Jun-15

24-Jun-15

Revise No-Resubmission
Required

47

QJI-SS-M&E-CSD-L1-PLAN (P-2)

Combined Services Drawing For Level 1 Plan (Part-2)

17-Jun-15

2-Jul-15

13-Apr-15

13-May-15

17-Jun-15

24-Jun-15

Revise No-Resubmission
Required

48

QJI-SS-M&E-CSD-L1-SEC-01

Combined Services Section Drawing For Level 1

17-Jun-15

2-Jul-15

13-Apr-15

13-May-15

17-Jun-15

24-Jun-15

Revise No-Resubmission
Required

49

QJI-SS-M&E-CSD-L1-SEC-02

Combined Services Section Drawing For Level 1

17-Jun-15

2-Jul-15

13-Apr-15

13-May-15

17-Jun-15

24-Jun-15

Revise No-Resubmission
Required

50

QJI-SS-M&E-SEM-L4-Openings

Submission for SEM Drawing (Floor & Wall Opening) at Level 4

30-Apr-15

14-May-15

30-Apr-15

28-May-15

QJI-SS-SFA-M&E-016

Revise - No Resubmission
Required

51

QJI-SS-M&E-SEM-L5-Openings

Submission for SEM Drawing (Floor & Wall Opening) at Level 5

30-Apr-15

14-May-15

30-Apr-15

28-May-15

QJI-SS-SFA-M&E-017

Revise - No Resubmission
Required

52

QJI-SS-M&E-CSD-L4-PLAN-01

Combined Service Drawing for L4(Part Print-1)

8-May-15

22-May-15

8-May-15

5-Jun-15

53

QJI-SS-M&E-CSD-L4-PLAN-02

Combined Service Drawing for L4(Part Print-2)

8-May-15

22-May-15

8-May-15

5-Jun-15

54

QJI-SS-M&E-CSD-L4-SEC-01

Combined Services Section Drawing For Level 4

8-May-15

22-May-15

8-May-15

5-Jun-15

Revise & Resubmit

55

QJI-SS-M&E-CSD-L5-PLAN-01

Combined Service Drawing for L5(Part Print-1)

8-May-15

22-May-15

8-May-15

5-Jun-15

Revise - No Resubmission
Required

56

QJI-SS-M&E-CSD-L5-PLAN-02

Combined Service Drawing for L5(Part Print-2)

8-May-15

22-May-15

8-May-15

5-Jun-15

57

QJI-SS-M&E-CSD-L5-SEC-01

Combined Services Section Drawing For Level 5

8-May-15

22-May-15

8-May-15

5-Jun-15

Revise - No Resubmission
Required

58

QJI-SS-M&E-CSD-L6-PLAN-01

Combined Service Drawing for L6(Part Print-1)

8-May-15

22-May-15

8-May-15

5-Jun-15

Revise - No Resubmission
Required

59

QJI-SS-M&E-CSD-L6-PLAN-02

Combined Service Drawing for L6(Part Print-2)

8-May-15

22-May-15

8-May-15

5-Jun-15

60

QJI-SS-M&E-CSD-L6-SEC-01

Combined Services Section Drawing For Level 6

8-May-15

22-May-15

8-May-15

5-Jun-15

Revise - No Resubmission
Required

61

QJI-SS-M&E-CSD-L2-PLAN-1

Combined Services Drawing For Level-2 High Level(Part-1)

22-May-15

5-Jun-15

22-May-15

9-Jun-15

Revise - No Resubmission
Required

62

QJI-SS-M&E-CSD-L2-PLAN-2

Combined Services Drawing For Level-2 High Level(Part-2)

22-May-15

5-Jun-15

22-May-15

9-Jun-15

Revise - No Resubmission
Required

63

QJI-SS-M&E-CSD-L2-SEC-01

Combined Services Drawing For Level-2 High Level Sections-1

22-May-15

5-Jun-15

22-May-15

9-Jun-15

Revise & Resubmit

64

QJI-SS-M&E-CSD-L2-SEC-02

Combined Services Drawing For Level-2 High Level Sections-2

22-May-15

5-Jun-15

22-May-15

9-Jun-15

Revise & Resubmit

65

QJI-SS-M&E-L1-PROPOSEDLOWER HEAD ROOM-01

Proposed M&E Services Lower Head Room For Level -1

3-Jun-15

19-Jun-15

3-Jun-15

26-Jun-15

66

QJI-SS-M&E-CSD-L3-PLAN-01

M&E Combined Service Drawing for Level 3 High Level


(Part-1)

8-Jun-15

22-Jun-15

8-Jun-15

18-Jun-15

67

QJI-SS-M&E-CSD-L3-PLAN-02

M&E Combined Service Drawing for Level 3 High Level


(Part-2)

8-Jun-15

22-Jun-15

8-Jun-15

18-Jun-15

68

QJI-SS-M&E-CSD-L3-SEC-01

M&E Combined Service Drawing for Level 3 High Level


(Sections)

8-Jun-15

22-Jun-15

8-Jun-15

18-Jun-15

8-Apr-15

13-May-15

QJI-SS-SFA-M&E-015 (Rev-1)

Revise - No Resubmission
Required

QJI-SS-SFA-M&E-018

QJI-SS-SFA-M&E-019

QJI-SS-SFA-M&E-020

Revise - No Resubmission
Required

Revise - No Resubmission
Required

Revise - No Resubmission
Required

QJI-SS-SFA-M&E-021

3/38

QJI-SS-SFA-M&E-022

Revise No
Resubmission
Required

QJI-SS-SFA-M&E-023

Revise No
Resubmission
Required
Revise No
Resubmission
Required
Revise No
Resubmission
Required

69

QJI-SS-M&E-CSD-L7-PLAN-01

70

QJI-SS-M&E-CSD-L7-PLAN-02

71

QJI-SS-M&E-CSD-L7-SEC-01

72

QJI-SS-M&E-CSD-L7-SEC-02

73

QJI-SS-M&E-CSD-L8-PLAN-01

74
75

M&E Combined Service Drawing for Level 7 High Level


(Part-1)
M&E Combined Service Drawing for Level 7 High Level
(Part-2)
M&E Combined Service Drawing for Level 7 High Level
(Sections)
M&E Combined Service Drawing for Level 7 High Level
(Sections)

26-Jun-15

10-Jul-15

26-Jun-15

14-Jul-15

26-Jun-15

10-Jul-15

26-Jun-15

14-Jul-15

Revise No
Resubmission
Required
Revise No

QJI-SS-SFA-M&E-024

Resubmission
Required
Revise No

26-Jun-15

10-Jul-15

26-Jun-15

14-Jul-15

Resubmission
Required
Revise No

26-Jun-15

10-Jul-15

26-Jun-15

14-Jul-15

Combined Service Drawing @ Level 8 High Level(Part-1)

2-Jul-15

16-Jul-15

2-Jul-15

14-Jul-15

Resubmission
Required
Revise & Resubmit

QJI-SS-M&E-CSD-L8-PLAN-01

Combined Service Drawing @ Level 8 High Level(Part-2)

2-Jul-15

16-Jul-15

2-Jul-15

14-Jul-15

QJI-SS-M&E-CSD-L8-Sec-01

Combined Service Drawing @ Level 8 High Level Section

2-Jul-15

16-Jul-15

2-Jul-15

14-Jul-15

QJI-SS-SFA-M&E-025

Revise No
Resubmission
Required
Revise No
Resubmission
Required

Date Over-due

Dont need to submit


Revise & Resubmit
Plumbing & Sanitary
Item

Updated date:
Target
Submission
Date

Target
Approval
Date

Date
Submitted

Date
Commented

Template for the title block submission (P&S)

3-Mar-14

6-Mar-14

3-Mar-14

5-Mar-14

Dwg Title

Dwg No.

1st Submission

2nd Submission
Date
Submitted

Date
Commented

Sanitary Installation Drawing At Basement-1

16-May-14

30-May-14

16-May-14

20-May-14

QJI-TS-M&E-P&S-SA-001
(DT-A)

Sanitary Installation Drawing At Basement-1

16-May-14

30-May-14

16-May-14

20-May-14

QJI-TS-M&E-P&S-SA-003
(DT-B)

Sanitary Installation Drawing At Basement-1

16-May-14

30-May-14

16-May-14

20-May-14

16-May-14

23-May-14

18-Aug-14

QJI-SS-M&E-P&S-SA-001(P-1)

Sanitary Basement Plan (Underground)

5-Dec-14

19-Dec-14

12Sep14

20Oct14

14Nov14

5-Dec-14

18Dec14

16-May-14

23-May-14

18-Aug-14

12Sep14

20Oct14

14Nov14

5-Dec-14

18Dec14

16-May-14

23-May-14

18-Aug-14

12Sep14

20Oct14

14Nov14

5-Dec-14

18Dec14

16-May-14

23-May-14

18-Aug-14

12Sep14

QJI-SS-M&E-P&S-SA-001(P-3)

Sanitary Basement Plan (Underground)

Sanitary Basement Plan (Underground)

5-Dec-14

5-Dec-14

19-Dec-14

19-Dec-14

QJI-SS-M&E-P&S-SA-001(P-4)

Sanitary Basement Plan (Underground)

20-Oct-14

4-Nov-14

10

QJI-SS-M&E-P&S-SA-002 P-1

Sanitary installation for Level 1

31-Mar-15

14-Mar-15

11

QJI-SS-M&E-P&S-SA-002 P-2

Sanitary installation for Level 1

12

QJI-SS-M&E-P&S-PL-001

Plumbing Installation Shop Drawing at Basement-1

14-Nov-14

28-Nov-14

7-Apr-15

21-Apr-15

11Jul14

9-Jul-14

Submission
Ref.

QJI-TS-SFA-ME-PS-001

Status
Replied by email
to use ACE Format

Revise & NoResubmission Required


Revise & NoResubmission Required

14Nov14
4Jul14

Date
Commented

Revise & NoResubmission Required

QJI-TS-M&E-P&S-SA-001

QJI-SS-M&E-P&S-SA-001(P-2)

Date
Submitted

QJI-TS-SFA-M&E-001

3rd Submission

25-Jul-15

18-Jan-15

31Mar15

6-Apr-15

14Nov14

18-Jan-15

10-Dec-14

29-Dec-14

17-Feb-15

16-Mar-15

7-Apr-15

20-Apr-15

3Oct14
(PartPrint)

14Oct14

Revise & NoResubmission Required


QJI-SS-SFA-ME-PS-001
(Rev-4)

No Exeption Taken
Revise -No
Resubmission Required

QJI-SS-SFA-ME-PS-001
(Rev-4)
23-Feb-15

17-Mar-15
QJI-SS-SFA-ME-PS-002
(Rev-3)

Revise & Resubmit


Revise -No
Resubmission Required
No Exeption Taken

13-Jan-15

5-Feb-15

QJI-SS-SFA-ME-PS-003
Rev-4

Revise -No
Resubmission Required

QJI-SS-SFA-ME-PS-004(Rev-2)

No Exeption Taken

13

QJI-SS-M&E-P&S-PL-WTANK

Domestic Water Transfer Tank and Pump Room Section &


Detail Drawing

7-Apr-15

21-Apr-15

9-Jul-14

26-Aug-14

17-Feb-15

16-Mar-15

7-Apr-15

20-Apr-15

14

QJI-SS-ME-PS-SA-STP-01

Sewage Treatment Plant Detail & Section Drawing

14-Oct-14

21-Oct-14

9-Jul-14

26-Aug-14

7Aug14

27Aug14

19Sep14

23Sep14

9-Jul-14

26-Aug-14

7Aug14

27Aug14

19Sep14

23Sep14

15

QJI-SS-ME-PS-SA-STP-02

Sewage Treatment Plant

20-Feb-15

6-Mar-15

14-Oct-14
(3rd Sub:)

21Oct14

24-Dec-14

2-Feb-15

20-Feb-15

23-Mar-15

Revise NoResubmission
Required

9-Jul-14

26-Aug-14

7Aug14

27Aug14

19Sep14

23Sep14

Revise No-

14-Oct-14
16

QJI-SS-ME-PS-SA-STP-03

21-Oct-14

Sewage Treatment Plant

4/38

No Exeption Taken

16

17

18

18

19

QJI-SS-ME-PS-SA-STP-03

QJI-SS-ME-PS-SA-STP-04

QJI-SS-ME-PS-SA-STP-05a

QJI-SS-ME-PS-SA-STP-05b

QJI-SS-ME-PS-SA-STP-06

Sewage Treatment Plant

Sewage Treatment Plant

Sewage Treatment Plant

Sewage Treatment Plant

Sewage Treatment Plant

24-Dec-14

20-Feb-15

20-Feb-15
14-Oct-14
(3rd Sub:)

7-Jan-14

6-Mar-15

6-Mar-15

14-Oct-14
(3rd Sub:)

21Oct14

9-Jul-14
14-Oct-14
(3rd Sub:)
9-Jul-14

26-Aug-14

7Aug14

27Aug14

21Oct14

24-Dec-14

2-Feb-15

26-Aug-14

7Aug14

27Aug14

19Sep14

23Sep14

14-Oct-14
(3rd Sub:)

21Oct14

24-Dec-14

2-Feb-15

20-Feb-15

23-Mar-15

9-Jul-14

26-Aug-14

7Aug14

27Aug14

19Sep14

23Sep14

14-Oct-14
(3rd Sub:)

21Oct14

24-Dec-14

2-Feb-15

20-Feb-15

23-Mar-15

19Sep14

23Sep14

Resubmission Required

21Oct14

23Sep14
QJI-SS-SFA-ME-PS-005
(Rev-4)

Revise NoResubmission Required


Revise NoResubmission Required

Revise & Resubmit

21Oct14
14-Oct-14
(3rd Sub:)

19Sep14

20

QJI-SS-M&E-P&S-SA-STP-02

Flow Diagram For Sewage Treatment Plant Drawing

9-Jul-14

29-Jul-14

9-Jul-14

26Aug14

21

QJI-SS-M&E-P&S-PL-WO

Domestic Water Transfer Tank and Pump Room


Wall Opening Drawing

9-Jul-14

29-Jul-14

9-Jul-14

26Aug14

22

QJI-SS-M&E-P&S-PL-002

Plumbing Installation Shop Drawing at Level-1

13-Jan-15

28-Jan-15

10-Dec-14

29-Dec-14

23

QJI-SS-M&E-P&S-PL-003

Plumbing Installation Shop Drawing at Level-2

13-Jan-15

28-Jan-15

13-Jan-15

5-Feb-15

24

QJI-SS-SFA-M&E-P&S-SA003

Sanitary Installation For Level 2

7-Apr-15

21-Apr-15

14-Jan-15

9-Feb-15

7-Apr-15

20-Apr-15

QJI-SS-SFA-M&E-P&S-SA004

14-Jan-15

9-Feb-15

7-Apr-15

11-May-15

25

Sanitary Installation For Level 3

1-Jul-15

15-Jul-15

26

QJI-SS-SFA-M&E-P&S-SA004a

Sanitary Installation For Level 3(PART)

27

QJI-SS-M&E-P&S-PL-004

28

No need to resubmit

13-Jan-15

5-Feb-15

22-May-15

Revise NoResubmission Required

QJI-SS-SFA-ME-PS-006

Same with Dwg No.


QJI-SS-ME-PS-SA-STP-01
that are gotten approval on
23-Sep-15.

QJI-SS-SFA-ME-PS-007

Revise &
Resubmit

QJI-SS-SFA-ME-PS-008

Revise -No
Resubmission Required

QJI-SS-SFA-ME-PS-009

Revise -No
Resubmission Required

QJI-SS-SFA-ME-PS-010
(Rev-1)

Revise -No
Resubmission Required

10-Jun-15
QJI-SS-SFA-ME-PS-011
(Rev-2)

1-Jul-15
1-Jul-15

15-Jul-15

7-Apr-15

11-May-15

Plumbing Installation Shop Drawing at Level-3

31-Mar-15

14-Apr-15

31-Mar-15

6-Apr-15

QJI-SS-M&E-P&S-PL-TYPD
-04

Plumbing Installation Riser Detail Section

22-May-15

5-Jun-15

7-Apr-15

11-May-15

22-May-15

29

QJI-SS-M&E-P&S-SA-010

Sanitary Installation @ Level 9

14-Jul-15

28-Jul-15

7-Apr-15

11-May-15

14-Jul-15

30

QJI-SS-M&E-P&S-SA-005

Sanitary Installation For Level 4

8-Apr-15

22-Apr-15

8-Apr-15

11-May-15

QJI-SS-SFA-ME-PS-015

Revise -No
Resubmission Required

31

QJI-SS-M&E-P&S-SA-006

Sanitary Installation For Level 5

8-Apr-15

22-Apr-15

8-Apr-15

11-May-15

QJI-SS-SFA-ME-PS-016

Revise -No
Resubmission Required

32

QJI-SS-M&E-P&S-SA-007

Sanitary Installation For Level 6

8-Apr-15

22-Apr-15

8-Apr-15

11-May-15

QJI-SS-SFA-ME-PS-017

Revise -No
Resubmission Required

33

QJI-SS-M&E-P&S-SA-008

Sanitary Installation For Level 7

8-Apr-15

22-Apr-15

8-Apr-15

11-May-15

QJI-SS-SFA-ME-PS-018

Revise -No
Resubmission Required

34

QJI-SS-M&E-P&S-SA-009

Sanitary Installation For Level 8

8-Apr-15

22-Apr-15

8-Apr-15

11-May-15

QJI-SS-SFA-ME-PS-019

Revise -No
Resubmission Required

35

QJI-SS-M&E-P&S-PL-005

Plumbing Installation @ Level 4

25-May-15

9-Jun-15

9-Apr-15

13-May-15

QJI-SS-SFA-ME-PS-020

Revise -No
Resubmission Required

5/38

22-May-15

10-Jun-15

1-Jul-15
QJI-SS-SFA-ME-PS-012

25-May-15

Supersede

28-May-15

28-May-15 QJI-SS-SFA-ME-PS-013 R1

Revise -No
Resubmission Required
Revise - No
Resubmission
Required

QJI-SS-SFA-ME-PS-014(Rev-1)

23-Jun-15

36

QJI-SS-M&E-P&S-PL-006

Plumbing Installation @ Level 5

9-Apr-15

23-Apr-15

9-Apr-15

13-May-15

QJI-SS-SFA-ME-PS-021

37

QJI-SS-M&E-P&S-PL-007

Plumbing Installation @ Level 6

9-Apr-15

23-Apr-15

9-Apr-15

13-May-15

QJI-SS-SFA-ME-PS-022

38

QJI-SS-M&E-P&S-PL-008

Plumbing Installation @ Level 7

9-Apr-15

23-Apr-15

9-Apr-15

13-May-15

QJI-SS-SFA-ME-PS-023

39

QJI-SS-M&E-P&S-PL-009

Plumbing Installation @ Level 8

9-Apr-15

23-Apr-15

9-Apr-15

13-May-15

QJI-SS-SFA-ME-PS-024

40

QJI-SS-M&E-P&S-PL-010

Plumbing Installation @ Level 9

25-May-15

9-Jun-15

9-Apr-15

13-May-15

41

QJI-SS-M&E-P&S-PL-011

Plumbing Installation @ Level 10

30-Apr-15

14-May-15

30-Apr-15

42

QJI-SS-M&E-P&S-SA-011

Sanitary Installation @ Level 10

30-Apr-15

14-May-15

43

QJI-SS-M&E-P&S-SA-012

Sanitary Installation @ Level 11

7-May-15

44

QJI-SS-M&E-P&S-SA-013

Sanitary Installation @ Level 12

45

QJI-SS-M&E-P&S-SA-014

46

No Exception Taken
Revise - No
Resubmission
Required
Revise - No
Resubmission
Required
No Exception
Taken

QJI-SS-SFA-ME-PS-025

Revise - No
Resubmission
Required

29-May-15

QJI-SS-SFA-ME-PS-026

Revise - No
Resubmission
Required

30-Apr-15

3-Jun-15

QJI-SS-SFA-ME-PS-027

Revise - No
Resubmission
Required

21-May-15

7-May-15

5-Jun-15

QJI-SS-SFA-ME-PS-028

Revise - No
Resubmission
Required

7-May-15

21-May-15

7-May-15

5-Jun-15

QJI-SS-SFA-ME-PS-029

Revise - No
Resubmission
Required

Sanitary Installation @ Level 13

7-May-15

21-May-15

7-May-15

5-Jun-15

QJI-SS-SFA-ME-PS-030

Revise - No
Resubmission
Required

QJI-SS-M&E-P&S-SA-015

Sanitary Installation @ Level 14

7-May-15

21-May-15

7-May-15

5-Jun-15

QJI-SS-SFA-ME-PS-031

Revise - No
Resubmission
Required

47

QJI-SS-M&E-P&S-SA-016

Sanitary Installation @ Level 15

7-May-15

21-May-15

7-May-15

5-Jun-15

QJI-SS-SFA-ME-PS-032

Revise - No
Resubmission
Required

48

QJI-SS-M&E-P&S-PS-013

Plumbing Installation @ Level 12

7-May-15

21-May-15

7-May-15

5-Jun-15

QJI-SS-SFA-ME-PS-033

Revise - No
Resubmission
Required

49

QJI-SS-M&E-P&S-PS-014

Plumbing Installation @ Level 13

7-May-15

21-May-15

7-May-15

5-Jun-15

QJI-SS-SFA-ME-PS-034

Revise - No
Resubmission
Required

50

QJI-SS-M&E-P&S-PS-015

Plumbing Installation @ Level 14

7-May-15

21-May-15

7-May-15

5-Jun-15

QJI-SS-SFA-ME-PS-035

Revise - No
Resubmission
Required

51

QJI-SS-M&E-P&S-PS-016

Plumbing Installation @ Level 15

7-May-15

21-May-15

7-May-15

5-Jun-15

QJI-SS-SFA-ME-PS-036

Revise - No
Resubmission
Required

Electrical Control Wiring Diagram ( Part-1 )

27-May-15

10-Jun-15

27-May-15

Electrical Control Wiring Diagram ( Part-2 )

27-May-15

10-Jun-15

27-May-15

Electrical Control Wiring Diagram ( Part-3 )

27-May-15

10-Jun-15

27-May-15

Electrical Control Wiring Diagram ( Part-4 )

27-May-15

10-Jun-15

27-May-15

Electrical Control Wiring Diagram ( Part-5 )

27-May-15

10-Jun-15

27-May-15

Electrical Control Wiring Diagram ( Part-6 )

27-May-15

10-Jun-15

27-May-15

52
53
54
55
56
57

QJI-SS-ME-PS-SA-STP-MCP-WD01
QJI-SS-ME-PS-SA-STP-MCP-WD02
QJI-SS-ME-PS-SA-STP-MCP-WD03
QJI-SS-ME-PS-SA-STP-MCP-WD04
QJI-SS-ME-PS-SA-STP-MCP-WD05
QJI-SS-ME-PS-SA-STP-MCP-WD06

58

QJI-SS-ME-PS-SA-STP-MCP-P1

STP Main Control Panel (Part 1)

27-May-15

10-Jun-15

27-May-15

59

QJI-SS-ME-PS-SA-STP-MCP-P2

STP Main Control Panel (Part 2)

27-May-15

10-Jun-15

27-May-15

6/38

25-May-15

23-Jun-15

QJI-SS-SFA-ME-PS-037

60

QJI-SS-M&E-P&S-PL-017

Plumbing Installation Shop Drawing @ Level 16

2-Jun-15

18-Jun-15

2-Jun-15

26-Jun-15

QJI-SS-SFA-ME-PS-038

61

QJI-SS-M&E-P&S-PL-018

Plumbing Installation Shop Drawing @ Level 17

2-Jun-15

18-Jun-15

2-Jun-15

26-Jun-15

QJI-SS-SFA-ME-PS-039

62

QJI-SS-M&E-P&S-PL-019

Plumbing Installation Shop Drawing @ Level 18

2-Jun-15

18-Jun-15

2-Jun-15

26-Jun-15

QJI-SS-SFA-ME-PS-040

63

QJI-SS-M&E-P&S-PL-020

Plumbing Installation Shop Drawing @ Level 19

2-Jun-15

18-Jun-15

2-Jun-15

26-Jun-15

QJI-SS-SFA-ME-PS-041

64

QJI-SS-M&E-P&S-PL-021

Plumbing Installation Shop Drawing @ Level 20

2-Jun-15

18-Jun-15

2-Jun-15

26-Jun-15

QJI-SS-SFA-ME-PS-042

65

QJI-SS-M&E-P&S-PL-022

Plumbing Installation Shop Drawing @ Level 21

2-Jun-15

18-Jun-15

2-Jun-15

26-Jun-15

QJI-SS-SFA-ME-PS-043

66

QJI-SS-M&E-P&S-PL-023

Plumbing Installation Shop Drawing @ Level 22

2-Jun-15

18-Jun-15

2-Jun-15

26-Jun-15

QJI-SS-SFA-ME-PS-044

67

QJI-SS-M&E-P&S-PL-024

Plumbing Installation Shop Drawing @ Level 23

2-Jun-15

18-Jun-15

2-Jun-15

26-Jun-15

QJI-SS-SFA-ME-PS-045

68

QJI-SS-M&E-P&S-SA-017

Sanitary Installation Shop Drawing @ Level 16

8-Jun-15

22-Jun-15

8-Jun-15

30-Jun-15

QJI-SS-SFA-ME-PS-046

69

QJI-SS-M&E-P&S-SA-018

Sanitary Installation Shop Drawing @ Level 17

8-Jun-15

22-Jun-15

8-Jun-15

30-Jun-15

QJI-SS-SFA-ME-PS-047

70

QJI-SS-M&E-P&S-SA-019

Sanitary Installation Shop Drawing @ Level 18

8-Jun-15

22-Jun-15

8-Jun-15

30-Jun-15

QJI-SS-SFA-ME-PS-048

71

QJI-SS-M&E-P&S-SA-020

Sanitary Installation Shop Drawing @ Level 19

8-Jun-15

22-Jun-15

8-Jun-15

30-Jun-15

QJI-SS-SFA-ME-PS-049

72

QJI-SS-M&E-P&S-SA-021

Sanitary Installation Shop Drawing @ Level 20

8-Jun-15

22-Jun-15

8-Jun-15

30-Jun-15

QJI-SS-SFA-ME-PS-050

73

QJI-SS-M&E-P&S-SA-022

Sanitary Installation Shop Drawing @ Level 21

8-Jun-15

22-Jun-15

8-Jun-15

30-Jun-15

QJI-SS-SFA-ME-PS-051

74

QJI-SS-M&E-P&S-SA-023

Sanitary Installation Shop Drawing @ Level 22

8-Jun-15

22-Jun-15

8-Jun-15

30-Jun-15

QJI-SS-SFA-ME-PS-052

75

QJI-SS-M&E-P&S-SA-024

Sanitary Installation Shop Drawing @ Level 23

8-Jun-15

22-Jun-15

8-Jun-15

30-Jun-15

QJI-SS-SFA-ME-PS-053

Revise - No
Resubmission
Required
Revise - No
Resubmission
Required
Revise - No
Resubmission
Required
Revise - No
Resubmission
Required
Revise - No
Resubmission
Required
Revise - No
Resubmission
Required
Revise - No
Resubmission
Required
Revise - No
Resubmission
Required
Revise - No
Resubmission
Required
Revise - No
Resubmission
Required
Revise - No
Resubmission
Required
Revise - No
Resubmission
Required
Revise - No
Resubmission
Required
Revise - No
Resubmission
Required
Revise - No
Resubmission
Required
Revise - No
Resubmission
Required

Date Over-due

Dont need to submit


M&E Shop Drawing Register
LPG Gas Installation
Item

Dwg No.

Updated date:
Dwg Title

QJI-SS-M&E-LPG-SCH-04

LPG Gas Installation System Schematic Diagram

QJI-SS-M&E-LPG-B-PLAN-01

LPG Gas Installation System Basement Plan

QJI-SS-M&E-LPG-L1-PLAN-02

LPG Gas Installation System Level 1 Plan

Target
Submission
Date

Target
Approval
Date

Date
Submitted

Date
Commented

Date
Submitted

Date
Commented

Date
Submitted

Date
Commented

20-Feb-15

6-Mar-15

3-Nov-14

14-Nov-14

9-Jan-15

4-Feb-15

20-Feb-15

23-Mar-15

9-Jan-15

24-Jan-15

9-Jan-15

4-Feb-15

20-Feb-15

6-Mar-15

9-Jan-15

4-Feb-15

1st Submission

7/38

2nd Submission

20-Feb-15

23-Mar-15

3rd Submission

Submission
Ref.

Revise & Resubmit


25-Jul-15
Status

QJI-SS-SFA-ME-LPG-001
(Rev-1)

Revise NoResubmission
Required

QJI-SS-SFA-ME-LPG-002

Revise NoResubmission
Required

QJI-SS-SFA-ME-LPG-003

Revise NoResubmission
Required

QJI-SS-M&E-LPG-L2-PLAN-03

LPG Gas Installation System Level 2 Plan

20-Feb-15

6-Mar-15

9-Jan-15

4-Feb-15

20-Feb-15

23-Mar-15

QJI-SS-SFA-ME-LPG-004

Revise NoResubmission
Required

Date Over-due
Dont need to submit
M&E Shop Drawing Register
ACMV System
Item

Updated date:

Dwg No.

RGCCL/6172/602-A/2

Dwg Title

Engineered Smoke Control System(Basement Plan)


Airconditioning & Mechanical Ventilation Installation
(Basement Plan)

Target
Submission
Date

21-May-14

Target
Approval
Date

11-Jun-14

1st Submission
Date
Submitted

21-May-14

Date
Commented

26-May-14

2nd Submission
Date
Submitted

Date
Commented

3rd Submission
Date
Submitted

Date
Commented

Submission
Ref.

Revise & Resubmit


25-Jul-15
Status

Revise & Resubmit


(ACE comments:
1.Based on archi drawing,
2.To cast section to show
achievable false ceiling)

Supersede( By Dividing as per system seperately )

QJI-TS-SFA-ME-ACMV-001
Revise & Resubmit
(ACE comments:
1.Based on archi drawing,
2.To cast section to show
achievable false ceiling)

RGCCL/6172/602-F/2

Engineered Smoke Control System(Basement Plan)


Fire Fighting & Alarm Installation(Basement Plan)

21-May-14

11-Jun-14

21-May-14

26-May-14

RGCCL/6172/602-A/21

Air Conditioning Piping Schematic

26-Jun-15

10-Jul-15

14-Aug-14

3Oct14

26-Jun-15

11-Jul-15

Revise-No Resubmission
Required

RGCCL/6172/602-A/2a

ACMV Basement Sections-1

24-Feb-15

10-Mar-15

14-Aug-14

3Oct14

24Feb15

29-Mar-15

Revise-No Resubmission
Required

RGCCL/6172/602-A/2b

ACMV Basement Sections-2

24-Feb-15

10-Mar-15

14-Aug-14

3Oct14

24Feb15

29-Mar-15

Revise-No Resubmission
Required

Supersede( By Dividing as per system seperately )

QJI-SS-SFA-ME-ACMV-001(Rev4)
Revise-No Resubmission
Required

RGCCL/6172/602-A/2c

ACMV Basement Sections-3

24-Feb-15

10-Mar-15

14-Aug-14

3Oct14

24Feb15

29-Mar-15

RGCCL/6172/602-A/2d

ACMV Basement Sections-4

24-Feb-15

10-Mar-15

14-Aug-14

3Oct14

24Feb15

29-Mar-15

RGCCL/6172/602-A/2

ACMV Basement Plan(Revision-2)

24-Feb-15

10-Mar-15

14-Aug-14

3Oct14

5N0v14

29-Dec-14

RGCCL/6172/602-A/3-1

Air Conditioning System @ Level 1

23-Feb-15

9-Mar-15

15-Aug-14

10Oct14

1-Dec-14

15-Jan-15

10

RGCCL/6172/602-A/3

Mechanical Ventilation @ Level 1

23-Feb-15

9-Mar-15

15-Aug-14

10Oct14

1-Dec-14

15-Jan-15

11

RGCCL/6172/602-A/3a

ACMV Level-1 Sections-1

23-Feb-15

9-Mar-15

15-Aug-14

10Oct14

23-Feb-15

30-Mar-15

12

RGCCL/6172/602-A/3b

ACMV Level-1 Sections-2

23-Feb-15

9-Mar-15

15-Aug-14

10Oct14

23-Feb-15

30-Mar-15

Revise & Resubmit

13

RGCCL/6172/602-A/3c

ACMV Level-1 Sections-3

23-Feb-15

9-Mar-15

15-Aug-14

10Oct14

23-Feb-15

30-Mar-15

Revise & Resubmit

14

RGCCL/6172/602-A/4-1

Air Conditioning System @ Level 2

2-Apr-15

16-Apr-15

21-Aug-14

10Oct14

1-Dec-14

2-Apr-15

8/38

Revise-No Resubmission
Required

29-Mar-15

Revise-No Resubmission
Required

23-Feb-15

30-Mar-15

Revise No-Resubmission
Required

23-Feb-15

30-Mar-15

Revise No-Resubmission
Required

24Feb15

QJI-SS-SFA-ME-ACMV-002
(Rev-1)

2-Apr-15

19-Apr-15

Revise & Resubmit

Revise No-Resubmission
Required

QJI-SS-SFA-ME-ACMV-003
(Rev-2)

Revise No-Resubmission
Required/
Submit Specified
Item

15

RGCCL/6172/602-A/4

Mechanical Ventilation @ Level 2

21-Aug-14

19-Sep-14

21-Aug-14

10Oct14

16

RGCCL/6172/602-A/4a

ACMV Level-2 Sections-2

21-Aug-14

19-Sep-14

21-Aug-14

10Oct14

Revise & Resubmit

17

RGCCL/6172/602-A/4b

ACMV Level-2 Sections-2

21-Aug-14

19-Sep-14

21-Aug-14

10Oct14

Revise & Resubmit

26-Aug-14
18

RGCCL/6172/602-A/5

ACMV Installation @ Level 3 Plan

1-Jun-15

15-Jun-15

3Dec14

1-Dec-14

28-Jan-15

15-Jan-15

5-Mar-15

6-Apr-15

11-May-15
QJI-SS-SFA-ME-ACMV-004
(Rev-3)

1-Jun-15
20

RGCCL/6172/602-A/5a

ACMV Installation @ Level 3 Sections

28-Jan-15

11-Feb-15

28-Jan-15

5-Mar-15

21

RGCCL/6172/602-A/6

ACMV Installation @ Level 4 Plan

30-Apr-15

14-May-15

26-Aug-14

3Dec14

22

RGCCL/6172/602-A/6a

ACMV Installation @ Level 4 Sections

28-Jan-15

11-Feb-15

28-Jan-15

5-Mar-15

23

RGCCL/6172/602-A/7

ACMV Installation @ Level 5 Plan

8-May-15

22-May-15

26-Aug-14

3Dec14

24

RGCCL/6172/602-A/7a

ACMV Installation @ Level 5 Sections

28-Jan-15

11-Feb-15

28-Jan-15

5-Mar-15

25

RGCCL/6172/602-A/8

ACMV Installation @ Level 6

13-May-15

27-May-15

28-Aug-14

3Dec14

Revise & Resubmit


28-Jan-15

5-Mar-15

30-Apr-15

QJI-SS-SFA-ME-ACMV-005
(Rev-2)

Revise No-Resubmission
Required
Revise & Resubmit

28-Jan-15

5-Mar-15

8-May-15

5-Jun-15

QJI-SS-SFA-ME-ACMV-006
(Rev-2)

Revise No-Resubmission
Required
Revise & Resubmit

2-Feb-15

5-Mar-15

13-May-15

5-Jun-15

Revise & Resubmit


QJI-SS-SFA-ME-ACMV-007
(Rev-2)

26

RGCCL/6172/602-A/8a

ACMV Installation @ Level 6 Section-1

2-Feb-15

16-Feb-15

2-Feb-15

5-Mar-15

27

RGCCL/6172/602-A/8b

ACMV Installation @ Level 6 Section-2

2-Feb-15

16-Feb-15

2-Feb-15

5-Mar-15

28

RGCCL/6172/602-A/9

ACMV Installation @ Level 7

23-Jun-15

7-Jul-15

28-Aug-14

3Dec14

23-Jun-15

29

RGCCL/6172/602-A/10

ACMV Installation @ Level 8

26-Jun-15

10-Jul-15

1-Sep-14

31-Dec-14

26-Jun-15

30

RGCCL/6172/602-A/11

ACMV Installation @ Level 9

26-Jun-15

10-Jul-15

2-Sep-14

31-Dec-14

26-Jun-15

31

RGCCL/6172/602-A/26

PANEL LAYOUT DRAWING(MCP/9-1)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

32

RGCCL/6172/602-A/26/P1

SCHEMATIC&SINGLE LINE DRAWING(MCP/9-1)(PART-1)

9-Jul-15

23-Jul-15

12-Sep-14

14-Jan-15

19-May-15

7-Jul-15

9-Jul-15

33

RGCCL/6172/602-A/26/P2

SCHEMATIC&SINGLE LINE DRAWING(MCP/9-1)(PART-2)

9-Jul-15

23-Jul-15

12-Sep-14

14-Jan-15

19-May-15

7-Jul-15

9-Jul-15

34

RGCCL/6172/602-A/26/C1

CONTROL CIRCUIT DIAGRAM

(MCP/9-1)(PART-1)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

35

RGCCL/6172/602-A/26/C2

CONTROL CIRCUIT DIAGRAM

(MCP/9-1)(PART-2)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

36

RGCCL/6172/602-A/26/C3

CONTROL CIRCUIT DIAGRAM

(MCP/9-1)(PART-3)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

37

RGCCL/6172/602-A/26/C4

CONTROL CIRCUIT DIAGRAM

(MCP/9-1)(PART-4)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

38

RGCCL/6172/602-A/26/C5

CONTROL CIRCUIT DIAGRAM

(MCP/9-1)(PART-5)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

39

RGCCL/6172/602-A/26/C6

CONTROL CIRCUIT DIAGRAM

(MCP/9-1)(PART-6)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

40

RGCCL/6172/602-A/26/C7

CONTROL CIRCUIT DIAGRAM

(MCP/9-1)(PART-7)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

41

RGCCL/6172/602-A/26/C8

CONTROL CIRCUIT DIAGRAM

(MCP/9-1)(PART-8)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

42

RGCCL/6172/602-A/26/C9

CONTROL CIRCUIT DIAGRAM

(MCP/9-1)(PART-9)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

43

RGCCL/6172/602-A/26/C10

CONTROL CIRCUIT DIAGRAM

(MCP/9-1)(PART-10)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

44

RGCCL/6172/602-A/26/C11

CONTROL CIRCUIT DIAGRAM

(MCP/9-1)(PART-11)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

45

RGCCL/6172/602-A/26/C12

CONTROL CIRCUIT DIAGRAM

(MCP/9-1)(PART-12)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

46

RGCCL/6172/602-A/26/C13

CONTROL CIRCUIT DIAGRAM

(MCP/9-1)(PART-13)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

47

RGCCL/6172/602-A/26/C14

CONTROL CIRCUIT DIAGRAM

(MCP/9-1)(PART-14)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

48

RGCCL/6172/602-A/26/C15

CONTROL CIRCUIT DIAGRAM

(MCP/9-1)(PART-15)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

49

RGCCL/6172/602-A/26/C16

CONTROL CIRCUIT DIAGRAM

(MCP/9-1)(PART-16)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

50

RGCCL/6172/602-A/26/C17

CONTROL CIRCUIT DIAGRAM

(MCP/9-1)(PART-17)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

51

RGCCL/6172/602-A/26/1

PANEL LAYOUT DRAWING FOR(SCP/11-5)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

9/38

29-May-15

Revise & Resubmit


Revise & Resubmit

QJI-SS-SFA-ME-ACMV-008
(Rev-1)
QJI-SS-SFA-ME-ACMV-009
(Rev-1)
QJI-SS-SFA-ME-ACMV-010
(Rev-1)

52

RGCCL/6172/602-A/26-1/P1

SCHEMATIC&SINGLE LINE

(SCP/11-5)(PART-1)

9-Jul-15

23-Jul-15

12-Sep-14

14-Jan-15

19-May-15

7-Jul-15

9-Jul-15

53

RGCCL/6172/602-A/26-1/P2

SCHEMATIC&SINGLE LINE

(SCP/11-5)(PART-2)

9-Jul-15

23-Jul-15

12-Sep-14

14-Jan-15

19-May-15

7-Jul-15

9-Jul-15

54

RGCCL/6172/602-A/26-1/P3

SCHEMATIC&SINGLE LINE

(SCP/11-5)(PART-3)

9-Jul-15

23-Jul-15

12-Sep-14

14-Jan-15

19-May-15

7-Jul-15

9-Jul-15

55

RGCCL/6172/602-A/26-1/C1

CONTROL SINGLE LINE

(SCP/11-5)(PART-1)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

56

RGCCL/6172/602-A/26-1/C2

CONTROL SINGLE LINE

(SCP/11-5)(PART-2)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

57

RGCCL/6172/602-A/26-1/C3

CONTROL SINGLE LINE

(SCP/11-5)(PART-3)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

58

RGCCL/6172/602-A/26-1/C4

CONTROL SINGLE LINE

(SCP/11-5)(PART-4)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

59

RGCCL/6172/602-A/26-1/C5

CONTROL SINGLE LINE

(SCP/11-5)(PART-5)

9-Jul-15

23-Jul-15

9-Jul-15

60

RGCCL/6172/602-A/26-1/C6

CONTROL SINGLE LINE

(SCP/11-5)(PART-6)

9-Jul-15

23-Jul-15

9-Jul-15

61

RGCCL/6172/602-A/26-1/C7

CONTROL SINGLE LINE

(SCP/11-5)(PART-7)

9-Jul-15

23-Jul-15

9-Jul-15

62

RGCCL/6172/602-A/26-1/C8

CONTROL SINGLE LINE

(SCP/11-5)(PART-8)

9-Jul-15

23-Jul-15

9-Jul-15

63

RGCCL/6172/602-A/26-1/C9

CONTROL SINGLE LINE

(SCP/11-5)(PART-9)

9-Jul-15

23-Jul-15

9-Jul-15

59

RGCCL/6172/602-A/26-1/T-1

TERMINATION DRAWING

(SCP/11-5)(PART-1)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

60

RGCCL/6172/602-A/26-1/T-2

TERMINATION DRAWING

(SCP/11-5)(PART-2)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

RGCCL/6172/602-A/26-1/T-3

TERMINATION DRAWING

(SCP/11-5)(PART-3)

9-Jul-15

23-Jul-15

9-Jul-15

61

RGCCL/6172/602-A/26-2

PANEL LAYOUT DRAWING(SCP/11-6)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

62

RGCCL/6172/602-A/26-2/P1

SCHEMATIC&SINGLE LINE

(SCP/11-6)(PART-1)

9-Jul-15

23-Jul-15

12-Sep-14

14-Jan-15

19-May-15

7-Jul-15

9-Jul-15

63

RGCCL/6172/602-A/26-2/P2

SCHEMATIC&SINGLE LINE

(SCP/11-6)(PART-2)

9-Jul-15

23-Jul-15

12-Sep-14

14-Jan-15

19-May-15

7-Jul-15

9-Jul-15

64

RGCCL/6172/602-A/26-2/P3

SCHEMATIC&SINGLE LINE

(SCP/11-6)(PART-3)

9-Jul-15

23-Jul-15

12-Sep-14

14-Jan-15

19-May-15

7-Jul-15

9-Jul-15

65

RGCCL/6172/602-A/26-2/C-1

CONTROL SINGLE LINE

(SCP/11-6)(PART-1)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

66

RGCCL/6172/602-A/26-2/C-2

CONTROL SINGLE LINE

(SCP/11-6)(PART-2)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

67

RGCCL/6172/602-A/26-2/C-3

CONTROL SINGLE LINE

(SCP/11-6)(PART-3)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

68

RGCCL/6172/602-A/26-2/C-4

CONTROL SINGLE LINE

(SCP/11-6)(PART-4)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

69

RGCCL/6172/602-A/26-2/T-1

TERMINATION DRAWING

(SCP/11-6)(PART-1)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

70

RGCCL/6172/602-A/26-2/T-2

TERMINATION DRAWING

(SCP/11-6)(PART-2)

9-Jul-15

23-Jul-15

19-May-15

7-Jul-15

9-Jul-15

71

RGCCL/6172/602-A/12

ACMV Installation @ Level 10

8-Sep-14

6-Oct-14

8-Sep-14

31-Dec-14

72

RGCCL/6172/602-A/28

AC EQUIPMENT SCHEDULE - PART-1

13-May-15

27-May-15

17-Sep-14

6-Jan-15

QJI-SS-SFA-ME-ACMV-011
(Rev-1)

QJI-SS-SFA-ME-ACMV-012

13-May-15

Revise & Resubmit

5-Jun-15

Revise NoResubmission
Required/
Submit Specified
Item
Revise NoResubmission
Required/
Submit Specified
Item

73

RGCCL/6172/602-A/28-1

AC EQUIPMENT SCHEDULE - PART-2

13-May-15

27-May-15

17-Sep-14

6-Jan-15

13-May-15

5-Jun-15

74

RGCCL/6172/602-A/29

MV EQUIPMENT SCHEDULE - PART-1

5-Mar-15

19-Mar-15

17-Sep-14

6-Jan-15

5-Mar-15

27-Mar-15

Revise NoResubmission Required

75

RGCCL/6172/602-A/29-1

MV EQUIPMENT SCHEDULE - PART-2

5-Mar-15

19-Mar-15

17-Sep-14

6-Jan-15

5-Mar-15

27-Mar-15

Revise NoResubmission Required

76

RGCCL/6172/602-A/13

ACMV Installation Plan @ Level 11

22-Sep-14

7-Oct-14

22-Sep-14

31-Dec-14

77

RGCCL/6172/602-A/13a

ACMV Installation Plan & Section @ Level 11

22-Sep-14

7-Oct-14

22-Sep-14

31-Dec-14

78

RGCCL/6172/602-A/14

ACMV Installation @ Level 12

24-Sep-14

20-Oct-14

24-Sep-14

31-Dec-14

10/38

QJI-SS-SFA-ME-ACMV-013
(Rev-2)

Revise & Resubmit


QJI-SS-SFA-ME-ACMV-014

Revise NoResubmission Required

QJI-SS-SFA-ME-ACMV-015

Revise & Resubmit

79

RGCCL/6172/602-A/15

ACMV Installation @ Level 13 to 15

24-Sep-14

20-Oct-14

24-Sep-14

31-Dec-14

80

RGCCL/6172/602-A/PEN-01

Penetration Drawing For Basement Plan @ ACMV Services

27-Jan-15

10-Feb-15

3-Oct-14

14Nov14

QJI-SS-SFA-ME-ACMV-016
27-Nov-14

30-Dec-14

27-Jan-15

25-Feb-15
QJI-SS-SFA-ME-ACMV-017
(Rev-1)

Revise & Resubmit


Revise NoResubmission Required
Revise NoResubmission Required

81

RGCCL/6172/602-A/PEN-01a

Basement Penetration Sections @ ACMV Services

3-Oct-14

10-Oct-14

3-Oct-14

14Nov14

82

RGCCL/6172/602-A/16

ACMV Installation @ Level 16

7-Oct-14

21-Oct-14

7-Oct-14

7-Jan-15

QJI-SS-SFA-ME-ACMV-018

Revise & Resubmit

83

RGCCL/6172/602-A/17

ACMV Installation @ Level 17 Plan

16-Oct-14

31-Oct-14

16-Oct-14

13-Jan-15

QJI-SS-SFA-ME-ACMV-019

Revise & Resubmit

84

RGCCL/6172/602-A/18

ACMV Installation @ Level 18 to 23 Plan

16-Oct-14

31-Oct-14

16-Oct-14

13-Jan-15

QJI-SS-SFA-ME-ACMV-020

Revise & Resubmit

85

RGCCL/6172/602-A/19

ACMV Installation @ Lower Roof

27-Oct-14

11-Nov-14

27-Oct-14

14-Jan-15

QJI-SS-SFA-ME-ACMV-021

Revise & Resubmit

86

RGCCL/6172/602-A/20

ACMV Installation @ Upper Roof

27-Oct-14

11-Nov-14

27-Oct-14

14-Jan-15

QJI-SS-SFA-ME-ACMV-022

Revise NoResubmission Required

87

RGCCL/6172/602-A/OS-01

1st Storey Opening Slab Opening(ACMV service)

2-Apr-15

16-Apr-15

27-Nov-14

29-Dec-14

QJI-SS-SFA-ME-ACMV-023
(Rev-1)

No Exception Taken

88

RGCCL/6172/602-A/PEN-02

Penetration Drawing For 1st Storey Plan

10-Jan-15

26-Jan-15

10-Jan-15

5-Feb-15

QJI-SS-SFA-ME-ACMV-024

Revise NoResubmission Required

89

RGCCL/6172/602-A/CT

Cooling Tower Layout Plan

1-un-15

16-Jun-15

26-Jan-15

13-Feb-15

2-Feb-15

1-Jun-15

5-Mar-15

2-Apr-15

22-Apr-15

29-Jun-15

Revise & Resubmit


QJI-SS-SFA-ME-ACMV-025
(Rev-1)

90

RGCCL/6172/602-A/CT-01

Cooling Tower Section

91

RGCCL/6172/602-A/PEN-03

Penetration Drawing For 2nd Storey Plan

1-un-15

16-Jun-15

26-Jan-15

13-Feb-15

26-Jan-15

9-Feb-15

26-Jan-15

12-Feb-15

1-Jun-15

29-Jun-15

QJI-SS-SFA-ME-ACMV026 R1

Revise NoResubmission Required


Revise NoResubmission Required

92

RGCCL/6172/602-A/SO-02

2nd Storey Slab Opening Drawing

2-Apr-15

16-Apr-15

26-Jan-15

12-Feb-15

26-Jan-15

20-Apr-15

Revise NoResubmission Required

93

RGCCL/6172/602-A/SO-03

3rd Storey Slab Opening Drawing

6-Apr-15

20-Apr-15

26-Jan-15

12-Feb-15

6-Apr-15

8-May-15

QJI-SS-SFA-ME-ACMV-027(Rev- Revise No1)


Resubmission Required

94

RGCCL/6172/602-A/OS-01 a

1st Storey Additional Opening Slab Drawing

13-Feb-15

27-Feb-15

13-Feb-15

20-Mar-15

Revise NoResubmission Required


QJI-SS-SFA-ME-ACMV-028
Revise NoResubmission Required

95

RGCCL/6172/602-A/OS-01 b

1st Storey Additional Opening Slab Drawing

13-Feb-15

27-Feb-15

13-Feb-15

20-Mar-15

96

RGCCL/6172/602-SCP/LB1-05

SCP/B1-6 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

97

RGCCL/6172/602-SCP/LB1-06

SCP/B1-8 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

98

RGCCL/6172/602-SCP/L1-18

SCP/B1-20 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

99

RGCCL/6172/602-SCP/L1-19

SCP/B1-21 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

100 RGCCL/6172/602-SCP/L1-20

SCP/B1-22 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

101 RGCCL/6172/602-SCP/L1-21

SCP/B1-23 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

11/38

102 RGCCL/6172/602-SCP/L1-22

SCP/1-18 PANEL LAYOUT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

103 RGCCL/6172/602-SCP/L1-22C

SCP/1-18 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

104 RGCCL/6172/602-SCP/L1-23

SCP/1-25 PANEL LAYOUT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

105 RGCCL/6172/602-SCP/L1-23C

SCP/1-25 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

106 RGCCL/6172/602-SCP/L1-24

SCP/1-16 PANEL LAYOUT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

107 RGCCL/6172/602-SCP/L1-24C

SCP/1-16 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

108 RGCCL/6172/602-SCP/L1-25

SCP/1-26 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

109 RGCCL/6172/602-SCP/L1-26

SCP/1-27 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

110 RGCCL/6172/602-SCP/L2-03

SCP/2-4 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

111 RGCCL/6172/602-SCP/L2-04

SCP/2-5&2-6 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

112 RGCCL/6172/602-SCP/L2-04C

SCP/2-5&2-6 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

113 RGCCL/6172/602-SCP/L2-05

SCP/2-7 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

114 RGCCL/6172/602-SCP/L2-06

SCP/2-8 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

115 RGCCL/6172/602-SCP/L3-04

SCP/3-4 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

116 RGCCL/6172/602-SCP/L4-06

SCP/4-8 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

117 RGCCL/6172/602-SCP/L5-06

SCP/5-8 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

118 RGCCL/6172/602-SCP/L6-09

SCP/6-8 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

119 RGCCL/6172/602-SCP/L7-08

SCP/7-9 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

120 RGCCL/6172/602-SCP/L8-01

SCP/8-1 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

121 RGCCL/6172/602-SCP/L9-05

SCP/9-6 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

122 RGCCL/6172/602-SCP/L9-06

SCP/9-7 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

123 RGCCL/6172/602-SCP/L9-07

SCP/9-8 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

12/38

124 RGCCL/6172/602-SCP/L9-08

SCP/9-9 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

125 RGCCL/6172/602-SCP/L10-02

SCP/10-3 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)
QJI-SS-SFA-ME-ACMV-029

126 RGCCL/6172/602-SCP/L11-04

SCP/11-8 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

127 RGCCL/6172/602-SCP/L12-02

SCP/12-3 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

128 RGCCL/6172/602-SCP/L13-2

SCP/13-3 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

129 RGCCL/6172/602-SCP/L14-02

SCP/14-3 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

130 RGCCL/6172/602-SCP/L15-02

SCP/15-3 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

131 RGCCL/6172/602-SCP/L16-02

SCP/16-3 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

132 RGCCL/6172/602-SCP/L17-02

SCP/17-3 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

133 RGCCL/6172/602-SCP/L17-03

SCP/17-4 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

134 RGCCL/6172/602-SCP/L18-02

SCP/18-3 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

135 RGCCL/6172/602-SCP/L19-02

SCP/19-3 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

136 RGCCL/6172/602-SCP/L20-02

SCP/20-3 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

137 RGCCL/6172/602-SCP/L21-02

SCP/21-3 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

138 RGCCL/6172/602-SCP/22-02

SCP/22-3 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

139 RGCCL/6172/602-SCP/L23-02

SCP/23-3 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

140 RGCCL/6172/602-SCP/L7-09

SCP/7-10 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

141 RGCCL/6172/602-SCP/L7-09C

SCP/7-10 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

142 RGCCL/6172/602-SCP/L7-10

SCP/7-11 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

143 RGCCL/6172/602-SCP/L7-10C

SCP/7-11 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

144 RGCCL/6172/602-SCP/L7-11

SCP/7-12 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

145 RGCCL/6172/602-SCP/L7-11C

SCP/7-12 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

13/38

146 RGCCL/6172/602-SCP/L7-12

SCP/7-13 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

147 RGCCL/6172/602-SCP/L7-12C

SCP/7-13 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

148 RGCCL/6172/602-SCP/LR-10

SCP/LR-6 PANEL LAYPUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

149 RGCCL/6172/602-SCP/LR-10C

SCP/LR-6 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

150 RGCCL/6172/602-SCP/LR-11

SCP/LR-7 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

151 RGCCL/6172/602-SCP/LR-11C

SCP/LR-7 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

152 RGCCL/6172/602-SCP/LR-12

SCP/LR-8 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

153 RGCCL/6172/602-SCP/LR-12C

SCP/LR-8 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

154 RGCCL/6172/602-SCP/LR-13

SCP/LR-9 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

155 RGCCL/6172/602-SCP/LR-13C

SCP/LR-9 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

156 RGCCL/6172/602-SCP/B1-01

SCP/B1-1 PANEL LAYOUT& POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

157 RGCCL/6172/602-SCP/B1-01C

SCP/B1-1 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

158 RGCCL/6172/602-SCP/B1-02

SCP/B1-2&B1-3 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

159 RGCCL/6172/602-SCP/B1-02C

SCP/B1-2&B1-3CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

160 RGCCL/6172/602-SCP/B1-03

SCP/B1-4 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

161 RGCCL/6172/602-SCP/B1-03C

SCP/B1-4 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

162 RGCCL/6172/602-SCP/B1-04

SCP/B1-5 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

163 RGCCL/6172/602-SCP/B1-04C

SCP/B1-5 CONTOL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

164 RGCCL/6172/602-SCP/L1-01

SCP/1-1 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

165 RGCCL/6172/602-SCP/L1-01C

SCP/1-1 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

166 RGCCL/6172/602-SCP/L1-02

SCP/1-2 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

167 RGCCL/6172/602-SCP/L1-02C

SCP/1-2 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

14/38

168 RGCCL/6172/602-SCP/L1-02T

SCP/1-2 TERMINATION DWG

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

169 RGCCL/6172/602-SCP/L1-03

SCP/1-3&1-4 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

170 RGCCL/6172/602-SCP/L1-03C

SCP/1-3&1-4 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

171 RGCCL/6172/602-SCP/L1-04

SCP/1-5 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

172 RGCCL/6172/602-SCP/L1-04C

SCP/1-5 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

173 RGCCL/6172/602-SCP/L1-05

SCP/1-7 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

174 RGCCL/6172/602-SCP/L1-05C

SCP/1-7 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

175 RGCCL/6172/602-SCP/L1-10

SCP/1-29 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

176 RGCCL/6172/602-SCP/L1-10C

SCP/1-29 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

177 RGCCL/6172/602-SCP/L1-11

SCP/1-8 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

178 RGCCL/6172/602-SCP/L1-11C

SCP/1-8 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

179 RGCCL/6172/602-SCP/L1-12

SCP/1-9 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

180 RGCCL/6172/602-SCP/L1-12C

SCP/1-9 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

181 RGCCL/6172/602-SCP/L1-13

SCP/1-10 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

182 RGCCL/6172/602-SCP/L1-13C

SCP/1-10 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

183 RGCCL/6172/602-SCP/L1-13T

SCP/1-10 TERMINATION DWG

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

184 RGCCL/6172/602-SCP/L1-14

SCP/1-11 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

185 RGCCL/6172/602-SCP/L1-14C

SCP/1-11 CONTROL CIRCUI

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

186 RGCCL/6172/602-SCP/L1-15

SCP/1-12 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

187 RGCCL/6172/602-SCP/L1-15C

SCP/1-12 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

188 RGCCL/6172/602-SCP/L1-15T

SCP/1-12 TERMINATION DWG

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

189 RGCCL/6172/602-SCP/L1-16

SCP/1-13 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

15/38

190 RGCCL/6172/602-SCP/L1-16C

SCP/1-13 CONTROLCIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

191 RGCCL/6172/602-SCP/L1-17

SCP/1-14 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

192 RGCCL/6172/602-SCP/L1-17C

SCP/1-14 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

193 RGCCL/6172/602-SCP/L1-18

SCP/1-15 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

194 RGCCL/6172/602-SCP/L1-19

SCP/1-28 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

195 RGCCL/6172/602-SCP/L1-19C

SCP/1-28 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

196 RGCCL/6172/602-SCP/L1-19T

SCP/1-28 TERMINATION DWG

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

197 RGCCL/6172/602-SCP/L1-20

SCP/1-42 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

198 RGCCL/6172/602-SCP/L1-20C

SCP/1-42 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

199 RGCCL/6172/602-SCP/L1-20T

SCP/1-42 TERMINATION DWG

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

200 RGCCL/6172/602-SCP/L1-21

SCP/1-30 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

201 RGCCL/6172/602-SCP/L1-21C

SCP/1-30 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

202 RGCCL/6172/602-SCP/L1-21T

SCP/1-30 TERMINATION DWG

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

203 RGCCL/6172/602-SCP/L2-01

SCP/2-1 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

204 RGCCL/6172/602-SCP/L2-01C

SCP/2-1 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

205 RGCCL/6172/602-SCP/L2-01T

SCP/2-1 TERMINATION DWG

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

206 RGCCL/6172/602-SCP/L2-02

SCP/2-2&2-3 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

207 RGCCL/6172/602-SCP/L2-02C

SCP/2-2&2-3 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

208 RGCCL/6172/602-SCP/L3-01

SCP/3-1&3-2 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

209 RGCCL/6172/602-SCP/L3-01C

SCP/3-1&3-2 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

210 RGCCL/6172/602-SCP/L3-02

SCP/3-3 PANEL LAYOUT& SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

211 RGCCL/6172/602-SCP/L3-03

SCP/3-4 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

16/38

212 RGCCL/6172/602-SCP/L3-03C

SCP/ CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

213 RGCCL/6172/602-SCP/L4-01

SCP/4-1 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

214 RGCCL/6172/602-SCP/L4-02

SCP/4-2 PANEL LAYOUT& SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

215 RGCCL/6172/602-SCP/L4-03

SCP/4-3 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

216 RGCCL/6172/602-SCP/L4-04

SCP/4-4&4-5 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

217 RGCCL/6172/602-SCP/L4-04C

SCP/4-4&4-5 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

218 RGCCL/6172/602-SCP/L4-05

SCP/4-6&4-7 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

219 RGCCL/6172/602-SCP/L4-05C

SCP/4-6&4-7 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

220 RGCCL/6172/602-SCP/L5-01

SCP/5-1 PANEL LAYOUT&SIGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

221 RGCCL/6172/602-SCP/L5-02

SCP/5-2 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

222 RGCCL/6172/602-SCP/L5-03

SCP/5-3 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

223 RGCCL/6172/602-SCP/L5-04

SCP/5-5 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

224 RGCCL/6172/602-SCP/L5-04C

SCP/5-5 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

225 RGCCL/6172/602-SCP/L5-05

SCP/5-6&5-7 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

226 RGCCL/6172/602-SCP/L5-05C

SCP/5-6&5-7 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

227 RGCCL/6172/602-SCP/L6-01

SCP/6-1 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

228 RGCCL/6172/602-SCP/L6-02

SCP/6-2 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

229 RGCCL/6172/602-SCP/L6-03

SCP/6-3 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

230 RGCCL/6172/602-SCP/L6-04

SCP/6-4 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

231 RGCCL/6172/602-SCP/L6-05

SCP/6-5 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

232 RGCCL/6172/602-SCP/L6-06

SCP/6-6 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

233 RGCCL/6172/602-SCP/L6-07

SCP/6-7 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

17/38

No remark from ACE


(To follow latest Design)

234 RGCCL/6172/602-SCP/L6-08

SCP/6-8 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

235 RGCCL/6172/602-SCP/L7-01

SCP/7-1 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

236 RGCCL/6172/602-SCP/L7-01C

SCP/7-1 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

237 RGCCL/6172/602-SCP/L7-02

SCP/7-2 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

238 RGCCL/6172/602-SCP/L7-02C

SCP/7-2 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

239 RGCCL/6172/602-SCP/L7-03

SCP/7-3 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

240 RGCCL/6172/602-SCP/L7-04

SCP/7-4 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

241 RGCCL/6172/602-SCP/L7-05

SCP/7-5&7-6 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

242 RGCCL/6172/602-SCP/L7-05C

SCP/7-5&7-6 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

243 RGCCL/6172/602-SCP/L7-06

SCP/7-7 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

244 RGCCL/6172/602-SCP/L7-06C

SCP/7-7 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

245 RGCCL/6172/602-SCP/L7-07

SCP/7-8 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

246 RGCCL/6172/602-SCP/L9-01

SCP/9-1&9-2 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

247 RGCCL/6172/602-SCP/L9-01C

SCP/9-1&9-2 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

248 RGCCL/6172/602-SCP/L9-02

SCP/9-3 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

249 RGCCL/6172/602-SCP/L9-02C

SCP/9-3 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

250 RGCCL/6172/602-SCP/L9-03

SCP/9-4 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

251 RGCCL/6172/602-SCP/L9-03C

SCP/9-4 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

252 RGCCL/6172/602-SCP/L9-04

SCP/9-5 PANEL LAYOUT&SINGLE LINE

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

253 RGCCL/6172/602-SCP/L10-01

SCP/10-1&10-2 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

254 RGCCL/6172/602-SCP/L10-01C

SCP/10-1&10-2 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

255 RGCCL/6172/602-SCP/L11-01

SCP/11-1&11-2 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

18/38

QJI-SS-SFA-ME-ACMV-030

No remark from ACE


(To follow latest Design)

256 RGCCL/6172/602-SCP/L11-01C

SCP/11-1&11-2 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

257 RGCCL/6172/602-SCP/L11-02

SCP/11-3 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

258 RGCCL/6172/602-SCP/L11-02C

SCP/11-3 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

259 RGCCL/6172/602-SCP/L11-02T

SCP/11-3 TERMINATION DWG

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

260 RGCCL/6172/602-SCP/L11-03

SCP/11-4 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

261 RGCCL/6172/602-SCP/L11-03C

SCP/11-4 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

262 RGCCL/6172/602-SCP/L11-03T

SCP/11-4 TERMINATION DWG

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

263 RGCCL/6172/602-SCP/L12-01

SCP/12-1&12-2 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

264 RGCCL/6172/602-SCP/L12-01C

SCP/12-1&12-2 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

265 RGCCL/6172/602-SCP/L13-01

SCP/13-1&13-2 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

266 RGCCL/6172/602-SCP/L13-01C

SCP/13-1&13-2 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

267 RGCCL/6172/602-SCP/L14-01

SCP/14-1&14-2 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

268 RGCCL/6172/602-SCP/L14-01C

SCP/14-1&14-2 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

269 RGCCL/6172/602-SCP/L15-01

SCP/15-1&15-2 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

270 RGCCL/6172/602-SCP/L15-01C

SCP/15-1&15-2 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

271 RGCCL/6172/602-SCP/L16-01

SCP/16-1&16-2 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

272 RGCCL/6172/602-SCP/L16-01C

SCP/16-1&16-2 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

273 RGCCL/6172/602-SCP/L17-01

SCP/17-17&17-2 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

274 RGCCL/6172/602-SCP/L17-01C

SCP/17-17&17-2 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

275 RGCCL/6172/602-SCP/L18-01

SCP/18-1&18-2 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

276 RGCCL/6172/602-SCP/L18-01C

SCP/18-1&18-2 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

277 RGCCL/6172/602-SCP/L19-01

SCP/19-1&19-2 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

19/38

278 RGCCL/6172/602-SCP/L19-01C

SCP/19-1&19-2 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

279 RGCCL/6172/602-SCP/L20-01

SCP/20-1&20-2 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

280 RGCCL/6172/602-SCP/L20-01C

SCP/20-1&20-2 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

281 RGCCL/6172/602-SCP/L21-01

SCP/21-1&21-2 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

282 RGCCL/6172/602-SCP/L21-01C

SCP/21-1&21-2 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

283 RGCCL/6172/602-SCP/L22-01

SCP/22-1&22-2 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

284 RGCCL/6172/602-SCP/L22-01C

SCP/22-1&22-2 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

285 RGCCL/6172/602-SCP/L23-01

SCP/23-1&23-2 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

286 RGCCL/6172/602-SCP/L23-01C

SCP/23-1&23-2 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

287 RGCCL/6172/602-SCP/LR-01

SCP/LR-1 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

288 RGCCL/6172/602-SCP/LR-01C

SCP/LR-1 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

289 RGCCL/6172/602-SCP/LR-02

SCP/LR-2 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

290 RGCCL/6172/602-SCP/LR-02C

SCP/LR-2 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

291 RGCCL/6172/602-SCP/LR-03

SCP/LR-3 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

292 RGCCL/6172/602-SCP/LR-03C

SCP/LR-3 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

293 RGCCL/6172/602-SCP/LR-03T

SCP/LR-3 TERMINATION DWG

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

294 RGCCL/6172/602-SCP/LR-04

SCP/LR-4 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

295 RGCCL/6172/602-SCP/LR-04C

SCP/LR-4 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

296 RGCCL/6172/602-SCP/LR-05

SCP/LR-5 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

297 RGCCL/6172/602-SCP/LR-05C

SCP/LR-5 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

298 RGCCL/6172/602-SCP/LR-06P1

SCP/LR-10&11 PANEL LAYOUT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

299 RGCCL/6172/602-SCP/LR-06P2

SCP/LR-10&11 POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

20/38

300 RGCCL/6172/602-SCP/LR-06C1

SCP/LR-10&11 CONTROL CIRCUIT PART-1

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

301 RGCCL/6172/602-SCP/LR-06C2

SCP/LR-10&11 CONTROL CIRCUIT PART-2

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

302 RGCCL/6172/602-SCP/LR-06T

SCP/LR-10&11 TERMINATION DWG

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

303 RGCCL/6172/602-SCP/LR-07

SCP/LR-12 PANEL LAYOUT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

304 RGCCL/6172/602-SCP/LR-07P

SCP/LR-12 POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

305 RGCCL/6172/602-SCP/LR-07C

SCP/LR-12 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

306 RGCCL/6172/602-SCP/LR-07T

SCP/LR-12 TERMINATION DWG

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

307 RGCCL/6172/602-SCP/LR-08

SCP/LR-13 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

308 RGCCL/6172/602-SCP/LR-08C

SCP/LR-13 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

309 RGCCL/6172/602-SCP/LR-09

SCP/LR-14&15 PANEL LAYOUT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

310 RGCCL/6172/602-SCP/LR-09P

SCP/LR-14&15 POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

311 RGCCL/6172/602-SCP/LR-09C

SCP/LR-14&15 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

312 RGCCL/6172/602-SCP/UR-01

SCP/UR-1 PANEL LAYOUT&POWER CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

313 RGCCL/6172/602-SCP/UR-01C

SCP/UR-1 CONTROL CIRCUIT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

314 RGCCL/6172/602-SCP/UR-01T

SCP/UR-1 TERMINATION DWG

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

315 RGCCL/6172/602/-DT-S01

MIMIC & SUPERVISORY PANEL


LOCATED IN LEVEL-9(CHILLER PLANT ROOM)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

316 RGCCL/6172/602/-DT-S02

MIMIC DIAGRAM

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

317 RGCCL/6172/602/-DT-S03

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-1)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

318 RGCCL/6172/602/-DT-S04

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-2)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

319 RGCCL/6172/602/-DT-S05

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-3)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

320 RGCCL/6172/602/-DT-S06

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-4)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

321 RGCCL/6172/602/-DT-S07

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-5)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

21/38

322 RGCCL/6172/602/-DT-S08

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-6)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

323 RGCCL/6172/602/-DT-S09

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-7)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

324 RGCCL/6172/602/-DT-S10

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-8)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

325 RGCCL/6172/602/-DT-S11

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-9)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

326 RGCCL/6172/602/-DT-S12

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-10)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

327 RGCCL/6172/602/-DT-S13

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-11)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

328 RGCCL/6172/602/-DT-S14

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-12)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

329 RGCCL/6172/602/-DT-S15

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-13)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

330 RGCCL/6172/602/-DT-S16

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-14)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

331 RGCCL/6172/602/-DT-S17

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-15)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

332 RGCCL/6172/602/-DT-S18

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-16)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

333 RGCCL/6172/602/-DT-S19

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-17)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

334 RGCCL/6172/602/-DT-S20

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-18)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

335 RGCCL/6172/602/-DT-S21

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-19)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

336 RGCCL/6172/602/-DT-S22

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-20)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

337 RGCCL/6172/602/-DT-S23

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-21)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

338 RGCCL/6172/602/-DT-S24

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-22)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

339 RGCCL/6172/602/-DT-S25

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-23)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

340 RGCCL/6172/602/-DT-S26

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-24)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

341 RGCCL/6172/602/-DT-S27

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-25)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

342 RGCCL/6172/602/-DT-S28

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-26)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

343 RGCCL/6172/602/-DT-S29

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-27)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

22/38

QJI-SS-SFA-ME-ACMV-031

No remark from ACE


(To follow latest Design)

344 RGCCL/6172/602/-DT-S30

MIMIC & SUPERVISORY PANEL CONTROL CIRCUIT


(PART-28)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

345 RGCCL/6172/602/-DT-S31

SUPERVISORY PANEL LAYOUT

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

346 RGCCL/6172/602-DT-SIP-01

STATUS INDICATOR PANEL LAYOUT DWG


LOCATED IN LEVEL-1 (FCC ROOM)

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

347 RGCCL/6172/602-DT-SIP-02

STATUS INDICATOR PANEL CONTROL CIRCUIT-1

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

348 RGCCL/6172/602-DT-SIP-03

STATUS INDICATOR PANEL CONTROL CIRCUIT-2

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

349 RGCCL/6172/602-DT-SIP-04

STATUS INDICATOR PANEL CONTROL CIRCUIT-3

19-May-15

2-Jun-15

19-May-15

7-Jul-15

No remark from ACE


(To follow latest Design)

350 RGCCL/6172/602-DT/RS-01

Duct Riser And Pipe Riser Detail

1-Jun-15

15-Jun-15

1-Jun-15

QJI-SS-SFA-ME-ACMV-032

351 RGCCL/6172/602-A/22

Pre-Cool Fresh Air Schematic

1-Jun-15

15-Jun-15

1-Jun-15

QJI-SS-SFA-ME-ACMV-033

352 RGCCL/6172/602-A/CH

Chiller Plant Room Detail

1-Jun-15

16-Jun-15

1-Jun-15

29-Jun-15

353 RGCCL/6172/602-A/CH-01

Chiller Plant Room Section 1

1-Jun-15

16-Jun-15

1-Jun-15

29-Jun-15
QJI-SS-SFA-ME-ACMV-034

Revise NoResubmission
Required
Revise NoResubmission
Required
Revise NoResubmission
Required
Revise NoResubmission
Required

354 RGCCL/6172/602-A/CH-02

Chiller Plant Room Section 2

1-Jun-15

16-Jun-15

1-Jun-15

29-Jun-15

355 RGCCL/6172/602-A/CH-03

Chiller Plant Room Section 3

1-Jun-15

16-Jun-15

1-Jun-15

29-Jun-15

356 RGCCL/6172-602-A/23

Mechanical Ventilation Schematic Stair Case Toilets/ Smoke


Stop Lobby/ Fire Fighting Lobby

8-Jun-15

22-Jun-15

8-Jun-15

31-Jul-15

QJI-SS-SFA-ME-ACMV-035

Revise NoResubmission
Required

357 RGCCL/6172-602-A/24

Mechanical Ventilation Schematic Kitchen/ Car Park/ Plant Room

11-Jun-15

25-Jun-15

11-Jun-15

31-Jul-15

QJI-SS-SFA-ME-ACMV-036

Revise NoResubmission
Required

358 RGCCL/6172/602-A/25

Typical Details for Air-Conditioning & Mechanical Ventilation


Installation

23-Jun-15

7-Jul-15

23-Jun-15

QJI-SS-SFA-ME-ACMV-037

Date Over-due
Dont need to submit
M&E Shop Drawing Register
Fire Fighting & Alarm Installation
Item

Dwg No.

RGCCL/6172/602-FF/4

Updated date:
Dwg Title

Fire Fighting & Alarm Installation @ Level 2

Target
Submission
Date

Target
Approval
Date

Date
Submitted

Date
Commented

Date
Submitted

Date
Commented

Date
Submitted

Date
Commented

6-Apr-15

20-Apr-15

21-Aug-14

24-Sep-14

10-Feb-15

18-Mar-15

6-Apr-15

11-May-15

1st Submission

2nd Submission

3rd Submission

Submission
Ref.

QJI-SS-SFA-ME-FFAI-001
(Rev-2)
2

RGCCL/6172/602-FA/4

RGCCL/6172/602-FF/5
RGCCL/6172/602-FF/5a

Fire Alarm Installation @ Level 2

Fire Fighting & Alarm Installation @ Level 3

6-Apr-15

20-Apr-15

21-Aug-14

24Sep14

5-Feb-15

5-Mar-15

27-Jan-15

10-Feb-15

26-Aug-14

23-Dec-14

27-Jan-15

25-Feb-15

27-Jan-15

10-Feb-15

27-Jan-15

25-Feb-15

23/38

6-Apr-15

11-May-15

Revise & Resubmit


14-Jul-15
Status
Revise NoResubmission
Required
Revise NoResubmission
Required
Revise NoResubmission
Required

QJI-SS-SFA-ME-FFAI-002

Revise & Resubmit

RGCCL/6172/602-FA/5

5-Feb-15

19-Feb-15

26-Aug-14

23-Dec-14

RGCCL/6172/602-FF/6

26-Aug-14

23-Sep-14

26-Aug-14

23-Dec-14

5-Feb-15

5-Mar-15

QJI-SS-SFA-ME-FFAI-003

Fire Fighting & Alarm Installation @ Level 4


6

RGCCL/6172/602-FA/6

RGCCL/6172/602-FF/7

5-Feb-15

19-Feb-15

26-Aug-14

23-Dec-14

28-Aug-14

26-Sep-14

28-Aug-14

23-Dec-14

5-Feb-15

5-Mar-15

Fire Fighting & Alarm Installation @ Level 5


8

RGCCL/6172/602-FA/7

RGCCL/6172/602-FF/8

QJI-SS-SFA-ME-FFAI-004
16-Jun-15

1-Jul-15

28-Aug-14

23-Dec-14

10-Feb-15

28-Aug-14

26-Sep-14

28-Aug-14

23-Dec-14

10-Feb-15

18-Mar-15

16-Jun-15

29-Jun-15

QJI-SS-SFA-ME-FFAI-005

Fire Fighting & Alarm Installation @ Level 6


10

RGCCL/6172/602-FA/8

16-Jun-15

1-Jul-15

28-Aug-14

23-Dec-14

10-Feb-15

18-Mar-15

11

RGCCL/6172/602-FF/9

10-Feb-15

24-Feb-15

28-Aug-14

23-Dec-14

27-Jan-15

25-Feb-15

16-Jun-15

QJI-SS-SFA-ME-FFAI-006
(Rev-2)

Fire Fighting & Alarm Installation @ Level 7


12

RGCCL/6172/602-FA/9

10-Feb-15

24-Feb-15

28-Aug-14

24-Dec-14

13

RGCCL/6172/602-FF/10

1-Sep-14

3-Oct-14

1-Sep-14

24-Dec-14

10-Feb-15

19-Mar-15

QJI-SS-SFA-ME-FFAI-007
(Rev-1)

Fire Fighting & Alarm Installation @ Level 8


14

RGCCL/6172/602-FA/10

15

RGCCL/6172/602-FF/11

Fire Fighting Installation @ Level 9

1-Sep-14

24-Dec-14

10-Feb-15

19-Mar-15

Revise No
Resubmission
Required

24-Feb-15

10-Mar-15

2-Sep-14

24-Dec-14

24-Feb-15

24-Mar-15

Revise NoResubmission
Required

RGCCL/6172/602-FA/11

Fire Alarm Installation @ Level 9

23-Jun-15

7-Jul-15

2-Sep-14

24-Dec-14

23-Jun-15

17

RGCCL/6172/602-FF/12

Fire Fighting & Alarm Installation @ Level 10

24-Feb-15

10-Mar-15

2-Sep-14

24-Dec-14

24-Feb-15

24-Mar-15

18

RGCCL/6172/602-FF/13

Fire Fighting Installation @ Level 11

24-Feb-15

10-Mar-15

17-Sep-14

24-Dec-14

24-Feb-15

24-Mar-15

QJI-SS-SFA-ME-FFAI-009

QJI-SS-SFA-ME-FFAI-010

20

RGCCL/6172/602-FF/14

Fire Alarm Installation @ Level 11

23-Jun-15

7-Jul-15

17-Sep-14

24-Dec-14

23-Jun-15

24-Feb-15

10-Mar-15

24-Sep-14

7-Jan-15

24-Feb-15

24-Mar-15
QJI-SS-SFA-ME-FFAI-011

Fire Fighting & Alarm Installation @ Level 12


21

RGCCL/6172/602-FA/14

22

RGCCL/6172/602-FF/15

Fire Fighting Installation @ Level 13 to 15

23

RGCCL/6172/602-FA/15

24

Revise NoResubmission
Required

24-Feb-15

16

RGCCL/6172/602-FA/13

Revise NoResubmission
Required

10-Feb-15

QJI-SS-SFA-ME-FFAI-008

19

Revise NoResubmission
Required
Revise NoResubmission
Required
Revise NoResubmission
Required
Revise NoResubmission
Required
Revise NoResubmission
Revise NoResubmission
Required
Revise NoResubmission
Revise NoResubmission
Required

24-Sep-14

20-Oct-14

24-Sep-14

7-Jan-15

1-Jul-15

15-Jul-15

24-Sep-14

7-Jan-15

Fire Alarm Installation @ Level 13 to 15

24-Sep-14

20-Oct-14

24-Sep-14

7-Jan-15

RGCCL/6172-602F/PEN-01

Penetration Drawing for Basement Plan & Sections @ Fire


services

27-Jan-15

10-Feb-15

3-Oct-14

14Nov14

25

RGCCL/6172-602F/PEN-01a

Penetration Drawing for Basement Plan & Sections @ Fire


services

3-Oct-14

10-Oct-14

3-Oct-14

14Nov14

26

RGCCL/6172/602-FF/16

Fire Fighting & Alarm Installation @ Level 16

1-Jul-15

15-Jul-15

7-Oct-14

7-Jan-15

Revise NoResubmission
Required

Revise NoResubmission
Required
Revise NoResubmission
Required

1-Jul-15
QJI-SS-SFA-ME-FFAI-012

1-Dec-14

29-Dec-14

27-Jan-15

25-Feb-15
QJI-SS-SFA-ME-FFAI-013
(Rev-2)

1-Jul-15
QJI SS SFA ME FFAI 014

24/38

Revise NoResubmission
Required

Revise NoResubmission
Required
Revise NoResubmission Required
Revise NoResubmission
Required

QJI-SS-SFA-ME-FFAI-014
28

RGCCL/6172/602-FA/16

Fire Fighting & Alarm Installation @ Level 16

7-Oct-14

21-Oct-14

7-Oct-14

7-Jan-15

29

RGCCL/6172/602-FF/17

Fire Fighting Installation @ Level 17

1-Jul-15

15-Jul-15

16-Oct-14

14-Jan-15

1-Jul-15

30

RGCCL/6172/602-FA/17

Fire Alarm Installation @ Level 17

23-Jun-15

7-Jul-15

16-Oct-14

14-Jan-15

23-Jun-15

31

RGCCL/6172/602-FF/18

Fire Fighting Installation @ Level 18 to 22 Plan

1-Jul-15

15-Jul-15

16-Oct-14

14-Jan-15

1-Jul-15

32

RGCCL/6172/602-FA/18

Fire Alarm Installation @ Level 18 to 22 Plan

16-Oct-14

31-Oct-14

16-Oct-14

14-Jan-15

33

RGCCL/6172/602-FF/19

Fire Fighting Installation @ Level 23 Plan

1-Jul-15

15-Jul-15

16-Oct-14

14-Jan-15

34

RGCCL/6172/602-FA/19

Fire Alarm Installation @ Level 23 Plan

16-Oct-14

31-Oct-14

16-Oct-14

14-Jan-15

35

RGCCL/6172/602-FF/20

27-Oct-14

11-Nov-14

27-Oct-14

14-Jan-15

Revise NoResubmission
Required

QJI-SS-SFA-ME-FFAI-015

QJI-SS-SFA-ME-FFAI-016
Revise & Resubmit
1-Jul-15
QJI-SS-SFA-ME-FFAI-017
Revise & Resubmit
Revise & Resubmit

Fire Fighting & Alarm Installation @ Lower Roof


36

RGCCL/6172/602-FA/20

37

RGCCL/6172/602-F/22

Automatic Fire Alarm and & Automatic Fire Extinguisher System


for IT Room Schematic Diagram

QJI-SS-SFA-ME-FFAI-018
27-Oct-14

11-Nov-14

27-Oct-14

23-Jun-15

7-Jul-15

23-Jun-15

14-Jan-15

Revise & Resubmit


QJI-SS-SFA-ME-FFAI-020

Date Over-due
Dont need to submit
M&E Shop Drawing Register
Fire Fighting System
Item

Dwg No.

Updated date:
Dwg Title

RGCCL/130803-02/FH-1

Penetration for Fire Hydrant 1

RGCCL/130803-02/FH-2

Penetration for Fire Hydrant 2

Target
Submission
Date

Target
Approval
Date

Date
Submitted

Date
Commented

Date
Submitted

Date
Commented

22-Sep-14

7-Oct-14

9-Jun-14

18-Jun-14

12-Aug-14

14Sep14

3-Feb-15

17-Feb-15

9-Jun-14

18-Jun-14

12-Aug-14

14Sep14

5Nov14

29-Dec-14

3-Feb-15

4Mar15

9-Jun-14

18-Jun-14

12-Aug-14

14Sep14

5Nov14

29-Dec-14

3-Feb-15

4Mar15

3-Feb-15
3

RGCCL/130803-02/FH-3

17-Feb-15

Penetration for Fire Hydrant 3

1st Submission

2nd Submission

RGCCL/6172/602-F/2-FH-PEN

Penetration for Fire Hydrants Plan

22-Sep-14

7-Oct-14

9-Jun-14

18-Jun-14

12-Aug-14

14Sep14

RGCCL/6172/602-FF/2

Fire Fighting Installation @ Basement 1 Plan

5-Nov-14

19-Nov-14

14-Aug-14

14Sep14

5-Nov-14

29-Dec-14

3rd Submission
Date
Submitted

Date
Commented

Submission
Ref.

RGCCL/6172/602-FF/2 a

Fire Fighting Installation @ Basement Section

5-Nov-14

19-Nov-14

14-Aug-14

14Sep14

5-Nov-14

29-Dec-14

RGCCL/6172/602-FF/3

Fire Fighting Installation @ Level 1

2-Jan-15

16-Jan-15

15-Aug-14

24-Sep-14

2-Jan-15

9-Feb-15

RGCCL/6172/602-FF/3a

Fire Fighting Installation @ Level 1 Sections

23-Feb-15

9-Mar-15

2-Jan-15

9-Feb-15

23-Feb-15

23-Mar-15

RGCCL/6172/602-FF/3b

Fire Fighting Installation @ Level 1 Sections

9-Jan-15

19-Jan-15

2-Jan-15

Supersede

9-Jan-15

10

RGCCL/6172/602-FF/02b

FL01 Lift Pith Section Detail for Sprinkler Pipe

24-Nov-14

8-Dec-14

24-Nov-14

11

RGCCL/6172/602-F/SO-01

1st Storey Opening Slab Opening (Fire Services)

27-Nov-14

10-Dec-14

12

RGCCL/6172/602-F/PEN-02

Penetration Drawing For 1st Storey Plan

2-Apr-15

13

RGCCL/6172/602-F/PEN-03

Penetration Drawing For 2nd Storey Plan

2-Apr-15

Status
Revise No-Resubm
ission Required

22-Sep-14

14Oct14

Revise & Resubmit


QJI-SS-SFA-ME-FF-001(Rev-4)

22-Sep-14

14Oct14

Revise & Resubmit


Revise No-Resubm
ission Required

QJI-SS-SFA-ME-FF-002(Rev-1)

Revise & Resubmit


25-Jul-15

Revie NoResubmission
Required
Revie NoResubmission
Required
Revise NoResubmission
Required

QJI-SS-SFA-ME-FF-003
(Rev-2)

No Exception Taken

14-Jan-15

QJI-SS-SFA-ME-FF-004

1-Dec-14

29-Dec-14

QJI-SS-SFA-ME-FF-005

Revise NoResubmission
Required
Revise NoResubmission
Required
Revise NoResubmission
Required

16-Apr-15

14-Jan-15

9-Feb-15

2-Apr-15

22-Apr-15

QJI-SS-SFA-ME-FF-006

Revise-No
Resubmission
Required

16-Apr-15

26-Jan-15

13-Feb-15

2-Apr-15

22-Apr-15

QJI-SS-SFA-ME-FF-007

Revise-No
Resubmission
Required

25/38

14

RGCCL/6172/602-F/SO-02

2nd Storey Opening Drawing

26-Jan-15

9-Feb-15

26-Jan-15

13-Feb-15

QJI-SS-SFA-ME-FF-007

No remark from ACE

15

RGCCL/6172/602-F/SO-03

3rd Storey Opening Drawing

26-Jan-15

9-Feb-15

26-Jan-15

13-Feb-15

QJI-SS-SFA-ME-FF-008

Revise-No
Resubmission
Required

16

RGCCL/6172/602-FF/4b

Sprinkler Pump Room Installation Details @ Level 2

10-Feb-15

24-Feb-15

10-Feb-15

19-Mar-15

Revise NoResubmission Required


QJI-SS-SFA-ME-FF-009

17

RGCCL/6172/602-FF/4c

Sprinkler Pump Room Installation Details @ Level 2


Sections

18

RGCCL/6172/602-F/21

Automatic Fire Sprinkler, Hosereel, Wet & Dry Riser Piping


Schematic Diagram

10-Feb-15

24-Feb-15

10-Feb-15

19-Mar-15

Revise NoResubmission Required

1-Jun-15

16-Jun-15

1-Jun-15

16-Jul-15

Revise & Resubmit

M&E Shop Drawing Register


Engineered Smoke Control System
Item

Dwg No.

Updated date:
Dwg Title

Target
Submission
Date

Target
Approval
Date

Date
Submitted

Date
Commented

Date
Submitted

Date
Commented

1st Submission

2nd Submission

3rd Submission
Date
Submitted

Date
Commented

Submission
Ref.

Date Over-due
Dont need to submit
Revise & Resubmit
25-Jul-15
Status

RGCCL/130803-ESCS/01

Engineered Smoke Control System @ Basement 1

17-Sep-14

20-Oct-14

14-Aug-14

9-Sep-14

17-Sep-14

24-Sep-14

QJI-SS-SFA-ME-ESCS-001(Rev-1)

No Exception Taken

RGCCL/130803-ESCS/02

Engineered Smoke Control System @ Level 1

11-Sep-14

13-Oct-14

15-Aug-14

26-Aug-14

11-Sep-14

24-Sep-14

QJI-SS-SFA-ME-ESCS-002(Rev-1)

No Exception Taken

RGCCL/130803-ESCS/03

Engineered Smoke Control System @ Level 2

24-Nov-14

8-Dec-14

21-Aug-14

9-Sep-14

17-Sep-14

24-Sep-14

RGCCL/130803-ESCS/04

Engineered Smoke Control System @ Level 3

26-Aug-14

23-Sep-14

26-Aug-14

9-Sep-14

QJI-SS-SFA-ME-ESCS-004

No Exception Taken

RGCCL/130803-ESCS/05

Engineered Smoke Control System @ Level 4

26-Aug-14

23-Sep-14

26-Aug-14

9-Sep-14

QJI-SS-SFA-ME-ESCS-005

No Exception Taken

RGCCL/130803-ESCS/06

Engineered Smoke Control System @ Level 5

26-Aug-14

23-Sep-14

26-Aug-14

9-Sep-14

QJI-SS-SFA-ME-ESCS-006

No Exception Taken

RGCCL/130803-ESCS/07

Engineered Smoke Control System @ Level 6

28-Aug-14

26-Sep-14

28-Aug-14

9-Sep-14

QJI-SS-SFA-ME-ESCS-007

No Exception Taken

RGCCL/130803-ESCS/08

Engineered Smoke Control System @ Level 7

26-Jun-15

10-Jul-15

28-Aug-14

9-Sep-14

QJI-SS-SFA-ME-ESCS-008

No Exception Taken

17719-1A

SCP/1-34 & SCP/7-14 Panel Layout Diagram

8-May-15

22-May-15

8-May-15

10

17719-1B

SCP/1-34 & SCP/7-14 Panel Schematic Diagram

8-May-15

22-May-15

8-May-15

11

17719-1C

SCP/1-34 & SCP/7-14 Panel Control Circuit Diagram

8-May-15

22-May-15

8-May-15

12

17719-1D

SCP/1-34 & SCP/7-14 Panel Control Circuit Diagram

8-May-15

22-May-15

8-May-15

13

17972-1A

MDCP-B1-01 Panel Layout & Control Circuit Diagram

8-May-15

22-May-15

8-May-15

14

17972-2A

MDCP-B1-01 Panel Layout & Control Circuit Diagram

8-May-15

22-May-15

8-May-15

15

17972-2B

MDCP-B1-02/03/04/05 Panel Layout & Control Circuit Diagram

8-May-15

22-May-15

8-May-15

16

17972-3A

MDCP-B1-06/07/08/09 Panel Layout & Control Circuit Diagram

8-May-15

22-May-15

8-May-15

17

17972-3B

MDCP-B1-06/07/08/09 Panel Layout & Control Circuit Diagram

8-May-15

22-May-15

8-May-15

18

17972-4A

MDCP-B1-10 Panel Layout & Control Circuit Diagram

8-May-15

22-May-15

8-May-15

19

17972-5A

MDCP-L2-01/02/03 Panel Layout & Control Circuit Diagram

8-May-15

22-May-15

8-May-15

20

17972-5B

MDCP-L2-01/02/03 Control Circuit Diagram

8-May-15

22-May-15

8-May-15

26-Jun-15

24-Nov-14

14-Jan-15

30-Jun-15

QJI-SS-SFA-ME-ESCS-003(Rev-2) No Exception Taken

QJI-SS-SFA-ME-ESCS-009

Date Over-due
Dont need to submit
M&E Shop Drawing Register
Electrical System
It

Updated date:
D

Titl

Target
S b i i

Target
A
l

1st Submission

26/38

2nd Submission

3rd Submission

Submission

Revise & Resubmit


25-Jul-15
St t

Item

Dwg No.

QJI-SS-M&E-ELEC/LTN-03

QJI-SS-M&E-ELEC/DT-001

QJI-SS-M&E-ELEC/DT-002

QJI-SS-M&E-ELEC/ETH-001

QJI-SS-M&E-ELEC/ETH-002

QJI-SS-M&E-ELEC/DT-003

QJI-SS-M&E-ELEC/DT-08

QJI-SS-M&E-ELEC-LTG-02(P-1)

8
QJI-SS-M&E-ELEC-LTG-02(P-2)
(QJI-SS-M&E-ELECT-LEVEL1-DT-01)

Dwg Title

Lightning Protection System Layout, Basement-1 Plan


Lightning Protection System Installation Detail Drawing(Part
1of2)
Lightning Protection System Installation Detail Drawing(Part
2of2)
Earthing System Layout, Installation Detail and Schematic
Diagram(Part-1)
Earthing System Layout, Installation Detail and Schematic

Submission
Date

Approval
Date

Date
Submitted

Date
Commented

Date
Submitted

Date
Commented

Date
Submitted

Date
Commented

20-Jan-15

5-Feb-15

2-Dec-14

10-Dec-14

8-Jan-15

by mail

20-Jan-15

27-Jan-15

2-Dec-14

16-Dec-14

2-Dec-14

10-Dec-14

2-Dec-14

16-Dec-14

2-Dec-14

2-Dec-14

16-Dec-14

2-Dec-14

Revise No-Resubmission
requied

.,
QJI-SS-SFA-ME-EL-003

Revise No-Resubmission

2-Dec-14

10-Dec-14

Lightning Protection System Detail, Section @ Basement-1

20-Jan-15

5-Feb-15

8-Jan-15

Supersede

20-Jan-15

16-Feb-15

2-Mar-15

17-Jan-15

19-Jan-15

16-Feb-15

Shop Drawing Submission for Lighting Layout Level 1 Plan(Part 1)


16-Feb-15

2-Mar-15

2)

UG Diesel Storage Tank Detail

17-Jan-15

Commented by
Mail 19-Jan-15

16-Feb-15

27-Mar-15

requied

QJI-SS-SFA-ME-EL-005
(TRANSMITTAL-018)
3-Feb-15

1/20/2015
(sent by Technical

QJI-SS-SFA-ME-EL-004
(Rev-1)

27-Jan-15

28-Jan-15

Meeting)

3-Feb-15

20-Jan-15

4-Feb-15

20-Jan-15

28-Jan-15

(Basement-1 & Level-1 ) Plan

27-Jan-15

10-Feb-15

20-Jan-15

Supersede

27-Jan-15

28-Jan-15

27-Jan-15

QJI-SS-M&E-ELEC-LTG-01

Lighting Layout Basement 1 Plan

24-Mar-15

7-Apr-15

10-Feb-15

24-Feb-15

26-Feb-15

27-Feb-15

13-Apr-15

12

QJI-SS-M&E-ELEC-ELV-01

ELV Layout Basement 1 Plan

24-Mar-15

7-Apr-15

10-Feb-15

24-Feb-15

13-Apr-15

13-Apr-15

2-Jun-15

13

QJI-SS-M&E-ELEC-PW-01

Power Layout Basement 1 Plan(Part 1 of 2)

24-Mar-15

7-Apr-15

10-Feb-15

24-Feb-15

13-Apr-15

13-Apr-15

2-Jun-15

14

QJI-SS-M&E-ELEC-PW-01

Power Layout Basement 1 Plan(Part 2 of 2)

24-Mar-15

7-Apr-15

10-Feb-15

24-Feb-15

13-Apr-15

13-Apr-15

2-Jun-15

15

QJI-SS-M&E-ELEC-DT-01

Detail Drawing ( Stair Case-01)

16-Feb-15

2-Mar-15

16-Feb-15

27-Mar-15

1/20/2015
(sent by
Technical
Meeting)

28-Jan-15

1/20/2015
(sent by
Technical
Meeting)

28-Jan-15

QJI-SS- M&E-ELEC-UGST & FP-01

10

QJI-SS- M&E-ELEC-UGST & FP-02

11

16

17

QJI-SS-M&E-ELEC-LTG-02(P-1)

QJI-SS-M&E-ELEC-LTG-02(P-2)

UG Diesel Storage Tank Layout And Fuel Pipes Routing For

Lighting Layout Level 1 Plan (1 of 2)

Lighting Layout Level 1 Plan (2 of 2)

requied

No Exception Taken

10-Dec-14

16-Dec-14

Shop Drawing Submission for Lighting Layout Level 1 Plan(Part -

Revise No-Resubmission

No Exception Taken

2-Dec-14

( Stair Case 01)

QJI-SS-SFA-ME-EL-001
(Rev-2)

Status

QJI-SS-SFA-ME-EL-002

Diagram(Part-2)

Shop Drawing Submission for Detail Drawing

Submission
Ref.

17-Jan-15
13-Apr-15

13-Apr-15

22-Apr-15

Commented by
Mail 19-Jan-15

13-Apr-15

2-Jun-15

17-Jan-15

Commented by
Mail 19-Jan-15

22-Apr-15
13-Apr-15

27/38

2-Jun-15

24-Feb-15
By mail on
2/24/2015
By mail on

QJI-SS-SFA-ME-EL-006
(Rev-3)
(TRANSMITTAL-003)
(TRANSMITTAL-004)

QJI-SS-SFA-ME-EL-007

Revise No-Resubmission
requied

Revise & Resubmit


Revise & Resubmit

No Exception Taken

Revise No-Resubmission
Required

QJI-SS-SFA-ME-EL-007
(Rev-1)

Revise No-Resubmission

2-Jun-15

Required
Revise No-Resubmission

QJI-SS-SFA-ME-EL-008 R2
(TRANSMITTAL-016)
(TRANSMITTAL-001)
(TRANSMITTAL-023)

Required
Revise No-Resubmission
Required
Revise No-Resubmission
Required
No Exception Taken

3-Feb-15

Revise No-Resubmission
Required

3-Feb-15

Revise No-Resubmission
Required

QJI-SS-SFA-ME-EL-009 R1
(TRANSMITTAL-005)
(TRANSMITTAL 024)

(TRANSMITTAL-024)
Revise No-Resubmission

QJI-SS-M&E-ELECT-PW-02( 1 of 2)

Power & Cable Support Layout @ Level 1 Plan 1 0f 2

13-Apr-15

22-Apr-15

23-Feb-15

9-Mar-15

2-Jun-15

QJI-SS-M&E-ELECT-PW-02( 1 of 2)

Power & Cable Support Layout @ Level 1 Plan 2 0f 2

13-Apr-15

22-Apr-15

23-Feb-15

9-Mar-15

13-Apr-15

2-Jun-15

QJI-SS-M&E-ELECT-ELV-02( 1 of 2)

ELV & Cable Support Layout @ Level 1 Plan 1 0f 2

13-Apr-15

22-Apr-15

23-Feb-15

9-Mar-15

13-Apr-15

2-Jun-15

QJI-SS-M&E-ELECT-ELV-02( 1 of 2)

ELV & Cable Support Layout @ Level 1 Plan 2 0f 2

13-Apr-15

22-Apr-15

23-Feb-15

9-Mar-15

13-Apr-15

2-Jun-15

QJI-SS-M&E-ELECT-LTG-03( 1of2 )

Lighting Layout Level 2 Plan

13-Apr-15

22-Apr-15

3-Mar-15

27-Mar-15

13-Apr-15

QJI-SS-M&E-ELECT-LTG-03( 2of2 )

Lighting Layout Level 2 Plan

13-Apr-15

22-Apr-15

3-Mar-15

27-Mar-15

13-Apr-15

QJI-SS-M&E-ELECT-PW-03( 1 of 2 )

Power Layout Level 2 Plan

13-Apr-15

22-Apr-15

3-Mar-15

27-Mar-15

13-Apr-15

QJI-SS-M&E-ELECT-PW-03( 2of 2 )

Power Layout Level 2 Plan

13-Apr-15

22-Apr-15

3-Mar-15

27-Mar-15

13-Apr-15

QJI-SS-M&E-ELECT-ELV-03( 1 of 2)

ELV Layout Level 2 Plan

13-Apr-15

22-Apr-15

3-Mar-15

27-Mar-15

13-Apr-15

QJI-SS-M&E-ELECT-ELV-03( 2 of 2)

ELV Layout Level 2 Plan

13-Apr-15

22-Apr-15

3-Mar-15

27-Mar-15

13-Apr-15

22

QJI-SS-M&E-ELECT-STD-DT-02

Detail Drawing ( Stair Case-02)

3-Mar-15

17-Mar-15

3-Mar-15

27-Mar-15

23

QJI-SS-M&E-ELECT-STD-DT-03

Detail Drawing ( Stair Case-03)

3-Mar-15

17-Mar-15

3-Mar-15

27-Mar-15

24

QJI-SS-M&E-ELECT-STD-DT-04

Detail Drawing ( Stair Case-04)

3-Mar-15

17-Mar-15

3-Mar-15

27-Mar-15

QJI-SS-M&E-ELECT-LTG-04( 1of2 )

Lighting Layout Level 3 Plan

2-Jul-15

16-Jul-15

6-Mar-15

9-Apr-15

22-Apr-15

26-Jun-15

2-Jul-15

QJI-SS-M&E-ELECT-LTG-04( 2of2 )

Lighting Layout Level 3 Plan

2-Jul-15

16-Jul-15

6-Mar-15

9-Apr-15

22-Apr-15

26-Jun-15

2-Jul-15

QJI-SS-M&E-ELECT-PW-04( 1 of 2 )

Power Layout Level 3 Plan

2-Jul-15

16-Jul-15

6-Mar-15

9-Apr-15

22-Apr-15

26-Jun-15

2-Jul-15

QJI-SS-M&E-ELECT-PW-04( 2of 2 )

Power Layout Level 3 Plan

2-Jul-15

16-Jul-15

6-Mar-15

9-Apr-15

22-Apr-15

26-Jun-15

2-Jul-15

QJI-SS-M&E-ELECT-ELV-04( 1 of 2)

ELV Layout Level 3 Plan

2-Jul-15

16-Jul-15

6-Mar-15

9-Apr-15

22-Apr-15

26-Jun-15

2-Jul-15

QJI-SS-M&E-ELECT-ELV-04( 2 of 2)

ELV Layout Level 3 Plan

2-Jul-15

16-Jul-15

6-Mar-15

9-Apr-15

22-Apr-15

26-Jun-15

2-Jul-15

QJI-SS-M&E-ELECT-LTG-05( 1of2 )

Lighting Layout Level 4 Plan

6-Mar-15

20-Mar-15

6-Mar-15

9-Apr-15

QJI-SS-M&E-ELECT-LTG-05( 2of2 )

Lighting Layout Level 4 Plan

6-Mar-15

20-Mar-15

6-Mar-15

9-Apr-15

QJI-SS-M&E-ELECT-PW-05( 1 of 2 )

Power Layout Level 4 Plan

2-Jul-15

16-Jul-15

6-Mar-15

9-Apr-15

2-Jul-15

QJI-SS-M&E-ELECT-PW-05( 2of 2 )

Power Layout Level 4 Plan

2-Jul-15

16-Jul-15

6-Mar-15

9-Apr-15

2-Jul-15

QJI-SS-M&E-ELECT-ELV-05( 1 of 2)

ELV Layout Level 4 Plan

6-Mar-15

20-Mar-15

6-Mar-15

9-Apr-15

Required

17
Revise No-Resubmission
Required
Revise No-Resubmission
Required

18
Revise No-Resubmission
Required
Revise-No Resubmission
Required

19
Revise-No Resubmission
Required
Revise-No Resubmission

QJI-SS-SFA-ME-EL-010 R1
(TRANSMITTAL-007)
(TRANSMITTAL-025)

20

Required
Revise-No Resubmission
Required
Revise-No Resubmission
Required

21
Revise-No Resubmission
Required
No Exception Taken

QJI-SS-SFA-ME-EL-011
(TRANSMITTAL-008)

No Exception Taken
No Exception Taken

25

26

QJI-SS-SFA-ME-EL-012 R2
(TRANSMITTAL-009)

27

Revise-No Resubmission
Required

28
Revise-No Resubmission
Required

29

30

28/38

QJI-SS-SFA-ME-EL-013 R1
(TRANSMITTAL-010)

Revise-No Resubmission
Required

30
Revise-No Resubmission

QJI-SS-M&E-ELECT-ELV-05( 2 of 2)

ELV Layout Level 4 Plan

6-Mar-15

20-Mar-15

6-Mar-15

9-Apr-15

QJI-SS-M&E-ELECT-LTG-06( 1of2 )

Lighting Layout Level 5 Plan

6-Mar-15

20-Mar-15

6-Mar-15

9-Apr-15

QJI-SS-M&E-ELECT-LTG-06( 2of2 )

Lighting Layout Level 5 Plan

6-Mar-15

20-Mar-15

6-Mar-15

9-Apr-15

QJI-SS-M&E-ELECT-PW-06( 1 of 2 )

Power Layout Level 5 Plan

6-Mar-15

20-Mar-15

6-Mar-15

9-Apr-15

QJI-SS-M&E-ELECT-PW-06( 2of 2 )

Power Layout Level 5 Plan

6-Mar-15

20-Mar-15

6-Mar-15

9-Apr-15

QJI-SS-M&E-ELECT-ELV-06( 1 of 2)

ELV Layout Level 5 Plan

6-Mar-15

20-Mar-15

6-Mar-15

9-Apr-15

QJI-SS-M&E-ELECT-ELV-06( 2 of 2)

ELV Layout Level 5 Plan

6-Mar-15

20-Mar-15

6-Mar-15

9-Apr-15

Lighting Layout Level 6 Plan


Lighting Layout Level 6 Plan
Power Layout Level 6 Plan
Power Layout Level 6 Plan
ELV Layout Level 6 Plan
ELV Layout Level 6 Plan

22-Apr-15
22-Apr-15
22-Apr-15
22-Apr-15
22-Apr-15
22-Apr-15

8-May-15
8-May-15
8-May-15
8-May-15
8-May-15
8-May-15

11-Mar-15
11-Mar-15
11-Mar-15
11-Mar-15
11-Mar-15
11-Mar-15

27-Mar-15
27-Mar-15
27-Mar-15
27-Mar-15
27-Mar-15
27-Mar-15

22-Apr-15
22-Apr-15
22-Apr-15
22-Apr-15
22-Apr-15
22-Apr-15

Sunlight (MSB/7-1)LV switchboard

27-May-15

10-Jun-15

11-Mar-15

16-Apr-15

27-May-15

Required
Revise-No Resubmission
Required

31

32

Revise-No Resubmission
Required

QJI-SS-SFA-ME-EL-014
(TRANSMITTAL-011)
TRANSMITTAL-015

Revise & Resubmit


Revise & Resubmit
Revise-No Resubmission
Required

33

34
35
36

QJI-SS-M&E-ELECT-LTG-07( 1of2 )
QJI-SS-M&E-ELECT-LTG-07( 2of2 )
QJI-SS-M&E-ELECT-PW-07( 1 of 2 )
QJI-SS-M&E-ELECT-PW-07( 2of 2 )
QJI-SS-M&E-ELECT-ELV-07( 1 of 2)
QJI-SS-M&E-ELECT-ELV-07( 2 of 2)

37

38

39

QJI-SS-M&E-ELECT-P.Routing-01

QJI-SS-M&E-ELECT-P.Routing-01

Concealed Conduit Pipe Routing Layout Basement 1


Plan 1 of 2
Concealed Conduit Pipe Routing Layout Basement 1

25-Mar-15

Plan 2 of 2

25-Mar-15

5-Apr-15

5-Apr-15

Revise-No Resubmission
Required
Revise & Resubmit

QJI-SS-SFA-ME-EL-015
(TRANSMITTAL-012)
( TRANSMITTAL-29)

QJI-SS-SFA-ME-EL-016
TRANSMITTAL-013

14-Jul-15

25-Mar-15

Revise & Resubmit

No Exception Taken/ Revise


- No Resubmission
Required

Revise No
Resubmission
Required
Revise-No Resubmission

Lighting Layout Level 7 Plan

24-Mar-15

7-Apr-15

24-Mar-15

2-Jun-15

41

QJI-SS-M&E-ELECT-LTG-08( 2of2 )

Lighting Layout Level 7 Plan

24-Mar-15

7-Apr-15

24-Mar-15

2-Jun-15

42

QJI-SS-M&E-ELECT-PW-08( 1 of 2 )

Power Layout Level 7 Plan

2-Jul-15

16-Jul-15

24-Mar-15

2-Jun-15

2-Jul-15

43

QJI-SS-M&E-ELECT-PW-08( 2of 2 )

Power Layout Level 7 Plan

2-Jul-15

16-Jul-15

24-Mar-15

2-Jun-15

2-Jul-15

44

QJI-SS-M&E-ELECT-ELV-08( 1 of 2)

ELV Layout Level 7 Plan

24-Mar-15

7-Apr-15

24-Mar-15

2-Jun-15

45

QJI-SS-M&E-ELECT-ELV-08( 2 of 2)

ELV Layout Level 7 Plan

24-Mar-15

7-Apr-15

24-Mar-15

2-Jun-15

46

QJI-SS-M&E-ELECT-DETAILS-01

Typical Installation details ( part 1 of 2 )

24-Mar-15

7-Apr-15

24-Mar-15

9-Apr-15

Required
Revise-No Resubmission
Required

QJI-SS-SFA-ME-EL-018 R1
(TRANSMITTAL-015)
Revise-No Resubmission
Required
Revise-No Resubmission
Required
Revise-No Resubmission

QJI-SS-SFA-ME-EL-019
(TRANSMITTAL-019)
47

QJI-SS-M&E-ELECT-DETAILS-02

Typical Installation details ( part 2 of 2 )

24-Mar-15

7-Apr-15

24-Mar-15

9-Apr-15

48

QJI-SS-M&E-ELECT-GEN-01

Generator Room Layout ( part 1 of 2 )

27-May-15

10-Jun-15

24-Mar-15

9-Apr-15

13-Apr-15

23-Apr-15

27-May-15

9-Jun-15

49

QJI-SS-M&E-ELECT-GEN-01

Generator Room Layout ( part 2of 2 )

27-May-15

10-Jun-15

24-Mar-15

9-Apr-15

13-Apr-15

23-Apr-15

27-May-15

9-Jun-15

7th Storey fuel pipe routing and details

Revise & Resubmit

No Exception Taken

QJI-SS-SFA-ME-EL-017
TRANSMITTAL-014

QJI-SS-M&E-ELECT-LTG-08( 1of2 )

QJI-SS-M&E-ELECT-GEN-02

Revise & Resubmit

Revise & Resubmit

25-Mar-15

40

50

Revise & Resubmit

27-May-15

10-Jun-15

24-Mar-15

29/38

9-Apr-15

Required
Revise-No Resubmission
Required

27-May-15

9-Jun-15

QJI-SS-SFA-ME-EL-020
(Rev-2)
TRANSMITTAL-020
TRANSMITTAL-022

Revise-No Resubmission
Required

Revise-No Resubmission

51

QJI-SSM&E-ELEC-WO-01

Wall Opening Basement 1(Part 1 of 2)

24-Mar-15

7-Apr-15

24-Mar-15

52

QJI-SS-M&E-ELECT-LTG-09( P-1 )

Lighting Layout Level 8 Plan (1 of 2)

13-Apr-15

27-Apr-15

13-Apr-15

53

QJI-SS-M&E-ELECT-LTG-09( P-2 )

Lighting Layout Level 8 Plan (2 of 2)

13-Apr-15

27-Apr-15

13-Apr-15

54

QJI-SS-M&E-ELECT-PW-09( P-1 )

13-Apr-15

27-Apr-15

13-Apr-15

55

QJI-SS-M&E-ELECT-PW-09( P-2 )

(2 of 2)

13-Apr-15

27-Apr-15

13-Apr-15

56

QJI-SS-M&E-ELECT-ELV-09( P-1)

ELV & Cable Support system Layout Level 8 Plan (1 of 2)

13-Apr-15

27-Apr-15

13-Apr-15

57

QJI-SS-M&E-ELECT-ELV-09( P-2 )

(2 of 2)

13-Apr-15

27-Apr-15

13-Apr-15

52

QJI-SS-M&E-ELECT-LTG-10( P-1 )

Lighting Layout Level 9 Plan (1 of 2)

22-Apr-15

8-May-15

22-Apr-15

53

QJI-SS-M&E-ELECT-LTG-10( P-2 )

Lighting Layout Level 9 Plan (2 of 2)

22-Apr-15

8-May-15

22-Apr-15

54

QJI-SS-M&E-ELECT-PW-10( P-1 )

22-Apr-15

8-May-15

22-Apr-15

55

QJI-SS-M&E-ELECT-PW-10( P-2 )

(2 of 2)

22-Apr-15

8-May-15

22-Apr-15

56

QJI-SS-M&E-ELECT-ELV-10( P-1)

ELV & Cable Support system Layout Level 9 Plan (1 of 2)

22-Apr-15

8-May-15

22-Apr-15

57

QJI-SS-M&E-ELECT-ELV-10( P-2 )

22-Apr-15

8-May-15

22-Apr-15

58

QJI-SS-M&E-ELECT-ELV-SCH-06

22-Apr-15

8-May-15

22-Apr-15

30-Jun-15

59

YHA/15/040/FP/GLA/001 Rev A

General Arrangement for fuel pump panel (Sheet 10)

22-Apr-15

8-May-15

22-Apr-15

9-Jun-15

Revise - No
Resubmission Required

60

YHA/15/040/PP/GLA/002 Rev A

General Layout Arrangement (Sheet02)

22-Apr-15

8-May-15

22-Apr-15

9-Jun-15

Revise - No
Resubmission Required

61

YHA/15/040/PP/SLD/001 Rev A

Single Line Diagram

22-Apr-15

8-May-15

22-Apr-15

9-Jun-15

Revise & Resubmit

Power & cable support system layout Level 8 Plan


(1 of 2)
Power & cable support system layout Level 8 Plan

ELV & Cable Support system Layout Level 8 Plan

Power & cable support system layout Level 9 Plan


(1 of 2)
Power & cable support system layout Level 9 Plan

ELV & Cable Support system Layout Level 9 Plan


(2 of 2)
Carpark barrier equipment layout, detail & schematic diagram

9-Apr-15

Required

QJI-SS-SFA-ME-EL-021
TRANSMITTAL-021

QJI-SS-SFA-ME-EL-022
TRANSMITTAL-026

QJI-SS-SFA-ME-EL-023
(QJI-SS-ME-ELEC-SFATRANSMITTAL-027)

QJI-SS-SFA-ME-EL-024
(QJI-SS-ME-ELEC-SFAEL-030)

Revise - No
Resubmission Required

62

YHA/15/040/FP/CD/002 Rev A

General Arrangement for fuel pump layout (Sheet 02) Rev-A

22-Apr-15

8-May-15

22-Apr-15

9-Jun-15

63

YHA/15/040/FP/CD/003 Rev A

General Arrangement for fuel pump layout (Sheet 03) Rev-A

22-Apr-15

8-May-15

22-Apr-15

9-Jun-15

Revise & Resubmit

64

YHA/15/040/PP/PCD/003 Rev A

Circuit Control diagram #01 (Sheet 03)

22-Apr-15

8-May-15

22-Apr-15

9-Jun-15

Revise & Resubmit

65

YHA/15/040/PP/PCD/003 Rev A

Circuit Control diagram #02 (Sheet 04)

22-Apr-15

8-May-15

22-Apr-15

9-Jun-15

Revise & Resubmit

66

QJI-SS-M&E-ELECT-LTG-11 (P-1)

Lighting layout level 10 plan (1 of 2)

11-May-15

25-May-15

11-May-15

67

QJI-SS-M&E-ELECT-LTG-11 (P-2)

Lighting layout level 10 plan (2 of 2)

11-May-15

25-May-15

11-May-15

68

QJI-SS-M&E-ELECT-PW-11 (P-1)

11-May-15

25-May-15

11-May-15

69

QJI-SS-M&E-ELECT-PW-11 (P-2)

11-May-15

25-May-15

11-May-15

70

QJI-SS-M&E-ELECT-ELV-11 (P-1)

11-May-15

25-May-15

11-May-15

71

QJI-SS-M&E-ELECT-ELV-11 (P-2)

plan (2 of 2)

11-May-15

25-May-15

11-May-15

72

QJI-SS-M&E-ELECT-LTG-12 (P-1)

Lighting layout level 11 plan (1 of 2)

11-May-15

25-May-15

11-May-15

73

QJI-SS-M&E-ELECT-LTG-12 (P-2)

Lighting layout level 11 plan (2 of 2)

11-May-15

25-May-15

11-May-15

Power & cable support systemr layout level 10


plan (1 of 2)
Power & cable support system layout level 10
plan (1 of 2)
ELV & cable support system layout level 10
plan (1 of 2)
ELV & cable support system layout level 10

QJI-SS-SFA-ME-EL-025

30/38

Revise & Resubmit

74

QJI-SS-M&E-ELECT-PW-12 (P-1)

75

QJI-SS-M&E-ELECT-PW-12 (P-2)

76

QJI-SS-M&E-ELECT-ELV-12 (P-1)

77

QJI-SS-M&E-ELECT-ELV-12 (P-2)

78

Power & cable support systemr layout level 11

11-May-15

25-May-15

11-May-15

11-May-15

25-May-15

11-May-15

11-May-15

25-May-15

11-May-15

plan (2 of 2)

11-May-15

25-May-15

11-May-15

QJI-SS-M&E-ELECT-LTG-13 (P-1)

Lighting layout level 12 plan (1 of 2)

11-May-15

25-May-15

11-May-15

79

QJI-SS-M&E-ELECT-LTG-13 (P-2)

Lighting layout level 12 plan (2 of 2)

11-May-15

25-May-15

11-May-15

80

QJI-SS-M&E-ELECT-PW-13 (P-1)

11-May-15

25-May-15

11-May-15

81

QJI-SS-M&E-ELECT-PW-13 (P-2)

11-May-15

25-May-15

11-May-15

82

QJI-SS-M&E-ELECT-ELV-13 (P-1)

11-May-15

25-May-15

11-May-15

83

QJI-SS-M&E-ELECT-ELV-13 (P-2)

plan (2 of 2)

11-May-15

25-May-15

11-May-15

84

QJI-SS-M&E-ELECT-HT-001R1

HT Switchroom Layout and Installation Details

15-May-15

29-May-15

15-May-15

25-May-15

Revise-No
Resubmission Required

85

QJI-SS-M&E-ELECT-HT-002R1

33Kv GIS ZX1.2 Switchgear Panel Front & Section

15-May-15

29-May-15

15-May-15

25-May-15

Revise-No
Resubmission Required

86

SEV.650/KHO-15/01-TD Rev C

MSB/7-1 Technical Data

15-May-15

29-May-15

15-May-15

15-Jun-15

87

SEV.650/KHO-15/01-S1 to S3 Rev C

MSB/7-1 Single Line Diagram

15-May-15

29-May-15

15-May-15

15-Jun-15

88

SEV.650/KHO-15/01-L1 to L8 Rev C

MSB/7-1 Switchboard Layout

15-May-15

29-May-15

15-May-15

15-Jun-15

89

SEV.650/KHO-15/01-C1 to C13 Rev C

MSB/7-1 Control Circuit

15-May-15

29-May-15

15-May-15

15-Jun-15

90

SEV.650/KHO-15/01-SD Rev C

MSB/7-1 Schematic Diagram

15-May-15

29-May-15

15-May-15

15-Jun-15

91

SEV.650/KHO-14/02-TD

Capacitor Bank

15-May-15

29-May-15

15-May-15

15-Jun-15

92

SEV.650/KHO-14/02-L

Capacitor Bank(Switchboard Layout)

15-May-15

29-May-15

15-May-15

15-Jun-15

93

SEV.650/KHO-14/02-C

Capacitor bank

15-May-15

29-May-15

15-May-15

15-Jun-15

90

QJI-SS-M&E-ELECT-LTG-14

20-May-15

3-Jun-15

20-May-15

91

QJI-SS-M&E-ELECT-PW-14

20-May-15

3-Jun-15

20-May-15

92

QJI-SS-M&E-ELECT-ELV-14

level 14 to level 15)

20-May-15

3-Jun-15

20-May-15

93

QJI-SS-M&E-ELECT-LTG-15

Lighting layout level 16 plan

20-May-15

3-Jun-15

20-May-15

94

QJI-SS-M&E-ELECT-PW-15

Power & cable support systemr layout level 16 plan

20-May-15

3-Jun-15

20-May-15

95

QJI-SS-M&E-ELECT-ELV-15

ELV & cable support system layout level 16 plan

20-May-15

3-Jun-15

20-May-15

96

QJI-SS-M&E-ELECT-LTG-16

Lighting layout level 17 plan

20-May-15

3-Jun-15

20-May-15

97

QJI-SS-M&E-ELECT-PW-16

Power & cable support systemr layout level 17 plan

20-May-15

3-Jun-15

20-May-15

98

QJI-SS-M&E-ELECT-ELV-16

ELV & cable support system layout level 17 plan

20-May-15

3-Jun-15

20-May-15

99

QJI-SS-M&E-ELECT-LTG-17

20-May-15

3-Jun-15

20-May-15

100

QJI-SS-M&E-ELECT-PW-17

20-May-15

3-Jun-15

20-May-15

101

QJI-SS-M&E-ELECT-ELV-17

20-May-15

3-Jun-15

20-May-15

plan (1 of 2)
Power & cable support system layout level 11
plan (1 of 2)
ELV & cable support system layout level 11
plan (1 of 2)
ELV & cable support system layout level 11

Power & cable support systemr layout level 12


plan (1 of 2)
Power & cable support system layout level 12
plan (1 of 2)
ELV & cable support system layout level 12
plan (1 of 2)
ELV & cable support system layout level 12

Lighting layout level 13 plan


(Typical for level 14 to level 15)
Power & cable support systemr layout level 13 plan (Typical for
level 14 to level 15)
ELV & cable support system layout level 12 plan (Typical for

Lighting layout level 18 plan


(Typical for level 19 to level 23)
Power & cable support systemr layout level 18 plan (Typical for
level 19 to level 23)
ELV & cable support system layout level 18 plan (Typical for
level 19 to level 23)

QJI-SS-SFA-ME-EL-026

QJI-SS-SFA-ME-EL-027

31/38

QJI-SS-SFA-ME-EL-028

QJI-SS-SFA-ME-EL-029

QJI-SS-SFA-ME-EL-030

QJI-SS-SFA-ME-EL-031

QJI-SS-SFA-ME-EL-032

Revise-No
Resubmission Required
Revise-No
Resubmission Required
Revise-No
Resubmission Required
Revise-No
Resubmission Required
Revise-No
Resubmission Required
Revise-No
Resubmission Required
Revise-No
Resubmission Required
Revise-No
Resubmission Required

102

QJI-SS-M&E-ELECT-ELV-SCH-04

IP CCTV System Schematic Diagram

27-May-15

10-Jun-15

27-May-15

6-Jul-15

103

QJI-SS-M&E-ELECT-ELV-SCH-05

Firemen Intercom System Schematic Diagram

27-May-15

10-Jun-15

27-May-15

6-Jul-15

104

QJI-SS-M&E-ELECT-ELV-SCH-02

SMATV Schematic Diagram

27-May-15

10-Jun-15

27-May-15

6-Jul-15

104

QJI-SS-M&E-ELECT-PW-19

LV Switchroom & Transformer Room Layout (P 1-2)

28-May-15

11-Jun-15

28-May-15

18-Jun-15

105

QJI-SS-M&E-ELECT-PW-19

LV Switchroom & Transformer Room Layout (P 2-2)

28-May-15

11-Jun-15

28-May-15

106

QJI-SS-M&E-ELECT-SLD-01

Electrical Distribution Schematic Diagram

5-Jun-15

19-Jun-15

5-Jun-15

Revise & Resubmit


QJI-SS-SFA-ME-EL-033

Revise & Resubmit


Revise & Resubmit

29-Jun-15

30-Jun-15

29-Jun-15

30-Jun-15

Revise-No
Resubmission Required
QJI-SS-SFA-ME-EL-034
(QJI-SS-ME-ELEC-SFA-EL-033)
(QJI-SS-ME-ELEC-SFA-EL-037) Revise-No
Resubmission Required
Revise-No
Resubmission Required

30-Jun-15
QJI-SS-SFA-ME-EL-035

107

QJI-SS-M&E-ELECT-SLD-02

Main Single Line Diagram

5-Jun-15

19-Jun-15

5-Jun-15

30-Jun-15

Revise-No
Resubmission Required

108

QJI-SS-M&E-ELECT-PW-21

Chiller Plant Room & Genset Room Busbar Layout


Routing (P1-2)

8-Jun-15

22-Jun-15

8-Jun-15

18-Jun-15

Revise-No
Resubmission Required

Chiller Plant Room & Genset Room Busbar Layout


Routing (P2-2)

8-Jun-15

109

QJI-SS-M&E-ELECT-PW-21

QJI-SS-SFA-ME-EL-036
(QJI-SS-ME-ELEC-SFA-EL-037)
22-Jun-15

8-Jun-15

Revise-No
Resubmission Required

18-Jun-15

Date Over-due
Dont need to submit
M&E Shop Drawing Register
Fire Alarm System
Item

Dwg No.

Updated date:
Dwg Title

Target
Submission
Date

Target
Approval
Date

Date
Submitted

Date
Commented

14-Aug-14

4-Sep-14

14-Aug-14

24Sep14

1st Submission

2nd Submission
Date
Submitted

Date
Commented

3rd Submission
Date
Submitted

Date
Commented

Submission
Ref.

RGCCL/6172/602-FA/2

Fire Alarm Installation @ Basement 1

QJI-SS-SFA-ME-FA-001

RGCCL/6172/602-FA/3

Fire Alarm Installation @ Level 1

2-Jan-15

16-Jan-15

15-Aug-14

24Sep14

RGCCL/6172/602-FA/3a

Fire Alarm Installation @ Level 1 Sections

2-Jan-15

16-Jan-15

2-Jan-15

29-Jan-15

QJI-SS-SFA-ME-FA-002

RGCCL/6172/602-FA/12

Fire Alarm Installation @ Level 10

8-Sep-14

6-Oct-14

8-Sep-14

24-Dec-14

QJI-SS-SFA-ME-FA-003

2-Jan-15

29-Jan-15

QJI-SS-SFA-ME-FA-002

M&E Shop Drawing Register


Public Address System
Item

Dwg No.

RGCCL/6172/602-PA/1

RGCCL/6172/602-PA/1a

RGCCL/6172/602-PA/2

Updated date:
Dwg Title

Target
Submission
Date

Target
Approval
Date

Date
Submitted

Date
Commented

Date
Submitted

Date
Commented

Date
Submitted

Date
Commented

9-Mar-15

13-Mar-15

14Aug14

16Sep14

20-Nov-14

10Dec14

10-Feb-15

27-Feb-15

9Mar15

20Mar15

Public Address System @ Basement 1


Public Address System @ Basement 1

1st Submission

10-Feb-15

24-Feb-15

10-Feb-15

27-Feb-15

10-Feb-15

24-Feb-15

4Sep14

10Oct14

RGCCL/6172/602-PA/2 a

3rd Submission

Submission
Ref.

QJI-SS-SFA-ME-PA-001
(Rev-3)

20-Nov-14

10Dec14

10-Feb-15

20-Mar-15
QJI-SS-SFA-ME-PA-002
(Rev-2)

Public Address System @ Level 1


4

2nd Submission

10-Feb-15

24-Feb-15

10-Feb-15

32/38

20-Mar-15

Revise & Resubmit


25-Jul-15
Status
Revise NoResubmission
required
Revise NoResubmission
required
Revise NoResubmission
required
Revise NoResubmission Required

Date Over-due
Dont need to submit
Revise & Resubmit
25-Jul-15
Status

No Exception Taken
Revise & Resubmit
Revise No
Resubmission
Required
Revise No
Resubmission
Required

RGCCL/6172/602-PA/3

Public Address System @ Level 2

6-May-15

20-May-15

4Sep14

10Oct14

10-Feb-15

25-Mar-15

6-May-15

18-May-15

QJI-SS-SFA-ME-PA-003
(Rev-1)

Revise NoResubmission Required

RGCCL/6172/602-PA/4

Public Address System @ Level 3

3-Jun-15

19-Jun-15

27Nov14

14-Dec-14

10-Feb-15

31-Mar-15

3-Jun-15

8-Jun-15

QJI-SS-SFA-ME-PA-004
(Rev-2)

Revise NoResubmission Required

RGCCL/6172/602-PA/5

Public Address System @ Level 4

11-Jun-15

25-Jun-15

8Sep14

17Oct14

10-Feb-15

31-Mar-15

11-Jun-15

19-Jun-15

QJI-SS-SFA-ME-PA-005
(Rev-2)

RGCCL/6172/602-PA/6

Public Address System @ Level 5

16-Jun-15

30-Jun-15

8Sep14

17Oct14

10-Feb-15

31-Mar-15

16-Jun-15

26-Jun-15

QJI-SS-SFA-ME-PA-006
(Rev-2)

RGCCL/6172/602-PA/7

Public Address System @ Level 6

16-Jun-15

30-Jun-15

8Sep14

17Oct14

10-Feb-15

31-Mar-15

16-Jun-15

26-Jun-15

QJI-SS-SFA-ME-PA-007
(Rev-2)

10

RGCCL/6172/602-PA/8

Public Address System @ Level 7

16-Jun-15

30-Jun-15

8Sep14

17Oct14

10-Feb-15

31-Mar-15

16-Jun-15

26-Jun-15

QJI-SS-SFA-ME-PA-008
(Rev-2)

11

RGCCL/6172/602-PA/9

Public Address System @ Level 8

16-Jun-15

30-Jun-15

12Sep14

10Oct14

10-Feb-15

31-Mar-15

16-Jun-15

26-Jun-15

QJI-SS-SFA-ME-PA-009
(Rev-2)

12

RGCCL/6172/602-PA/10

Public Address System @ Level 9

8-Jul-15

22-Jul-15

12Sep14

10Oct14

8-Jul-15

QJI-SS-SFA-ME-PA-010(Rev-1)

13

RGCCL/6172/602-PA/11

Public Address System @ Level 10

8-Jul-15

22-Jul-15

12Sep14

10Oct14

8-Jul-15

QJI-SS-SFA-ME-PA-011(Rev-1)

14

RGCCL/6172/602-PA/12

Public Address System @ Level 11

8-Jul-15

22-Jul-15

17Sep14

10Oct14

8-Jul-15

QJI-SS-SFA-ME-PA-012(Rev-1)

15

RGCCL/6172/602-PA/13

Public Address System @ Level 12

20-Jul-15

3-Aug-15

24Sep14

10Oct14

20-Jul-15

QJI-SS-SFA-ME-PA-013(Rev-1)

16

RGCCL/6172/602-PA/14

Public Address System @ Level 13 to 15

20-Jul-15

3-Aug-15

24Sep14

10Oct14

20-Jul-15

QJI-SS-SFA-ME-PA-014(Rev-1)

17

RGCCL/6172/602-PA/15

Public Address System @ Level 16

20-Jul-15

3-Aug-15

7Oct14

27Oct14

20-Jul-15

QJI-SS-SFA-ME-PA-015(Rev-1)

18

RGCCL/6172/602-PA/16

Public Address System @ Level 17

20-Jul-15

3-Aug-15

16Oct14

27Oct14

20-Jul-15

QJI-SS-SFA-ME-PA-016(Rev-1)

19

RGCCL/6172/602-PA/17

Public Address System @ Level 18

20-Jul-15

3-Aug-15

16Oct14

27Oct14

20-Jul-15

QJI-SS-SFA-ME-PA-017

20

RGCCL/6172/602-PA/18

Public Address System @ Level 19 to 23

20-Jul-15

3-Aug-15

27Oct14

21Nov14

20-Jul-15

QJI-SS-SFA-ME-PA-018

21

RGCCL/6172/602-PA/19

Emergency Public Address System Schematic Diagram

11-Jun-15

25-Jun-15

20-Nov-14

10Dec14

11-Jun-15

QJI-SS-SFA-ME-PA-019
(Rev-1)

Revise No
Resubmission
Required
Revise No
Resubmission
Required
Revise No
Resubmission
Required
Revise No
Resubmission
Required
Revise No
Resubmission
Required

Date Over-due
Dont need to submit
M&E Shop Drawing Register
BMS System
Item

Updated date:

Dwg No.

Dwg Title

Target
Submission
Date

Target
Approval
Date

Date
Submitted

Date
Commented

Date
Submitted

Date
Commented

6-May-15
(Supersede)

5-Jun-15

1st Submission

2nd Submission

3rd Submission
Date
Submitted

Date
Commented

Submission
Ref.

Revise & Resubmit


25-Jul-15
Status

QJI-SS-SFA-ME-BMS-001

Revise NoResubmission Required

18-May-15

QJI-SS-SFA-ME-BMS-002

Revise NoResubmission Required

27-May-15

29-Jun-15

QJI-SS-SFA-ME-BMS-003

Revise NoResubmission Required

5-Jun-15

16-Jul-15

QJI-SS-SFA-ME-BMS-004

Revise & Resubmit

RGCCL/6172/602-E/BMS/
FP-01

Basement DDC Panel Trunking Layout Plan

6-May-15

20-May-15

11-Dec-14

18-May-15

RGCCL/6172/602-DT/BMS-01

BMS Panel Layout Plan @ 3rd Storey

11-Dec-14

25-Dec-14

11-Dec-14

RGCCL/6172/602-E/BMS/
FP-02

Level-1 DDC Panel Trunking Layout Plan

27-May-15

10-Jun-15

RGCCL/6172/602-A-27

BMS Schematic Diagram

5-Jun-15

22-Jun-15

33/38

RGCCL/6172/602-E/BMS/FP-03

BMS Trunking Layout Plan @ Level 2

8-Jun-15

22-Jun-15

8-Jun-15

30-Jun-15

QJI-SS-SFA-ME-BMS-005

Revise NoResubmission Required

RGCCL/6172/602-E/BMS/FP-04

BMS Trunking Layout Plan @ Level 3

12-Jun-15

26-Jun-15

12-Jun-15

30-Jun-15

QJI-SS-SFA-ME-BMS-006

Revise NoResubmission Required

RGCCL/6172/602-E/BMS/FP-05

BMS Trunking Layout Plan @ Level 4

12-Jun-15

26-Jun-15

12-Jun-15

30-Jun-15

QJI-SS-SFA-ME-BMS-007

Revise NoResubmission Required

RGCCL/6172/602-E/BMS/FP-06

BMS Trunking Layout Plan @ Level 5

12-Jun-15

26-Jun-15

12-Jun-15

30-Jun-15

QJI-SS-SFA-ME-BMS-008

Revise NoResubmission Required

RGCCL/6172/602-E/BMS/FP-07

BMS Trunking Layout Plan @ Level 6

23-Jun-15

7-Jul-15

23-Jun-15

QJI-SS-SFA-ME-BMS-009

10

RGCCL/6172/602-E/BMS/FP-08

BMS Trunking Layout Plan @ Level 7

23-Jun-15

7-Jul-15

23-Jun-15

QJI-SS-SFA-ME-BMS-010

11

RGCCL/6172/602-E/BMS/FP-09

BMS Trunking Layout Plan @ Level 8

23-Jun-15

7-Jul-15

23-Jun-15

QJI-SS-SFA-ME-BMS-011

12

RGCCL/6172/602-E/BMS/FP-10

BMS Trunking Layout Plan @ Level 9

9-Jul-15

22-Jul-15

9-Jul-15

QJI-SS-SFA-ME-BMS-012

13

RGCCL/6172/602-E/BMS/FP-11

BMS Trunking Layout Plan @ Level 10

9-Jul-15

22-Jul-15

9-Jul-15

QJI-SS-SFA-ME-BMS-013

14

RGCCL/6172/602-E/BMS/FP-12

BMS Trunking Layout Plan @ Level 11

9-Jul-15

22-Jul-15

9-Jul-15

QJI-SS-SFA-ME-BMS-014

15

RGCCL/6172/602-E/BMS/FP-13

BMS Trunking Layout Plan @ Level 12

9-Jul-15

22-Jul-15

9-Jul-15

QJI-SS-SFA-ME-BMS-015

16

RGCCL/6172/602-E/BMS/FP-14

BMS Trunking Layout Plan @ Level 13 to 15

9-Jul-15

22-Jul-15

9-Jul-15

QJI-SS-SFA-ME-BMS-016

17

RGCCL/6172/602-E/BMS/FP-15

BMS Trunking Layout Plan @ Level 16

9-Jul-15

22-Jul-15

9-Jul-15

QJI-SS-SFA-ME-BMS-017

18

RGCCL/6172/602-E/BMS/FP-16

BMS Trunking Layout Plan @ Level 17

9-Jul-15

22-Jul-15

9-Jul-15

QJI-SS-SFA-ME-BMS-018

19

RGCCL/6172/602-E/BMS/FP-17

BMS Trunking Layout Plan @ Level 18

9-Jul-15

22-Jul-15

9-Jul-15

QJI-SS-SFA-ME-BMS-019

20

RGCCL/6172/602-E/BMS/FP-18

BMS Trunking Layout Plan @ Level 19 to 23

9-Jul-15

22-Jul-15

9-Jul-15

QJI-SS-SFA-ME-BMS-020

21

RGCCL/6172/602-E/BMS/FP-19

BMS Trunking Layout Plan @ Lower Roof

9-Jul-15

22-Jul-15

9-Jul-15

QJI-SS-SFA-ME-BMS-021

22

RGCCL/6172/602-E/BMS/FP-20

BMS Trunking Layout Plan @ Upper Roof

9-Jul-15

22-Jul-15

9-Jul-15

QJI-SS-SFA-ME-BMS-022

Date Over-due
Dont need to submit
Revise & Resubmit

M&E Shop Drawing Register


Lift and Escalator Installation
Item

Dwg No.

Updated date:
Dwg Title

Target
Submission
Date

Target
Approval
Date

Date
Submitted

Date
Commented

Date
Submitted

Date
Commented

Date
Submitted

Date
Commented

13-Nov-14

21Nov14

1st Submission

2nd Submission

3rd Submission

Submission
Ref.

25-Jul-15
Status

SPA/47/LIFT/L12

Lift Shaft Plan For Lift No. FL 01

3-Nov-14

17-Nov-14

14-Aug-14

19-Sep-14

15-Oct-14

17-Oct-14

SPA/47/LIFT/L12A

Continuation Of Lift Well Section For Lifts No. FL01

8-Dec-14

22-Dec-14

13-Nov-14

21Nov14

8-Dec-14

20-Jan-15

No Exception Taken

SPA/47/LIFT/L12B

Lift Shaft Lighting For Lift No. FL01

18-Feb-15

4-Mar-15

8-Dec-14

18-Feb-15

18-Feb-15

9-Mar-15

No Exception Taken

SPA/47/LIFT/L13

Lift Entrance Opening For Lift No. FL01

17-Nov-14

2-Dec-14

14-Aug-14

19-Sep-14

17-Nov-14

22-Dec-14

34/38

No Exception Taken

QJI-SS-SFA-ME-LES-001
(Rev-7)

No Exception Taken

SPA/47/LIFT/L14

Lift Machine Room Plan For Lift No. FL01

7-Jan-15

22-Jan-15

14-Aug-14

19-Sep-14

17-Nov-14

22-Dec-14

SPA/47/LIFT/L15

Penetration Through Lift Machine Room Floor Slab For Lift


No.FL01

17-Nov-14

2-Dec-14

14-Aug-14

19-Sep-14

17-Nov-14

22-Dec-14

SPA/47/LIFT/L16

14-Aug-14

19-Sep-14

15-Oct-14

17-Oct-14

Lift Well Section For Lift No. FL01

8-Dec-14

22-Dec-14
8-Dec-14

20-Jan-15

14-Aug-14

19-Sep-14

9-Mar-15

27-Mar-15

9-Mar-15
8

SPA/47/LIFT/L17

23-Mar-15

3-Nov-14

Lift Shaft Plan For Lift No. FL 02

21Nov14

7-Jan-15

No Exception Taken
3-Nov-14

8-Dec-14

SPA/47/LIFT/L17A

Lift Shaft Lighting For Lift No. FL 02

8-Dec-14

22-Dec-14

8-Dec-14

Supersede

18-Feb-15

9-Mar-15

12

SPA/47/LIFT/L18

Lift Entrance Opening For Lift No. FL02

17-Nov-14

2-Dec-14

14-Aug-14

19-Sep-14

17-Nov-14

22-Dec-14

13

SPA/47/LIFT/L19

Lift Machine Room Plan For Lift No. FL02

7-Jan-15

22-Jan-15

14-Aug-14

19-Sep-14

17-Nov-14

22-Dec-14

14

SPA/47/LIFT/L20

Penetration Through Lift Machine Room Floor


Slab For Lift No.FL02

17-Nov-14

2-Dec-14

14-Aug-14

19-Sep-14

17-Nov-14

22-Dec-14

18-Feb-15

4-Mar-15

14-Aug-14

19-Sep-14

3-Nov-14

SPA/47/LIFT/L21

Lift Well Section For Lift No. FL02

21Nov14

8-Dec-14

15

18-Feb-15

9-Mar-15
7-Jan-15

SPA/47/ESCS/E01

Side Elevation No. B1-1 & B1-2

17

SPA/47/ESCS/E02

Basement Plan for Escalators

18

SPA/47/ESCS/E03

Level 1 Plan for Escalators

21Nov14

No Exception Taken

20-Jan-15
No Exception Taken

11

16

Revise NoResubmission Required

20-Jan-15

QJI-SS-SFA-ME-LES-001
(Rev-7)
7-Jan-15

SPA/47/ESCS/E04

Side Elevation for Escalators No. 1-1 & 1-2

20

SPA/47/ESCS/E05

Level 1 Plan for Escalators No. 1-1 & 1-2

No Exception Taken

Supersede

7-Jan-15

22-Jan-15

14-Aug-14

19-Sep-14

24-Sep-14

22-Dec-14

24-Sep-14

10-Oct-14

14-Aug-14

19-Sep-14

24-Sep-14

22-Dec-14

27-Jan-15

10-Feb-15

14-Aug-14

19-Sep-14

24-Sep-14

22-Dec-14

7-Jan-15

Supersede

No Exception Taken

30-Apr-15

No Exception Taken
Revise NoResubmission Required
Revise NoResubmission Required
QJI-SS-SFA-ME-LES-002
(Rev-3)

7-Jan-15

22-Jan-15

14-Aug-14

19-Sep-14

24-Sep-14

Supersede

7-Jan-15

30-Apr-15

27-Jan-15

10-Feb-15

14-Aug-14

19-Sep-14

24-Sep-14

Supersede

7-Jan-15

Supersede

Revise NoResubmission Required

19-Sep-14

24-Sep-14

Supersede

7-Jan-15

Supersede

Revise NoResubmission Required

27-Jan-15
27-Jan-15
21

No Exception Taken
Revise NoResubmission Required

20-Jan-15

27-Jan-15
19

No Exception Taken

10-Feb-15

14-Aug-14

No Exception Taken

SPA/47/ESCS/E06

Level 2 Plan for Escalators No. 1-1 & 1-2

22

SPA/47/ESCS/E07

Escalator Truss Supporting Beams for Escalators No. B1-1, B12, 1-1 & 1-2

24-Sep-14

10-Oct-14

14-Aug-14

19-Sep-14

24-Sep-14

22-Dec-14

23

SPA/47/LIFT/L22

Lift Pit & Lift Shaft Plan For Lifts No. PD01 PD04

8-Dec-14

22-Dec-14

14-Aug-14

19-Sep-14

3-Nov-14

21Nov14

24

SPA/47/LIFT/L22A

Lift Shaft Lighting For Lift No. PD01 - PD04

31-Mar-15

14-Apr-15

8-Dec-14

Supersede

31-Mar-15

30-Apr-15

25

SPA/47/LIFT/L23

Lift Pit & Lift Equipment Plan For Lifts No. PD01 PD04

7-Jan-15

22-Jan-15

14-Aug-14

19-Sep-14

17-Nov-14

22-Dec-14

26

SPA/47/LIFT/L24

Lift Entrance Opening For Lifts No. PD01 PD04

17-Nov-14

2-Dec-14

14-Aug-14

19-Sep-14

17-Nov-14

22-Dec-14

27

SPA/47/LIFT/L25

Lift Well Section For Lifts No. PD01 PD04

8-Dec-14

22-Dec-14

14-Aug-14

19-Sep-14

3-Nov-14

21Nov14

8-Dec-14

20-Jan-15

Revise NoResubmission Required

28

SPA/47/LIFT/L01

Lift Shaft Plan For Lift No. PL01-PL04

8-Dec-14

22-Dec-14

14-Aug-14

19-Sep-14

3-Nov-14

21Nov14

8-Dec-14

20-Jan-15

No Exception Taken

29

SPA/47/LIFT/L01 A

Lift Shaft Lighting For Lift No. PL01-PL04

31-Mar-15

14-Apr-15

8-Dec-14

Supersede

31-Mar-15

30-Apr-15

30

SPA/47/LIFT/L02

Lift Entrance Opening For Lifts No. PL01 PL04

17-Nov-14

2-Dec-14

14-Aug-14

19-Sep-14

17-Nov-14

22-Dec-14

31

SPA/47/LIFT/L03

Lift Machine Room Plan For Lifts No. PL01 PL04

7-Jan-15

22-Jan-15

14-Aug-14

19-Sep-14

17-Nov-14

22-Dec-14

32

SPA/47/LIFT/L04

Penetrations Through Lifts Machine Room Floor Slab For Lifts


PL01-Pl04

17-Nov-14

2-Dec-14

14-Aug-14

19-Sep-14

17-Nov-14

22-Dec-14

27-Jan-15

35/38

No Exception Taken

8-Dec-14

Revise NoResubmission Required

20-Jan-15

No Exception Taken

7-Jan-15

20-Jan-15

QJI-SS-SFA-ME-LES-003
(Rev-5)

Revise NoResubmission Required


No Exception Taken

No Exception Taken
QJI-SS-SFA-ME-LES-004
(Rev-5)
7-Jan-15

20-Jan-15

No Exception Taken
Revise Noresubmission Required
No Exception Taken

33

SPA/47/LIFT/L05

Lift Well Section For Lifts No. PL01-PL04

21-Nov-14

5-Dec-14

14-Aug-14

19-Sep-14

3-Nov-14

21Nov14

8-Dec-14

20-Jan-15

No Exception Taken

34

SPA/47/LIFT/L06

Lift Shaft Plan For Lifts No. PL05 PL08

8-Dec-14

22-Dec-14

14-Aug-14

19-Sep-14

3-Nov-14

21-Nov-14

8-Dec-14

20-Jan-15

No Exception Taken

35

SPA/47/LIFT/L06A

Lift Shaft Lighting For Lift No. PL05-PL08

31-Mar-15

14-Apr-15

8-Dec-14

Supersede

31-Mar-15

30-Apr-15

No Exception Taken

36

SPA/47/LIFT/L06B

Continuation Of Lift Shaft Lighting For Lift No. PL05-08

31-Mar-15

14-Apr-15

8-Dec-14

Supersede

31-Mar-15

30-Apr-15

No Exception Taken

37

SPA/47/LIFT/L07

Lift Entrance Opening For Lifts No. PL05 PL08

17-Nov-14

2-Dec-14

14-Aug-14

19-Sep-14

17-Nov-14

22-Dec-14

No Exception Taken

38

SPA/47/LIFT/L08

Lift Machine Room Plan For Lifts No. PL05- PL08

7-Jan-15

22-Jan-15

14-Aug-14

19-Sep-14

17-Nov-14

22-Dec-14

39

SPA/47/LIFT/L09

Penetration Through Lifts Machine Room For Floor Slab For


Lifts No. PL05- PL08

17-Nov-14

2-Dec-14

40

SPA/47/LIFT/L10

Lift Well Section For Lifts No. PL05 PL08

31-Mar-15

14-Apr-15

7-Jan-15
QJI-SS-SFA-ME-LES-005(Rev-5)

14-Aug-14

19-Sep-14

17-Nov-14

22-Dec-14

14-Aug-14

19-Sep-14

3-Nov-14

21-Nov-14

31-Mar-15

30-Apr-15

Revise Noresubmission Required


No Exception Taken

8-Dec-14

Supersede
No Exception Taken

Revise Noresubmission Required

41

SPA/47/LIFT/L11

Continuation Of Lift Well Section For Lifts No.


PL05-PL08

8-Dec-14

22-Dec-14

14-Aug-14

19-Sep-14

3-Nov-14

21-Nov-14

42

SPA/47/LIFT/F01

Elevation Of Lift Entrance For Lifts No. PL01 - PL04

17-Nov-14

2-Dec-14

14-Aug-14

15Oct14

17-Nov-14

22-Dec-14

Revise Noresubmission Required

43

SPA/47/LIFT/F02

Elevation Of Lift Entrance For Lifts No. PL05 - PL08

17-Nov-14

2-Dec-14

14-Aug-14

15Oct14

17-Nov-14

22-Dec-14

Revise Noresubmission Required

44

SPA/47/LIFT/F03

Section & Details Of Lift Entrance For Lifts No. PL01 PL08

17-Nov-14

2-Dec-14

14-Aug-14

15Oct14

17-Nov-14

22-Dec-14

Revise Noresubmission Required

45

SPA/47/LIFT/F04

Elevation Of Lift Entrance For Lifts No. PD01 PD04)

17-Nov-14

2-Dec-14

14-Aug-14

15Oct14

17-Nov-14

22-Dec-14

29-Jul-15

46

SPA/47/LIFT/F05

Section & Details Of Lift Entrance For Lifts No. PD01 PD04

17-Nov-14

2-Dec-14

14-Aug-14

15Oct14

17-Nov-14

22-Dec-14

29-Jul-15

47

SPA/47/LIFT/F06

Elevation Of Lift Entrance For Lifts No. FL01 & FL02

17-Nov-14

2-Dec-14

14-Aug-14

15Oct14

17-Nov-14

22-Dec-14

29-Jul-15

1-Jul-15

48

SPA/47/LIFT/F07

Section & Details of Lift Entrance For Lifts No. FL01 & FL02

17-Nov-14

2-Dec-14

14-Aug-14

15Oct14

17-Nov-14

22-Dec-14

29-Jul-15

1-Jul-15

49

SPA/47/LIFT/F08

Hall Button And Firemens Switch For Lifts No. PL01 To PL08,
FL01 And FL02

17-Nov-14

2-Dec-14

18-Aug-14

10-Oct-14

17-Nov-14

22-Dec-14

Revise NoResubmission Required

50

SPA/47/LIFT/F09

Hall Button For Lifts No. PD01 To PD04

17-Nov-14

2-Dec-14

18-Aug-14

10-Oct-14

17-Nov-14

22-Dec-14

Revise NoResubmission Required

51

SPA/47/LIFT/F10

Hall Position Indicator And Hall Lantern for all Lifts

7-Jan-15

22-Jan-15

18-Aug-14

10-Oct-14

17-Nov-14

22-Dec-14

7-Jan-15

20-Jan-15

Revise NoResubmission Required

52

SPA/47/LIFT/F11

Main & Auxiliary Car Operating Panels For Lifts No. PL01 To PL04

7-Jan-15

22-Jan-15

18-Aug-14

10-Oct-14

17-Nov-14

22-Dec-14

7-Jan-15

20-Jan-15

Revise NoResubmission Required

53

SPA/47/LIFT/F12

Main & Auxiliary Car Operating Panels For Lifts No. PL05 To PL08

7-Jan-15

22-Jan-15

18-Aug-14

10-Oct-14

17-Nov-14

22-Dec-14

7-Jan-15

20-Jan-15

Revise NoResubmission Required

54

SPA/47/LIFT/F13

Main Car Operating Panel For Lift No. FL01

7-Jan-15

22-Jan-15

18-Aug-14

10-Oct-14

17-Nov-14

22-Dec-14

7-Jan-15

20-Jan-15

55

SPA/47/LIFT/F14

Auxiliary Car Operating Panels For Lift No. FL01

7-Jan-15

22-Jan-15

18-Aug-14

10-Oct-14

17-Nov-14

22-Dec-14

7-Jan-15

20-Jan-15

18-Aug-14

10-Oct-14

17-Nov-14

22-Dec-14

7-Jan-15

20-Jan-15

56

SPA/47/LIFT/F15

Main & Auxiliary Car Operating Panels For Lift No. FL02

14-May-15

29-May-15
9-Mar-15

27-Mar-15

14-May-15

18-Aug-14

10-Oct-14

17-Nov-14

57

SPA/47/LIFT/F16

Main & Auxiliary Car Operating Panels For


Lift N PD01 PD04

14-May-15

8-Dec-14

2-Jul-15

QJI-SS-SFA-ME-LES-006
(Rev-4)

QJI-SS-SFA-ME-LES-007
(Rev-4)

Revise NoResubmission Required


Revise NoResubmission Required

No Exception Taken

29-May-15

22-Dec-14

7-Jan-15

20-Jan-15
No Exception Taken

36/38