SCHEDULE for Level 3 to 8

No Level

Outstanding Works

RG

To rectify HR pipe and SPK 32mm pipe near HR

Yes

To close one opening

Yes

Khoom To fix one lighting fixture only

Yes

5.4.2016

PAHU Ducting outlet

Yes

4.5.2016

To cover fire rated at diesel fuel pipe

Yes

6.6.2016

one lighting point damaged.need To prepare t

Yes

Archi To close one opening

Yes

FAD (100x100)
Chiller pipe & CDP Pipe
RG Chiller pipe & CDP Pipe
RG Chiller pipe & CDP Pipe
RG To Fit Louver at the paint store (Duct)
Khoom Power and Lighting
Pmeco To Rectify Speaker at Corridor
RG To Fit Louver at the small EF outlet (Duct)
Khoom Power and Lighting

Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

RG

7B

6B

4
5

5B
4B

3A

3B

Material Target
Verify
Complete
(Yes/No)
Date

Khoom

RG

4.6.2016
11.6.2016
11.6.2017
11.6.2018
5.6.2016
4.6.2016
4.6.2016
5.6.2016
10.6.2016

Remark
RG and Ms.Kyi is discussing about it.
I have already informed MR.Jasper to close
this opening.This opening is no used.
Labelling and painting will finish at
6.6.2016
After L1,khoom can start L7B.L1 will take
next 2 days.
Khoom requested extra charges.So,I
informed to Mr.ZayYarMyo.
I have already informed MR.Jasper to close
this opening.This opening is no used.
progressing
They can start installation at 7.6.2016
They can start installation at 7.6.2016
They can start installation at 7.6.2016
inspection/ T&C will start 6.6.2016

inspection/ T&C will start 11.6.2016

Level

Company Name

SCHEDULE for Level 3 to 8

1 8

RG

No

RG Outstanding Works

RG Can Do
the work
RG Allow
Painting Painting
before
Access
Start
Finish
painting?
Date
(yes/no)

2 7A

Y6-Y7 & XA-XB (1200X500FAD)


Y3-Y4 & XB-XC (800X800FAD)
RG Y1-Y2 & XA-XB (EAD AND FAN CONNECTION)

_
_
_

11.5.2016
11.5.2016
29.4.2016 4.5.2016 9.5.2106

3 7B

RG PAHU Ducting outlet

14.5.2016 16.5.2016 20.5.2016

10 3A

RG

Y14-15 & XA-XC (DUCTING IN TOILET ROOMS)


Y6-8 & XA-XB (DUCTING)

Yes
Yes

1.5.2016 6.5.2016

11.5.2016 16.5.2016

_
_

Note
1 Level 8 's target schedule can not finished 24.5.2016.So,RG engineer changed Schedule to 26.5.2016
2 Level 7 's target schedule can not finished 24.5.2016.So,RG engineer changed Schedule to 26.5.2016

RG
Target
Material
Complete
Verify
Date
(Yes/No)
19.5.2016
19.5.2016
19.5.2016
20.5.2016
(16:00)
Yes
Yes

Schedule to 26.5.2016
Schedule to 26.5.2016

Remark

26.5.2016 Progressing(RG changed target date)


26.5.2016 Progressing(RG changed target date)
22.5.2016 Finished(23.5.2016)
26.5.2016 Progressing
26.5.2016 Progressing(25.5.2016 will finished)
26.5.2016 Progressing(25.5.2016 will finished)

Level

Company Name

SCHEDULE for Level 3 to 8

1 8

RG

No

RG Outstanding Works

RG Can Do
RG
the work
RG Allow
Painting Painting
Material
before
Access
Start
Finish
Verify
painting?
Date
(Yes/No)
(yes/no)

2 7A

Y6-Y7 & XA-XB (1200X500FAD)


Y3-Y4 & XB-XC (800X800FAD)
RG Y1-Y2 & XA-XB (EAD AND FAN CONNECTION)

_
_
_

3 7B

RG PAHU Ducting outlet

10 3A

RG

11 3B

RG Y13-14 & XC-XD (DUCTING TO RISER)

Y14-15 & XA-XC (DUCTING IN TOILET ROOMS)


Y6-8 & XA-XB (DUCTING)

Yes
Yes

11.5.2016 19.5.2016
11.5.2016 19.5.2016
29.4.2016 4.5.2016 9.5.2106 19.5.2016
20.5.2016
14.5.2016 16.5.2016 20.5.2016
(16:00)
_
Yes
11.5.2016 16.5.2016
_
Yes

Yes

13.5.2016 18.5.2016

1.5.2016 6.5.2016

Yes

Target
Complete
Date

Remark

22.5.2016 Progressing
22.5.2016 Progressing
22.5.2016 Progressing
23.5.2016 Material Wait
24.5.2016 Progressing
24.5.2016 Progressing
22.5.2016 Finished(20.5.2016)

Company Name

No

Level

SCHEDULE for Level 3 to 8

RG Outstanding Works

RG Can Do
RG
the work
RG Allow
Painting Painting
Material
before
Access
Start
Finish
Verify
painting?
Date
(Yes/No)
(yes/no)

Y6-Y7 & XA-XB (1200X500FAD)


Y3-Y4 & XB-XC (800X800FAD)
1 8
RG Fire Alarm (Fire bell,manual call point,Beacon lig
Khoom Lighting
Y1-Y2 & XA-XB (EAD AND FAN CONNECTION)
Y4-Y5 & XB-XC (300X200 EAD)
RG
Y5-Y6 & XB-XC (300X200 EAD)
2 7A
Y13-Y14 & XA-XB (DUCTING AND FAN CONNECTION)
RG Fire Alarm (Fire bell,manual call point,Beacon lig
Khoom To fit lighting only
RG

RG PAHU Ducting outlet


3 7B

4 6A

5 6B

6 5A

7 5B

8 4A

9 4B

10 3A

RG Fire Alarm (Fire bell,manual call point,Beacon


Khoom To fit lighting only
Y1-Y2 & XA-XB (EAD AND FAN CONNECTION)
Y4-Y5 & XB-XC (300X200 EAD)
RG
Y5-Y6 & XB-XC (300X200 EAD)
Y12-14 & XA-AB (DUCTING AND FAN CONNECTION)
RG Fire Alarm (Fire bell,manual call point,Beacon
Khoom To fit lighting only
Y5-6 & XB-XC(200X150 TED DUCTING)
RG
Y13-14 & XC-XD (DUCTING)
RG Fire Alarm (Fire bell,manual call point,Beacon
Khoom To fit lighting only
Y1-Y1A & XA-XB (FAN AND DUCT CONNECTION)
Y4-Y5 & XB-XC (300X200 EAD)
RG Y5-Y6 & XB-XC (300X200 EAD)
Y12-13 & XA-XB (FAN AND DUCT CONNECTION)
Y13-14 & XA-XB (DUCTING TO RISER)
RG Fire Alarm (Fire bell,manual call point,Beacon
Khoom To fit lighting only
Y13-14 & XC-XD (DUCTING TO RISER)
RG
Y1-Y1A & XC-XD (FAN AND DUCT CONNECTION)
RG Fire Alarm (Fire bell,manual call point,Beacon
Khoom To fit lighting only
Y4-Y5 & XB-XC (300X200 EAD)
RG
Y5-Y6 & XB-XC (300X200 EAD)
RG Fire Alarm (Fire bell,manual call point,Beacon
Khoom To fit lighting only
RG There is no outstanding .
RG Fire Alarm (Fire bell,manual call point,Beacon
Khoom To fit lighting only
Y14-15 & XA-XC (DUCTING IN TOILET ROOMS)
RG
Y6-8 & XA-XB (DUCTING)
RG Fire Alarm (Fire bell,manual call point,Beacon

_
_
_
_
_
_
_
_
_
_
_

lig

lig

lig

lig

lig

lig

lig

lig

_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
Yes
Yes
_
_
_
_
_
Yes
Yes
_

11.5.2016
11.5.2016
1.5.2016 6.5.2016
11.5.2016
11.5.2016
9.5.2106
9.5.2106
9.5.2106
29.4.2016 4.5.2016
9.5.2106
9.5.2106
9.5.2106

17.5.2016
17.5.2016
Yes
Yes
18.5.2016
Yes
Yes
13.5.2016
Yes
Yes

18.5.2016 13.5.2016
14.5.2016 16.5.2016 18.5.2016
18.5.2016
11.5.2016
11.5.2016
11.5.2016
3.5.2016 8.5.2016
11.5.2016
11.5.2016
11.5.2016
14.5.2016
14.5.2016
5.5.2016 10.5.2016
14.5.2106
14.5.2106
_
_
_
6.5.2016 11.5.2016
_
_
_
_
_
_
7.5.2016 12.5.2016
_
_
_
_
9.5.2016 14.5.2016
_
_
_
10.5.2016 15.5.2016
_
_
_
_
11.5.2016 16.5.2016
_

Yes
Yes
13.5.2016
Yes
Yes
13.5.2016
Yes
Yes
Yes
Yes
Yes
Yes
13.5.2016
Yes
Yes
13.5.2016
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

10 3A

11.5.2016 16.5.2016

Khoom To fit lighting only


RG Y13-14 & XC-XD (DUCTING TO RISER)
11 3B RG Fire Alarm (Fire bell,manual call point,Beacon lig
Khoom To fit lighting only

Note
Painting Schedule is out
Painting job is still doing

_
Yes
_
_

13.5.2016 18.5.2016

_
_
_
_

Yes
Yes
Yes
Yes

Target
Complete
Date
19.5.2016
19.5.2016
14.5.2016
14.5.2016
19.5.2016
12.5.2016
12.5.2016
14.5.2016
14.5.2016
15.5.2016
20.5.2016
14.5.2016
14.5.2016
14.5.2016
12.5.2016
12.5.2016
14.5.2016
14.5.2016
14.5.2016
15.5.2016
15.5.2016
14.5.2016
15.5.2016
22.5.2016
22.5.2016
22.5.2016
22.5.2016
22.5.2016
14.5.2016
15.5.2016
22.5.2016
22.5.2016
14.5.2016
15.5.2016
22.5.2016
22.5.2016
14.5.2016
15.5.2016
22.5.2016
14.5.2016
15.5.2016
22.5.2016
22.5.2016
14.5.2016

Remark

Duct fabricating & material wait


Duct fabricating & material wait
Finished
Finished
Material wait
Finished
Finished
Finished
Finished
Finished
Level 7 forbid not to enter
because of painting process
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Finished
Progressing
Progressing
Finished

15.5.2016
22.5.2016
14.5.2016
15.5.2016

Finished
Progressing
Finished
Finished

SCHEDULE for Level 3 to 8


No Level

7A

7B

6A

6B

5A

5B

4A

4B

10

3A

11

3B

RG Outstanding Works

RG
RG Can Do the
RG Allow
Target
Painting Painting
Material
work before
Access
Complete
Start
Finish
Verify
painting?(yes/no)
Date
Date
(Yes/No)

Y6-Y7 & XA-XB (1200X500FAD)


Y3-Y4 & XB-XC (800X800FAD)
Y1-Y2 & XA-XB (EAD AND FAN CONNECTION)
Y4-Y5 & XB-XC (300X200 EAD)
RG
Y5-Y6 & XB-XC (300X200 EAD)
Y13-Y14 & XA-XB (DUCTING AND FAN CONNECTI
Khoom To fit lighting only
RG

RG

PAHU Ducting outlet

Y1-Y2 & XA-XB (EAD AND FAN CONNECTION)


Y4-Y5 & XB-XC (300X200 EAD)
RG
Y5-Y6 & XB-XC (300X200 EAD)
Y12-14 & XA-AB (DUCTING AND FAN CONNECTIO
Khoom To fit lighting only
Y5-6 & XB-XC(200X150 TED DUCTING)
RG
Y13-14 & XC-XD (DUCTING)
Y1-Y1A & XA-XB (FAN AND DUCT CONNECTION)
Y4-Y5 & XB-XC (300X200 EAD)
RG Y5-Y6 & XB-XC (300X200 EAD)
Y12-13 & XA-XB (FAN AND DUCT CONNECTION)
Y13-14 & XA-XB (DUCTING TO RISER)
Y13-14 & XC-XD (DUCTING TO RISER)
RG
Y1-Y1A & XC-XD (FAN AND DUCT CONNECTION)
Y4-Y5 & XB-XC (300X200 EAD)
RG
Y5-Y6 & XB-XC (300X200 EAD)
RG There is no outstanding .
Y14-15 & XA-XC (DUCTING IN TOILET ROOMS)
RG
Y6-8 & XA-XB (DUCTING)
RG Y13-14 & XC-XD (DUCTING TO RISER)

Note

_
_
_
_
_
_
_

11.5.2016
11.5.2016
9.5.2106
9.5.2106
29.4.2016 4.5.2016 9.5.2106
9.5.2106
9.5.2106

14.5.2016 16.5.2016 17.5.2016 13.5.2016 19.5.2016

_
_
_
_
_
_
_
_
_
_
_
_
_
_
Yes
Yes
_
Yes
Yes
Yes

1.5.2016 6.5.2016

3.5.2016

5.5.2016

6.5.2016

7.5.2016

11.5.2016
11.5.2016
8.5.2016 11.5.2016
11.5.2016
9.5.2106
14.5.2016
10.5.2016
14.5.2016
_
_
11.5.2016
_
_
_
_
12.5.2016
_

9.5.2016 14.5.2016
10.5.2016 15.5.2016
11.5.2016 16.5.2016
13.5.2016 18.5.2016

16.5.2016
16.5.2016
13.5.2016
Yes
Yes
13.5.2016
Yes

13.5.2016
Yes
Yes
13.5.2016
Yes
Yes
Yes
13.5.2016
Yes
Yes
13.5.2016
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes

18.5.2016
17.5.2016
14.5.2016
12.5.2016
12.5.2016
14.5.2016
15.5.2016

14.5.2016
12.5.2016
12.5.2016
14.5.2016
15.5.2016
15.5.2016
15.5.2016
22.5.2016
22.5.2016
22.5.2016
22.5.2016
22.5.2016
22.5.2016
22.5.2016
22.5.2016
22.5.2016
22.5.2016
22.5.2016
22.5.2016
22.5.2016

Remark
Duct fabricating
Need to hack the opening
Just a little ,Material wait
Finished
Finished
Just a little ,Material wait
Progressing
Level 7 forbid not to enter
because of painting process
Just a little ,Material wait
Finished
Finished
Just a little ,Material wait
Progressing
Tomorrow will start
Tomorrow will start
Material wait
Finished
Finished
Material wait
Finished
Finished
Progressing
Progressing
Finished
Progressing
Progressing
Progressing

Painting Schedule is out


Painting job is still doing