HOJA DE METRADOS
ESTRUCTURAS
OBRA:

FECHA:
POR:

CAMAL DE ANTA

SET-2005

ING.

DIMENSIONES
CODIGO

DESCRIPCION Y UBICACION

LONG/CANT

ANCHO

ALTURA

SUB
CANTIDAD UND
TOTAL ELEMENTOS

TOTAL

01.00.00

OBRAS PRELIMINARES

01.01.00

CONSTRUCCIONES PRELIMINARES

01.01.01

ALMACEN, OFICINA Y CASETA DE GUARDIANIA

GLB

1.00

01.01.02

CARTEL DE IDENTIFICACION DE OBRA

UND

1.00

01.02.00

LIMPIEZA DE TERRENO

01.02.01

ELIMINACION DE MATERIAL INORGANICO (DESMONTE Y BASURA)

01.03.00

TRAZO Y REPLANTEO

01.03.01
01.03.02

M2

300.00

TRAZO/REPLANTEO PRELIMINAR CON NIVEL Y TEODOLITO SUPERFICIE

M2

2542.57

TRAZO DURANTE LA EJECUCION DE LA OBRA

M2

521.04

01.03.03

TRAZO, NIVELES FINALES EN OBRA

M2

521.04

01.04.00

DEMOLICIONES

01.04.01

DEMOLICION DE CONSTRUCCION EXISTENTE

EST

1.00

02.00.00

MOVIMIENTO DE TIERRAS

02.01.00

NIVELACION DE TERRENO

02.01.01

NIVELACION Y COMPACTACION DE TERRENO CON EQUIPO LIVIANO

M2

2466.26

02.01.02

NIVELACION Y APISONADO PREVIO AL PISO

M2

818.75

02.02.00

EXCAVACION DE ZANJAS

02.02.01

EXCAV. ZANJAS NO CLASIFICADAS PARA ESTRUCTURAS

M3

264.77

EXCAV. ZANJAS PARA ZAPATAS


ZAPATAS TIPO 1

1.60

1.60

1.30

3.33

M3

19.97

ZAPATAS TIPO 2

1.20

1.20

1.30

1.87

14

M3

26.21

ZAPATAS TIPO 3

1.00

1.00

1.30

1.30

M3

10.40

ZAPATAS TIPO 4

0.80

0.80

1.30

0.83

16

M3

13.31

7.20

0.70

0.70

3.53

M3

3.53

5.80

0.70

0.70

2.84

M3

2.84

2.96

0.70

0.70

1.45

M3

1.45

2.30

0.70

0.70

1.13

M3

1.13

3.72

0.70

0.70

1.82

M3

1.82

EJE A - CC1

4.00

0.40

1.00

1.60

M3

1.60

EJE A - CC2

4.70

0.40

0.70

1.32

M3

1.32

EJE A - CC5

25.70

0.40

1.00

10.28

M3

10.28

1.48

0.40

0.70

0.41

M3

0.41

1.60

0.40

0.70

0.45

M3

0.45

1.36

0.40

0.70

0.38

M3

0.38

0.38

0.40

0.70

0.11

M3

0.11

1.35

0.40

0.70

0.38

M3

0.38

4.57

0.40

0.70

1.28

M3

1.28

4.70

0.40

0.70

1.32

M3

1.32

4.95

0.40

0.70

1.39

M3

1.39

9.57

0.40

0.70

2.68

M3

2.68

4.08

0.40

0.70

1.14

M3

1.14

4.00

0.40

0.70

1.12

M3

1.12

EJE E' - CC2

5.26

0.40

0.70

1.47

M3

1.47

EJE G - CC2

5.44

0.40

0.70

1.52

M3

1.52

2.12

0.40

0.70

0.59

M3

0.59

3.83

0.40

0.70

1.07

M3

2.14

4.08

0.40

0.70

1.14

M3

1.14

EJE H - CC1

5.68

0.40

1.00

2.27

M3

2.27

EJE H' - CC2

14.04

0.40

0.70

3.93

M3

3.93

3.34

0.40

0.70

0.94

M3

0.94

19.80

0.40

1.00

7.92

M3

7.92

EJE 1 - CC3

5.00

0.40

0.70

1.40

M3

1.40

EJE 2 - CC2

2.56

0.40

0.70

0.72

M3

0.72

EJE 5 - CC2

2.56

0.40

0.70

0.72

M3

0.72

EJE 6 - CC3

5.51

0.40

0.70

1.54

M3

1.54

EJE 7 - CC1

4.63

0.40

1.00

1.85

M3

1.85

11.13

0.40

1.00

4.45

M3

4.45

3.55

0.40

1.00

1.42

M3

1.42

INTERMEDIO EJES 7 Y 8 - CC2

1.41

0.40

0.70

0.39

M3

0.39

EJE 8 - CC2

4.63

0.40

0.70

1.30

M3

1.30

CIMIENTO CORRIDO PARA MUROS DE ADOBE


GUARDIANIA

CIMIENTOS CORRIDOS PARA MUROS DE LADRILLO

INTERMEDIOS EJES A Y B - CC2

EJE B - CC2

EJE E - CC2

EJE H - CC2

EJE H' - CC4

2de25

HOJA DE METRADOS
ESTRUCTURAS
OBRA:

FECHA:
POR:

CAMAL DE ANTA

SET-2005

ING.

DIMENSIONES
CODIGO

DESCRIPCION Y UBICACION

LONG/CANT

ANCHO

ALTURA

SUB
CANTIDAD UND
TOTAL ELEMENTOS

TOTAL

1.33

0.40

0.70

0.37

M3

0.37

1.22

0.40

0.70

0.34

M3

0.34

INTERMEDIO EJES 8 Y 9 - CC2

3.67

0.40

0.70

1.03

M3

1.03

EJE 9 - CC2

4.63

0.40

0.70

1.30

M3

1.30

2.75

0.40

0.70

0.77

M3

0.77

INTERMEDIO EJES 9 Y 10 - CC2

3.05

0.40

0.70

0.85

M3

0.85

EJE 10 - CC2

4.60

0.40

0.70

1.29

M3

1.29

INTERMEDIO EJES 10 Y 11 - CC2

4.63

0.40

0.70

1.30

M3

1.30

16.13

0.40

1.00

6.45

M3

6.45

2.40

0.40

1.00

0.96

M3

0.96

1.70

0.40

1.00

0.68

M3

0.68

2.38

0.40

1.00

0.95

M3

0.95

TANQUE CISTERNA

5.80

4.55

1.40

36.95

M3

36.95

TANQUE SEPTICO

4.50

9.20

1.60

66.24

M3

66.24

POZO DE ESTIERCOL

1.70

2.85

0.60

2.91

M3

2.91

SEPARADORES DE GRASA

1.40

1.40

1.10

2.16

M3

2.16

M3

207.75

M3
M3

57.02
658.90

M2

80.15

EJE 11 - CC1
RAMPAS

EXCAVACIONES PARA INSTALACIONES SANITARIAS

02.03.00
02.03.01
02.04.00
02.04.01
02.04.02

03.00.00
03.01.00
03.01.01

03.02.00
03.02.01

ELIMINACION DE MATERIAL EXCEDENTE


ELIMINACION DE MATERIAL EXCENDENTE D=30 MTS
RELLENO Y APISONADO
RELLENO C/MATERIAL PROPIO COMPACTADO
RELLENO CON MATERIAL DE PRESTAMO COMPACTADO

CONCRETO SIMPLE
SOLADOS
SOLADOS DE CONCRETO CICLOPEO C:H 1:12

1.20
21.20

1.20
22.20

0.90
1.40

1.30
658.90

44
1

E=0.05m

SOLADOS EN ZAPATAS
ZAPATAS TIPO 1
ZAPATAS TIPO 2
ZAPATAS TIPO 3
ZAPATAS TIPO 4

1.60
1.20
1.00
0.80

1.60
1.20
1.00
0.80

2.56
1.44
1.00
0.64

6
14
8
16

15.36
20.16
8.00
10.24

SOLADO EN TANQUE CISTERNA

5.80

4.55

26.39

26.39

CIMIENTOS CORRIDOS
CIMIENTOS CORRIDOS + 30% PIEDRA
CIMIENTO CORRIDO PARA MUROS DE ADOBE
GUARDIANIA

CIMIENTOS CORRIDOS PARA MUROS DE LADRILLO


EJE A - CC1
EJE A - CC2
EJE A - CC5
INTERMEDIOS EJES A Y B - CC2

EJE B - CC2

EJE E - CC2

EJE E' - CC2


EJE G - CC2
EJE H - CC2
EJE H - CC1
EJE H' - CC2
EJE H' - CC4
EJE 1 - CC3
EJE 2 - CC2
EJE 5 - CC2
EJE 6 - CC3
EJE 7 - CC1

INTERMEDIO EJES 7 Y 8 - CC2


EJE 8 - CC2

INTERMEDIO EJES 8 Y 9 - CC2


EJE 9 - CC2
INTERMEDIO EJES 9 Y 10 - CC2
EJE 10 - CC2
INTERMEDIO EJES 10 Y 11 - CC2
EJE 11 - CC1
RAMPAS

M3

129.28

7.20
5.80
2.96
2.30
3.72

0.70
0.70
0.70
0.70
0.70

0.60
0.60
0.60
0.60
0.60

3.02
2.44
1.24
0.97
1.56

1
1
1
1
1

M3
M3
M3
M3
M3

3.02
2.44
1.24
0.97
1.56

4.00
4.70
25.70
1.48
1.60
1.36
0.38
1.35
4.57
4.70
4.95
9.57
4.08
4.00
5.26
5.44
2.12
3.83
4.08
5.68
14.04
3.34
19.80
5.00
2.56
2.56
5.51
4.63
11.13
3.55
1.41
4.63
1.33
1.22
3.67
4.63
2.75
3.05
4.60
4.63
16.13
2.40
1.70
2.38

0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40
0.40

2.40
0.60
2.10
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
2.40
0.60
0.60
2.40
0.60
0.60
0.60
0.60
2.40
2.40
2.40
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
0.60
2.40
1.70
1.70
1.70

3.84
1.13
21.59
0.36
0.38
0.33
0.09
0.32
1.10
1.13
1.19
2.30
0.98
0.96
1.26
1.31
0.51
0.92
0.98
5.45
3.37
0.80
19.01
1.20
0.61
0.61
1.32
4.44
10.68
3.41
0.34
1.11
0.32
0.29
0.88
1.11
0.66
0.73
1.10
1.11
15.48
1.63
1.16
1.62

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

3.84
1.13
21.59
0.36
0.38
0.33
0.09
0.32
1.10
1.13
1.19
2.30
0.98
0.96
1.26
1.31
0.51
1.84
0.98
5.45
3.37
0.80
19.01
1.20
0.61
0.61
1.32
4.44
10.68
3.41
0.34
1.11
0.32
0.29
0.88
1.11
0.66
0.73
1.10
1.11
15.48
1.63
1.16
1.62

3de25

HOJA DE METRADOS
ESTRUCTURAS
OBRA:

FECHA:
POR:

CAMAL DE ANTA

SET-2005

ING.

DIMENSIONES
CODIGO

DESCRIPCION Y UBICACION

LONG/CANT

ANCHO

ALTURA

SUB
CANTIDAD UND
TOTAL ELEMENTOS

TOTAL

4de25

HOJA DE METRADOS
ESTRUCTURAS
OBRA:

FECHA:
POR:

CAMAL DE ANTA

SET-2005

ING.

DIMENSIONES
CODIGO
03.03.00
03.03.01

DESCRIPCION Y UBICACION

CIMIENTO CORRIDO PARA MUROS DE ADOBE


GUARDIANIA

CIMIENTOS CORRIDOS PARA MUROS DE LADRILLO


EJE A - CC1
EJE A - CC2
INTERMEDIOS EJES A Y B - CC2

EJE B - CC2

EJE E - CC2

EJE E' - CC2


EJE G - CC2
EJE H - CC2
EJE H - CC1
EJE H' - CC2
EJE 1 - CC3
EJE 2 - CC2
EJE 5 - CC2
EJE 6 - CC3
EJE 7 - CC1

INTERMEDIO EJES 7 Y 8 - CC2


EJE 8 - CC2

INTERMEDIO EJES 8 Y 9 - CC2


EJE 9 - CC2
INTERMEDIO EJES 9 Y 10 - CC2
EJE 10 - CC2
INTERMEDIO EJES 10 Y 11 - CC2
EJE 11 - CC1

03.03.02

LONG/CANT

ANCHO

ALTURA

SUB
CANTIDAD UND
TOTAL ELEMENTOS

SOBRECIMIENTO
CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS

CIMIENTOS CORRIDOS PARA MUROS DE LADRILLO


EJE A - CC1
EJE A - CC2
INTERMEDIOS EJES A Y B - CC2

EJE B - CC2

EJE E - CC2

EJE E' - CC2


EJE G - CC2
EJE H - CC2
EJE H - CC1
EJE H' - CC2

M3

12.30

7.20
5.80
2.96
2.30
3.72

0.50
0.50
0.50
0.50
0.50

0.30
0.30
0.30
0.30
0.30

1.08
0.87
0.44
0.35
0.56

1
1
1
1
1

M3
M3
M3
M3
M3

1.08
0.87
0.44
0.35
0.56

4.00
4.70
1.48
1.60
1.36
0.38
1.35
4.57
4.70
4.95
9.57
4.08
4.00
5.26
5.44
2.12
3.83
4.08
5.68
14.04
3.34
5.00
2.56
2.56
5.51
4.63
11.13
3.55
1.41
4.63
1.33
1.22
3.67
4.63
2.75
3.05
4.60
4.63
16.13

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.25
0.15
0.15
0.25
0.25
0.25
0.15
0.25
0.15
0.15
0.25
0.25
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

0.18
0.21
0.07
0.07
0.06
0.02
0.06
0.21
0.21
0.22
0.43
0.18
0.18
0.39
0.24
0.10
0.29
0.31
0.43
0.63
0.25
0.23
0.12
0.19
0.41
0.21
0.50
0.16
0.06
0.21
0.06
0.05
0.17
0.21
0.12
0.14
0.21
0.21
0.73

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

0.18
0.21
0.07
0.07
0.06
0.02
0.06
0.21
0.21
0.22
0.43
0.18
0.18
0.39
0.24
0.10
0.57
0.31
0.43
0.63
0.25
0.23
0.12
0.19
0.41
0.21
0.50
0.16
0.06
0.21
0.06
0.05
0.17
0.21
0.12
0.14
0.21
0.21
0.73

M2

633.62

ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTA 0.30 m


ENCOFRADO MUROS CC1
EJE A - CC1
EJE H - CC1
EJE 7 - CC1
EJE 11 - CC1
ENCOFRADO MUROS CC4
EJE H' - CC4
ENCOFRADO MUROS CC5
EJE A - CC5
CIMIENTO CORRIDO PARA MUROS DE ADOBE
GUARDIANIA

TOTAL

4.00
5.68
4.63
16.13

1.40
1.40
1.40
1.40

5.60
7.95
6.48
22.58

2
2
2
2

M2
M2
M2
M2

22.40
31.81
25.93
90.33

19.80

1.40

27.72

M2

110.88

25.70

1.10

28.27

M2

113.08

7.20
5.80
2.96
2.30
3.72

0.30
0.30
0.30
0.30
0.30

2.16
1.74
0.89
0.69
1.12

2
2
2
2
2

M2
M2
M2
M2
M2

8.64
6.96
3.55
2.76
4.46

4.00
4.70
1.48
1.60
1.36
0.38
1.35
4.57
4.70
4.95
9.57
4.08
4.00
5.26
5.44
2.12
3.83
4.08
5.68
14.04

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

1.20
1.41
0.44
0.48
0.41
0.11
0.41
1.37
1.41
1.49
2.87
1.22
1.20
1.58
1.63
0.64
1.15
1.22
1.70
4.21

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
4
2
2
2

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

4.80
5.64
1.78
1.92
1.63
0.46
1.62
5.48
5.64
5.94
11.48
4.90
4.80
6.31
6.53
2.54
9.19
4.90
6.82
16.85

5de25

HOJA DE METRADOS
ESTRUCTURAS
OBRA:

FECHA:
POR:

CAMAL DE ANTA

SET-2005

ING.

DIMENSIONES
CODIGO

DESCRIPCION Y UBICACION
EJE 1 - CC3
EJE 2 - CC2
EJE 5 - CC2
EJE 6 - CC3
EJE 7 - CC1

INTERMEDIO EJES 7 Y 8 - CC2


EJE 8 - CC2

INTERMEDIO EJES 8 Y 9 - CC2


EJE 9 - CC2
INTERMEDIO EJES 9 Y 10 - CC2
EJE 10 - CC2
INTERMEDIO EJES 10 Y 11 - CC2
EJE 11 - CC1
03.04.00
03.04.01

LONG/CANT

3.34
5.00
2.56
2.56
5.51
4.63
11.13
3.55
1.41
4.63
1.33
1.22
3.67
4.63
2.75
3.05
4.60
4.63
16.13

ANCHO

ALTURA

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

FALSO PISO
FALSO PISO DE 4" DE CONCRETO 1:10
FALSO PISOS
Guardiania
Mantenimiento
SSHH Servicio
Medico Veter
Despacho
sala Beneficio
Dep Mantenimi
Necropsia
Tratam Visceras
Tratam Cabesa
Deposito
Administ
Laboratorio

04.00.00
04.01.00
04.01.01

04.01.02

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

04.02.00

TANQUE CISTERNA
CONCRETO FC=210 KG/CM2 PARA TANQUE CISTERNA
CONCRETO TANQUE CISTERNA
MUROS
LOSA

04.02.02

ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

04.02.03

ENCOFRADO Y DESENCOFRADO INTERIOR EN CISTERNA SUBTERRANEA


ENCOFRADO EN TANQUE CISTERNA
MUROS
LOSA TECHO

04.03.00
04.03.01

18.64
8.30
26.91
10.49
83.67
237.69
6.78
14.08
23.04
23.03
24.56
14.78
13.24

1
1
1
1
1
1
1
1
1
1
1
1
1

CONCRETO ARMADO
ZAPATAS
CONCRETO F'C= 210 KG/CM2. EN ZAPATAS
CONCRETO EN ZAPATAS
ZAPATAS TIPO 1
ZAPATAS TIPO 2
ZAPATAS TIPO 3
ZAPATAS TIPO 4

04.02.01

SUB
CANTIDAD UND
TOTAL ELEMENTOS
1.00
2
M2
1.50
2
M2
0.77
2
M2
0.77
2
M2
1.65
2
M2
1.39
2
M2
3.34
2
M2
1.07
2
M2
0.42
2
M2
1.39
2
M2
0.40
2
M2
0.37
2
M2
1.10
2
M2
1.39
2
M2
0.83
2
M2
0.92
2
M2
1.38
2
M2
1.39
2
M2
4.84
2
M2

1.60
1.20
1.00
0.80

1.60
1.20
1.00
0.80

0.30
0.30
0.30
0.30

0.77
0.43
0.30
0.19

6
14
8
16

(VER METRADO DE FIERROS)

5.40
3.75
5.80
5.40

0.20
0.20
4.55
4.15

1.60
1.60
0.20
0.20

1.73
1.20
5.28
4.48

2
2
1
1

(VER METRADO DE FIERROS)

5.40
3.75
5.00
5.40
4.15

0.20
0.20
3.75

1.60
1.60
0.20
0.20

8.64
6.00
18.75
1.08
0.83

4
4
1
2
2

COLUMNAS
CONCRETO f'c=210 kg/cm2 PARA COLUMNAS

TOTAL
4.01
6.00
3.07
3.07
6.61
5.56
13.36
4.26
1.69
5.56
1.60
1.46
4.40
5.56
3.30
3.66
5.52
5.56
19.36

M2

505.21

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

18.64
8.30
26.91
10.49
83.67
237.69
6.78
14.08
23.04
23.03
24.56
14.78
13.24

M3

16.13

M3
M3
M3
M3

4.61
6.05
2.40
3.07

KG

816.00

M3

15.62

M3
M3
M3
M3

3.46
2.40
5.28
4.48

KG

1166.31

M2

81.13

M2
M2
M2
M2
M2

34.56
24.00
18.75
2.16
1.66

M3

23.86

CONCRETO EN COLUMNAS
PRIMER NIVEL
C1
C2
C3
C4
C5

0.40
0.30
0.30
0.25
0.15

0.40
0.30
0.30
0.25
0.25

8.20
6.25
6.25
3.50
3.50

1.31
0.56
0.56
0.22
0.13

6
14
8
14
2

M3
M3
M3
M3
M3

7.87
7.88
4.50
3.06
0.26

SEGUNDO NIVEL
C2

0.30

0.30

1.60

0.14

M3

0.29

KG

4984.91

M2

302.16

04.03.02

ACERO GRADO 60 EN COLUMNAS

04.03.03

ENCOFRADO Y DESENCOFRADO PARA COLUMNAS

(VER METRADO DE FIERROS)

6de25

HOJA DE METRADOS
ESTRUCTURAS
OBRA:

FECHA:
POR:

CAMAL DE ANTA

SET-2005

ING.

DIMENSIONES
CODIGO

DESCRIPCION Y UBICACION
ENCOFRADO EN COLUMNAS
PRIMER NIVEL
C1
C2
C3
C4
C5
SEGUNDO NIVEL
C2

04.04.00
04.04.01

LONG/CANT

ANCHO

ALTURA

SUB
CANTIDAD UND
TOTAL ELEMENTOS

TOTAL

0.40
0.30
0.30
0.25
0.15

0.40
0.30
0.30
0.25
0.25

8.20
6.25
6.25
3.50
3.50

13.12
7.50
7.50
3.50
2.80

6
14
8
14
2

M2
M2
M2
M2
M2

78.72
105.00
60.00
49.00
5.60

0.30

0.30

1.60

1.92

M2

3.84

M3

36.67

VIGAS
CONCRETO f'c=210 kg/cm2 PARA VIGAS
ALA IZQUIERDA
VI-NT-1
VI-NT-2
VI-NT-3
VI-NT-4
VI-NT-5
VI-NT-6
VI-NT-E'
VI-NT-F
VI-NT-G
VI-NT-H'

5.46
5.34
3.09
3.09
6.09
6.09
5.76
5.91
20.69
20.05

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

0.41
0.40
0.23
0.23
0.46
0.46
0.43
0.44
1.55
1.50

1
1
1
1
1
1
1
1
1
1

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

0.41
0.40
0.23
0.23
0.46
0.46
0.43
0.44
1.55
1.50

NAVE PRINCIPAL PRIMER NIVEL


V-ARR-7
V-ARR-11
V-NT-8 TRAMO E-H
V-NT-8 TRAMO A-B
V-NT-9 TRAMO E-H
V-NT-9 TRAMO A-B
V-NT-10
V-NT-A
V-ARR-B
V-ARR-E
V-NT-H

20.82
16.82
5.22
4.30
5.22
4.30
5.22
10.28
21.50
21.50
21.50

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35

1.82
1.47
0.39
0.32
0.39
0.32
0.39
0.77
1.88
1.88
1.88

1
1
1
1
1
1
1
1
1
1
1

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

1.82
1.47
0.39
0.32
0.39
0.32
0.39
0.77
1.88
1.88
1.88

NAVE PRINCIPAL 2 NIVEL


V-NT-7
V-NT-8
V-NT-9
V-NT-10
V-NT-11
V-NT-B
V-NT-C
V-NT-D
V-NT-E
VB-1
VB-2

11.90
11.90
11.90
11.90
11.90
21.50
21.50
21.50
21.50
21.50
21.50

0.25
0.30
0.30
0.30
0.25
0.25
0.30
0.30
0.25
0.20
0.20

0.40
0.40
0.40
0.40
0.40
0.35
0.40
0.40
0.35
0.40
0.40

1.19
1.43
1.43
1.43
1.19
1.88
2.58
2.58
1.88
1.72
1.72

1
1
1
1
1
1
1
1
1
1
1

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

1.19
1.43
1.43
1.43
1.19
1.88
2.58
2.58
1.88
1.72
1.72

KG

4698.67

M2

391.14

04.04.02

ACERO GRADO 60 EN VIGAS

04.04.03

ENCOFRADO Y DESENCOFRADO PARA VIGAS

(VER METRADO DE FIERROS)

ALA IZQUIERDA
VI-NT-1
VI-NT-2
VI-NT-3
VI-NT-4
VI-NT-5
VI-NT-6
VI-NT-E'
VI-NT-F
VI-NT-G
VI-NT-H'

5.46
5.34
3.09
3.09
6.09
6.09
5.76
5.91
20.69
20.05

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30
0.30

4.64
4.54
2.63
2.63
5.18
5.18
4.90
5.02
17.59
17.04

1
1
1
1
1
1
1
1
1
1

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

4.64
4.54
2.63
2.63
5.18
5.18
4.90
5.02
17.59
17.04

NAVE PRINCIPAL PRIMER NIVEL


V-ARR-7
V-ARR-11
V-NT-8 TRAMO E-H
V-NT-8 TRAMO A-B
V-NT-9 TRAMO E-H
V-NT-9 TRAMO A-B
V-NT-10
V-NT-A
V-ARR-B
V-ARR-E
V-NT-F

20.82
16.82
5.22
4.30
5.22
4.30
5.22
10.28
21.50
21.50
21.50

0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25
0.25

0.35
0.35
0.30
0.30
0.30
0.30
0.30
0.30
0.35
0.35
0.35

19.78
15.98
4.44
3.66
4.44
3.66
4.44
8.74
20.43
20.43
20.43

1
1
1
1
1
1
1
1
1
1
1

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

19.78
15.98
4.44
3.66
4.44
3.66
4.44
8.74
20.43
20.43
20.43

NAVE PRINCIPAL 2 NIVEL


V-NT-7
V-NT-8
V-NT-9
V-NT-10
V-NT-11
V-NT-B
V-NT-C
V-NT-D
V-NT-E
VB-1
VB-2

11.90
11.90
11.90
11.90
11.90
21.50
21.50
21.50
21.50
21.50
21.50

0.25
0.30
0.30
0.30
0.25
0.25
0.30
0.30
0.25
0.20
0.20

0.40
0.40
0.40
0.40
0.40
0.35
0.40
0.40
0.35
0.40
0.40

12.50
13.09
13.09
13.09
12.50
20.43
23.65
23.65
20.43
21.50
21.50

1
1
1
1
1
1
1
1
1
1
1

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

12.50
13.09
13.09
13.09
12.50
20.43
23.65
23.65
20.43
21.50
21.50

METRADO DE FIERRO (FC)


Obra :
Partida

CAMAL DE ANTA
:

ELEMENTO

Hecho :

ACERO EN ZAPATAS

fy = 4200 kg/cm2

GEOMETRIA DEL ELEM.

CANT.

Fecha :

Longi -

tud

Z-1

Cantidad

N DE

LONG.

LONGIT.

Preliminar

ELEM.

EMPAL.

ELEMEN.

OBSERV.

LONGITUD TOTAL EN ML.


1/4"

3/8"

1/2"

0.2

1.50

0.2

1/2

1.50

0.20

18

1.90

205.2

0.2

1.10

0.2

1/2

14

1.10

0.20

14

1.50

294.0

0.2

0.90

0.2

1/2

0.90

0.20

12

1.30

124.8

0.2

0.70

0.2

1/2

16

0.70

0.20

10

1.10

176.0

5/8"

3/4"

1"

(1.6X1.6)
Z-2
(1.2X1.2)
Z-3
(1.0X1.0)
Z-4
(0.8X0.8)
PESO EN KILOGRAMO POR METRO LINEAL

0.25

0.56

1.02

1.60

2.26

4.04

LONGITUD TOTAL EN METROS LINEALES

0.0

0.0

800.0

0.0

0.0

0.0

PESO PARCIAL DE ACUERDO AL ( )

0.0

0.0

816.0

0.0

0.0

0.0

3/4"

1"

816.00

PESO TOTAL EN KILOGRAMOS

KG

METRADO DE FIERRO (FC)


Obra :
Partida

CAMAL DE ANTA
:

ELEMENTO

Hecho :

TANQUE CISTERNA

fy = 4200 kg/cm2

GEOMETRIA DEL ELEM.

CANT.

Fecha :

Longi -

tud

Cantidad

N DE

LONG.

LONGIT.

Preliminar

ELEM.

EMPAL.

ELEMEN.

OBSERV.

LONGITUD TOTAL EN ML.


1/4"

3/8"

1/2"

5/8"

LOSA FON

0.1

5.80

0.1

1/2

4.45

0.25

19

38

6.00

228.0

DOBLE CAPA

LOSA FON

0.1

4.45

0.1

1/2

5.80

0.25

24

48

4.65

223.2

DOBLE CAPA

1/2

4.09

0.25

17

34

2.04

138.7

DOBLE CAPA

1/2

5.34

0.25

22

44

2.04

179.5

DOBLE CAPA

0.14
MUROS

1.70
0.2
0.14

MUROS

1.70
0.2

LOSA TECH

0.1

5.30

0.1

1/2

4.07

0.25

17

34

5.50

187.0

DOBLE CAPA

LOSA TECH

0.1

4.05

0.1

1/2

5.32

0.25

22

44

4.25

187.0

DOBLE CAPA

PESO EN KILOGRAMO POR METRO LINEAL

0.25

0.56

1.02

1.60

2.26

4.04

LONGITUD TOTAL EN METROS LINEALES

0.0

0.0

1143.4

0.0

0.0

0.0

PESO PARCIAL DE ACUERDO AL ( )

0.0

0.0

1166.3

0.0

0.0

0.0

PESO TOTAL EN KILOGRAMOS

1166.31

KG

METRADO DE FIERRO (FC)


Obra :
Partida

CAMAL DE ANTA
:

ELEMENTO

Hecho :

ACERO EN COLUMNAS
GEOMETRIA DEL ELEM.

fy = 4200 kg/cm2

CANT.

Fecha :

Longi -

tud

Cantidad

N DE

LONG.

LONGIT.

Preliminar

ELEM.

EMPAL.

ELEMEN.

OBSERV.

LONGITUD TOTAL EN ML.


1/4"

3/8"

1/2"

5/8"

3/4"

1"

0.3
C1

8.80

3/4

0.80

10.20

489.6

PRINCIPAL

5/8

14

0.60

10.00

1120.0

PRINCIPAL

5/8

7.40

355.2

PRINCIPAL

1/2

14

4.40

369.6

PRINCIPAL

1/2

4.40

35.2

PRINCIPAL

3/8

52

(0.40X0.40)
0.3
0.3
C2

8.80

(0.30X0.30)
0.3
0.3
C3

6.80

(0.30X0.30)
0.3
0.25
C4

3.90

(0.25X0.25)
0.25
0.25
C5

3.90

(0.25X0.15)
0.25
0.32
C1

0.32

0.32

0.20

1.48

461.8

ESTRIBOS

(0.40X0.40)

1@5,14@10,R@25
0.32
0.22

C2

0.22

0.22

3/8

14

53

0.20

1.08

801.4

ESTRIBOS

(0.30X0.30)

1@5,11@10,R@25
0.22
0.22

C3

0.22

0.22

3/8

41

0.20

1.08

354.2

ESTRIBOS

(0.30X0.30)

1@5,11@10,R@25
0.22
0.17

C4

0.17

0.17

3/8

14

27

0.20

0.88

332.6

ESTRIBOS

(0.25X0.25)

1@5,7@10,R@20
0.17
0.17

C5

0.17

0.17

1/4

30

0.20

0.88

52.8

ESTRIBOS

(0.25X0.15)

1@5,7@10,R@15
0.17
PESO EN KILOGRAMO POR METRO LINEAL

0.25

0.56

1.02

1.60

2.26

4.04

LONGITUD TOTAL EN METROS LINEALES

52.8

1950.0

404.8

1475.2

489.6

0.0

PESO PARCIAL DE ACUERDO AL ( )

13.2

1092.0

412.9

2360.3

1106.5

0.0

PESO TOTAL EN KILOGRAMOS

4,984.91

KG

METRADO DE FIERRO (FC)


Obra :
Partida

CAMAL DE ANTA
:

ELEMENTO

Hecho :

ACERO EN VIGAS 0.25 * 0.40 M fy = 4200 kg/cm2

GEOMETRIA DEL ELEM.

CANT.

Fecha :

Longi tud

Cantidad

N DE

LONG.

LONGIT.

Preliminar

ELEM.

EMPAL.

ELEMEN.

OBSERV.

LONGITUD TOTAL EN ML.


1/4"

3/8"

1/2"

5/8"

3/4"

1"

NAVE SEC.

EJE 1

0.2

5.38

0.2

1/2

5.78

23.12

0.2

5.26

0.2

1/2

5.66

22.64

0.2

3.00

0.2

1/2

3.40

27.20

0.2

6.00

0.2

1/2

6.40

51.20

0.2

5.68

0.2

5/8

6.08

24.32

0.2

5.83

0.2

5/8

6.23

24.92

0.2

20.61

0.2

5/8

1.20

22.21

88.84

0.2

19.97

0.2

5/8

1.20

21.57

86.28

0.22

1/4

44

0.20

0.98

(0.25X0.30)
EJE 2
(0.25X0.30)
EJES 3,4
(0.25X0.30)
EJES 5,6
(0.25X0.30)
EJE E'
(0.25X0.30)
EJE F
(0.25X0.30)
EJE G
(0.25X0.30)
EJE H'
(0.25X0.30)
0.17
EJE 1

0.22

43.1

ESTRIBOS

(0.25X0.30)

1@5,R@12
0.17
0.17

EJE 2

0.22

0.22

1/4

40

0.20

0.98

39.2

ESTRIBOS

(0.25X0.30)

1@5,R@12
0.17
0.17

EJES 3,4

0.22

0.22

1/4

23

0.20

0.98

45.1

ESTRIBOS

(0.25X0.30)

1@5,R@12
0.17
0.17

EJES 5,6

0.22

0.22

1/4

46

0.20

0.98

90.2

ESTRIBOS

(0.25X0.30)

1@5,R@12
0.17
0.17

EJE E'

0.22

0.22

3/8

45

0.20

0.98

44.1

(0.25X0.30)

ESTRIBOS
1@5,R@12

0.17
0.17
EJE F

0.22

0.22

3/8

47

0.20

0.98

46.1

(0.25X0.30)

ESTRIBOS
1@5,R@12

0.17
0.17
EJE G

0.22

0.22

3/8

162

0.20

0.98

158.8

(0.25X0.30)

ESTRIBOS
1@5,R@12

0.17
0.17
EJE H'

0.22

0.22

3/8

156

0.20

0.98

152.9

ESTRIBOS

(0.25X0.30)

1@5,R@12
0.17

NAVE PRIN
PRIM. NIV.
EJE 7

0.25

20.74

0.25

5/8

1.20

22.44

89.76

0.25

16.74

0.25

5/8

0.60

17.84

71.36

0.2

5.14

0.2

5/8

5.54

44.32

TRAMO E-H

0.2

4.22

0.2

5/8

4.62

36.96

TRAMO A-B

0.2

5.14

0.2

5/8

5.54

22.16

0.2

10.20

0.2

5/8

0.60

11.20

44.80

0.25

21.42

0.25

5/8

1.20

23.12

277.44

0.27

3/8

129

0.20

1.08

(0.25X0.35)
EJE 11
(0.25X0.35)
EJES 8,9
(0.25X0.30)
EJES 8,9
(0.25X0.30)
EJE 10
(0.25X0.30)
EJE A
(0.25X0.30)
EJES B,E,H
(0.25X0.35)
0.17
EJE 7

0.27

139.3

(0.25X0.35)

ESTRIBOS
1@5,R@15

0.17
0.17
EJE 11

0.27

0.27

3/8

104

0.20

1.08

112.3

(0.25X0.35)

ESTRIBOS
1@5,R@15

0.17
0.17
TRAMO E-H
EJES 8,9

0.22

0.22

3/8

33

0.20

0.98

64.7

(0.25X0.30)

ESTRIBOS
1@5,R@15

0.17
0.17
TRAMO A-B
EJES 8,9

0.22

0.22

3/8

26

0.20

0.98

51.0

(0.25X0.30)

ESTRIBOS
1@5,R@15

0.17
EJE 10

0.22

0.22

3/8

33

0.20

0.98

32.3

(0.25X0.30)

ESTRIBOS
1@5,R@15

0.17
0.17
EJE A

0.22

0.22

3/8

81

0.20

0.98

79.4

(0.25X0.30)

ESTRIBOS
1@5,R@12

0.17
0.17
EJES B,E,H

0.27

0.27

(0.25X0.35)

3/8

136

0.20

1.08

440.6

ESTRIBOS
1@5,R@15

0.17

NAVE PRIN
SEG. NIV.
EJES 7,11

0.25

11.82

0.25

5/8

0.60

12.92

0.25

11.82

0.25

3/4

0.80

13.12

0.2

21.42

0.2

5/8

1.20

23.02

0.2

21.42

0.2

3/4

1.60

23.42

0.2

21.42

0.2

5/8

1.20

23.02

0.32

3/8

62

0.20

1.18

103.36

(0.25X0.40)
EJES 8,9,10

196.80

(0.30X0.40)
EJES B,E

184.16

(0.25X0.35)
EJES C,D

234.20

(0.30X0.40)
VB1-VB2

184.16

(0.20X0.40)
0.17
EJES 7,11

0.32

146.3

ESTRIBOS

(0.25X0.40)

1@5,R@18
0.17
0.22

EJES 8,9,10

0.32

0.32

3/8

62

0.20

1.28

238.1

ESTRIBOS

(0.30X0.40)

1@5,R@18
0.22
0.17

EJES B,E

0.27

0.27

3/8

137

0.20

1.08

295.9

ESTRIBOS

(0.25X0.35)

1@5,R@15
0.17
0.22

EJES C,D

0.32

0.32

3/8

140

0.20

1.28

358.4

ESTRIBOS

(0.30X0.40)

1@5,7@10,R@18
0.22
0.12

VB1-VB2

0.32

0.32

3/8

140

0.20

1.08

302.4

ESTRIBOS

(0.20X0.40)

1@5,7@10,R@18
0.12
PESO EN KILOGRAMO POR METRO LINEAL

0.3

0.6

1.0

1.6

2.3

4.0

LONGITUD TOTAL EN METROS LINEALES

217.6

2662.6

124.2

1282.8

431.0

0.0

PESO PARCIAL DE ACUERDO AL ( )

54.4

1491.0

126.6

2052.5

974.1

0.0

PESO TOTAL EN KILOGRAMOS

4698.67

KG

13de25

HOJA DE METRADOS
OBRA:

ARQUITECTURA
CAMAL DE ANTA

FECHA:
POR:
ING.
DIMENSIONES
LONG/CANT
ANCHO
ALTURA

CODIGO
05.00.00
05.01.00
05.01.01

DESCRIPCION Y UBICACION
MUROS Y TABIQUES DE ALBAILERIA
MUROS Y TABIQUES DE LADRILLOS DE ARCILLA
MUROS DE LADRILLO KK DE ARCILLA DE SOGA C/M 1:4 X 1.5CM.

SET-2005

SUB
TOTAL

MUROS DE LADRILLO (SOGA) EN AREA DE OFICINAS, LABORATORIOS, Y SALAS DE TRATAMIENTO


dep Mantenimiento
6.63
2.57
17.04
1.46
1.20
1.75
Necropsia
10.62
2.57
27.29
4.00
1.60
6.40
Aislamiento
2.94
2.57
7.56
1.46
1.20
1.75
Visceras
12.01
2.57
30.87
2.00
1.60
3.20
Cabeza
7.38
2.57
18.97
2.00
1.60
3.20
Herramientas
11.63
2.57
29.89
Laboratorio
7.13
2.57
18.32
6.33
2.57
16.27
Beneficio
28.30
3.90
110.37
Guardiania
13.86
2.57
35.62
6.00
1.20
7.20
Deposito
5.79
2.57
14.88
1.46
1.20
1.75
SSHH
17.34
2.57
44.56
3.75
1.20
4.50
Medico
5.34
2.57
13.72
2.65
1.20
3.18
Despacho
8.21
2.57
21.10

05.01.02

Herramientas
Laboratorio

3.81
2.90
2.70

1.20
1.20
1.20

4.57
3.48
3.24

Necropcia
Deposito de Mantenimento
Insinerador
Sala de visceras

Tratamiento de cabezas

Deposito de herramientas
Sala de Medico veterinario

Laboratorio
Sala de beneficio

Servicios higienicos

10.05
1.46
13.00
4.00
8.90
1.50
17.45
12.85
3.75
2.00
12.60
3.75
2.00
19.60
3.65
9.85
2.90
1.90
11.35
2.70
44.20
1.10
7.70
7.40
33.90

2.70
1.70
2.70
1.00
2.70
1.70
2.70
2.70
1.20
1.30
2.70
1.20
1.50
2.70
1.20
2.70
1.20
1.30
2.70
1.20
2.70
3.00
3.00
3.00
2.70

27.14
2.48
35.10
4.00
24.03
2.55
47.12
34.70
4.50
2.60
34.02
4.50
3.00
52.92
4.38
26.60
3.48
2.47
30.65
3.24
119.34
3.30
23.10
22.20
91.53

TOTAL

439.40

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

17.04
1.75
27.29
6.40
7.56
1.75
30.87
3.20
18.97
3.20
29.89
18.32
16.27
110.37
35.62
7.20
14.88
1.75
44.56
4.50
13.72
3.18
21.10

M2

15.68

0.25
0.25
0.25

M2
M2
M2

10.58
1.14
1.14

0.25
0.25
0.25

M2
M2
M2

1.14
0.87
0.81

M2

779.34

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

27.14
2.48
35.10
4.00
24.03
2.55
47.12
34.70
4.50
2.60
34.02
4.50
3.00
52.92
4.38
26.60
3.48
2.47
30.65
3.24
119.34
3.30
23.10
22.20
183.06

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

REVOQUES ENLUCIDOS Y MOLDURAS


TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA
TARRAJEO EN MUROS INTERIORES
Corral aislamiento

UND

M2

MUROS DE LADRILLO KK DE ARCILLA DE CABEZA C/M 1:4 X 1.5CM.


MUROS DE LADRILLO (CABEZA) EN AREA DE OFICINAS, LABORATORIOS, Y SALAS DE TRATAMIENTO
Incinerador
16.46
2.57
42.30
Visceras
3.81
1.20
4.57
Cabeza
3.81
1.20
4.57

06.00.00
06.01.00

CANTIDAD
ELEMENTOS

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2

14de25

HOJA DE METRADOS
OBRA:

CODIGO

ARQUITECTURA
CAMAL DE ANTA

DESCRIPCION Y UBICACION

Administracion

LONG/CANT
3.75
1.95
9.30
2.60

FECHA:
POR:
ING.
DIMENSIONES
ANCHO
ALTURA
1.70
1.70
2.70
1.20

SET-2005

SUB
TOTAL
6.38
3.32
25.11
3.12

CANTIDAD
ELEMENTOS
4
1
1
8

UND
M2
M2
M2
M2

TOTAL
25.50
3.32
25.11
24.96

15de25

HOJA DE METRADOS
OBRA:

CODIGO
06.02.00

ARQUITECTURA
CAMAL DE ANTA

FECHA:
POR:
ING.
DIMENSIONES
DESCRIPCION Y UBICACION
LONG/CANT
ANCHO
ALTURA
TARRAJEO EXTERIOR CON MORTERO 1:5 X 1.5 cm (INCLUYE COLUMNAS EMPOTRADAS)
TARRAJEO EN EXTERIORES
Corral aislamiento

M2

286.49

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

7.48
2.48
21.47
4.00
9.59
2.55
25.11
8.10
4.80
2.93
8.10
4.80
12.15
4.50
3.48
2.60
6.75
2.40
90.18
6.63
25.50
21.00
9.90

6.31
6.31
2.90
2.90
4.65
4.65
10.00
4.65
4.65
10.00
8.91
8.91
4.20
4.90
8.91
8.91

1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40

8.83
8.83
4.06
4.06
6.51
6.51
14.00
6.51
6.51
14.00
12.47
12.47
5.88
6.86
12.47
12.47

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

142.46
8.83
8.83
4.06
4.06
6.51
6.51
14.00
6.51
6.51
14.00
12.47
12.47
5.88
6.86
12.47
12.47

VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS

77.31

CIELORRASOS
CIELORRASOS CON YESO Y ENCHACLADO DE CARRIZO

M2

198.05

CIELO RASO CON ENCHACLADO DE CARRIZO


Guardiania
Medico Veter
Dep Herramientas
Necropsia
Tratam Visceras
Tratam Cabeza
Administ
Laboratorio
SSHH Servicio

M2
M2
M2
M2
M2
M2
M2
M2
M2

29.80
14.10
24.17
16.47
29.44
29.50
11.61
12.97
30.00

PISOS Y PAVIMENTOS
CONTRAPISOS
CONTRAPISO DE 48 MM.

M2

46.37

CONTRAPISOS
SSHH Servicio
Necropsia
Tratam Visceras
Tratam Cabesa

M2
M2
M2
M2

30.00
3.88
6.22
6.28

PISOS DE PIEDRA EMBOQUILLADA

M2

1062.50

PISOS DE PIEDRA
Corral Aislamiento
Corral Vacunos
Corral Espera
Crematorio

M2
M2
M2
M2

23.09
201.54
108.81
49.50

Deposito de herramientas
Sala de Medico veterinario
Laboratorio
Sala de beneficio
Servicios higienicos

TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA 1:4


Sala deNecropsia

Tratamiento de Visceras

Tratamiento de Cabeza y patas

Sala de Beneficio

08.01.02

TOTAL

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
4
1
1

Tratamiento de cabezas

08.00.00
08.01.00
08.01.01

UND

7.48
2.48
21.47
4.00
9.59
2.55
25.11
8.10
4.80
2.93
8.10
4.80
12.15
4.50
3.48
2.60
6.75
2.40
90.18
3.32
6.38
21.00
9.90

Insinerador
Sala de visceras

07.00.00
07.01.00

CANTIDAD
ELEMENTOS

2.70
1.70
2.70
1.00
2.70
1.70
2.70
2.70
1.20
1.30
2.70
1.20
2.70
1.20
1.20
1.30
2.70
1.20
2.70
1.70
1.70
3.00
3.00

Deposito de Mantenimento

06.04.00

SUB
TOTAL

2.77
1.46
7.95
4.00
3.55
1.50
9.30
3.00
4.00
2.25
3.00
4.00
4.50
3.75
2.90
2.00
2.50
2.00
33.40
1.95
3.75
7.00
3.30

Necropcia

06.03.00

SET-2005

16de25

HOJA DE METRADOS
OBRA:

CODIGO

08.01.03

ARQUITECTURA
CAMAL DE ANTA

DESCRIPCION Y UBICACION
Tendal Estiercol

FECHA:
POR:
ING.
DIMENSIONES
LONG/CANT
ANCHO
ALTURA

SET-2005

SUB
TOTAL

CANTIDAD
ELEMENTOS

UND

TOTAL

M2

679.56

PISOS DE PIEDRA CHANCADA ACOMODADA

M2

560.00

PISOS DE PIEDRA CHANCADA


Zona de Ingreso

M2

560.00

17de25

HOJA DE METRADOS
OBRA:

CODIGO
08.02.00
08.02.01

08.03.00
08.03.01

09.00.00
09.01.00
09.01.01

ARQUITECTURA
CAMAL DE ANTA

DESCRIPCION Y UBICACION
PISO DE LOSETA CERAMICA
PISO DE LOSETA CERAMICA DE 20X20 CM.

SET-2005

SUB
TOTAL

CANTIDAD
ELEMENTOS

UND

TOTAL

M2

46.37

PISO DE LOSETA CERAMICA


SSHH Servicio
Necropsia
Tratam Visceras
Tratam Cabesa

M2
M2
M2
M2

30.00
3.88
6.22
6.28

PISOS DE CEMENTO
PISOS DE CEMENTO PULIDO CON ADITIVO IMPERMEABILIZANTE

M2

445.05

PISOS DE CEMENTO PULIDO


Guardiania
Medico Veter
Oreado Carcaza
sala Beneficio/corredores
Dep Herramientas
Necropsia
Tratam Visceras
Tratam Cabeza
Despacho Carcaza
Administ
Laboratorio

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

29.80
14.10
105.63
132.85
24.17
12.59
23.22
23.22
54.89
11.61
12.97

CONTRAZOCALO
CONTRAZOCALO DE MAYOLICA
CONTRAZOCALO DE MAYOLICA BLANCA DE 20 X 20 cm DE 1RA

M2

142.46

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

8.83
8.83
4.06
4.06
6.51
6.51
14.00
6.51
6.51
14.00
12.47
12.47
5.88
6.86
12.47
12.47

M2

66.72

M2
M2

57.20
9.52

CONTRAZOCALOS DE MAYOLICA
Sala deNecropsia

Tratamiento de Visceras

Tratamiento de Cabeza y patas

Sala de Beneficio

10.00.00
10.01.00
10.01.01

FECHA:
POR:
ING.
DIMENSIONES
LONG/CANT
ANCHO
ALTURA

6.31
6.31
2.90
2.90
4.65
4.65
10.00
4.65
4.65
10.00
8.91
8.91
4.20
4.90
8.91
8.91

1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40
1.40

8.83
8.83
4.06
4.06
6.51
6.51
14.00
6.51
6.51
14.00
12.47
12.47
5.88
6.86
12.47
12.47

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

CARPINTERIA DE MADERA
PUERTAS
PUERTA CONTRAPLACADA DE 45 MM TRIPLAY
PUERTAS CONTRAPLACADAS
TIPO P1
TIPO P2

1.00
0.70

2.20
1.70

2.20
1.19

13
4

18de25

HOJA DE METRADOS
OBRA:

CODIGO
10.02.00
10.02.01

ARQUITECTURA
CAMAL DE ANTA

DESCRIPCION Y UBICACION
TECHOS
TIJERALES DE MADERA
Guardiania
Sala de beneficio

12.02.00
12.02.01
13.00.00
13.01.00

TOTAL

684.90

M2
M2
M2
M2
M2
M2
M2
M2

59.28
51.96
190.21
151.09
96.94
82.80
43.52
9.10

CERCO ROLLIZO 8"

39.35

CARPINTERIA METALICA
PUERTAS METALICAS
PUERTA METAL LAC 1/16" C/MARCO 2"X2"X1/4" Y REFUERZOS

M2

48.00

M2
M2

30.00
18.00

CERRAJERIA
CERRAJERIA
CERRADURA PTA.INTR.PESTILLO MANIJA LLAVE GOAL 53 NPS DORMIT.
COLOCACION DE CERRADURAS ESPECIALES EN MADERA

PZA
PZA

29.00
5.00

BISAGRAS Y PORTEUELAS
BISAGRA ALUMINIZADA CAPUCHINA DE 3" X 3"

PZA

68.00

P2

336.76

M2
M2
M2
M2
M2
M2
M2
M2

4.80
1.50
8.25
6.38
4.02
1.18
2.25
2.92

M2

27.12

M2
M2

23.68
3.44

7.80
11.42
6.05
6.70
13.10
20.70
6.40
9.10

3.80
4.55
15.72
22.55
3.70
4.00
3.40
1.00

29.64
51.961
95.106
151.085
48.47
82.8
21.76
9.1

2
1
2
1
2
1
2
1

7.80
11.42
6.05
6.70
13.10
20.70
6.40
9.10

5.00
2.00

3.80
4.55
15.72
22.55
3.70
4.00
3.40
1.00

29.64
51.961
95.106
151.085
48.47
82.8
21.76
9.1

3.00
1.50

15
3

2
1
2
1
2
1
2
1

2
6

VIDRIOS, CRISTALES Y SIMILARES


VIDRIOS TRIPLES NACIONALES
VIDRIOS
V1
V2
V6
V7
V8
V9
V10
V11

13.02.00

UND

M2

PUERTAS METALICAS
PUERTA TIPO 1
PUERTA TIPO2
12.00.00
12.01.00
12.01.01
12.01.02

CANTIDAD
ELEMENTOS

COBERTURA DE CALAMINA GALVANIZADA

Necropcio y salas aledaas

11.00.00
11.01.00
11.01.01

SUB
TOTAL

684.90
59.28
51.96
190.21
151.09
96.94
82.80
43.52
9.10

COBERTURA DE CALAMINA
Guardiania
Sala de beneficio

10.02.03

SET-2005

M2
M2
M2
M2
M2
M2
M2
M2
M2

Necropcio y salas aledaas

10.02.02

FECHA:
POR:
ING.
DIMENSIONES
LONG/CANT
ANCHO
ALTURA

2.00
1.50
3.75
2.90
3.65
1.96
3.75
2.65

1.20
0.50
1.10
1.10
1.10
0.60
0.60
1.10

2.4
0.75
4.125
3.19
4.015
1.176
2.25
2.915

2
2
2
2
1
1
1
1

MALLA METALICA PROTECTORA CON ALAMBRE N.12 X COCADAS DE 1"


MALLA METALICA
V3
V4

3.70
2.15

1.60
1.60

5.92
3.44

4
1

19de25

HOJA DE METRADOS
OBRA:

CODIGO
14.00.00
14.01.00
14.01.01

ARQUITECTURA
CAMAL DE ANTA

DESCRIPCION Y UBICACION

CANTIDAD
ELEMENTOS

UND

TOTAL

286.49

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

7.48
2.48
21.47
4.00
9.59
2.55
25.11
8.10
4.80
2.93
8.10
4.80
12.15
4.50
3.48
2.60
6.75
2.40
90.18
6.63
25.50
21.00
9.90

M2

779.34

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2

27.14
2.48
35.10
4.00
24.03
2.55
47.12
34.70
4.50
2.60
34.02
4.50
3.00
52.92
4.38
26.60
3.48
2.47
30.65
3.24
119.34
3.30
23.10
22.20
183.06
25.50
3.32
25.11
24.96

PINTADO DE CARPINTERIA DE MADERA


PINTURA EN PUERTAS C/BARNIZ 2 MANOS

M2

66.72

LIMPIEZA FINAL
LIMPIEZA FINAL VIDRIOS/PISOS/JARDINES/ACCESOS Y OTROS

EST

1.00

Deposito de Mantenimento
Insinerador
Sala de visceras

Tratamiento de cabezas
Deposito de herramientas
Sala de Medico veterinario
Laboratorio
Sala de beneficio
Servicios higienicos

2.77
1.46
7.95
4.00
3.55
1.50
9.30
3.00
4.00
2.25
3.00
4.00
4.50
3.75
2.90
2.00
2.50
2.00
33.40
1.95
3.75
7.00
3.30

2.70
1.70
2.70
1.00
2.70
1.70
2.70
2.70
1.20
1.30
2.70
1.20
2.70
1.20
1.20
1.30
2.70
1.20
2.70
1.70
1.70
3.00
3.00

7.48
2.48
21.47
4.00
9.59
2.55
25.11
8.10
4.80
2.93
8.10
4.80
12.15
4.50
3.48
2.60
6.75
2.40
90.18
3.32
6.38
21.00
9.90

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
4
1
1

PINTURA EN INTERIORES
PINTURA EN INTERIORES AL TEMPLE 2 MANOS
PINTURA EN MUROS INTERIORES
Corral aislamiento
Necropcia
Deposito de Mantenimento
Insinerador
Sala de visceras

Tratamiento de cabezas

Deposito de herramientas
Sala de Medico veterinario

Laboratorio
Sala de beneficio

Servicios higienicos

Administracion

15.00.00
15.01.00

SUB
TOTAL

M2

Necropcia

14.03.00
14.03.02

SET-2005

PINTURA
PINTURA DE EXTERIORES
PINTURA EN EXTERIORES AL TEMPLE 2 MANOS
PINTURA EN MUROS EXTERIORES
Corral aislamiento

14.02.00
14.02.01

FECHA:
POR:
ING.
DIMENSIONES
LONG/CANT
ANCHO
ALTURA

10.05
1.46
13.00
4.00
8.90
1.50
17.45
12.85
3.75
2.00
12.60
3.75
2.00
19.60
3.65
9.85
2.90
1.90
11.35
2.70
44.20
1.10
7.70
7.40
33.90
3.75
1.95
9.30
2.60

2.70
1.70
2.70
1.00
2.70
1.70
2.70
2.70
1.20
1.30
2.70
1.20
1.50
2.70
1.20
2.70
1.20
1.30
2.70
1.20
2.70
3.00
3.00
3.00
2.70
1.70
1.70
2.70
1.20

27.14
2.48
35.10
4.00
24.03
2.55
47.12
34.70
4.50
2.60
34.02
4.50
3.00
52.92
4.38
26.60
3.48
2.47
30.65
3.24
119.34
3.30
23.10
22.20
91.53
6.38
3.32
25.11
3.12

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
4
1
1
8

20de25

HOJA DE METRADOS
INSTALACIONES SANITARIAS
OBRA:

FECHA:
POR:

CAMAL DE ANTA

SET-2005

ING.

DIMENSIONES
CODIGO
16.00.00

DESCRIPCION Y UBICACION

LONG/CANT

PZA

SUB
TOTAL

PTO

CANTIDAD

UND

TOTAL

ELEMENTOS

RED DE AGUA

16.01.00 ZANJAS Y EMPOTRAMIENTOS


16.01.01 EXCAVAC. ZANJA T.S.R. A PULSO TUB. 6" MENOR= 1.25 M
16.01.02 CAMA DE ASIENTO DE ARENA PARA TUB. HASTA 2"
16.01.03 RELLENO CON MATERIAL PROPIO COMPACTADO

M
M
M3

133.00
133.00
68.00

M
M
M
M
UND
UND
UND
UND
PTO
PTO
UND

59.00
6.00
68.00
10.62
7.00
4.00
1.00
2.00
68.00
65.00
4.00

M
M
M3

193.00
193.00
46.32

M
M
M
PZA
PTO

109.95
60.00
22.75
2.00
30.00

16.02.00 TUBERIAS Y ACCESORIOS


16.02.01 TUBERIA PVC SAP PRESION P/AGUA CLASE C-10 D=1/2"
16.02.02 TUBERIA PVC SAP PRESION P/AGUA CLASE C-10 D=3/4"
16.02.03 TUBERIA PVC SAP PRESION P/AGUA CLASE C-10 D=1"
16.02.04 TUBERIA CRIBADA DE 1/2"
16.02.05 VALVULAS DE COMPUERTA DE BRONCE DE 1/2"
16.02.06 VALVULAS DE COMPUERTA DE BRONCE DE 3/4"
16.02.07 VALVULAS DE COMPUERTA DE BRONCE DE 1"
16.02.08 GRIFOS DE RIEGO DE 1/2"
16.02.09 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1"
16.02.10 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"
16.02.11 GRIFOS DE 1/2" PARA LAVADEROS
17.00.00

RED DE DESAGE Y DISTRIBUCION

17.01.00 ZANJAS Y EMPOTRAMIENTOS


17.01.01 EXCAVAC. ZANJA T.S.R. A PULSO TUB. 6" MENOR= 1 M
17.01.02 CAMA DE ASIENTO DE ARENA PARA TUB. HASTA 2"
17.01.03 RELLENO C/MATERIAL PROPIO COMPACTADO
17.02.00 TUBERIAS Y ACCESORIOS
17.02.01 TUBERIA DE PVC SAL 6"
17.02.02 TUBERIA DE PVC SAL 4"
17.02.03 TUBERIA DE PVC SAL 2"
17.02.04 SOMBRERO VENTILACION PVC DE 2"
17.02.05 SALIDA DE DESAGUE EN PVC
17.03.00 CAJAS Y REGISTROS (1.30 X 1.30/0.80 X 0.80)
17.03.01 CONCRETO CICLOPEO FC=140KG/CM2 + 30 % PM.

CONCRETO EN CAJA DE REGISTRO


CAJA DE REGISTRO DE 1.3X1.3

CAJA DE REGISTRO DE 0.8X 0.8

1.40
0.80
1.30

0.20
0.15
0.20

0.39
0.62
0.34

2
2
2

M3
M3
M3

0.78
1.25
0.68

0.90
3.20
0.80

0.90
0.80
0.80

0.20
0.15
0.20

0.16
0.38
0.13

3
3
3

M3
M3
M3

0.49
1.15
0.38

M2

6.00

M2

6.00

KG

67.75

KG

67.75

M2

25.20

M2
M2

6.00
6.00

PZA
PZA

5.00
1.00

PZA
UND
UND
PZA
PZA
UND
PZA
PZA
PZA

2.00
6.00
4.00
2.00
2.00
2.00
2.00
2.00
2.00

PZA

2.00

1.00

1.00

1.00

17.03.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

ACERO CORRUGADO EN CAJAS DE REGISTRO


ACERO DE 3/8"
17.03.04 TARRAJEO PULIDO

TARRAJEO PULIDO

17.03.05 REGISTROS DE BRONCE DE 4"


17.03.06 CAJA DE REGISTRO DE DESAGUE 12" X 24"
18.00.00

4.73

1.40
5.20
1.30

17.03.02 ENCOFRADO Y DESENCOFRADO NORMAL

ENCOFRADO

M3

1.00
4.00

1.00
0.80

1.00
1.00

6
6

INSTALACION DE APARATOS Y ACCESORIOS SANITARIOS

18.01.00 APARATOS SANITARIOS C/A Y DE LOZA DE 1RA


18.01.01 INODORO TANQUE BAJO BLANCO
18.01.02 SUMIDERO DE BRONCE 4" PROVISION Y COLOCACION
18.01.03 SUMIDERO DE BRONCE 2", PROVISION Y COLOCACION
18.01.04 LAVATORIO DE PARED BLANCO 1 LLAVE
18.01.05 LAVADERO DE ACERO INOXIDABLE
18.01.06 DUCHA CROMADA 1 LLAVE INCL.ACCESORIOS
18.01.07 TOALLERA DE PLASTICO 24" DE COLOR
18.01.08 JABONERAS DE LOZA BLANCA SIMPLE DE 15 X 15
18.01.09 PAPELERA DE LOZA BLANCA DE 13 X 15
18.02.00 COLOCACION DE APARATOS SANITARIOS
18.02.01 COLOCACION DE APARATOS SANITARIOS

21de25

HOJA DE METRADOS
INSTALACIONES SANITARIAS
OBRA:

FECHA:
POR:

CAMAL DE ANTA

SET-2005

ING.

DIMENSIONES
CODIGO

DESCRIPCION Y UBICACION

18.02.02 COLOCACION DE ACCESORIOS SANITARIOS

LONG/CANT

PZA

PTO

SUB
TOTAL

CANTIDAD

UND

TOTAL

ELEMENTOS

PZA

5.00

22de25

HOJA DE METRADOS
INSTALACIONES SANITARIAS
OBRA:

FECHA:
POR:

CAMAL DE ANTA

SET-2005

ING.

DIMENSIONES
CODIGO

DESCRIPCION Y UBICACION

LONG/CANT

PZA

SUB
TOTAL

PTO

CANTIDAD

UND

TOTAL

ELEMENTOS

18.03.00 MESAS Y LAVADEROS


18.03.01 CONCRETO CICLOPEO FC=140KG/CM2 + 30 % PM.

CONCRETO EN MESAS
Mesas en zona de beneficio
Viceras
Patas ycabeza

0.80
0.80
0.80
0.80
0.80

5.61
2.85
4.85
2.85
4.85

0.60
0.80
0.60
0.60
0.60

2.69
1.82
2.33
1.37
2.33

1
1
1
1
1

18.03.02 ENCOFRADO Y DESENCOFRADO NORMAL

ENCOFRADO EN MESAS

0.80
0.80
0.80
0.80

2.80
3.42
4.35
3.85

2.24
2.74
3.48
3.08

1
1
4
3

18.03.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

ACERO CORRUGADO DE 3/8"


18.03.04 MUROS DE LADRILLO KK DE ARCILLA DE CABEZA CON MEZCLA 1:5 X 1.5 cm

MURO DE LADRILLO DE BASE 0.25M

0.88

0.80

0.70

30

18.03.05 TARRAJEO

M3

10.54

M3
M3
M3
M3
M3

2.69
1.82
2.33
1.37
2.33

M2

28.14

M2
M2
M2
M2

2.24
2.74
13.92
9.24

KG

284.08

KG

284.08

M2

21.12

M2

21.12

M2

50.66

TARRAJEO EN MESAS

Tarrajeo
Pozas
Mesas

Costado

18.03.06 CERAMICOS

4.00
0.80
0.80
0.80
1.50
0.12
0.12
0.12

0.60
3.42
4.35
3.85
0.72
3.42
4.35
3.85

0.80
0.80
0.80
0.80
0.80

5.61
2.85
4.85
2.85
4.85

0.60
0.80
0.60
0.60
0.60

2.40
2.74
3.48
3.08
1.08
0.41
0.52
0.46

6
1
4
3
6
1
4
3

M2
M2
M2
M2
M2
M2
M2
M2

14.40
2.74
13.92
9.24
6.48
0.41
2.09
1.39

2.69
1.82
2.33
1.37
2.33

1
1
1
1
1

M3
M3
M3
M3
M3
M2

2.69
1.82
2.33
1.37
2.33
12.93

M3

12.93

M3
M3
M3
M3
M3
M3

6.71
0.88
0.73
3.31
0.83
0.47

M2

41.40

M2

41.40

M2

80.16

M2
M2
M2
M2
M2

11.70
9.75
44.16
8.25
6.30

KG

500.28

KG

500.28

M2

113.70

18.04.00 TANQUE SEPTICO


18.04.01 TRAZO Y REPLANTEO
18.04.02 CONCRETO FC=175 KG/CM2

CONCRETO EN TANQUE SEPTICO


Fondo
Muros

Dique
Caja

18.04.03

8.60
3.90
3.90
8.00
3.30
2.10

3.90
1.50
1.25
1.38
1.25
1.50

0.20
0.15
0.15
0.15
0.20
0.15

6.71
0.88
0.73
1.66
0.83
0.47

1
1
1
2
1
1

TAPAS DE CONCRETO E=0.15


CONCRETO EN TAPAS

Tapas de concreto e=0.15

9.20

4.50

41.40

18.04.04 ENCOFRADO Y DESENCOFRADO NORMAL

ENCOFRADO DE TANQUE SEPTICO


Muros

Dique
Caja
18.04.05 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60

ACERO CORRUGADO 3/8" EN TANQUE SEPTICO


18.04.06 TARRAJEO PULIDO

3.90
3.90
8.00
3.30
2.10

1.50
1.25
1.38
1.25
1.50

5.85
4.88
11.04
4.13
3.15

2
2
4
2
2

23de25

HOJA DE METRADOS
INSTALACIONES SANITARIAS
OBRA:

FECHA:
POR:

CAMAL DE ANTA

SET-2005

ING.

DIMENSIONES
CODIGO

DESCRIPCION Y UBICACION
TARRAJEO PULIDO EN TANQUE SEPTICO

LONG/CANT

8.60
3.90
3.90
8.00
3.30
2.10

PZA

PTO

3.90
1.50
1.25
1.38
1.25
1.50

SUB
TOTAL

ELEMENTOS

33.54
5.85
4.88
11.04
4.13
3.15

1
2
2
4
2
2

CANTIDAD

UND

M2
M2
M2
M2
M2
M2

TOTAL

33.54
11.70
9.75
44.16
8.25
6.30

24de25

HOJA DE METRADOS
INSTALACIONES SANITARIAS
OBRA:

FECHA:
POR:

CAMAL DE ANTA

SET-2005

ING.

DIMENSIONES
CODIGO

DESCRIPCION Y UBICACION

LONG/CANT

PZA

SUB
TOTAL

PTO

CANTIDAD

UND

TOTAL

ELEMENTOS

18.05.00 SEPARADOR DE GRASAS


18.05.01 TRAZO Y REPLANTEO

M2

1.96

18.05.03 CONCRETO FC=175 KG/CM2

M3

0.57

M3
M3

0.39
0.18

M2

4.81

M2
M2

1.69
3.12

M2

2.40

M2

2.40

76.94

1
2
5
1
1

M
M
M
M
M

14.10
9.22
46.00
2.61
5.01

0.42
0.14
0.27
0.07
0.15

3
3
3
3
3

M3
M3
M3
M3
M3
M3

1.26
0.42
0.81
0.21
0.45
3.15

4.23
1.38
2.76
0.78
1.50

3
3
3
3
3

M2
M2
M2
M2
M2
M2

12.69
4.19
8.28
2.34
4.50
32.00

1
1
1
1
1

M
M
M
M
M
M

14.10
4.61
9.20
2.61
5.01
35.53

M3

9.23

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

0.63
1.06
0.41
0.69
2.07
3.45
0.12
0.20
0.23
0.38

M2

11.54

M2
M2
M2
M2
M2

2.12
1.38
6.90
0.39
0.75

19.04.00 CANALETA COLECTORA DE AGUAS PLUVIALES

150.73

19.05.00 TUBERIA DE PVC SAL 4"

18.00

CONCFRETO EN SEPARADOR DE GRASAS

1.40
1.10

1.40
1.10

0.20
0.15

0.39
0.18

1
1

18.05.04 TARRAJEO PULIDO

TARRAJEO PULIDO

1.30
5.20

1.30
0.60

1.69
3.12

1
1

18.05.05 MURO DE LADRILLO

MUROS DE LADRILLO 0.25 M


19.00.00

4.00

0.60

2.40

EVACUACION DE AGUAS PLUVIALES

19.01.00 REJILLA COLECTORA

Rejillas de 0.30 m de ancho

14.10
4.61
9.20
2.61
5.01

CONCRETO

14.10
4.61
9.20
2.61
5.01

0.30
0.30
0.30
0.30
0.30

ENCOFRADO

14.10
4.61
9.20
2.61
5.01

0.30
0.30
0.30
0.30
0.30

EXCAVACION DE SANJAS

14.10
4.61
9.20
2.61
5.01

0.10
0.10
0.10
0.10
0.10

ENCOFRADO Y DESENCOFRADO NORMAL

19.02.00 CONCRETO FC=140 KG/CM2

CONCRETO EN REJILLA COLECTORA

14.10
14.10
4.61
4.61
9.20
9.20
2.61
2.61
5.01
5.01

0.30
0.25
0.30
0.25
0.30
0.25
0.30
0.25
0.30
0.25

0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15
0.15

0.63
0.53
0.21
0.17
0.41
0.35
0.12
0.10
0.23
0.19

1
2
2
4
5
10
1
2
1
2

19.03.00 TARRAJEO PULIDO

Tarrajeo interior de canales

14.10
4.61
9.20
2.61
5.01

0.30
0.30
0.30
0.30
0.30

0.25
0.25
0.25
0.25
0.25

2.12
0.69
1.38
0.39
0.75

1
2
5
1
1

25de25

HOJA DE METRADOS
INSTALACIONES ELECTRICAS
OBRA:

FECHA:
POR:

CAMAL DE ANTA

SET-2005

ING.

DIMENSIONES
CODIGO

DESCRIPCION Y UBICACION

LONG/CANT

PZA

PTO

SUB
TOTAL

CANTIDAD

UND

TOTAL

ELEMENTOS

20.00.00
INSTALACIONES ELECTRICAS
20.01.00 SALIDAS
20.01.01 SALIDA PARA CENTROS DE LUZ
20.01.02 SALIDA PARA TOMACORRIENTE SIMPLE SIN/PTA A TIERRA
20.01.03 SALIDA PARA TOMACORRIENTE DOBLE C/PTA A TIERRA
20.01.04 INTERRUPTOR SIMPLE
20.01.05 INTERRUPTOR DOBLE
20.01.06 SALIDA PARA TELEFONO
20.0107

INTERRUPTOR DE CONMUTACION SIMPLE

PTO
PTO
PTO
PTO
PTO
PTO
PTO

47.00
23.00
8.00
9.00
8.00
2.00
16.00

UND
UND
UND
PZA

21.00
3.00
7.00
1.00

PZA
PZA
GLB
PTO
GLB
UND

1.00
1.00
1.00
1.00
1.00
12.00

20.02.00 ARTEFACTOS ELECTRICOS


20.02.01 ARTEFACTO FLUORESCENTE 1 x 40 W C/PANTALLA SIMPLE
20.02.02 ARTEFACTO FLUORESCENTE 2 x 40 W C/PANTALLA SIMPLE
20.02.03 ARTEFACTO FLUORESCENTE CIRCULAR 1 x 32 W
20.02.04 LAMPARA AHORRADORA DE 15W
20.03.00 TABLEROS Y PUESTA A TIERRA
20.03.01 TABLERO GENERAL TG
20.03.02 TABLERO DE DISTRIBUCION TD
20.03.03 ALIMENTADOR TABLEROS TG Y TD
20.03.04 POZO A TIERRA
20.03.05 CONDUCTOR DE PUESTA A TIERRA
20.03.06 CAJATOMA PARA MEDIDOR DE ENERGIA

Potrebbero piacerti anche