Measurements
B
D
5
6
Qty
7
1
1
x9
x1
1.30
22.98
1.30
0.45
1.50
0.10
22.82
1.03
1
1
1
x1
x1
x9
4.78
1.65
1.30
0.45
1.00
0.45
0.10
0.15
0.10
0.22
0.25
-0.53
23.79
Cum
Plain Cement Concrete (1:5:10) prop using 40mm size HBG (SS5) metal
including Cost and Conveyance of all materials and curing charges but
excluding unskilled wages etc., complete for finished item of work for
Foundations and Flooring Bed (APSS No. 402) (CSSR)
Column footings
Inbetween columns alround the
building
For Cross wall
For steps
Duduct column footing portion
For Flooring
Clinic
Delivery Room
Toilet
L
4
Nos
1
1
x9
x1
1.30
22.98
1.30
0.45
0.30
0.10
4.56
1.03
1
1
1
x1
x1
x9
4.78
1.65
0.23
0.45
1.00
0.23
0.10
0.15
0.10
0.22
0.25
-0.05
1
1
1
x1
x1
x1
5.00
3.70
3.05
2.75
3.05
1.20
0.10
0.10
0.10
1.38
1.13
0.37
8.89
Cum
0.20
3.04
RCC M20 Nominal mix corresponding to Table-9 of IS 456 using 20mm size
graded machine crushed hard Granite metal incl. C/c of all M/L charges but
excluding cost of steel and its fabrication charges, centering and Shittering etc.,
comp for finished item of work
a) Column footing flat portion
x9
1.30
Trapezoidal portion
x9
0.10 0.232+1.302 +
3
1.30
0.23 x 1.30
2
0.61
1
1
x9
x9
0.23
0.23
0.23
0.23
0.90
3.90
x9
0.23
0.23
0.30
1
1
x1
x1
22.98
5.00
0.23
0.23
0.30
0.30
Page 1
3.65
Cum
0.43
1.86
-0.14
2.15
Cum
1.59
0.35
1.94
Cum
d) For Lintels over Doors and Window
Over Door
Over Window
1
1
x1
x4
1.65
1.95
1
1
x4
x1
1.95
1.50
Page 2
0.23
0.23
0.60
0.60
0.15
0.15
0.06
0.27
0.33
Cum
4.68
0.90
5.58
Sqm
1
1
1
x2
x3
x5
6.03
5.00
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.64
0.79
0.06
1.49
x1
7.09
6.06
42.97
Sqm
0.40
0.40
6.10
5.50
11.60
Cum
Filling with gravel in trenches, sides of foundations and basement complete for
finished item of work. (APSS NO. 309 & 310)(CSSR)
inside Delevery room and Toilet
inside Clinic
1
1
x1
x1
5.00
5.00
3.05
2.75
Masonry in superstructure with CM (1:8) prop: using 2nd class traditional Bricks
of size 23x11x7 cms having minimum crushing strength of 50 kg/cm2 including
Cost and Conveyance of all materials, scaffolding charges, etc complete for
finished item of work. (APSS No. 501 & 504).
For Basement Brick on edge
For Cross wall
1
1
x2
x2
22.98
5.00
0.075
0.075
0.30
0.30
1.03
0.23
x1
22.98
0.35
0.30
2.41
x1
5.00
0.35
0.30
0.53
1
1
1
1
1
1
x1
x1
x1
x1
x1
x1
22.98
5.00
3.05
1.50
1.50
1.50
0.23
0.23
0.10
0.90
0.60
0.30
3.07
3.07
3.07
0.30
0.30
0.30
16.23
3.53
0.94
0.41
0.27
0.14
25.72
1
1
1
1
1
1
1
x9
x2
x1
x4
x6
x1
x4
0.23
1.20
0.75
1.50
0.90
1.65
1.95
0.23
0.23
0.10
0.23
0.23
0.23
0.23
3.37
2.10
2.10
1.35
0.30
0.15
0.15
-1.60
-1.16
-0.16
-1.86
-0.37
-0.06
-0.27
20.24
Cum
Providing impervious coat over RCC roof slab to required slopes with CM (1:3)
prop. 20mm thick (average) mixed with water proofing compound at 1Kg/bag of
cement, laid over roof slab when it is green, finished smooth with a floating coat
of neat cement and thread lining at regular intervals of 45cmx45cm including
Cost and Conveyance of all materials complete for finished item of work (APSS
No. 901 & 903).(CSSR)
x1
Page 3
7.09
6.06
42.97
Sqm
Supply and Fixing of 15-18mm thick Polished Shahabad stone slab (Tandur
Blue Variety 1st quality) in Single piece with the edges flat nosed and set over
already laid CC Bed/RCC roof slab and fixing in position with neat cement paste
including c/c of all materials,taxes on all materials,dressing of stones to the
required sizes, mixing of cement mortar, fixing in position, curing, lift charges
etc., complete for finished item of work (APSS No.701 & 707) (CSSR)
Delivery room
Clinic room
1x
1x
1
1
3.70
5.00
3.05
2.75
11.29
13.75
25.04
Sqm
1.50
2.00
-
12.75
-1.50
3.66
-0.14
14.77
Sqm
Flooring with ceramic non skid tiles of first quality of make as approved by
ingineer in charge 7.30 mmthick of size 300 x 300 mm set over a base coat of
CM (1:8)prop , 12 mm thick over CC bed already laid including neat cement
slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with
white cement paste to full depth mixed with pigment of matching shade,
including cost of all materials like cement, sand water and tiles etc.,
complete(excluding cost of cc bed), including seigniorage charges on all
materials cost of base coat and all labour charges for mixing ao cement mortor
laying tiles to required slope as directed by the Engineer in charge curing etc.,
complete for finished item of workAPSS No.701 & 707
etc, complete.
For Toilets alround
Deduct Door portion
For Toilet flooring
Deduct water closet portion
1x
1x
1x
1x
1
1
1
1
8.50
0.75
3.05
0.45
1.20
0.30
11 Supply and fixing of M.S grill of any design including C/C of all
materials etc complete
For ventilators
1x 6
each 15Kg
90.00
kg
12 Painting to new wood work with two coats of ready mixed synthetic enamel paint
first quality all shades over a base coat of wood primer making three coats in all
to give an even shade after thoroughly brushing the surface to remove all
remains of loose powdered materials, including c/c of all materials, site and
other taxes, all operationa, incidental and labour charges etc., complete for
finished item of work in all flooring for external walls. (APSS No.1201,1207
&1212). (CSSR)
complete.
For Doors
For Windows
For Ventilators
2x
4x
6x
2.25
2.75
2.00
1.20
1.50
0.90
13 Supply and fixing of Sal wood Door Double shutter fully pannlled door of size
1.20 x 2.10mt with frame made of well seasoned sal wood scantlings of size 100
x 75mm mm and shutter made of side rails 125mm X38, top rail 125mmX38mm,
bottom rail 125mmX38mm and intermediate rails of 125 x 38 mm and panels 8 nos 25mm thick with all fixtures complete as per specifications (APSS
NO.1001 & 1002)(CSSR)
Page 4
2.10
1.35
0.30
11.34
7.43
1.08
19.85
Sqm
1x
2.00
No
1.00
No
4.00
Nos
14 Supply and fixing of salwood Door single shutter fully pannlled door of size .75
x 2.0mt with frame of sal Wood scantlings of size 100 x 75mm and bottom
reeper of size 75x38mm and shutter of side rails 125mm X38, top rail
125mmX38mm, bottom rail 175mmX38mm and intermediate rails of 125 x 38
mm and panels - 4 nos 25mm thick with all fixtures complete including cost and
conveyance of all materials and labour charges etc. complete as per
specifications (APSS NO.1001 & 1002) (CSSR)
x 2.00 M with double leaf inclu ding cost and conveyance of all labour
charges fixtures for wrought and putup and fixing in position of frames
and shutters for Doors
1x
1
-
15 Supply and fixing of Window size 1.25 x 1.25 mt with sal wood frame of size
75x100mm along with II class teak wood three shutters made with styles& rails
of 100mmx30mm thick with 12mm prelaminated particle board both side
laminated interior grade and S/F of 4Nos. MS Hold fasts, 6Nos. MS tower bolts
100mm long. 6 Nos. MS Hinges 75mm long,2Nos MS Handles 3 Nos window
stays. incl. all labour charges and fiXing 11 Nos. 16mm plain safety bars in to
frame etc,(CSSR)
1x
Page 5
1x 1
1x 1
1x 1
1 x4
1 x1
3.05
3.05
2.75
1.95
25.10
3.70
1.20
5.00
0.60
0.30
11.29
3.66
13.75
4.68
7.53
40.91
Sqm
17 Plastering 12mm thick double coat in CM (1:6) 8mm thick base coat and top
coat CM(1:4) of 4mm thick with dubara sponge finish including c/c of all
materials like cement, sand,water etc., to site, other taxes on all materials, all
operational, incidental charges etc etc., complete for finished item of work.
(APSS 901,903 & 904) - Internal Walls
Inside
Delivery room alround
Toilet room alround
Clinic inside
Out side
Building alround
Sunshade edges
Roof slab edge alround
Deductions
Doors
Toilet Door
Windows
1x
1x
1x
1
1
1
13.50
8.50
15.50
3.30
1.80
3.30
44.55
15.30
51.15
1x 1
1x 4
1 x1
23.90
3.15
26.30
3.90
0.05
0.10
93.21
0.63
2.63
1.20
0.75
1.50
2.10
2.00
1.35
-5.04
-1.50
-8.10
192.83
Sqm
1x
1x
1x
2
1
4
18 Whiting to new walls and ceiling in two coats with Surya cem or equavalent
quality to give an even shade after throughly brushing the surface to remove all
loose powdered materials including c/c of all materials and water to site, &
other taxes, all operational, incidental and labour charges such as cleaning the
surface, painting, curing etc., complete for finished item of work. (APSS No.901
& 908) (CSSR)
As per Qty item No 16 + Inside quantity of item No.17
Deductions
Door
1x 1
Toilet Door
1x 1
As per out side qty item No 17
Deductions
Doors
1x 1
Windows
1x 4
151.91
1.20
0.75
2.10
2.00
-2.52
-1.50
96.47
1.20
1.50
2.10
1.35
-2.52
-8.10
233.74
1150.00
Kg
Providing high yield strength deformed (HYSD) steel TMT bars (Fe 415 grade as
per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending and binding
wire of 20SWG, forming grills for reinforcement work as per approved designs
and drawings including Cost and Conveyance of bars from approved sources to
site of work with all taxes complete for finished item of work (APSS No.126) in
all floors
23 Provision for VAT 5%
24 0.50% QC Charges
Page 6
Assistant Engineer
PR Mahabubabad
Page 7
1.42 Lakhs
Rate
per
Amount
10
91.00 Cum
2165.00
2924.04 Cum
25995.00
5657.12 Cum
20648.00
6684.33 Cum
14371.00
7169.12 Cum
13908.00
Page 8
6695.33 Cum
2209.00
556.52 sqm
3105.00
Page 9
6862.93 Cum
10226.00
702.99 sqm
3021.00
292.44 Cum
3392.00
3146.18 Cum
63679.00
249.87 Sqm
10737.00
Page 10
364.23 Sqm
9120.00
571.50 sqm
8441.00
65.00 Kg
5850.00
92.16 10Sqm
Page 11
183.00
8843.89 each
17688.00
6065.41 each
6065.00
2435.71 No.
9743.00
Page 12
100.82 Sqm
4125.00
198.95 Sqm
38364.00
203.88 10sqm
50890.00 MT
4765.00
58524.00
14000.00
1634.00
Page 13
Total Rs:
351958.00
Page 14
SPECIFICATION REPORT
Name of the work:- Construction of Addl Room to PHC Building at Jangiligonda of Maha
Grant : BRGF 50% M P Share
ESTIMATE COST:-
RCC M20 Nominal mix corresponding to Table-9 of IS 456 using 20mm size graded machine crushed hard
M/L charges but excluding cost of steel and its fabrication charges, centering and Shittering etc., comp for finis
f) Roof level beams L/W
g) Roof slab 110mm thick
Providing high yield strength deformed (HYSD) steel TMT bars (Fe 415 grade as per IS 1786-1985) of 8mm
bending and binding wire of 20SWG, forming grills for reinforcement work as per approved designs and d
Conveyance of bars from approved sources to site of work with all taxes complete for finished item of work (AP
0.50% QC Charges
With the above provision the estimate is worked out to Rs 0.70 Lakhs. This estimate is prepared
2011-12 and with AP revised standard datas.
An early technical sanction to this estimate is solicited
Assistant Engineer
PR Mahabubabad
SPECIFICATION REPORT
9 of IS 456 using 20mm size graded machine crushed hard Granite metal incl. C/c of all
brication charges, centering and Shittering etc., comp for finished item of work
steel TMT bars (Fe 415 grade as per IS 1786-1985) of 8mm to 40mm diameters, cutting,
grills for reinforcement work as per approved designs and drawings including Cost and
te of work with all taxes complete for finished item of work (APSS No.126) in all floors
mate is worked out to Rs 0.70 Lakhs. This estimate is prepared based on current SOR of
estimate is solicited
Name of the work:- Construction of Addl Room to PHC Building at Jangiligonda of Mahabubab
Grant : BRGF 50% M P Share
Nos
Measurements
Sl
Description of item
NO
L
B
D
2
3
4
5
6
1
1 RCC M20 Nominal mix corresponding to Table-9 of IS 456 using 20mm size
graded machine crushed hard Granite metal incl. C/c of all M/L charges but
excluding cost of steel and its fabrication charges, centering and Shittering etc.,
comp for finished item of work
Qty
7
1
1
1
x2
x3
x5
6.03
5.00
0.23
0.23
0.23
0.23
0.23
0.23
0.23
0.64
0.79
0.06
1.49
x1
7.09
6.06
42.97
Sqm
Providing high yield strength deformed (HYSD) steel TMT bars (Fe 415 grade as
per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending and binding
wire of 20SWG, forming grills for reinforcement work as per approved designs
and drawings including Cost and Conveyance of bars from approved sources to
site of work with all taxes complete for finished item of work (APSS No.126) in
all floors
-
0.50% QC Charges
Assistant Engineer
PR Mahabubabad
430.00
Kg
ESTIMATE
0.70 Lakhs
Rate
per
Amount
10
6862.93 Cum
10226.00
702.99 sqm
30207.00
50890.00 MT
21883.00
62316.00
3116.00
312.00
29.00
Total Rs:
65773.00
Qty
Rate
1
1
x9
x1
1.30
22.98
1.30
0.45
1.50
0.10
22.82
1.03
1
1
x1
x9
4.78
1.30
0.45
0.45
0.10
0.10
0.22
-0.53
23.54
Cum
Plain Cement Concrete (1:5:10) prop using 40mm size HBG (SS5) metal
including Cost and Conveyance of all materials and curing charges but
excluding unskilled wages etc., complete for finished item of work for
Foundations and Flooring Bed (APSS No. 402) (CSSR)
Column footings
Inbetween columns alround the
building
For Cross wall
Duduct column footing portion
For Flooring
Clinic
Delivery Room
Toilet
1
1
x9
x1
1.30
22.98
1.30
0.45
0.30
0.10
4.56
1.03
1
1
x1
x9
4.78
0.23
0.45
0.23
0.10
0.10
0.22
-0.05
1
1
1
x1
x1
x1
5.00
3.70
3.05
2.75
3.05
1.20
0.10
0.10
0.10
5.76
Cum
91.00
2924.04
RCC M20 Nominal mix corresponding to Table-9 of IS 456 using 20mm size
graded machine crushed hard Granite metal incl. C/c of all M/L charges but
excluding cost of steel and its fabrication charges, centering and Shittering etc.,
comp for finished item of work
a) Column footing flat portion
x9
1.30
Trapezoidal portion
x9
0.10 0.232+1.302 +
3
1.30
0.20
0.61
0.232 x 1.302
1
1
x9
x9
0.23
0.23
0.23
0.23
0.90
3.90
x9
0.23
0.23
0.30
1
1
x1
x1
x2
Page 19
22.98
5.00
6.03
3.04
0.23
0.23
0.23
0.30
0.30
0.23
3.65
Cum
0.43
1.86
-0.14
2.15
Cum
1.59
0.35
1.94
Cum
0.64
5657.12
6684.33
7169.12
.do . S/W
Deduct column portion
x3
x5
5.00
0.23
x1
7.09
0.23
0.23
0.23
0.23
6.06
0.79
0.06
1.49
42.97
Sqm
0.40
0.40
6.10
5.50
11.60
Cum
6862.93
702.99
Filling with gravel in trenches, sides of foundations and basement complete for
finished item of work. (APSS NO. 309 & 310)(CSSR)
inside Delevery room and Toilet
inside Clinic
1
1
1
1
x1
x1
5.00
5.00
3.05
2.75
292.44
Providing high yield strength deformed (HYSD) steel TMT bars (Fe 415 grade as
per IS 1786-1985) of 8mm to 40mm diameters, cutting, bending and binding
wire of 20SWG, forming grills for reinforcement work as per approved designs
and drawings including Cost and Conveyance of bars from approved sources to
site of work with all taxes complete for finished item of work (APSS No.126) in
all floors
-
0.50% QC Charges
1000.00
Kg
50890.00
Total Rs:
Assistant Engineer
PR Mahabubabad
Page 20
ABSTRACT ESTIMATE
Building at Anatharam of Mahabubabad (M)
1.42 Lakhs
per
Amount
10
Cum
2142.00
Cum
16842.00
Cum
20648.00
Cum
14371.00
Cum
13908.00
Page 21
Cum
10226.00
sqm
3021.00
Cum
3392.00
MT
50890.00
135440.00
6772.00
677.00
160.00
143049.00
Page 22
3.30M
3.05M
2.75M
Flooring with Polished stone 25MM th.
0.60M
Sand
filling
0.90m
0.10
0.20
0.30
0
1.30M
0.10M
1.50M
0.30
1.30M
1.30M
SECTION A - A'
M 2.98
TOILET
X 1.20 3.05
C/C
M 2.615
C/C
D1
M 5.23
C/C
DELiVERY ROOM
X 3.70 3.05
M 5.46
CLINIC
X 5.00 2.75
A
W
D
W
M 2.615
C/C
M C/C 6.26
D : 1.20 x 2.10
W : 1.50 x 1.35
PLAN
Assistant Engineer
PR Mahabubabad
V : 0.90 x 0.30
T- Beam 0.23 x 0.45
0
0
f Mahabubabad (M)
'A
20 x 2.10
50 x 1.35
90 x 0.30
am 0.23 x 0.45
CALCULATION OF STEEL
S.No
1
1
No
3
L
4
Column footings
10 mm dia bars
2x
Columns
12 mm dia main bars
8 mm dia stirrups
12 mm dia over laps
9x
9x
9x
4
38
4
6.30
0.82
0.48
3x
3x
3x
4
2
43
6.41
6.81
0.96
2x
2x
2x
5x
4
2
43
6
6.04
6.44
0.96
0.48
1x
1x
1x
1x
4
2
43
2
2.81
3.01
0.96
0.48
2x
2x
2x
2x
2
1
2
7
1.46
1.10
1.46
0.66
4x
4x
4x
4x
2
1
2
7
1.46
1.66
1.46
0.66
Plinth beam
Long walls
12 mm dia main bars St.
12 mm dia main bars Crank
8 mm dia stirrups
Short walls
12 mm dia main bars St.
12 mm dia main bars Crank
8 mm dia stirrups
12 mm dia over laps
Cross wall between varandah
and store room
12 mm dia main bars St.
12 mm dia main bars Crank
8 mm dia stirrups
12 mm dia over laps
Lintel over Door
10 mm dia main bars
10 mm dia main bars Crank
8 mm dia hanging bars
8mm dia stirrups
Lintel over Window
12 mm dia main bars
12 mm dia main bars Crank
10 mm dia hanging bars
8mm dia stirrups
9x
1.00
Varandah Beam
Long wall
12 mm dia main bars St.
12 mm dia main bars Crank
8 mm dia stirrups
Short walls
12 mm dia main bars St.
12 mm dia main bars Crank
8 mm dia stirrups
Sunshade
over windows
8mm dia main bars
6mm dia dist.
Over Varandah
Long wall
8mm dia main bars
6mm dia dist.
Short walls
8mm dia main bars
6mm dia dist.
Roof level Beam
Long walls
12mm main bars
12mm crank bars
8mm dia stirrups
Short walls
12mm main bars
12mm crank bars
8mm dia stirrups
Short walls
12mm main bars
12mm crank bars
8mm dia stirrups
Short walls
12mm main bars
12mm crank bars
8mm dia stirrups
Fornt Long walls
12mm main bars
12mm crank bars
1x
1x
1x
4
2
15
2.29
2.43
0.82
1x
1x
1x
4
2
18
2.81
2.95
0.82
4x
4x
12
5
0.83
1.45
1x
1x
31
5
0.83
3.89
1x
1x
27
5
0.83
3.41
2x
2x
2x
4
2
36
6.45
6.85
0.96
1x
1x
1x
4
2
19
3.50
3.70
0.96
1x
1x
1x
4
2
16
2.65
3.85
0.96
1x
1x
1x
4
3
19
3.35
3.55
0.96
1x
1x
4
2
6.10
6.50
1x
36
0.96
1x
1x
1x
5
3
19
3.50
3.85
0.96
1x
1x
1x
1x
1x
1x
42
36
2x
2x
10
9
7.03
6.65
1.20
1.20
1.40
1.20
10
10
ram MP Julurupad
Qty
7
6mm
8mm
162.00
226.80
280.44
17.28
76.92
40.86
123.84
48.32
25.76
82.56
14.40
11.24
6.02
41.28
0.96
5.84
2.20
5.84
9.24
11.68
6.64
11.68
18.48
10mm
12mm
162.00
226.80
280.44
17.28
76.92
40.86
123.84
48.32
25.76
82.56
14.40
11.24
6.02
41.28
0.96
5.84
2.20
5.84
9.24
11.68
6.64
11.68
18.48
16mm
9.16
4.86
12.30
9.16
4.86
12.30
11.24
5.90
14.76
11.24
5.90
14.76
39.84
29.00
29.00
25.73
19.45
19.45
22.41
17.05
51.60
27.40
69.12
14.00
7.40
18.24
10.60
7.70
15.36
13.40
10.65
18.24
24.40
13.00
39.84
25.73
22.41
17.05
51.60
27.40
69.12
14.00
7.40
18.24
10.60
7.70
15.36
13.40
10.65
18.24
24.40
13.00
34.56
34.56
17.50
11.55
18.24
17.50
11.55
18.24
295.26
239.40
24.00
24.00
14.00
10.80
295.26
239.40
24.00
24.00
14.00
10.80
65.5
Total qty =
1457.94
181.72
727.24
x0.22
x 0.39
x 0.62
x 0.89
14.41
568.6
112.67
647.24
1342.92 Kg
SVPCPL
A
PMGSY
C
LEAD CHARGES
Earth/Gravel/San
d
RCC NP3 P
Metal
Bricks
600
loading
34.30
68.30
134.10
unloading
stacking
0
0
10.90
0.00
0.00
0.00
10.90
0.00
0.00
0.00
21.50
19.10
31.75
60.90
2
3
4
5
6
30.20
40.20
48.80
57.40
66.00
26.70
40.20
48.80
57.40
66.00
44.46
59.28
71.98
84.68
97.38
60.90
60.90
60.90
60.90
63.70
74.60
74.60
110.08
66.50
8
9
83.20
91.80
83.20
91.80
122.78
135.48
69.30
72.10
10
100.40
100.40
148.18
74.90
11
109.00
109.00
160.88
77.70
12
117.60
117.60
173.58
80.50
13
126.20
126.20
186.28
83.30
14
134.80
134.80
198.98
86.10
15
143.40
143.40
211.68
88.90
16
152.00
152.00
224.38
91.70
17
160.60
160.60
237.08
94.50
18
169.20
169.20
249.78
97.30
19
177.80
177.80
262.48
100.10
Warangal Dist
SVPCPL
PMGSY
20
186.40
186.40
275.18
102.90
21
195.00
195.00
287.88
105.70
22
203.60
203.60
300.58
108.50
23
212.20
212.20
313.28
111.30
24
25
26
27
220.80
229.40
238.00
246.60
220.80
229.40
238.00
246.60
325.98
338.68
351.38
364.08
114.10
116.90
119.70
122.50
28
255.20
255.20
376.78
125.30
29
30
31
32
263.80
272.40
279.60
286.80
263.80
272.40
279.60
286.80
389.48
402.18
412.76
423.34
128.10
130.90
133.70
136.50
33
294.00
294.00
433.92
139.30
34
301.20
301.20
444.50
142.10
35
308.40
308.40
455.08
144.90
36
315.60
315.60
465.66
147.70
37
322.80
322.80
476.24
150.50
38
330.00
330.00
486.82
153.30
39
337.20
337.20
497.40
156.10
40
344.40
344.40
507.98
158.90
41
351.60
351.60
518.56
161.70
Warangal Dist
SVPCPL
PMGSY
42
358.80
358.80
529.14
164.50
43
44
45
366.00
373.20
380.40
366.00
373.20
380.40
539.72
550.30
560.88
167.30
170.10
172.90
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
387.60
394.80
402.00
409.20
416.40
423.60
430.80
438.00
445.20
452.40
459.60
466.80
474.00
481.20
488.40
495.60
502.80
510.00
517.20
524.40
531.60
538.80
546.00
553.20
560.40
567.60
574.80
582.00
589.20
596.40
603.60
610.80
618.00
625.20
632.40
387.60
394.80
402.00
409.20
416.40
423.60
430.80
438.00
445.20
452.40
459.60
466.80
474.00
481.20
488.40
495.60
502.80
510.00
517.20
524.40
531.60
538.80
546.00
553.20
560.40
567.60
574.80
582.00
589.20
596.40
603.60
610.80
618.00
625.20
632.40
571.46
582.04
592.62
603.20
613.78
624.36
634.94
645.52
656.10
666.68
677.26
687.84
698.42
709.00
719.58
730.16
740.74
751.32
761.90
772.48
783.06
793.64
804.22
814.80
825.38
835.96
846.54
857.12
867.70
878.28
888.86
899.44
910.02
920.60
931.18
175.70
178.50
181.30
184.10
186.90
189.70
192.50
195.30
198.10
200.90
203.70
206.50
209.30
212.10
214.90
217.70
220.50
223.30
226.10
228.90
231.70
234.50
237.30
240.10
242.90
245.70
248.50
251.30
254.10
256.90
259.70
262.50
265.30
268.10
270.90
Warangal Dist
SVPCPL
81
82
83
84
85
86
87
88
89
PMGSY
639.60
646.80
654.00
661.20
668.40
675.60
682.80
690.00
697.20
639.60
646.80
654.00
661.20
668.40
675.60
682.80
690.00
697.20
941.76
952.34
962.92
973.50
984.08
994.66
1005.24
1015.82
1026.40
273.70
276.50
279.30
282.10
284.90
287.70
290.50
293.30
296.10
Warangal Dist
SVPCPL
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
PMGSY
704.40
711.60
718.80
726.00
733.20
740.40
747.60
754.80
762.00
769.20
776.40
783.60
790.80
798.00
805.20
812.40
819.60
826.80
834.00
841.20
848.40
855.60
862.80
870.00
877.20
884.40
891.60
898.80
906.00
913.20
920.40
927.60
934.80
942.00
949.20
956.40
963.60
970.80
978.00
985.20
992.40
999.60
1006.80
1014.00
1021.20
1028.40
1035.60
1042.80
1050.00
704.40
711.60
718.80
726.00
733.20
740.40
747.60
754.80
762.00
769.20
776.40
783.60
790.80
798.00
805.20
812.40
819.60
826.80
834.00
841.20
848.40
855.60
862.80
870.00
877.20
884.40
891.60
898.80
906.00
913.20
920.40
927.60
934.80
942.00
949.20
956.40
963.60
970.80
978.00
985.20
992.40
999.60
1006.80
1014.00
1021.20
1028.40
1035.60
1042.80
1050.00
1036.98
1047.56
1058.14
1068.72
1079.30
1089.88
1100.46
1111.04
1121.62
1132.20
1142.78
1153.36
1163.94
1174.52
1185.10
1195.68
1206.26
1216.84
1227.42
1238.00
1248.58
1259.16
1269.74
1280.32
1290.90
1301.48
1312.06
1322.64
1333.22
1343.80
1354.38
1364.96
1375.54
1386.12
1396.70
1407.28
1417.86
1428.44
1439.02
1449.60
1460.18
1470.76
1481.34
1491.92
1502.50
1513.08
1523.66
1534.24
1544.82
298.90
301.70
304.50
307.30
310.10
312.90
315.70
318.50
321.30
324.10
326.90
329.70
332.50
335.30
338.10
340.90
343.70
346.50
349.30
352.10
354.90
357.70
360.50
363.30
366.10
368.90
371.70
374.50
377.30
380.10
382.90
385.70
388.50
391.30
394.10
396.90
399.70
402.50
405.30
408.10
410.90
413.70
416.50
419.30
422.10
424.90
427.70
430.50
433.30
Warangal Dist
SVPCPL
139
140
141
142
143
144
145
146
147
148
149
150
PMGSY
1057.20
1064.40
1071.60
1078.80
1086.00
1093.20
1100.40
1107.60
1114.80
1122.00
1129.20
1136.40
1057.20
1064.40
1071.60
1078.80
1086.00
1093.20
1100.40
1107.60
1114.80
1122.00
1129.20
1136.40
1555.40
1565.98
1576.56
1587.14
1597.72
1608.30
1618.88
1629.46
1640.04
1650.62
1661.20
1671.78
436.10
438.90
441.70
444.50
447.30
450.10
452.90
455.70
458.50
461.30
464.10
466.90
Warangal Dist
SVPCPL
800
900
1000
1200
PMGSY
2370.00
466.00
0.00
0.00
3129.00
594.00
0.00
0.00
3920.00
693.00
0.00
0.00
4885.00
866.00
0.00
0.00
6762.00
1371.00
0.00
0.00
67.70
81.20
106.60
128.70
155.70
67.70
67.70
67.70
67.70
71.00
81.20
81.20
81.20
81.20
84.50
106.60
106.60
106.60
106.60
112.80
128.70
128.70
128.70
128.70
134.90
155.70
155.70
155.70
155.70
162.40
74.30
87.80
119.00
141.10
169.10
77.60
80.90
91.10
94.40
125.20
131.40
147.30
153.50
175.80
182.50
84.20
97.70
137.60
159.70
189.20
87.50
101.00
143.80
165.90
195.90
90.80
104.30
150.00
172.10
202.60
94.10
107.60
156.20
178.30
209.30
97.40
110.90
162.40
184.50
216.00
100.70
114.20
168.60
190.70
222.70
104.00
117.50
174.80
196.90
229.40
107.30
120.80
181.00
203.10
236.10
110.60
124.10
187.20
209.30
242.80
113.90
127.40
193.40
215.50
249.50
Warangal Dist
SVPCPL
PMGSY
117.20
130.70
199.60
221.70
256.20
120.50
134.00
205.80
227.90
262.90
123.80
137.30
212.00
234.10
269.60
127.10
140.60
218.20
240.30
276.30
130.40
133.70
137.00
140.30
143.90
147.20
150.50
153.80
224.40
230.60
236.80
243.00
246.50
252.70
258.90
265.10
283.00
289.70
296.40
303.10
143.60
157.10
249.20
271.30
309.80
146.90
150.20
153.50
156.80
160.40
163.70
167.00
170.30
255.40
261.60
267.80
274.00
277.50
283.70
289.90
296.10
316.50
323.20
329.90
336.60
160.10
173.60
280.20
302.30
343.30
163.40
176.90
286.40
308.50
350.00
166.70
180.20
292.60
314.70
356.70
170.00
183.50
298.80
320.90
363.40
173.30
186.80
305.00
327.10
370.10
176.60
190.10
311.20
333.30
376.80
179.90
193.40
317.40
339.50
383.50
183.20
196.70
323.60
345.70
390.20
186.50
200.00
329.80
351.90
396.90
Warangal Dist
SVPCPL
PMGSY
189.80
203.30
336.00
358.10
403.60
193.10
196.40
199.70
206.60
209.90
213.20
342.20
348.40
354.60
364.30
370.50
376.70
410.30
417.00
423.70
203.00
206.30
209.60
212.90
216.20
219.50
222.80
226.10
229.40
232.70
236.00
239.30
242.60
245.90
249.20
252.50
255.80
259.10
262.40
265.70
269.00
272.30
275.60
278.90
282.20
285.50
288.80
292.10
295.40
298.70
302.00
305.30
308.60
311.90
315.20
216.50
219.80
223.10
226.40
229.70
233.00
236.30
239.60
242.90
246.20
249.50
252.80
256.10
259.40
262.70
266.00
269.30
272.60
275.90
279.20
282.50
285.80
289.10
292.40
295.70
299.00
302.30
305.60
308.90
312.20
315.50
318.80
322.10
325.40
328.70
360.80
367.00
373.20
379.40
385.60
391.80
398.00
404.20
410.40
416.60
422.80
429.00
435.20
441.40
447.60
453.80
460.00
466.20
472.40
478.60
484.80
491.00
497.20
503.40
509.60
515.80
522.00
528.20
534.40
540.60
546.80
553.00
559.20
565.40
571.60
382.90
389.10
395.30
401.50
407.70
413.90
420.10
426.30
432.50
438.70
444.90
451.10
457.30
463.50
469.70
475.90
482.10
488.30
494.50
500.70
506.90
513.10
519.30
525.50
531.70
537.90
544.10
550.30
556.50
562.70
568.90
575.10
581.30
587.50
593.70
430.40
437.10
443.80
450.50
457.20
463.90
470.60
477.30
484.00
490.70
497.40
504.10
510.80
517.50
524.20
530.90
537.60
544.30
551.00
557.70
564.40
571.10
577.80
584.50
591.20
597.90
604.60
611.30
618.00
624.70
631.40
638.10
644.80
651.50
658.20
Warangal Dist
SVPCPL
318.50
321.80
325.10
328.40
331.70
335.00
338.30
341.60
344.90
PMGSY
332.00
335.30
338.60
341.90
345.20
348.50
351.80
355.10
358.40
577.80
584.00
590.20
596.40
602.60
608.80
615.00
621.20
627.40
599.90
606.10
612.30
618.50
624.70
630.90
637.10
643.30
649.50
664.90
671.60
678.30
685.00
691.70
698.40
705.10
711.80
718.50
Warangal Dist
SVPCPL
348.20
351.50
354.80
358.10
361.40
364.70
368.00
371.30
374.60
377.90
381.20
384.50
387.80
391.10
394.40
397.70
401.00
404.30
407.60
410.90
414.20
417.50
420.80
424.10
427.40
430.70
434.00
437.30
440.60
443.90
447.20
450.50
453.80
457.10
460.40
463.70
467.00
470.30
473.60
476.90
480.20
483.50
486.80
490.10
493.40
496.70
500.00
503.30
506.60
PMGSY
361.70
365.00
368.30
371.60
374.90
378.20
381.50
384.80
388.10
391.40
394.70
398.00
401.30
404.60
407.90
411.20
414.50
417.80
421.10
424.40
427.70
431.00
434.30
437.60
440.90
444.20
447.50
450.80
454.10
457.40
460.70
464.00
467.30
470.60
473.90
477.20
480.50
483.80
487.10
490.40
493.70
497.00
500.30
503.60
506.90
510.20
513.50
516.80
520.10
633.60
639.80
646.00
652.20
658.40
664.60
670.80
677.00
683.20
689.40
695.60
701.80
708.00
714.20
720.40
726.60
732.80
739.00
745.20
751.40
757.60
763.80
770.00
776.20
782.40
788.60
794.80
801.00
807.20
813.40
819.60
825.80
832.00
838.20
844.40
850.60
856.80
863.00
869.20
875.40
881.60
887.80
894.00
900.20
906.40
912.60
918.80
925.00
931.20
655.70
661.90
668.10
674.30
680.50
686.70
692.90
699.10
705.30
711.50
717.70
723.90
730.10
736.30
742.50
748.70
754.90
761.10
767.30
773.50
779.70
785.90
792.10
798.30
804.50
810.70
816.90
823.10
829.30
835.50
841.70
847.90
854.10
860.30
866.50
872.70
878.90
885.10
891.30
897.50
903.70
909.90
916.10
922.30
928.50
934.70
940.90
947.10
953.30
725.20
731.90
738.60
745.30
752.00
758.70
765.40
772.10
778.80
785.50
792.20
798.90
805.60
812.30
819.00
825.70
832.40
839.10
845.80
852.50
859.20
865.90
872.60
879.30
886.00
892.70
899.40
906.10
912.80
919.50
926.20
932.90
939.60
946.30
953.00
959.70
966.40
973.10
979.80
986.50
993.20
999.90
1006.60
1013.30
1020.00
1026.70
1033.40
1040.10
1046.80
Warangal Dist
SVPCPL
509.90
513.20
516.50
519.80
523.10
526.40
529.70
533.00
536.30
539.60
542.90
546.20
PMGSY
523.40
526.70
530.00
533.30
536.60
539.90
543.20
546.50
549.80
553.10
556.40
559.70
937.40
943.60
949.80
956.00
962.20
968.40
974.60
980.80
987.00
993.20
999.40
1005.60
959.50
965.70
971.90
978.10
984.30
990.50
996.70
1002.90
1009.10
1015.30
1021.50
1027.70
1053.50
1060.20
1066.90
1073.60
1080.30
1087.00
1093.70
1100.40
1107.10
1113.80
1120.50
1127.20
Warangal Dist
SVPCPL
E
F
Cost of Materials, Labour
Material Rates
1
2
3
14
360.00
390.00
500.00
15
830.00
16
17
18
19
950.00
690.00
560.00
430.00
260.00
20
505.00
236.00
Stone crusher dust finer than 3mm with not more than 10% passing
through 75 micron
255.00
595.00
765.00
630.00
805.00
985.00
21
50.50
22
29
PMGSY
260.00
220.00
Warangal Dist
SVPCPL
29
Fine aggregate / sand (Un-screened) including seigniorage
Sand for Filling and blindage
70.00
110.00
130.00
136.00
117.00
71.00
95.00
145.00
114.00
98.00
114.00
156.00
130.00
23
745.00
24
1155.00
25
1175.00
26
980.00
27
820.00
28
655.00
30
4
5
6
7
8
9
10
11
12
13
PMGSY
130.00
41.25
82.00
Warangal Dist
SVPCPL
31
43000.00
32
33
34
32500.00
5700.00
32000.00
BT-Rates
Bulk 80/100 Grade
Bulk 60/70 Grade
Emulsion (Bulk) RS
Emulsion (Bulk) MS
Emulsion (Bulk) SS
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
PMGSY
Blasting charges
Blasting charges
Blasting charges for rough stone
Seigniorage charges G.O Ms.No: 198 13/08/2009
Metal
Gravel/earth
Sand
Labour Rates
Mate
Mason Ist class
Mazdoor unskilled
Machinery Rates
Dozer D80 HP for spreading @ 200 cum per hour
Motor grader 3.35M Blade @50 cum/Hr
Hydralic excavator
Front end loader 1 cum capacity
Tipper 5 cum
Vibratory roller 8T
smooth wheeled roller 8 Ton
Water tanker 6 KL
Tractor
Tractor with Rotavator
Tractor with ripper attachment @ 60 cum per hour
Air compressor 250 cfm
Wet mix plant of 60 tonne hr. capacity
Mechanical broom @ 1250 sqm/hr.
Bitumen pressure distributor @1750 sqm/hr
Emulsion pressure distributor @1750 sqm/hr
Hot mix plant 40 to 60 TPH
Mechanical Paver finisher 100 TPH
Hydraulic self propelled chip spreader @ 1500 sqm/hr.
Finish rolling with 6-8 tonne smooth wheeled tandem roller.
Pneumatic road Roller
GSB Plant 50 Cum
Generator 250 KVA
30,458.60
31,373.96
23,833.69
24,062.53
23,135.72
70.00
70.00
50.00
22.00
40.00
285.00
315.00
250.00
1729.90
2600.00
1808.50
1320.00
629.80
1704.60
746.50
345.00
345.00
345.00
345.00
370.00
1320.00
290.00
940.00
690.00
15525.00
1090.00
2070.00
1320.00
1035.00
920.00
1550.00
Warangal Dist
SVPCPL
70
71
72
73
74
75
76
77
78
PMGSY
1090.00
620.00
345.00
4.50
4.50
40.00
1725.00
280.00
630.00
Warangal Dist
SVPCPL
PMGSY
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
64
99
100
101
102
Binding wire
100mm dia AC pipe CL 20
MS clamps
Filter media for drainage to mass walls
Concrete mixer 0.2/0.80 cum
Bricks
Polished shabad stone (0.457 x 0.304m)
1729.90
285.00
108.60
7991.00
5756.00
5100.00
4064.00
2412.00
90.00
95.00
50.00
520.00
2530.00
102.50
114.10
52.00
224.00
30.00
305.00
345.00
3100.00
1291.00
Warangal Dist
SVPCPL
PMGSY
Warangal Dist
SVPCPL
53 I / 16
52 h / 16
51g / 16
50 f / 16
49 e / 16
48 d / 16
47 c / 16
46 b / 16
45 33 a / 16
M 030 / 26
92 b / 17
M 021 / 26
M 038 / 27
M 036 / 27
M 041 / 27
M 043 / 27
M 046 / 27
90 34 & 91 35 a / 17
M-008/25
28 / 12
93 36.a / 17
PMGSY
Warangal Dist
SVPCPL
27 / 12
94 36.b / 17
M-004/25
M-005/25
9 d iv / 14
8 d iii / 14
2 b I / 14
3 b ii / 14
M-003 / 25
4 b iii / 14
6 d I / 14
7 d ii / 14
5 c / 14
83,84 / 17
Average of (47.5+35)/2
78 z 2 / 17
PMGSY
M-002 / 25
M-055 / 27
500.00
30 33.f / 15
M-054 / 27
828.00
29 33.e / 15
M-053 / 27
844.00
28 33.d / 15
M-052 / 27
688.00
27 33.c / 15
M-051 / 27
560.00
26 33.b / 15
M-050 / 27
428.00
25 33.a / 15
Warangal Dist
SVPCPL
134
135
135
71. 21 / 11
1a/9
78 6 b / 11
1 / 28
2 / 28
3 / 28
4 / 28
5 / 28
6 / 28
7 / 28
8 / 28
9 / 28
10 / 28
11 / 28
12 / 28
13 / 28
14 / 28
15 / 28
16 / 29
20 / 29
22 / 29
23 / 29
24 / 29
25 / 29
28 / 29
41 / 30
PMGSY
Warangal Dist
SVPCPL
41 / 30
41 / 30
36A / 30
43 / 30
43 / 30
46 / 31
33D / 29
33c / 29
33b / 29
PMGSY
Warangal Dist
SVPCPL
40206.00
1a/9
at 3700 cement rate
at 33000 6mm steel rate
M 189 / 34
15 / 12
70 / 13
74 / 14
21 / 29
3 / 11
/ 61
LQR
M 012 / 26
sl. No.18 / 130
BMTA-01/10
BMT-B05/11
PMGSY
Warangal Dist
SVPCPL
PMGSY
Warangal Dist