1. What is the existing SAP landscape? How many servers (each product wise) and SAP products are in place (for example ECC, CRM, BI BW etc.. are products) 2. What is the existing size of the database in GB 3. Please specify the Operating System, Database, SAP Version of the existing system. -
Response : as per the email.
OS:-Redhat Linux 6.5 Total SAP Servers:-3 SAP Version:-ECC 6.0 EHP 7 Database:-Sybase 15.7 Database Size:-250 GB Overall Size of servers which are occupied is approx. 500GB
4. For the purpose of DR setup which application is being considered ? Is it
only ECC Production Environment? Or some more applications are also being considered. Please specify. 5. What is the Recovery Point Objective (RPO) and Recovery Time Objective (RTO) to be set for the DR 6. Is there any cluster in existing setup? 7. How many concurrent users and transactions are happening in on a given day. Also specify the average load 8. Do you currently have access on live on existing production from outside the premise? 9. Is there any load balancing done for ECC Production environment 10.Which methodology would you opt for or prefer for failover? automated failover or manual failover activity process 11.What are the Number of SAPs for the production server 12.Please provide identification of the number of users module wise for the purpose of load calculation. Also specify the ratio at which you would like to allocate the users in case of disaster. i.e. whether you would like to consider 100% transfer of users to the DR site or only 70% etc..
Advait Business Solutions Pvt. Ltd.
Questionnaire for SAP AMS services
1. How many modules are currently implemented please specify
2. Please provide the Nature of business. That is whether it is manufacturing or not. Also mention whether the process is discrete manufacturing or process industry or repetitive in nature. 3. Are the SAP OSS support services active 4. Total number of custom objects (RICEFs) or ABAP development objects 5. Average number of tickets or issues faced module wise 6. Total number of PRs and CRs in a given month and across the year 7. Which support module would you like to go for a. 100% onshore b. Combination of Onsite or Offshore (near shore) c. 100% Offshore 8. Approximate number of transactions in a given month for SD (Invoices) and MM modules 9. What is your existing TAX procedure? Is it TAXINN or TAXINJ 10.Are you looking forward to GST implementation? If yes then please specify the duration by which you would like to finalise the same.