Sei sulla pagina 1di 38

PT.

CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

FORM CSSL-062
Things: 1/3
CHECK LIST AUDIT SHIPS
Name
Ship
Port
Helmsman

N
o.

:.....................

Date : . . . . . . . . . . . . . . . . . .

:.....................
:.....................

Voyage : . . . . . . . . . . . . . . . . . .
KKM : . . . . . . . . . . . . . . . . . .

Question

General/Administrative

What is the company's policy on safety and


environmental protection are on display in every
room?

What is the circular/memo the company always


up-to-date?

If a copy of the charter party vessel?

If there are 2 (two) sets operating manual boat


and placement is correct?

If handover checklist/monthly report the latest


always ship certificate?

Whether the requirements and instructions charge


there on the ship?

What is the correct place, appointment book and

NC

Description

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

available?

What is the certificate of the vessel is always upto-date?

What is log book maintenance means of self


rescue and firefighting is always up-to-date?

10

What is log book maintenance means of self


rescue and firefighting is always up-to-date?

11

What is log book maintenance means of self


rescue and firefighting is always up-to-date?

12

Whether routine emergency testing engine has


been recorded?

13

Whether the engine and deck log book is complete


in accordance with the requirements?

JL. Tanjung Realize No.7 60177 Surabaya, East Java, Indonesia


Tel 031-3579683, 3579031 Fax: 031 3578662 Email: css.line@sby.dnet.net.id
things: 1/22

Terms: 2/3

No

Question

NC

Description

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

Operation

Whether the checklist of the ship/land is already


complete?

Whether outfitting personnel such as helmet,


safety shoes and overalls are used?

Whether the checklist bunker equipped?

Is there any documentation about routine


maintenance ullage gauge?

What is the log book entry keruang the latest


always closed?

Is it a sign of "the procedure Entry Tank" is


placed in the right place?

What is pollution prevention and


countermeasures equipment is always in place,
checked each month and recorded?

Does the archive work permit dangerous (Hot


Work Permit) is always up-to-date?

Do routine maintenance the valve P/V


documented?

10

Do note the test hose butterworth in accordance

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

with International Safety Guide For Oil


Terminal and Tangker (ISGOTT)

Incident/Accident (Accident/Incident)

Does the archive personnel in ship accident


always up-to-date?

Whether the events including Genesis almost


always recorded and archived to the Central
Office?

Have the incident/accidents recorded since the


last audit?

What is log book medical inventory always up-todate?

What is the regular meetings of the safety


Committee of the note?

JL. Tanjung Realize No.7 60177 Surabaya, East Java, Indonesia


Tel 031-3579683, 3579031 Fax: 031 3578662 Email: css.line@sby.dnet.net.id
Case: 2/22

Terms:
3/3

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

N
o.

Question

Navigation

Whether the planning service in accordance with the


requirements of the company?

Whether the command fixed/night nahkoda


command is always the latest and signed?

What is the book of sports motion always up-todate?

Whether a book is always the latest compass error?

What is the latest book of chronometer always?

Whether book correction is complete?

Whether the correction on a map are recorded in the


log book the map?

Does the radio log book is always up-to-date?

What is the monthly maintenance station radio


checked/documented and recorded in the radio log
book?

Exercise
(Drill)

Date of last fire drills and exercises go into a

NC

Descriptio
n

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

confined space?

Last date of exercise decreased the lifeboat?

Last date of exercise penangulangan contamination


(SOPED)?

The last date the emergency steering drills?

I.S. M

Whether internal audit program nahkoda for


procedures on his boat?

Whether internal audit program KKM for procedure


engine parts?

Whether all procedures procedures documented on


his boat in the Central Office?

JL. Tanjung Realize No.7 60177 Surabaya, East Java, Indonesia


Tel 031-3579683, 3579031 Fax: 031 3578662 Email: css.line@sby.dnet.net.id :
3/22

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

FORM CSSL-063
NOTICE OF IMPLEMENTATION OF INTERNAL SAFETY AUDIT
To The Designation. : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
From : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
The Audit will be carried out according to plan on the part of the brothers to the
schedule as follows:

No.

ACTIVITIES THAT WILL BE


AUDITED

The DATE of the

Confirmation of our brothers wait for selambat the latest on:


Hari . . . . . . . . . . . . . . . . . . . . . . Tanggal . . . . . . . . . . . . . . . . . . .
Jam . . . . . . . . . . . . . . . . . . .
When no response we think brother agree with schedule.

TIME

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

Jakarta, ... ... ... ... ... ....


INTERNAL
AUDITOR

..................
To The Designation : . . . . . . . . . . . . . . . . . . . . . . .
From : . . . . . . . . . . . . . . . . . . . . . . .
I agree with the above schedule;
I propose the following itinerary;
Jakarta, . . . . . . . . . . . . . .

JL. Tanjung Realize No.7 60177 Surabaya, East Java, Indonesia


Tel 031-3579683, 3579031 Fax: 031 3578662 Email: css.line@sby.dnet.net.id :
4/22
.....................
FORM
CSSL-064
LIST OF PRESENT INTERNAL SAFETY AUDIT

LIST OF PRESENT OPENING/CLOSING


INTERNAL AUDIT

Today:

Place:

The Leadership Meeting:

Date:

Page:

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

N
O.

The NAME of the

The OFFICE
of the

SIGNATURE

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

JL. Tanjung Realize No.7 60177 Surabaya, East Java, Indonesia


Tel 031-3579683, 3579031 Fax: 031 3578662 Email: css.line@sby.dnet.net.id
Case: 5/22

CSSL FORM-065
DISCREPANCIES AND DEMAND CORRECTIVE ACTION
REPORT
REPORT DISCREPANCIES (NC)
AND CORRECTIVE ACTION REQUEST (CAR)
The Scope Of The Audit

CATEGORIZED AS Number:
Date:

DETAILS OF DISCREPANCIES
Type mismatch: MAJOR MINOR
OBSERVATION
Signature auditor:

Mark tanga audit:

CORRECTIVE ACTIONS

Estimated completion date:


Audit signature:

Date:

CORRECTIVE ACTIONS HAVE BEEN VERIFIED (filled by the auditor)

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

The reason changes according the above


requirements

Corrective actions/implemented
With good

Signature Auditor:

Audit Signature:

Date:

Date:

JL. Tanjung Realize No.7 60177 Surabaya, East Java, Indonesia


Tel 031-3579683, 3579031 Fax: 031 3578662 Email: css.line@sby.dnet.net.id :
6/22

FORM
CSSL-066
Auditor's Name:

INTERNAL AUDIT REPORTS


No. Audit

The audited work units:

Date Of Audit
Page
1/

The Scope Of The Audit:

Conclusion:

The Name Of The Auditor

The Office of the

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

Auditees

Head Of Work Unit Auditees

The name of the


DD
Note

The name of the


DD

JL. Tanjung Realize No.7 60177 Surabaya, East Java, Indonesia


Tel 031-3579683, 3579031 Fax: 031 3578662 Email: css.line@sby.dnet.net.id It:
7/22

FORM
CSSL-067
THE REPEATED AUDIT RECOMMENDATIONS
Audit Name
Section
Implementation of personnel
Auditor
Date of audit
The following audit results delivered over the safety management system are
conducted at random/random, so that still allow the existence of a discrepancy in
the other.
LARGE DISCREPANCIES
SMALL DISCREPANCIES
OBSERVATION
Jakarta, . . . . . . . . . . . . . . . . . . . .

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL
Internal Audit of safety

JL. Tanjung Realize No.7 60177 Surabaya, East Java, Indonesia


Tel 031-3579683, 3579031 Fax: 031 3578662 Email: css.line@sby.dnet.net.id It:
8/10

FORM
CSSL-068
MINUTES OF MANAGEMENT MEETINGS
Meeting Date:
List Of Participants:

Agenda:
1. Actions of the
meeting of
previously
2. The arrangement of the
Organization
3. The Status of the
implementation of the

Results of the study


process:
1. Mismatch
2. Process improvement

Policy Manual:
1. Other safety

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL
Participants

Action

Date of completion

Next meeting date:


Signature (Chairman)
Date:

.....................

JL. Tanjung Realize No.7 60177 Surabaya, East Java, Indonesia


Tel 031-3579683, 3579031 Fax: 031 3578662 Email: css.line@sby.dnet.net.id It:
9/22

CSSL
FORM-069
Things: 1/4
THE REPORT NOTES THE INSPECTION & MAINTENANCE
RADIO AND NAVIGATION EQUIPMENT
KM
......
CRUISE NO
......
No.
1.
a.

:..............................
: ... ... ... ... ... ... ... ... ....

NO
DATE REPORT

Type Of Inspection
MAIN & EMERGENCY TRANSCEIVER
Check whether the battery in good condition?

:.........
:.........
Yes/No
Yes/No

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL
b.
c.
d.
e.
f.
g.
h.
2.
a.
b.
c.
d.
e.
f.
g.
h.
I.
j.
k.

Check whether the antenna wire and isulator installed


properly?
What is the cooling system of the aircraft/blower work?
Before transmitting make sure whether band frequency
has been appropriate and tunning-up is correct
appropriate tunning-chart?
What is the voltage/current in PA tube is in compliance
with the standard manual?
For radiating does not occur over load?
Complete use of the transmitter is already ascertained
that the antenna system is grounded and has been on
the ground to function properly?
Note the abnormality in the scanner in a State free of
berpopular and gear-gear terlumasi well?
RADAR
Check whether the scanner in a State free of berpopular
and gear-gear terlumasi well?
What is the wave guide is not suitable and in good
condition?
What is the cooling system of the aircraft/blower work?
Check magnetron current, does the engine above 80%?
If all the buttons on the control panel display is
functioning properly?
Whether tunning meter working properly?
If all pilot lamp pererangan work well?
Whether echo as well as baringan and in accordance
with the actual form?
Complete use of the radar all buttons are already played
back on minimum position?
If the content is already in the appropriate logbook use
radar?
Notes on measurements or observational abnormalities:

Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No

Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No

JL. Tanjung Realize No.7 60177 Surabaya, East Java, Indonesia


Tel 031-3579683, 3579031 Fax: 031 3578662 Email: css.line@sby.dnet.net.id
Case: 10/22

CSSL FORM-069
Terms:
2/4

No.
3.

Type Of Inspection
VHF TRANSCEIVER

Yes/No

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

a.

Check the voltage of the battery is still within the limits


of good?

Yes/No

b.

Whether testing the aircraft using a DC power supply


(accu) carried out periodically every cruise?

Yes/No

c.

Whether aircraft VHF can be used effectively at a


distance of achieving 30 m?

Yes/No

d.

Whether the maintenance, inspection and measurement


were in accordance with the manuals?

Yes/No

e.

Notes on measurements or observational abnormalities:

Yes/No

4.

E.P.I.R. B

a.

Whether at the time of testing for 2 seconds the led


indicator the led test functioning normally?

Yes/No

b.

If after you have finished testing, mode switch auto


position returned to fashion?

Yes/No

c.

What is the life time lithium battery still larger was


20%?

Yes/No

d.

What is the life time hydrostatic sensor still release


greater than 20%?

Yes/No

e.

Notes on measurements or observational abnormalities:

Yes/No

5.

GYRO COMPASS

a.

What is gyro compass error is still within the limits of

Yes/No

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

tolerance?
b.

Whether the maintenance, inspection and measurement


routines have been implemented in accordance with the
manuals?

Yes/No

c.

Is there a voice disorders?

Yes/No

d.

What is the life time of a sphere or highspeed gyro


bearings has exceeded 70%?

Yes/No

e.

Do all repeaters in the room including kemud working


with the master compass?

Yes/No

f.

What is the auto pilot worked/work?

Yes/No

g.

Notes on measurements or observational abnormalities?

Yes/No

6.

AUTO PILOT

a.

If the manual switch works fine?

Yes/No

b.

Whether the weather correction function properly?

Yes/No

c.

What is the latitude correction is functioning properly


and is set on the corresponding position?

Yes/No

d.

Notes on measurements or observational abnormalities:

Yes/No

JL. Tanjung Realize No.7 60177 Surabaya, East Java, Indonesia


Tel 031-3579683, 3579031 Fax: 031 3578662 Email: css.line@sby.dnet.net.id :
11/22

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

No
.
a.
b.
c.
d.
e.
f.
g.
h.
I.

Type Of Inspection
7.
MAGNETIC COMPASS
Does a magnetic compass work well?
If calibration certification still valid?
What is the appropriate place on each map deviasinya is
still within the limits of tolerance and has been recorded in
the log book?
Whether supporting liquid still enough?
What is Tin penimbal still complete and appropriate
position?
If the lamp lighting the Roses guidelines work well?
If the Roses guidelines can still be read easily?
Is it still good reflector so that the designation of the Roses
guidelines can be read from the sterring stand?
Note the observation or measurement for abnormalities on
the sbb?

CSSL
FORM-069
Terms:
3/4
Yes/No

Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL
8.
a.
b.
c.
d.
9.
a.
b.
c.
d.
e.

ELECTRO MAGNETIC LOG


Whether the tranducer can be operated up and down from
the platform and steering spaces?
Whether the results of the record still accurate?
If all the function keys work normal?
Notes on measurements or observational abnormalities?
PORTABLE LIFE BOAT
Whether portable aircraft life boat each month tried using
dummly antenna at all frequency?
Whether the finished aircraft was set to try again on a
frequency 500 khz danger?
Whether the equipment antenna and so on complete and
have truly become one with the portable life boat?
Whether done tried aircraft have been closed again with the
meeting so that the watertight?
If the aircraft is placed at the right place/right?

Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No

JL. Tanjung Realize No.7 60177 Surabaya, East Java, Indonesia


Tel 031-3579683, 3579031 Fax: 031 3578662 Email: css.line@sby.dnet.net.id :
12/22

CSSL
FORM-069
It:
4/4
No
.
a.
b.
c.
11
.
a.
b.

Type Of Inspection
10.
S.A.R. T
What is the lifetime of battery is still above 6 months?
Whether automatic emit respondance signal (12 sweeps)
can be read by a 9 Ghz radar (at the time of the final RDF
calibration or Boat Drill)?
Note the abnormality in measurement tools as well as sbb
observation?
TWO WAY RADIO COMUNICATION
What is the condition of the battery still good (final radiating
light, indicator not Dim)?
Whether the transmitter and receiver on every channel can

Yes/No

Yes/No
Yes/No
Yes/No

Yes/No
Yes/No

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

c.
d.
12
.
a.
b.

c.
d.
e.
f.
g.
13
.
a.
b.
c.

be functioning properly?
Whether all the charger works fine?
Note the observation or measurement for abnormalities on
the sbb?
BATTERY (ACCUMULATOER)
Does the device a backup device on a regular basis every
day on the test?
If after the completion of the use of the device the device
backup, accu is filled (charger) back to the brim so that the
voltage of each cell is around 2.6-2.7 volts or elecrolitnya
type weight 1.24 1.26?
What is the level of the water should be in accordance with
the accu (about 1 cm above the cell)?
Does the cover cover every cell examined and cleaned so
that the ventilation holes are not clogged gas dust/dirt?
Whether the ventilation room accu function with normal, not
closed other objects?
What is the position of the accu is good so it doesn't shake
when a ship hit by waves?
Notes on measurements or observational abnormalities?
ANTENNA SYSTEM (TRANSMITTER, RECEIVER)
What is the condition of the antenna wire is still good (there
hasn't been a break up or porous)?
Whether all the safety link still good?
What is the driving force of the rope (hosting wire) is still
good and coated vinyl?

Yes/No
Yes/No

Yes/No

Yes/No
Yes/No
Yes/No
Yes/No
Yes/No

Yes/No
Yes/No
Yes/No

JL. Tanjung Realize No.7 60177 Surabaya, East Java, Indonesia


Tel 031-3579683, 3579031 Fax: 031 3578662 Email: css.line@sby.dnet.net.id
Case: 13/22

CSSL
FORM-069
No
.

Type Of Inspection
d.

What is the condition of


sackle, wrapped and
insulators still good?

It: 4/4
Yes/No
Yes/No

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL
e.
f.
g.
14
.
a.
b.
c.
d.
15
.
a.
b.
c.
d.
e.

Whether antenna charger working properly?


Special antenna receiver, whether intercharger jack works
fine?
Notes on measurements or observational abnormalities:
BATTERY CHARGER

Yes/No
Yes/No

What is the ampere meter and volt meter to the charging and
discharging is still working?
What is the charging and discharging switch function
normally?
If charging the battery with a trickle charge function properly?
Notes on measurements or observational abnormalities:
CHRONOMETER

Yes/No

What is a chronometer is still functioning properly?


What is the deviation of the appointment time is still within
the limits of tolerance of constant Fund?
Whether the matching time and discrepancy designation
recorded in the radio log book?
Whether the matching time and discrepancy designation
recorded in the radio log book?
Notes on measurements or observational abnormalities:

Yes/No
Yes/No

FIND OUT

Yes/No

Yes/No
Yes/No
Yes/No

Yes/No
Yes/No
Yes/No

THE RADIO OFFICER

HELMSMAN

JL. Tanjung Realize No.7 60177 Surabaya, East Java, Indonesia


Tel 031-3579683, 3579031 Fax: 031 3578662 Email: css.line@sby.dnet.net.id
Case: 15/22

CHECK THE LIST OF PLAN OF CARE SYSTEMS

FORM CSSL029

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL
Things: 1/7
No.

Desc
ripti
on

Care

7
H

3
B

I. MOTOR MASTER BRAND: HORSE POWER


1
Holder M/2
Inspection of bolt tightening of
the fitting, and adjustments
2
Window
Examination of cran cam, gea &
Machine
measurement of deflection
crank shaft (crank shat) every
1500
3
Close Cylinder
Open (including the valves)
every 3,000 hours 5,000 s/d
4
The
At the open, measured and
Shaft/Piston
replaced the spring shaft every
6,000 8,000 s/d
5
Cylinder liner
Bergesek surface inspection,
measurement of the wear plate
cylinder lner (-there are times
the lid of the cylinder is opened)
6
Exhoust Valve
Replacement/Maintenance
7
Starting valve
Replacement/Maintenance
8
Puel Valve
Replacement/Maintenance
9
Relief valve
Replacement/Maintenance
10 Indicator valve
Replacement/Maintenance
11 Fuel pump
Replacement/Maintenance
12 Bearing &
Examination breaks down
kournal No.
1s/d 8
13 Cam shafts
Opened and inspected every
1,500 hours
14 Rotor T.
Opened and maintained
Charger
15 Fan T. Charger
Wash and pembersihaan air
filter
16 Intercooler
Wash
17 Reduction gear Treatment by maker
18 Pipe system
a. fuel Filter
b. Filter Lubricant
19 Air conditioners Examination of both sides with
chemicals
20 Keep your
a. opened and inspected
distance
control system
of sports
motion
b. replacement of oil the turbo
charger 1,500 hours and tiap oil
governor each year

6
B

T
H

T
H

5
T
H
X
X

X
X

X
X

X
X
X
X
X

X
X
X
X
X
X
X
X

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

II. SHAFT PROPELLER CARGO 0 = LUBRICATION SYSTEM


1

Shaft bearings

Opened and inspected

Cargo shaft
propeller

Unplugged and checked


(Magnaflux test)

Pad tube on
the tube

The stern tube bearing on the


examination

Tabng shaft
lubricant cargo
propeller

Replace lubricants and filters

Rubber seal

Replacement/maintenance

III. AUXILIARY MOTOR


1

Holder M/I

Inspection of bolt fitting,


pengencengan and adjustment

* Machine
window Crank
case

Examination of the crankshaft,


gear and the crank cheek

The curvature
of the
crankshaft

Measurement

Close cylinder

Open (including the valves)


every 3,000 hours 5,000 s/d

CARDIOTHORA
CIC SURGERY

Opened, measured and


replaced the spring shaft every
6,000 hours 8,000 s/d

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

Governor

Treatment by maker

Turbo charger

Go to complete every 7,000


s/d 15,000 hours

Pump

Go to the complete

Sump Tanks

Cleaned and lubricated

1
0

Air
conditioners

Cleaning of dang anti


lubricants

1
1

Sieve

Cleanup

1
2

Alternator
rotor/stater
charcoal

Cleaning and inspection

IV. EMERGENCY GENERATOR


1

Performance

Test run

V. EMERGENCY PUMP
1

Performance

Test run

Vi. THE BOARDS OF THE HYPHEN


1

ACB

Test functions and adjustments


by maker

Ground lights

Test run

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

Measuring
meter

Inspection and calibration


errors

JL. Tanjung Realize No.7 60177 Surabaya, East Java, Indonesia


Tel 031-3579683, 3579031 Fax: 031 3578662 Email: css.line@sby.dnet.net.id
Case: 16/22

VII. ALARM

Alarm
temperature M/I

Test the function by means of


simulation

Alarm pressure
M/I

Test the function by means of


simulation

Emergency
termination of

Test function

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

M/I

M/I speed more

Test the function by means of


simulation

M/I primary
circuit board

Test the function by means of


simulation

Fire alaram

Test the function by means of


simulation

Bilge alarm

Test the function by means of


simulation

High surface

Test function

a. test function with simulation of


the fuel tank

b. test function with simulation of


fuel

VIII. PIPING SYSTEMS

Sea water pump

Opened, maintained, inspected,


and cleaning sieve

Fresh water
pump

Opened, maintained, inspected


and cleaning sieve

Feed pump

Opened, maintained, inspected


and cleaning sieve

Fuel pump

Opened, maintained, inspected


and cleaning sieve

Fuel transfer
pump

Opened, maintained, inspected


and cleaning sieve

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

Lubricating oil
pump

Opened, maintained, inspected


and cleaning sieve

IX. TANK

For the
purposes of the
daily M/I setting
tanks

Inspection and cleaning of the


exhaust vent (every 4 hours)

For the
purposes of the
auxiliary motor
daily (setting
tank) location:

Inspection and cleaning of the


hole (every 4 hours)

Other tanks:

Inspection and cleaning of the


exhaust vent (every 4 hours)

Other tanks:

Open and clean the

JL. Tanjung Realize No.7 60177 Surabaya, East Java, Indonesia


Tel 031-3579683, 3579031 Fax: 031 3578662 Email: css.line@sby.dnet.net.id
Case: 17/22

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

THE SHIP'S DISPLACEMENT X.


1

Oil cooling of
public relations

a. open the complete


examination
b. open the sea-water side of
dang anti anode zinc

Sea water
cooling

a. open the complete


examination
b. open the sea water side and
replace the zinc anodes

Auxiliary
condenser

Go to the complete replacement


of the anode, zinc (1 year)

Fuel heaters

Go to the complete replacement


of the anode, zinc (1 year)

XI. AIR COMPRESSOR

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

CARDIOTHORAC
IC SURGERY

Go to the complete

Suction and
pressure valves

The complete open and


adjustment

Crank case

Open, check out, and anti


lubricating

Cooling

Go To The Complete

XII. AIR CONDITIONING AND REFRIGERATION TOOLS (REFRIGENERATOR)


1

Cardiothoracic
surgery

Go to the complete

Suction and
pressure valves

The complete open and


adjustment

Crank case

Open, check out, and anti


lubricating

cooling

Go To The Complete

XII. MACHINE STEERING


1

Hydraulic valve

Go to the complete

Sieve

Open and clean the

X
X

XIII. MESISN DECK


1

Hydraulic valve
u/msn
anchor/Tow

a. open the complete


examination

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

b. hydraulic pipeline Strainer


2

Hydraulic motor
u/msn anchor

a. open the complete


examination

b. hydraulic pipeline strainer


3

Anchor machine

Hydraulic pipe cleaning sieve

Cover the hole


palkah

Any cleanup before loading

X
X
X

XIV. EQUIPMENT SYSTEM


1

Standby pump

Test run

Emergency
generator

Test run

X
X

JL. Tanjung Realize No.7 60177 Surabaya, East Java, Indonesia


Tel 031-3579683, 3579031 Fax: 031 3578662 Email: css.line@sby.dnet.net.id
Case: 18/22

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

Emergency fire
pump

Test run

Emergency
steering
machine

Test run

Lifeboat engine

Test run

XVI. NAVIGATION EQUIPMENT


1

Auto pilot
brand:

Test treatment by maker

Auto pilot
brand:

Test treatment by maker

Komas
magnetism
brand:

Tests and treatments by


penbuat (data care should be
recorded at the time the
completed pengedokan)

The Radar
Brand:

Testing and treatment by maker

GPS brand:

Testing and treatment by maker

Wall clock
brand:

Testing and treatment by maker

Echo sounder
brand:

Testing and treatment by maker

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

XVII. DECK EQUIPMENT


1

Fair leader

a. it opened complete

b. given a fat

Peranginan

It opened complete

Tool cover

Trial operation and given a fat

Watertight
doors

Trial operation and give fat

X
X
X

XVIII. FIRE FIGHTING EQUIPMENT


1

Hydrants, fire
hose
firefighting
danozle

Examination

Fireman tubes

Examination number of tubes


and replacement content

Tube CO2

The number of replacement and


testing

Foam fluid

Replacement by the
manufacturer of the

XVIII. SAFETY EQUIPMENT


1

Lifeboat

An examination of the exterior


and the engine test

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

Steel arrives

Give grease or replace the

JL. Tanjung Realize No.7 60177 Surabaya, East Java, Indonesia


Tel 031-3579683, 3579031 Fax: 031 3578662 Email: css.line@sby.dnet.net.id :
19/22

CSSL FORM070
K-SET

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL
LIST OF DOCUMENTS AND REFERENCE BOOKS

N
o.

Editio
n

Document Name

SOLAS
Consolidated
Text

1997

Responsib
ility
Responsib
ility

Propagator II

The location
of the

The Viewing
Room

MARPOL 73/78 Consolidated

1997

Propagato
r II

The Viewing
Room

STCW 1995

1996

Propagato
r II

The Viewing
Room

The international regulation for


Preventing Conlision At Sea 1972

1996

Propagato
r II

The Viewing
Room

The ISM Code

1994

Propagato
r II

The Viewing
Room

SOLAS Training Manuals

Propagato
r II

The Viewing
Room

Ship Captain's Medical Guide

Propagato
r II

The Viewing
Room

Nautical Almanac

Propagato
r II

The Viewing
Room

Map-map

Propagato
r II

The Viewing
Room

1
0

The Book Ups And Downs Indonesia

Propagato
r II

The Viewing
Room

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

1
1

Sailors News Indonesia

Propagato
r II

The Viewing
Room

1
2

Indonesia's Diary

Propagato
r II

The Viewing
Room

1
3

Diary Of Decks

Propagato
rI

The Viewing
Room

1
4

Shipboar Oil Pollution Emergency Plan


(SOPEP)

Markonis

The Viewing
Room

1
5

Oil Record Book

Propagato
r II

The Viewing
Room

1
6

Diary Machines

KKM

Space KKM

1
7

Book List Of Ups And Downs

KKM

Space KKM

1
8

Book List Flare Indonesia

Propagato
r II

The Viewing
Room

1
9

Book Cruise Science List

Propagato
r II

The Viewing
Room

2
0

Marine Scouting Book

Propagato
r II

The Viewing
Room

JL. Tanjung Realize No.7 60177 Surabaya, East Java, Indonesia


Tel 031-3579683, 3579031 Fax: 031 3578662 Email: css.line@sby.dnet.net.id
Case: 20/22

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

FORM CSSL-071
P-SETS
INTERNAL AUDIT RECORDS

N
o.

No Auditing.

Work
Unit

Auditor

The date
of the

Audit
Results

The
status of
the

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

PT.CIPTA SAMUDERA SHIPPING LINE


DOKUMEN PROSEDUR OPERASIONAL KAPAL

JL. Tanjung Realize No.7 60177 Surabaya, East Java, Indonesia


Tel 031-3579683, 3579031 Fax: 031 3578662 Email: css.line@sby.dnet.net.id
Case: 21/22

FORM CSSL-072
PK-SET
LIST OF PICTURES OF THE SHIP
Ship Name:
No.

ID

Image Name

JL. Tanjung Realize No.7 60177 Surabaya, East Java, Indonesia


Tel 031-3579683, 3579031 Fax: 031 3578662 Email: css.line@sby.dnet.net.id :
22/22

Potrebbero piacerti anche