Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
xls
Item
Price Factor
1
Unit
QTY
SOW
reference
Materials
m
pcs
YJV-0.6/1KV-2*10mm2
m
pcs
9.1
pcs
9.2
pcs
1.27
1.28
1.31
1.33
11/15/2016
14
337087071.xls
Item
Unit
QTY
SOW
reference
Materials
1.4
KG
1.5
Steel Grade60
KG
1.6
pcs
1.7
m3
1.8
m3
1.9
set
1.10
1.11
1.12
Power cable:3*4mm2
1.13
Power cable:3*1.5mm2
1.14
Power cable:3*2.5mm2
1.15
Power cable(VMS):3*6mm2
m
m
m
m
m
m
1.16
STP 5e cable,waterproof
1.17
1.18
1.19
m
m
m
1.20
KG
1.21
1.22
m
m
1.23
Supply of outdoor 2 core fiber,Single Mode( ITU-T G.652 D) optical fiber cable
1.24
1.25
Traffic Lights:300mm,High light LED,Anti-Sunshine cover One for each lamp,as per
specification.
pcs
1.26
Arrow Traffic Lights:300mm,High light LED,Anti-Sunshine cover One for each lamp,as
per specification.
pcs
1.29
KG
1.32
RVVSP 5*0.5
Reference the
design drawings
1
1
IPNV Site
600/1000V,Newage/Fast
1
1
1
Nordan UK/3M
1
1
Service
2
2.1
2.2
2.3
2.4
3.1
4.1
Foundation Construction
Cum
site
Cum
Cum
Site
Grounding
Transportation&Installation
Transportation&Installation of IPNV with both pole and equipment as per standard with
proper safety
11/15/2016
Site
24
337087071.xls
4.2
4.3
4.4
4.5
4.6
4.7
4.7
Transportation&Installation of batteries
Transportation&Installation of RLMS with both pole and equipment as per standard with
proper safety
11/15/2016
Site
Site
Site
Site
Site
Site
site
34
337087071.xls
4.8
Transportation&Install the solar system with both support structure and solar panel as
per standard with proper safety.
5.1
6.1
Site
set
Wiring
Duct construction on naked soil surface/green belt as per Sow and spec.
6.2
6.3
6.4
6.5
6.6
HDD bore
Commissioning
site
7.2
site
8.1
Dismantle existing traffic lights (exclude pole and foundation)include cables packaged
and transport to appoint place.
set
8.2
Dismantle existing IPNV include cables packaged and transport to appoint place.
Ensure safety of dismantled IPNV equipments.
set
set/month
9
9.3
Frame Items
24X7 Bucket Crane Service for complete 30 days including Fuel
Remark:
1. All project management, business trip costs and acceptance cost
are included above.All equipments transportation cost from warehouse
to site are included above equipment installation service.
2. All cost of services required for execution the Contract are included
in the price as above.
3. All cost of materials, hardware,
software, license and etc required for execution the Contract are
included in the price as above, even though some item(bellows pipe)
and Qty are not indicated as above.
11/15/2016
44