Sei sulla pagina 1di 33

Commissioning Service Department

Commissioning Standard Test Formats


Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contract no.:
Contractor : AECC
4400001561

Record No. :
Sheet :
Page 1 of 33
Substation No : 8132 , AL-NIMAR

1. General Data and Information


Designation No.
TRF Manufacture

GT-2
SIEMENS

TR. Differential Relay Type


TR.R.E.F Relay Type

Rating

132/13.8/6.6 kV

HV CT Ratio

Winding Vector
Group

Ynyn0d1

LV CT Ratio

Impedance %

32.14/ 29.4/ 26.11 %

HV BCT Ratio

No. of Taps

27

LV BCT Ratio

Ratio

132 / 13.8 / 6.6 kV

Main Tap: 11/13.8 KV

RET670 / P643
RET670 / P643
600 /1 Class:
PX
3600 /1 Class:
PX
600 /1 Class:
X
3600 /1 Class:
X
Last Tap:27/148.5
KV

2. Transformer Stability and Sensitivity Test Procedure


2.1.Objective:
The objective of this test is confirm that the differential relay or REF relay doesn't
operate at normal conditions even though load currents are high, where It should
operate when a fault occurs in its zone.
2.2.Source:
Suitable 3 phase generator (Separate) 380 volt 60 Hz or Suitable Voltage.
SEC supply.
3. Precautions:
3.1.Good earth of:
3.1.1.
3.1.2.

The Generator.
The Transformer.
3.1.3.
The shield of the cables.
3.2.The correct size of connected testing cables.
3.3.Determine working zones and places and preventing any person to be in these zones.
3.4.Suitable MCB for 3-phase supply.
3.5.CT terminal blocks must be checked and tightness well.

Name:
Signature:
Date:

Tested by
S.IMRANKHAN AEC-014

Witnessed by
ENG.Mr.HAMDA

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contract no.:
Contractor : AECC
4400001561

Record No. :
Sheet :
Page 2 of 33
Substation No : 8132 , AL-NIMAR

3.6.All REF (Restricted Earth Fault) relays must be removed or its CT terminal shorted.
3.7.Check the Phase Sequence of the 3-Phase Supply.
3.8.Test equipments and tools:
Calibrated multi-meters.
Calibrated testers for measure current and phase angle.

4. Calculation:
-

Technical Data of Power Transformer:


Two winding - three phase - Ynyn0d1 transformer.
- 132/13.8 KV.
- 67 MVA.
- Rated current 293.04 / 2803.07 A.
- HV CTR = 600/1.
- LV CTR = 3600/1.
- Percentage impedance:

At Tap 1L = 32.19
%

At Tap 11N = 29.50


%

At Tap 27R = 26.13


%
Calculation:
At normal tap.
-

I1 p

H.V side:

67 10 6
3 132 10 3

293.04 A

i1 0.488 A
IPCT
-

Name:
Signature:
Date:

Tested by
S.IMRANKHAN AEC-014

Witnessed by
ENG.Mr.HAMDA

1
2.047
0.488
LV Side:

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contract no.:
Contractor : AECC
4400001561

Record No. :
Sheet :
Page 3 of 33
Substation No : 8132 , AL-NIMAR

I 2s

67 10 6
3 13.8 10 3

2803.07 A

i 2 0.778 A
1
1.284
0.778

IPCT

Z Z %

MVA

At Tap 1L

Z 0.3219

KV

13.8 0.9149
2

67

When we apply 380 V power supply at LV side

I 2( LV )

380
3
.....239.80 A
0.9149
i2

239.80
66.61mA
3600

i 2 66.61

1.284
3

After IPCT

I1( HV ) 239.80
i1

i1 37.14
After IPCT

Name:
Signature:
Date:

Tested by
S.IMRANKHAN AEC-014

49.38mA

13.8
22.28 A
148.5

22.28
37.14mA
600

2.047
3

Witnessed by
ENG.Mr.HAMDA

43.94mA

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contract no.:
Contractor : AECC
4400001561

Record No. :
Sheet :
Page 4 of 33
Substation No : 8132 , AL-NIMAR

Z 0.2950

13.8 0.8385
2

67

When we apply 380 V power supply at LV side

I 2( LV )
i2

380
3
261.65
0.8385

261.65
72.68mA
3600

i 2 72.68
After IPCT

I1( HV ) 261.65

i1

53.88mA

13.8
27.35mA
132

27.35
45.59mA
600

i1 45.59
After IPCT

1.284

At Tap 27R

Z 0.2613

2.047
3

53.88mA

13.8 0.7427
2

67

When we apply 380 V power supply at LV side

I 2( LV )
i2

380
3
295.41
0.7427

295.41
82.05mA
3600

i 2 82.05
After IPCT

Name:
Signature:
Date:

1.284
3

60.83mA

Tested by
S.IMRANKHAN AEC-014

At Tap 11N

Witnessed by
ENG.Mr.HAMDA

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contract no.:
Contractor : AECC
4400001561

I1( HV ) 295.41
i1

Record No. :
Sheet :
Page 5 of 33
Substation No : 8132 , AL-NIMAR

13.8
38.60 A
105.6

38.60
64.34mA
600

i1 64.34
After IPCT

2.047
3

76.04mA

5. Final setting testing check:


5.1. Check the final setting of the differential relay.
5.2. Check the final setting of the REF relays.
6. Transformer differential stability and sensitivity test for tap no 1
6.1. stability test
6.1.1.

Primary measurements

LV

HV

236

236

236

21.6

21.6

21.6

1.1.1. Secondary measurements

Name:
Signature:
Date:

Tested by
S.IMRANKHAN AEC-014

Witnessed by
ENG.Mr.HAMDA

I (A)

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contractor : AECC
Contract no.:
4400001561
Phase

HV Side

Core-2

Core-3

LV Side

Core-1

Core-2

SET-1

Diff.
relay
(HV
side)
Diff.
relay
(LV
side)

SET-2

Diff.
relay
(HV
side)

Name: Diff.
Signature:
relay
Date: (LV
side)

Record No. :
Sheet :
Page 6 of 33
Substation No : 8132 , AL-NIMAR

T.B.

X26A: 41

X26A: 38

X26A: 35

X26A: 33

I sec. (mA)

35

35

35

-91

148

28.8

T.B.

X26A: 27

X26A: 24

X26A: 21

X26A: 19

I sec. (mA)

35

35

35

-91

148

28.8

T.B.

X21: 2

X21: 4

X21: 6

X21: 7

I sec. (mA)

62

63

62

88

-31

-151

T.B.

X22: 2

X22: 4

X22: 6

X22: 7

I sec. (mA)

62

62

63

88

-31

-151

T.B.

X1:1

X1:3

X1:5

X1:7

I sec. (mA)

37

37

38

-91

148

28.8

T.B.

X1:11

X1:13

X1:15

X1:17

I sec. (mA)

64

64

64

88

-31

-151

T.B.

X1:1

X1:3

X1:5

X1:7

I sec. (mA)

37

37

37

-91

148

28

Tested by
T.B.
X1:11
S.IMRANKHAN
AEC-014

X1:13

Witnessed by
X1:15
X1:17
ENG.Mr.HAMDA

I sec. (mA)

64

64

65

88

-31

-151

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contract no.:
Contractor : AECC
4400001561

1.1.2.

Record No. :
Sheet :
Page 7 of 33
Substation No : 8132 , AL-NIMAR

Differential Relay Current Measurement (for Digital relays)

SET-1
Phase

DIFF Relay
Measurement
HV side current A

DIFF Relay
Measurement
LV side current A

DIFF Current
Id A

Restrain Current
IR A

20.87

229.93

3.21

24.02

21.26

228.79

3.10

24.02

20.93

229.14

3.11

24.02

Phase

DIFF Relay
Measurement
HV side current mA

DIFF Relay
Measurement
LV side current mA

DIFF Current
Id PU

Restrain Current
IR PU

36.47

63.48

0.012

0.079

36.69

64.79

0.009

0.077

36.79

65.65

0.007

0.078

SET-2

1.2. Sensitivity Test by swapping CT Terminals :


1.2.1. Secondary measurements

Name:
Signature:
Date:

Tested by
S.IMRANKHAN AEC-014

Witnessed by
ENG.Mr.HAMDA

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contractor : AECC
Contract no.:
4400001561
Phase

HV Side

Core-2

Core-3

LV Side

Core-1

Core-2

SET-1

Diff.
relay
(HV
side)
Diff.
relay
(LV
side)

SET-2

Diff.
relay
(HV
side)

Name: Diff.
Signature:
relay
Date: (LV
side)

Record No. :
Sheet :
Page 8 of 33
Substation No : 8132 , AL-NIMAR

T.B.

X26A: 41

X26A: 38

X26A: 35

X26A: 33

I sec. (mA)

37

37

37

-91

148

28

T.B.

X26A: 27

X26A: 24

X26A: 21

X26A: 19

I sec. (mA)

37

36

37

-91

148

29

T.B.

X21: 2

X21: 4

X21: 6

X21: 7

I sec. (mA)

64

64

65

-91

148

29

T.B.

X22: 2

X22: 4

X22: 6

X22: 7

I sec. (mA)

64

65

64

-91

148

28

T.B.

X1:1

X1:3

X1:5

X1:7

I sec. (mA)

37

37

37

-91

148

28

T.B.

X1:11

X1:13

X1:15

X1:17

I sec. (mA)

65

64

65

-91

148

28

T.B.

X1:1

X1:3

X1:5

X1:7

I sec. (mA)

37

37

37

-91

148

28

Tested by
T.B.
X1:11
S.IMRANKHAN
AEC-014

X1:13

Witnessed by
X1:15
X1:17
ENG.Mr.HAMDA

I sec. (mA)

64

64

65

-91

148

28

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contract no.:
Contractor : AECC
4400001561

1.2.2.

Record No. :
Sheet :
Page 9 of 33
Substation No : 8132 , AL-NIMAR

Differential Relay Current Measurement (for Digital relays)

SET-1
Phase

DIFF Relay
Measurement
HV side current A

21.409

Y
B

DIFF Relay
Measurement
LV side current A

DIFF Current
Id A

Restrain Current
IR A

229.72

44.823

24.206

21.263

229.19

45.558

24.206

20.76

230.62

44.931

24.206

Phase

DIFF Relay
Measurement
HV side current mA

DIFF Relay
Measurement
LV side current mA

DIFF Current
Id PU

Restrain Current
IR PU

34.7

65.08

0.156

0.079

34.6

63.25

0.158

0.078

35.9

67.07

0.157

0.080

SET-2

2. Transformer differential stability and sensitivity test for tap no 11


2.1.stability test
2.1.1.

Primary measurements

257

257

257

26.4

26.4

26.4

LV

Name:
Signature:
Date:

HV

Tested by
S.IMRANKHAN AEC-014

Witnessed by
ENG.Mr.HAMDA

I (A)

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contract no.:
Contractor : AECC
4400001561

Record No. :
Sheet :
Page 10 of 33
Substation No : 8132 , AL-NIMAR

2.1.2. Secondary measurements

Name:
Signature:
Date:

Tested by
S.IMRANKHAN AEC-014

Witnessed by
ENG.Mr.HAMDA

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contractor : AECC
Contract no.:
4400001561
Phase

HV Side

Core-2

Core-3

LV Side

Core-1

Core-2

SET-1

Diff.
relay
(HV
side)
Diff.
relay
(LV
side)

SET-2

Diff.
relay
(HV
side)

Name: Diff.
Signature:
relay
Date: (LV
side)

Record No. :
Sheet :
Page 11 of 33
Substation No : 8132 , AL-NIMAR

T.B.

X26A: 41

X26A: 38

X26A: 35

X26A: 33

I sec. (mA)

42

42

42

-91

148

28

T.B.

X26A: 27

X26A: 24

X26A: 21

X26A: 19

I sec. (mA)

42

42

42

-91

148

28

T.B.

X21: 2

X21: 4

X21: 6

X21: 7

I sec. (mA)

68

68

68

88

-31

-151

T.B.

X22: 2

X22: 4

X22: 6

X22: 7

I sec. (mA)

68

68

68

88

-31

-151

T.B.

X1:1

X1:3

X1:5

X1:7

I sec. (mA)

45

45

45

-91

148

28

T.B.

X1:11

X1:13

X1:15

X1:17

I sec. (mA)

70

70

70

88

-31

-151

T.B.

X1:1

X1:3

X1:5

X1:7

I sec. (mA)

45

45

45

-91

148

28

Tested by
T.B.
X1:11
S.IMRANKHAN
AEC-014

X1:13

Witnessed by
X1:15
X1:17
ENG.Mr.HAMDA

I sec. (mA)

70

70

70

88

-31

-151

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contract no.:
Contractor : AECC
4400001561

2.1.3.

Record No. :
Sheet :
Page 12 of 33
Substation No : 8132 , AL-NIMAR

Differential Relay Current Measurement(for Digital relays)

SET-1
Phase

DIFF Relay
Measurement
HV side current A

DIFF Relay
Measurement
LV side current A

DIFF Current
Id A

Restrain Current
IR A

26.091

251.167

0.832

26.332

26.382

250.006

0.907

26.332

26.653

250.532

1.13

26.332

Phase

DIFF Relay
Measurement
HV side current mA

DIFF Relay
Measurement
LV side current mA

DIFF Current
Id PU

Restrain Current
IR PU

44.32

71.4

0.003

0.089

43.61

70.4

0.002

0.090

44.05

71.6

0.001

0.091

SET-2

2.2.Sensitivity Test by swapping CT Terminals :


2.2.1.

Name:
Signature:
Date:

Secondary measurements

Tested by
S.IMRANKHAN AEC-014

Witnessed by
ENG.Mr.HAMDA

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contractor : AECC
Contract no.:
4400001561
Phase

HV Side

Core-2

Core-3

LV Side

Core-1

Core-2

SET-1

Diff.
relay
(HV
side)
Diff.
relay
(LV
side)

SET-2

Diff.
relay
(HV
side)

Name: Diff.
Signature:
relay
Date: (LV
side)

Record No. :
Sheet :
Page 13 of 33
Substation No : 8132 , AL-NIMAR

T.B.

X26A: 41

X26A: 38

X26A: 35

X26A: 33

I sec. (mA)

45

45

45

88

-31

-151

T.B.

X26A: 27

X26A: 24

X26A: 21

X26A: 19

I sec. (mA)

45

45

45

88

-31

-151

T.B.

X21: 2

X21: 4

X21: 6

X21: 7

I sec. (mA)

70

70

70

88

-31

-151

T.B.

X22: 2

X22: 4

X22: 6

X22: 7

I sec. (mA)

70

70

70

88

-31

-151

T.B.

X1:1

X1:3

X1:5

X1:7

I sec. (mA)

45

45

45

88

-31

-151

T.B.

X1:11

X1:13

X1:15

X1:17

I sec. (mA)

70

70

70

88

-31

-151

T.B.

X1:1

X1:3

X1:5

X1:7

I sec. (mA)

45

45

45

88

-31

-151

Tested by
T.B.
X1:11
S.IMRANKHAN
AEC-014

X1:13

Witnessed by
X1:15
X1:17
ENG.Mr.HAMDA

I sec. (mA)

70

70

70

88

-31

-151

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contract no.:
Contractor : AECC
4400001561

2.2.2.

Record No. :
Sheet :
Page 14 of 33
Substation No : 8132 , AL-NIMAR

Differential Relay Current Measurement(for Digital relays)

SET-1
Phase

DIFF Relay
Measurement
HV side current A

DIFF Relay
Measurement
LV side current A

DIFF Current
Id A

Restrain Current
IR A

26.398

250.6

52.216

26.318

26.057

250.4

52.4

26.375

25.455

250.4

51.5

26.293

Phase

DIFF Relay
Measurement
HV side current mA

DIFF Relay
Measurement
LV side current mA

DIFF Current
Id PU

Restrain Current
IR PU

43.50

70.28

0.179

0.09

43.24

68.11

0.182

0.09

42.48

72.93

0.182

0.09

SET-2

3. Transformer differential stability and sensitivity test for tap no 27


3.1.

stability test

3.1.1.Primary measurements :
LV

HV

291

291

291.2

36.7

36.7

36.7

Name:
Signature:
Date:

Tested by
S.IMRANKHAN AEC-014

Witnessed by
ENG.Mr.HAMDA

I (A)

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contract no.:
Contractor : AECC
4400001561

3.1.2.

Name:
Signature:
Date:

Record No. :
Sheet :
Page 15 of 33
Substation No : 8132 , AL-NIMAR

Secondary measurements:

Tested by
S.IMRANKHAN AEC-014

Witnessed by
ENG.Mr.HAMDA

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contractor : AECC
Contract no.:
4400001561
Phase

HV Side

Core-2

Core-3

LV Side

Core-1

Core-2

SET-1

Diff.
relay
(HV
side)
Diff.
relay
(LV
side)

SET-2

Diff.
relay
(HV
side)

Name: Diff.
Signature:
relay
Date: (LV
side)

Record No. :
Sheet :
Page 16 of 33
Substation No : 8132 , AL-NIMAR

T.B.

X26A: 41

X26A: 38

X26A: 35

X26A: 33

I sec. (mA)

60

60

60

88

-28

-148

T.B.

X26A: 27

X26A: 24

X26A: 21

X26A: 19

I sec. (mA)

60

60

60

88

-28

-148

T.B.

X21: 2

X21: 4

X21: 6

X21: 7

I sec. (mA)

77

77

77

89

-150

-31

T.B.

X22: 2

X22: 4

X22: 6

X22: 7

I sec. (mA)

77

77

77

89

-150

-31

T.B.

X1:1

X1:3

X1:5

X1:7

I sec. (mA)

62

62

62

88

-28

-148

T.B.

X1:11

X1:13

X1:15

X1:17

I sec. (mA)

79

79

79

-91

150

30

T.B.

X1:1

X1:3

X1:5

X1:7

I sec. (mA)

62

62

63

-91

28

148

Tested by
T.B.
X1:11
S.IMRANKHAN
AEC-014

X1:13

Witnessed by
X1:15
X1:17
ENG.Mr.HAMDA

I sec. (mA)

78

79

79

89

-150

-31

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contract no.:
Contractor : AECC
4400001561

Record No. :
Sheet :
Page 17 of 33
Substation No : 8132 , AL-NIMAR

3.1.3.Differential Relay Current Measurement(for Digital relays)


SET-1
Phase

DIFF Relay
Measurement
HV side current A

DIFF Relay
Measurement
LV side current A

DIFF Current
Id A

Restrain Current
IR A

36.85

282.5

7.43

36.89

36.85

282.6

7.30

36.8

36.25

282.8

6.85

36.8

Phase

DIFF Relay
Measurement
HV side current mA

DIFF Relay
Measurement
LV side current mA

DIFF Current
Id PU

Restrain Current
IR PU

62.77

81.83

0.023

0.115

63.16

79.09

0.026

0.117

62.27

79.94

0.027

0.115

SET-2

Name:
Signature:
Date:

Tested by
S.IMRANKHAN AEC-014

Witnessed by
ENG.Mr.HAMDA

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contract no.:
Contractor : AECC
4400001561

3.2.

Record No. :
Sheet :
Page 18 of 33
Substation No : 8132 , AL-NIMAR

Sensitivity Test by swapping CT Terminals :

3.2.1.

Name:
Signature:
Date:

Secondary measurements

Tested by
S.IMRANKHAN AEC-014

Witnessed by
ENG.Mr.HAMDA

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contractor : AECC
Contract no.:
4400001561
Phase

HV Side

Core-2

Core-3

LV Side

Core-1

Core-2

SET-1

Diff.
relay
(HV
side)
Diff.
relay
(LV
side)

SET-2

Diff.
relay
(HV
side)

Name: Diff.
Signature:
relay
Date: (LV
side)

Record No. :
Sheet :
Page 19 of 33
Substation No : 8132 , AL-NIMAR

T.B.

X26A: 41

X26A: 38

X26A: 35

X26A: 33

I sec. (mA)

62

62

62

88

-151

-30

T.B.

X26A: 27

X26A: 24

X26A: 21

X26A: 19

I sec. (mA)

62

62

62

88

-151

-30

T.B.

X21: 2

X21: 4

X21: 6

X21: 7

I sec. (mA)

78

79

79

89

-151

-31

T.B.

X22: 2

X22: 4

X22: 6

X22: 7

I sec. (mA)

78

79

79

89

-151

-31

T.B.

X1:1

X1:3

X1:5

X1:7

I sec. (mA)

62

62

62

88

-151

-30

T.B.

X1:11

X1:13

X1:15

X1:17

I sec. (mA)

78

79

79

89

-156

-30

T.B.

X1:1

X1:3

X1:5

X1:7

I sec. (mA)

62

62

62

88

-151

-31

Tested by
T.B.
X1:11
S.IMRANKHAN
AEC-014

X1:13

Witnessed by
X1:15
X1:17
ENG.Mr.HAMDA

I sec. (mA)

79

79

79

89

-151

-31

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contract no.:
Contractor : AECC
4400001561

Record No. :
Sheet :
Page 20 of 33
Substation No : 8132 , AL-NIMAR

3.2.2.Differential Relay Current Measurement(for Digital relays)


SET-1
Phase

DIFF Relay
Measurement
HV side current A

DIFF Relay
Measurement
LV side current A

DIFF Current
Id A

Restrain Current
IR A

36.82

282.8

66.617

37.129

37.29

285.0

66.736

37.129

36.44

284.7

66.175

37.129

Phase

DIFF Relay
Measurement
HV side current mA

DIFF Relay
Measurement
LV side current mA

DIFF Current
Id PU

Restrain Current
IR PU

61.79

78.26

0.222

0.114

62.82

79.84

0.234

0.116

64.19

81.53

0.231

0.115

SET-2

4. Stability And Sensitivity Of REF HV Side At Tap No 1


4.1.

Stability test
Primary current I
(A)

20.4

SET-1
Connected

Name:
Signature:
Date:

Measured I secondary

Tested by
S.IMRANKHAN AEC-014

REF relay

Witnessed by
ENG.Mr.HAMDA

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contract no.:
Contractor : AECC
4400001561

Record No. :
Sheet :
Page 21 of 33
Substation No : 8132 , AL-NIMAR

Wire From neutral


CT

Supply to
Phase

MK-box

T.B. No
R-N

X9:41
33

34

-94

Y-N

33

34

B-N

33

34

I (mA)

I (mA)

Wire From CT's


sum

I
(A)

ID
(A)

IB
(A)

35

82

19.76

0.916

19.62

26

35

-158

19.76

0.910

19.64

146

35

-38

19.76

0.916

19.61

I (mA)

X1:21

X1:7

SET-2
Connected
Supply to
Phase
T.B. No

4.2.

MK-box
I (mA)

Measured I secondary
Wire From neutral
Wire From CT's
CT
sum
I (mA)

I (mA)

X1:21

R-N

X9:45
33

33

-94

34

87

Y-N

33

33

26

34

-153

B-N

33

33

146

34

-33

REF relay
I
(mA)

ID
(mA)

IB
(mA)

3.32

33.33

3.3

33.32

3.31

33.32

X1:7
33.1
2
33.1
2
33.1
2

Sensitivity Test by Swapping CT Terminals :

SET-1
Connected

Name:
Signature:
Date:

Measured I secondary

Tested by
S.IMRANKHAN AEC-014

REF relay

Witnessed by
ENG.Mr.HAMDA

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contract no.:
Contractor : AECC
4400001561

Record No. :
Sheet :
Page 22 of 33
Substation No : 8132 , AL-NIMAR

Wire From neutral


CT

Supply to
Phase

MK-box

T.B. No
R-N

X9:41
33

34

93

Y-N

33

34

B-N

33

34

I (mA)

I (mA)

Wire From CT's


sum

I
(A)

ID
(A)

IB
(A)

34

93

19.64

38.34

19.66

-153

34

-153

19.64

38.34

19.58

-33

34

-33

19.64

38.3

19.60

I (mA)

X1:21

X1:7

SET-2
Connected
Supply to
Phase
T.B. No

MK-box
I (mA)

Measured I secondary
Wire From neutral
Wire From CT's
CT
sum
I (mA)

I (mA)

X1:21

R-N

X9:45
33

34

86

34

86

Y-N

33

34

-154

34

-154

B-N

33

34

-34

34

-34

REF relay
I
(mA)

ID
(mA)

IB
(mA)

66.7

33.80

66.3

33.75

66.3

33.80

X1:7
60.0
8
60.0
8
60.0
8

5. Stability and sensitivity of REF LV Side at Tap No 1


5.1.

Stability Test
Primary current I
(A)

Name:
Signature:
Date:

Tested by
S.IMRANKHAN AEC-014

220

Witnessed by
ENG.Mr.HAMDA

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contract no.:
Contractor : AECC
4400001561

Record No. :
Sheet :
Page 23 of 33
Substation No : 8132 , AL-NIMAR

SET-1
Connected
Supply to
Phase
T.B. No

MK-box
I (mA)

Measured I secondary
Wire From neutral
Wire From CT's
CT
sum
I (mA)

I (mA)

X1:21

REF relay

I
(A)

ID
(A)

IB
(A)

R-N

X9:60
58

X1:7

60

87

60

-94

214.4

35

213.1
6

Y-N

58

60

-153

60

26

214.4

35

213.1
3

B-N

58

60

-33

60

146

214.4

35.1

213.1
3

SET-2
Connected
Supply to
Phase
T.B. No

5.2.

MK-box
I (mA)

Measured I secondary
Wire From neutral
Wire From CT's
CT
sum
I (mA)

I (mA)

X1:21

REF relay

I
(A)

ID
(A)

IB
(A)

R-N

X9:64
58

X1:7

60

87

60

-91

58.81

7.31

60.22

Y-N

58

60

-153

60

29

58.81

7.27

60.19

B-N

58

60

-33

60

149

58.81

7.27

60.22

Sensitivity Test by Swapping CT Terminals :

SET-1

Name:
Signature:
Date:

Tested by
S.IMRANKHAN AEC-014

Witnessed by
ENG.Mr.HAMDA

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contract no.:
Contractor : AECC
4400001561
Connected
Supply to
Phase
T.B. No

MK-box
I (mA)

Record No. :
Sheet :
Page 24 of 33
Substation No : 8132 , AL-NIMAR

Measured I secondary
Wire From neutral
Wire From CT's
CT
sum
I (mA)

I (mA)

X1:21

REF relay

I
(A)

ID
(A)

IB
(A)

R-N

X9:60
58

X1:7

60

-94

60

-94

214.9

428.3

213.5

Y-N

58

60

26

60

26

214.9

428.3

213.8

B-N

58

60

146

60

146

214.9

428.5

213.5

SET-2
Connected
Supply to
Phase
T.B. No

MK-box
I (mA)

Measured I secondary
Wire From neutral
Wire From CT's
CT
sum
I (mA)

I (mA)

X1:21

REF relay

I
(A)

ID
(A)

IB
(A)

R-N

X9:64
58

X1:7

60

-94

60

-94

59.46

119.9

61.02

Y-N

58

60

26

60

26

59.46

119.1

61

B-N

58

60

146

60

146

59.46

119.1

61.02

6. Stability And Sensitivity Of REF HV Side At Tap No 11


6.1.

Stability test
Primary current I

Name:
Signature:
Date:

Tested by
S.IMRANKHAN AEC-014

26.2

Witnessed by
ENG.Mr.HAMDA

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contract no.:
Contractor : AECC
4400001561

Record No. :
Sheet :
Page 25 of 33
Substation No : 8132 , AL-NIMAR

(A)

SET-1
Connected
Supply to
Phase
T.B. No

MK-box
I (mA)

Measured I secondary
Wire From neutral
Wire From CT's
CT
sum
I (mA)

I (mA)

X1:21

REF relay

I
(A)

ID
(A)

IB
(A)

R-N

X9:41
42

X1:7

44

-93

43

84

25.5

0.376

25.6

Y-N

42

44

23

43

-156

25.5

0.377

25.4

B-N

42

44

143

43

-36

25.5

0.376

25.4

SET-2
Connected
Supply to
Phase
T.B. No

6.2.

MK-box
I (mA)

Measured I secondary
Wire From neutral
Wire From CT's
CT
sum
I (mA)

I (mA)

X1:21

R-N

X9:45
42

44

-97

44

84

Y-N

42

44

23

44

-156

B-N

42

44

143

44

-36

REF relay
I
(mA)

ID
(mA)

IB
(mA)

3.3

44.45

3.3

44.41

3.3

44.47

X1:7
43.3
6
43.3
6
43.3
6

Sensitivity Test by Swapping CT Terminals :

Name:
Signature:
Date:

Tested by
S.IMRANKHAN AEC-014

Witnessed by
ENG.Mr.HAMDA

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contract no.:
Contractor : AECC
4400001561

Record No. :
Sheet :
Page 26 of 33
Substation No : 8132 , AL-NIMAR

SET-1
Measured I secondary
Wire From neutral
Wire From CT's
CT
sum

Connected
Supply to
Phase

MK-box

T.B. No

X9:41

R-N

44

84

44

Y-N

44

-156

B-N

44

-36

I (mA)

I (mA)

REF relay

I
(A)

ID
(A)

IB
(A)

84

25.19

50.28

25.05

44.2

44

-156

25.19

50.28

25.05

44

44

-36

25.19

50.28

25.05

44.1

I (mA)

X1:21

X1:7

SET-2
Measured I secondary
Wire From neutral
Wire From CT's
CT
sum

Connected
Supply to
Phase

MK-box

T.B. No

X9:45

R-N

35

43

84

44

84

Y-N

35

43

-156

44

-156

B-N

35

43

-36

44

-36

I (mA)

I (mA)

I (mA)

X1:21

REF relay
I
(mA)

ID
(mA)

IB
(mA)

85.49

43.68

85.66

43.68

85.49

43.69

X1:7
43.1
4
43.1
4
43.1
4

7. Stability and sensitivity of REF LV Side at Tap No 11

Name:
Signature:
Date:

Tested by
S.IMRANKHAN AEC-014

Witnessed by
ENG.Mr.HAMDA

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contract no.:
Contractor : AECC
4400001561

7.1.

Record No. :
Sheet :
Page 27 of 33
Substation No : 8132 , AL-NIMAR

Stability Test
Primary current I
(A)

251

SET-1
Connected
Supply to
Phase
T.B. No

MK-box
I (mA)

Measured I secondary
Wire From neutral
Wire From CT's
CT
sum
I (mA)

I (mA)

X1:21

REF relay

I
(A)

ID
(A)

IB
(A)

R-N

X9:60
67

X1:7

68

84

68

-97

243.7

7.42

243.7

Y-N

67

68

-156

68

23

243.7

5.59

243.9

B-N

67

68

-36

68

143

243.7

6.39

243.9

SET-2
Connected
Supply to
Phase
T.B. No

Name:
Signature:
Date:

MK-box
I (mA)

Measured I secondary
Wire From neutral
Wire From CT's
CT
sum
I (mA)

I (mA)

X1:21

REF relay

I
(A)

ID
(A)

IB
(A)

R-N

X9:64
67

68

84

69

-97

70.33

3.186

69.80

Y-N

67

68

-156

69

23

70.33

3.154

69.80

B-N

67

68

-36

69

143

70.33

3.11

69.80

Tested by
S.IMRANKHAN AEC-014

X1:7

Witnessed by
ENG.Mr.HAMDA

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contract no.:
Contractor : AECC
4400001561

7.2.

Record No. :
Sheet :
Page 28 of 33
Substation No : 8132 , AL-NIMAR

Sensitivity Test by Swapping CT Terminals :

SET-1
Connected
Supply to
Phase
T.B. No

MK-box
I (mA)

Measured I secondary
Wire From neutral
Wire From CT's
CT
sum
I (mA)

I (mA)

X1:21

REF relay

I
(A)

ID
(A)

IB
(A)

R-N

X9:60
67

X1:7

68

-97

68

-97

244.5

493.1

243.8

Y-N

67

68

23

68

23

244.5

493.1

243

B-N

67

68

143

68

143

244.5

493

243.5

SET-2
Connected
Supply to
Phase
T.B. No

Name:
Signature:
Date:

MK-box
I (mA)

Measured I secondary
Wire From neutral
Wire From CT's
CT
sum
I (mA)

I (mA)

X1:21

REF relay

I
(A)

ID
(A)

IB
(A)

R-N

X9:64
67

68

-97

68

-97

68.3

138.1

69.3

Y-N

67

68

23

68

23

68.3

138

69.5

B-N

67

68

143

68

143

68.3

138.3

69.3

Tested by
S.IMRANKHAN AEC-014

X1:7

Witnessed by
ENG.Mr.HAMDA

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contract no.:
Contractor : AECC
4400001561

Record No. :
Sheet :
Page 29 of 33
Substation No : 8132 , AL-NIMAR

8. Stability And Sensitivity Of REF HV Side At Tap No 27


8.1.

Stability test
Primary current I
(A)

35.7

SET-1
Connected
Supply to
Phase
T.B. No

MK-box
I (mA)

Measured I secondary
Wire From neutral
Wire From CT's
CT
sum
I (mA)

I (mA)

X1:21

REF relay

I
(A)

ID
(A)

IB
(A)

R-N

X9:41
58

X1:7

59

-92

59

87

35.25

1.06

34.87

Y-N

58

59

28

59

-153

35.25

1.09

34.81

B-N

58

59

148

59

-33

35.25

1.08

34.81

SET-2
Connected
Supply to
Phase
T.B. No

Name:
Signature:
Date:

MK-box
I (mA)

Measured I secondary
Wire From neutral
Wire From CT's
CT
sum
I (mA)

I (mA)

X1:21

R-N

X9:45
57

59

-92

59

87

Y-N

57

59

28

59

-153

Tested by
S.IMRANKHAN AEC-014

REF relay
I
(mA)

ID
(mA)

IB
(mA)

2.48

59.97

2.47

59.97

X1:7
60.9
9
60.9
9

Witnessed by
ENG.Mr.HAMDA

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contract no.:
Contractor : AECC
4400001561
57

B-N

8.2.

59

Record No. :
Sheet :
Page 30 of 33
Substation No : 8132 , AL-NIMAR

148

59

-33

60.9
9

2.49

59.97

Sensitivity Test by Swapping CT Terminals :

SET-1
Connected
Supply to
Phase
T.B. No

MK-box
I (mA)

Measured I secondary
Wire From neutral
Wire From CT's
CT
sum
I (mA)

I (mA)

X1:21

REF relay

I
(A)

ID
(A)

IB
(A)

R-N

X9:41
58

X1:7

59

87

59

87

35.21

69.91

35.26

Y-N

58

59

-153

59

-153

35.21

69.96

35.28

B-N

58

59

-33

59

-33

35.21

69.91

35.24

SET-2
Connected
Supply to
Phase
T.B. No
R-N

Name:
Signature:
Date:

MK-box
I (mA)
X9:45
57

Measured I secondary
Wire From neutral
Wire From CT's
CT
sum
I (mA)

I (mA)

X1:21
59

Tested by
S.IMRANKHAN AEC-014

REF relay
I
(mA)

ID
(mA)

IB
(mA)

61.4
4

120.5

58.5

X1:7
87

59

87

Witnessed by
ENG.Mr.HAMDA

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contract no.:
Contractor : AECC
4400001561

Record No. :
Sheet :
Page 31 of 33
Substation No : 8132 , AL-NIMAR

Y-N

57

59

-153

59

-153

61.4
4

120.7

58.5

B-N

57

59

-33

59

-33

61.4
4

120.5

58.7

9. Stability and sensitivity of REF LV Side at Tap No 27


9.1.

Stability Test
Primary current I
(A)

278

SET-1
Connected
Supply to
Phase
T.B. No

MK-box
I (mA)

Measured I secondary
Wire From neutral
Wire From CT's
CT
sum
I (mA)

I (mA)

X1:21

REF relay

I
(A)

ID
(A)

IB
(A)

R-N

X9:60
74

X1:7

75

87

79

-92

269.3

0.947

269.9

Y-N

74

75

-153

79

28

269.3

0.943

269.9

B-N

74

75

-33

79

148

269.3

0.943

270

SET-2
Connected
Supply to
Phase

MK-box

T.B. No

X9:64

Name:
Signature:
Date:

I (mA)

Measured I secondary
Wire From neutral
Wire From CT's
CT
sum
I (mA)
X1:21

Tested by
S.IMRANKHAN AEC-014

I (mA)

REF relay
I
(A)

ID
(A)

X1:7

Witnessed by
ENG.Mr.HAMDA

IB
(A)

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Stability and Sensitivity Test
Equip. No. GT-2
Drawing ref.:
Contract no.:
Contractor : AECC
4400001561

9.2.

Record No. :
Sheet :
Page 32 of 33
Substation No : 8132 , AL-NIMAR

R-N

73

75

87

75

-92

75.39

3.307

76.03

Y-N

73

75

-153

75

28

75.39

3.302

76.01

B-N

73

75

-33

75

148

75.39

3.302

76

Sensitivity Test by Swapping CT Terminals :

SET-1
Connected
Supply to
Phase
T.B. No

MK-box
I (mA)

Measured I secondary
Wire From neutral
Wire From CT's
CT
sum
I (mA)

I (mA)

X1:21

REF relay

I
(A)

ID
(A)

IB
(A)

R-N

X9:60
74

X1:7

75

-92

75

-92

279.2

546

270

Y-N

74

75

28

75

28

279.3

546

270.3

B-N

74

75

148

75

148

279.2

546

270.1

SET-2
Connected
Supply to
Phase

MK-box
I (mA)

Name:
Signature:
Date:

Measured I secondary
Wire From neutral
Wire From CT's
CT
sum
I (mA)
I (mA)

Tested by
S.IMRANKHAN AEC-014

I
(A)

REF relay
ID
IB
(A)
(A)

Witnessed by
ENG.Mr.HAMDA

Commissioning Service Department


Commissioning Standard Test Formats
Description: Transformer Differential & REF
Record No. :
Stability and Sensitivity Test
Equip. No. GT-2
Sheet :
Page 33 of 33
Drawing ref.:
Contractor : AECC
Contract no.:
Substation No : 8132 , AL-NIMAR
4400001561
NO
CALIBRATION
CALIBRATION
TEST EQUIPMENT
SERIAL NUMBER
.
DATE
DUE DATE
T.B. No
X9:64
X1:21
X1:7
R-N
75
-92
76
-92
76.85
156
76.81
1.
ZERA MT 31073
2..

Y-N
73117
MULTIMETER
FLUKE
B-N

10.

73

75

28

76

28

76.83

156

76.8

75

148

76

148

76.85

156

76.84

TEST EQUIPMENT USED:

Name:
Signature:
Date:

Tested by
S.IMRANKHAN AEC-014

Witnessed by
ENG.Mr.HAMDA

Potrebbero piacerti anche