Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
OF
LOCATED AT
Barangay Malanang,Opol,
Misamis Oriental
Prepared by:
PATRIOTISMO L. NAVARRO, JR.
Mining Engineer
TABLE OF CONTENTS
Page no.
EXECUTIVE SUMMARY
1.0
2.0
3.0
Project Name
Project Description
1
2.1
Project Details
1
2.1.1
Project location
2.1.2
Estimated Capital
2.1.3
Minerals to be mined
2.1.4
Mining method
2.1.5
Estimated production
2.1.6
Processing plant
2.2
Quarry reserves/Mine life
2.3
Access/Transportation
3
2.4
Power Supply
2.5
Mining Equipment
2.6
Workforce Information
2.6.1
Administrative
2.6.2
Housing options
2.7
Development/ Utilization schedule
2.7.1
Ground preparation of project site
2.7.2
Re-engineering/Reconstruction
Environmental Impacts and Control
5
3.1
Land resources
5
3.2
Water resources
3.3
Sewerage
3.4
Solid waste
3.5
Noise
3.6
Air quality
1
2
2
3
3
3
3
3
4
4
4
5
5
5
5
6
6
6
6
7
3.7
Conservation values
3.8
3.9
7
7
7
7
8
4.0
5.0
10
Research
Reporting
11
11
ATTACHMENTS:
Figure 1
Location
Figure 2
Sketch plan
Figure 3
Figure 4
Figure 5
I.
Project Name:
Name of Project
Proponent
UKC BUILDERS,INC.
Address
Celphone No.
Quarry Site
Oriental
2.
Contact Person
JASON CHUA UY
President
Address
Project Description
2.1
Details
2.1.1
Project Location
The
proposed
project
is
located
at
Barangay
Estimated Production
10,000 loose cubic meter annually
2.2
2.3
2
Quarry Reserve/Resources/Mine Life
Blocked Ore Reserve
Access/Transportation
2.3.1
The project site is accessible thru a 10 kilometres all weather barangay
road from the area to Barangay Poblacion,passing thru either Barangay
Malanang o Patag.
2.3.2 Air Access
Opol, Misamis Oriental is about 40 kilometers to Alubijid International
Airport,Alubijid, Misamis Oriental,wherein several flights are available to
Manila and Cebu (vice Versa)and being serve both by CEBU PACIFIC
AIRLINES and PHILIPPINE AIRLINES.
2.3.3 Shipping
Opol, Misamis Oriental is respectively 12 and 32 kilometres from
Domestic and International Port of Cagayan De Oro and Tagoloan
International Container Port,Tagoloan, Misamis Oreiental.
2.4
Power Supply
Mining Equipment
Below are list of Mine Mobile Equipment to be use in the mining operation.
Quantity
Description
Hydraulic Excavator
Wheel Pay loader
Ten(10) wheeler dump truck
Capacity(Cubic
Meter)
1.5
1.5
10
3
2.6
Workforce Information
2.6.1 Total Operational Force
Project Manager ............................................................................ 1
MEPEO Officer
1
Administrative and Account
Officer.......................................................................
1
Marketing Officer .......................................................................... 1
Mine FOreman
1
Hydraulic Operator..........1
Pay loader Operator
1
Dump Truck Drivers
10
TOTAL WORKFORCE 17
TABLE OF ORGANIZATION
PROJECT MANAGER
MEPEO
MINE FOREMAN
ADMINISTRATI
ON OFFICE
MARKETING
OFFICER
HYDRAULIC
EXCAVATOR
OPERATOR
STAFF CLERK
DUMP TRUCK
DRIVERS
SERVICE VEHICLE
DRIVER
MECAHNIC
ROAD
MAINTENANCE
CREW
Development Schedule
As soon as the Quarry Permit is approved, a project proponent will
conduct immediately is development specially a mine access road, be area
stockpile pod and its mined benching system of 4 meters high. Development
take to about 1 month followed by its mining operation.
3.
Land Resources
3.1.1.2
General
Others
Water Resources
Area has no water resources, natural artificially created that will
be affected by run off or overflow from siltation pond from the mining
operations
Noise
Acceptable Levels emanating from potential source of noise.
The propose mining area is far from existing residence in the
area. Secondly the mining operation will be limited to 8:00 oclock P.M.
so as not to disturb the sleeping time of the residence of Barangay
Malanang Patag and Opol Poblacion, Misamis Oriental.
3.4
Air Quality
3.4.1 Acceptable Levels of Air Quality
1.
To avoid dust generation during the operation, a
proponent will undertake 3 schedule of water sprinkling 1 at 8:00 A.M.,
1 at 11:00 A.M. and 1 at 3:00 oclock P.M., water sprinkling will done in
all used roads.
2.
All loaded dump trucks should be covered by canvas and
properly tide up.
3.5
Conservation Values
The area has no existing natural parks, visual aestitics,
recreation and educational sites and heritage and cultural values to
be taken care by the proponent
Activities
Sources of
Impacts
Affected
Areas
Parameter
s
Considere
d
Foreseen
Impacts
Purpose of
Monitoring
Mitigating
Measures
Monitoring
Method
Estimated Budget
Monitoring
Locations
Monitoring
Frequency
Activities
Sources of
Impacts
Affected
Areas
Parameter
s
Considere
d
Foreseen
Impacts
Purpose of
Monitoring
Mitigating
Measures
Monitoring
Method
Estimated Budget
Monitoring
Locations
Monitoring
Frequency
Activities
Sources of
Impacts
Affected
Areas
Parameter
s
Considere
d
Foreseen
Impacts
Purpose of
Monitoring
Mitigating
Measures
Monitoring
Method
Estimated Budget
Monitoring
Locations
Monitoring
Frequency