1.0
2.0

3.0

Project Name
Project Description
1
2.1
Project Details
1
2.1.1
Project location
2.1.2
Estimated Capital
2.1.3
Minerals to be mined
2.1.4
Mining method
2.1.5
Estimated production
2.1.6
Processing plant
2.2
Quarry reserves/Mine life
2.3
Access/Transportation
3
2.4
Power Supply
2.5
Mining Equipment
2.6
Workforce Information
2.6.1
Administrative
2.6.2
Housing options
2.7
Development/ Utilization schedule
2.7.1
Ground preparation of project site
2.7.2
Re-engineering/Reconstruction
Environmental Impacts and Control
5
3.1
Land resources
5
3.2
Water resources
3.3
Sewerage
3.4
Solid waste
3.5
Noise
3.6
Air quality

1
2
2
3
3
3
3

3
4
4
4
5
5
5
5

6
6
6
6
7

3.7

Conservation values

3.8
3.9

3.7.1 Nature issues


3.7.2 Visual aesthetics
3.7.3 Recreation and education
Heritage and Cultural values
Social issue

7
7
7
7
8

SUMMARY MATRIX ON THE FORESEEN ENVIRONMENTAL IMPACTS


9

4.0

Approach and Scope of Environmental Monitoring Program


10
4.1
Monitoring
4.2
4.3

5.0

10
Research
Reporting

Five (5) year EPEP activities and costs


11

11
11

ATTACHMENTS:
Figure 1

Location

Figure 2

Sketch plan

Figure 3

Plan of Tailings Pond

Figure 4

Quarry Plan showing top and sectional view of Odiongan River

Figure 5

Layout Plans of Aggregates Processing Plant

I.

Project Name:
Name of Project

Malanang Filling Materials Project

Proponent

UKC BUILDERS,INC.

Address

Baloy, Cagayan De Oro City


Misamis Oriental

Celphone No.

Quarry Site
Oriental

Barangay Malanang, Opol, Misamis


Gingoog City

2.

Contact Person

JASON CHUA UY
President

Address

Baloy, Cagayan De Oro City


Misamis Oriental

Project Description
2.1

Details
2.1.1

Project Location
The

proposed

project

is

located

at

Barangay

Malanang,Opol, Misamis Oriental.It has an area of 2.3579


hectares bounded by the following Technical Description as
follows:.
TECHNICAL DESCRIPTION ( PORTION OF LOT 9227-A)
LINES
Bearing
Distance
(Meter)
1-2
N11 53 W
108.46
2-3
N18 35 E
103.43
3-4
N1932 E
34.49
4-5
S4514E
154.85
5-6
S46 53W
43.62
6-7
S0300E
55.55
7-8
S89 30W
38.03

2.1.2 Estimated Capital Cost


Php 7,818,000.00
2.1.3 Mineral to be mined
Filling Materials (Limestone)
2.1.4 Mining Method
The operation is an open cast benching mining method using heavy
equipments such as Hydraulic Excavator, Dump truck for its production.
Extraction start from the top portion of the area with a maximum bench height
of 4 meters and slope of 60 degrees. Run-Of Mine materials are brought to
the nearby proponent nearby project or market.
2.1.5

Estimated Production
10,000 loose cubic meter annually

2.2

2.3

2
Quarry Reserve/Resources/Mine Life
Blocked Ore Reserve

29,250 Loose Cubic Meters

Estimated Ore Reserve

60,000 Loose Cubic Meters

Access/Transportation
2.3.1
The project site is accessible thru a 10 kilometres all weather barangay
road from the area to Barangay Poblacion,passing thru either Barangay
Malanang o Patag.
2.3.2 Air Access
Opol, Misamis Oriental is about 40 kilometers to Alubijid International
Airport,Alubijid, Misamis Oriental,wherein several flights are available to
Manila and Cebu (vice Versa)and being serve both by CEBU PACIFIC
AIRLINES and PHILIPPINE AIRLINES.
2.3.3 Shipping
Opol, Misamis Oriental is respectively 12 and 32 kilometres from
Domestic and International Port of Cagayan De Oro and Tagoloan
International Container Port,Tagoloan, Misamis Oreiental.

2.4

Power Supply

Electric power is supplied by MORESCO II through a transmission line


from 167 KVA transformers. Power is being used for minor power
requirements of the project such as lighting system in the mining area, Mine
office, Camp house and Housing units.
2.5

Mining Equipment
Below are list of Mine Mobile Equipment to be use in the mining operation.
Quantity

Description

One (1) Unit


One (1) Unit
Ten(10) Unit

Hydraulic Excavator
Wheel Pay loader
Ten(10) wheeler dump truck

Capacity(Cubic
Meter)
1.5
1.5
10

3
2.6

Workforce Information
2.6.1 Total Operational Force
Project Manager ............................................................................ 1
MEPEO Officer
1
Administrative and Account
Officer.......................................................................
1
Marketing Officer .......................................................................... 1
Mine FOreman
1
Hydraulic Operator..........1
Pay loader Operator
1
Dump Truck Drivers
10
TOTAL WORKFORCE 17

TABLE OF ORGANIZATION
PROJECT MANAGER

MEPEO

MINE FOREMAN

ADMINISTRATI
ON OFFICE
MARKETING
OFFICER

HYDRAULIC
EXCAVATOR
OPERATOR

STAFF CLERK
DUMP TRUCK
DRIVERS

SERVICE VEHICLE
DRIVER

MECAHNIC

ROAD
MAINTENANCE
CREW

2.6.2 Housing Options


The project proponent will provide Mine Office and Camp house in the
area. Housing will also be constructed to accommodate personnel who will
relocate their near to the area of operation.
2.7

Development Schedule
As soon as the Quarry Permit is approved, a project proponent will
conduct immediately is development specially a mine access road, be area
stockpile pod and its mined benching system of 4 meters high. Development
take to about 1 month followed by its mining operation.

3.

Environmental Impacts and Control


3.1

Land Resources

3.1.1 Acceptable Impacts associated during the construction,


development and mining operation

3.1.1.2

For Open Cut Mines

Bench site are limited to 4 meters high for optimum


equipment efficiency an angle of repose of not more than 60
degrees for better slope stability. Waste dump well also be
develop for over burden produce during the development and
mining operation.
3.1.1.3

General

Mine Office Camp House including power line silting


ponds parking area will be constructed and installed such that it
will not be affected by the development in mining operations.
3.1.1.4

Others

Residential and community facilities for the support staff


and operators and drivers.
3.2

Water Resources
Area has no water resources, natural artificially created that will
be affected by run off or overflow from siltation pond from the mining
operations

3.2.2 Control Strategies


3.2.2.6
A series of sediment control dump will be
constructed on the existing creeks to have an efficient
impoundment and collection of run off materials.
3,3

Noise
Acceptable Levels emanating from potential source of noise.
The propose mining area is far from existing residence in the
area. Secondly the mining operation will be limited to 8:00 oclock P.M.
so as not to disturb the sleeping time of the residence of Barangay
Malanang Patag and Opol Poblacion, Misamis Oriental.

3.4

Air Quality
3.4.1 Acceptable Levels of Air Quality
1.
To avoid dust generation during the operation, a
proponent will undertake 3 schedule of water sprinkling 1 at 8:00 A.M.,
1 at 11:00 A.M. and 1 at 3:00 oclock P.M., water sprinkling will done in
all used roads.
2.
All loaded dump trucks should be covered by canvas and
properly tide up.

3.5

Conservation Values
The area has no existing natural parks, visual aestitics,
recreation and educational sites and heritage and cultural values to
be taken care by the proponent

3.9 Social Issues


The constituents of Barangay Malang, Patag are engaged in
Small Scale Farming and such as coco plantation and coco farming the
existence operation to generate income of the barangay in terms of
extraction fees and create employment opportunities in the area.
Other Suggestive Initiative are as follows:
1. Conduct training and seminar on livelihood seminar in coordination
with the department of Trade and Industry with the Local
government Unit of Opol, Misamis Oriental and Barangay
Malanang, Patag

SUMMARY MATRIX ON THE FORESEEN ENVIRONMENTAL IMPACTS


Item
No.

Activities

Sources of
Impacts

Affected
Areas

Parameter
s
Considere
d

Foreseen
Impacts

Purpose of
Monitoring

Mitigating
Measures

Monitoring
Method

Estimated Budget

Monitoring
Locations

Monitoring
Frequency

SUMMARY MATRIX ON THE FORESEEN ENVIRONMENTAL IMPACTS


Item
No.

Activities

Sources of
Impacts

Affected
Areas

Parameter
s
Considere
d

Foreseen
Impacts

Purpose of
Monitoring

Mitigating
Measures

Monitoring
Method

Estimated Budget

Monitoring
Locations

Monitoring
Frequency

SUMMARY MATRIX ON THE FORESEEN ENVIRONMENTAL IMPACTS


Item
No.

Activities

Sources of
Impacts

Affected
Areas

Parameter
s
Considere
d

Foreseen
Impacts

Purpose of
Monitoring

Mitigating
Measures

Monitoring
Method

Estimated Budget

Monitoring
Locations

Monitoring
Frequency

Potrebbero piacerti anche