Sei sulla pagina 1di 4

TEX VALLEY - LEASE CAP PILLAR WORKS

Non Tender Item No :

Date :04.03.15
Data for 1.00 Sqm

Description

unit

Providing & Laying of Half brick masonry


works with chamber bricks & CM 1:3 in lease Sqm
cap pillar

Qty

Rate

Amount

Cement mortar 1:3 (1cement : 3coarse sand)


all complete and as directed by Engineer-InCharge
Size - 1x3x.12x3.375=1.215 Sqm
Rate for 1.215 Sqm
A

Material
Brick 115mm thk

Nos

River Sand

Cft

66.69
1.82

4.73

315.10

33.00

60.14

Labour
L/C for Cement handling

Sqm

0.30

6.00

1.82

L/C for Brick shifting

Nos

66.69

1.00

66.69

L/C for Sand Seiving & Shifting Charges

Cft

1.82

6.00

10.94

Mason

Nos

1.00

700.00

700.00

Men Mazdoor

Nos

1.00

500.00

500.00

L/C for Curing

Sqm

1.22

50.00

60.75

Scaffolding material hire

Sqm

60.00

20.00

1 200.00

Lifting charges for each floors

Sqm

1.00

30.00

30.00

Tools and plants

Sqm

1.00

15.00

15.00

Kgs

0.32

75.00

23.63

Nos

15.00

5.50

82.50

Kgs

4.93

22.00

108.41

Sqm

60.00

20.00

1 200.00

Machinery

Vertical rod fixing


Cost of GI Binding (20 Nos Holes two side
binding)
L/C for holes making (8 Nos 6mm dia) (1 Rod -5
Holes)
L/C for Fabrication & Errecting Reinforcement
Scaffolding material hire & Labour charges

0.00
Sub Total

4 374.96

Water and power cost 2%

87.50

Total
Add Overaheads & Profit

4 462.46
15%

669.37
Rate for 1.215 Sqm

5 131.83

Rate / Sqm

4 223.73

Say

For URC Construction P Ltd.

4 224.00

For CS Projects (I) Pvt Ltd

Remarks

TEX VALLEY - LEASE CAP PILLAR CHIPPING WORKS


Non Tender Item No :

Date :04.03.15
Data for 1.00 Sqm

Description

unit

Qty

Rate

Amount

Wall brick work Chipping and debris cleaning


Rate for 1 Sqm
Size -5x.2x3.225=3.225 Sqm
Labour
Cost of Stone cutter

Day

2.00

700.00

1 400.00

Cost of Men Mazdoor

Day

2.00

500.00

1 000.00

Cost of Scaffolding ( Labour & Hire)

Sqm

50.00

20.00

1 000.00

Cost of 6mm dia Rod cutting

Nos

120.00

10.00

1 200.00

Hire charges for cutting Machine

Day

1.00

150.00

150.00

Cost of Cutting Blade

Nos

1.00

60.00

60.00

Machinery

Sub Total

4 810.00

Water and power cost 2%

96.20

Total
Add Overaheads & Profit

4 906.20
15%

735.93
Rate for 3.225 Sqm

5 642.13

Rate / Sqm

1 749.50

Say

For URC Construction P Ltd.

1 749.00

For CS Projects (I) Pvt Ltd

Remarks

TEX VALLEY - LEASE CAP PILLAR WALL PLASTERING


Non Tender Item No :

Date :04.03.15
Data for 1.00 Sqm

Description

unit

Qty

Rate

Amount

Lease Cap pillar Elevation plastering 50mm &


Side wall 15mm thk CM 1:4
Rate for 1 Sqm
Size -1x2x0.115x3.225=0.742Sqm
Size -1x4x0.155x3.225=1.935Sqm
Total Area -2.677 Sqm
Materials
River Sand

Cft

2.45

33.00

80.73

Labour
Cement handling charges

Bags

0.55

6.00

3.29

Cft

2.45

6.00

14.68

Mason

Days

1.00

700.00

700.00

Men Mazdoor

Days

1.00

500.00

500.00

Cost of Scaffolding ( Labour & Hire)

Sqm

20.00

20.00

400.00

Cost of curing

Sqm

2.68

20.00

53.54

Cost of tools & tackles

Sqm

2.68

12.00

32.12

L/C for Sand Seiving & Shifting Charges


L/C for plastering

Sub Total

1 784.36

Water and power cost 2%

35.69

Total
Add Overaheads & Profit

1 820.05
15%

273.01
Rate for 2.68 Sqm

2 093.06

Rate / Sqm

781.87

Say

For URC Construction P Ltd.

782.00

For CS Projects (I) Pvt Ltd

Remarks

TEX VALLEY -PLASTERING CHIPPING WORKS


Non Tender Item No :

Date :04.03.15
Data for 1.00 Sqm

Description

unit

Qty

Rate

Amount

15.56 Dismantling old plaster and cleaning the


surface of plaster including disposal of
rubbish to the dumping ground
Details for 10 Sqm
Rate for 1 Sqm
Labour
Beldar (Men Mazdoor)

Day

0.36

500.00

180.00

Coolie (Women Mazdoor)

Day

0.08

400.00

32.00

Bhisti ( Maistry)

Day

0.07

500.00

35.00

Sundries for Scaffolding etc

LS

1.85

2.65

1.43

Sub Total

249.65

Water and power cost 2%

4.99

Total
Add Overaheads & Profit

254.64
15%

38.20
Rate for 10.00Sqm

292.83

Rate 1 Sqm

29.28

Say

For URC Construction P Ltd.

29.00

For CS Projects (I) Pvt Ltd

Remarks

Potrebbero piacerti anche