Sei sulla pagina 1di 16

Follow up Log sheet that done by Chimec Rep.

for corrosion inhibitors (CH1038 & CH1052 &


CH1030) injection pumps at wells during 2010

Check form for corrosion inhibitor CH1052 & CH 1030 and CH 1038 injection at
the wellheads
SAT

CP

NG-1

NG-2

SG-1
Twice

NO-1

NO-2

Wells
N22
N23
N24
N25
N26
N27
N30
A9
N19
N20
N21
A42
A44
N31
N32
N33
N34
N35
S1
S2
S3
S1
S2
S3
N5
N6
N7
N8
N10
N11
N13
N14
N15
N16
N17
N2
N28
N29
A43
A38

A7
A35
A33
A31
A27
A29
A1
A9
A8
A37
A24
A42
A44
A15
A21
A25
A19
A2
A40
A13
A41
A40
A13
A41
A6
A30
A28
A22
A26
A4
A20
A16
A14
A3
A18
A36
A17
A23
A43
A38

Target
Tank
Check date
cc/min
level %
7.6
10
5.7
15.2
10.7
10.5
7.1
5.9
5.1
10.8
5.0
9.5
9.3
6.2
10.3
11.2
8.9
11.4
14.1
16.4
15.2
14.1
16.4
15.2
14
8.2
2.8
2.4
4.1
6.5
13.2
7.7
2.2
1.5
10.8
9.0
8.3
8.0
9.4
5.9

04/01/10
04/01/10
04/01/10
04/01/10
04/01/10
04/01/10
04/01/10
04/01/10
04/01/10
04/01/10
04/01/10
03/01/10
03/01/10
03/01/10
03/01/10
03/01/10
03/01/10
03/01/10
02/01/10
02/01/10
02/01/10
28/12/09
28/12/09
28/12/09
05/01/10
05/01/10
05/01/10
05/01/10
06/01/10
06/01/10
06/01/10
06/01/10
06/01/10
06/01/10
06/01/10
06/01/10
06/01/10
06/01/10
06/01/10
06/01/10

40
75
30
25
70
60
30
80
50
25
40
60
50
100
65
75
60
60
80
80
35
85
40
40
30
40
25
30
100
---45
30
85
60
45
--60
90
40
---

After Adjustment
Injection rate
Stroke
%
cc / min lts/day
8
11.52
75
10
14.4
90
6
8.64
55
15.5
22.32
100
11
15.84
100
------100
7.5
10.8
60
6
17.28
65
5.5
7.92
60
11
15.84
95
5
7.2
50
9.5
13.68
80
9.5
13.68
40
6.5
9.36
55
10.5
15.12
100
11.5
16.56
100
9
12.96
85
11.5
16.56
100
14
20.16
45
16.6
23.76
100
15.5
22.32
50
15
21.6
50
16.5
23.76
100
15.5
22.32
50
14
20.16
100
8.5
12.24
70
3
4.32
35
3
4.32
35
4.5
6.48
50
-------70
13.5
19.44
100
8
11.52
70
2.5
3.6
30
2
2.88
30
11
15.84
95
--------8.5
12.24
75
8
11.52
85
9.5
13.68
80
------70

Remarks

P=0

Leakage

Shut Down

Shut Down

Shut Down

Check form for corrosion inhibitor CH1052 & CH 1030 and CH 1038 injection at
the wellheads
SAT

CP

NG-1

NG-2

SG-1
Twice

NO-1

NO-2

Wells
N22
N23
N24
N25
N26
N27
N30
A9
N19
N20
N21
A42
A44
N31
N32
N33
N34
N35
S1
S2
S3
S1
S2
S3
N5
N6
N7
N8
N10
N11
N13
N14
N15
N16
N17
N2
N28
N29
A43
A38

A7
A35
A33
A31
A27
A29
A1
A9
A8
A37
A24
A42
A44
A15
A21
A25
A19
A2
A40
A13
A41
A40
A13
A41
A6
A30
A28
A22
A26
A4
A20
A16
A14
A3
A18
A36
A17
A23
A43
A38

Target
Tank
Check date
cc/min
level %
7.6
10
5.7
15.2
10.7
10.5
7.1
5.9
5.1
10.8
5.0
9.5
9.3
6.2
10.3
11.2
8.9
11.4
14.1
16.4
15.2
14.1
16.4
15.2
14
8.2
2.8
2.4
4.1
6.5
13.2
7.7
2.2
1.5
10.8
9.0
8.3
8.0
9.4
5.9

09/01/10
09/01/10
09/01/10
09/01/10
09/01/10
09/01/10
09/01/10
09/01/10
09/01/10
09/01/10
09/01/10
11/01/10
11/01/10
11/01/10
11/01/10
11/01/10
11/01/10
11/01/10
10/01/10
10/01/10
10/01/10
14/01/10
14/01/10
14/01/10
12/01/10
12/01/10
12/01/10
12/01/10
13/01/10
13/01/10
13/01/10
13/01/10
13/01/10
13/01/10
13/01/10
13/01/10
13/01/10
13/01/10
13/01/10
13/01/10

30
75
80
25
70
60
85
80
30
75
35
85
70
60
80
85
70
65
90
75
40
50
30
80
40
90
90
90
80
---60
70
75
40
60
--90
50
90
---

After Adjustment
Injection rate
Stroke
%
cc / min lts/day
8
11.52
75
------90
6
8.64
55
------100
------100
------100
7.5
10.8
60
------65
5.5
7.92
60
11
15.84
95
5
7.2
50
9.5
13.68
80
9.5
13.68
35
6.5
9.36
55
10.5
15.12
100
11.5
16.56
100
9
12.96
85
11.5
16.56
100
14
20.16
45
16.6
23.76
100
15.5
22.32
50
14
20.16
45
16.5
23.76
100
15.5
22.32
50
14
20.16
100
8.5
12.24
70
3
4.32
35
3
4.32
35
4.5
6.48
50
-------70
13.5
19.44
100
8
11.52
70
2.5
3.6
30
2
2.88
30
11
15.84
95
--------8.5
12.24
75
8
11.52
80
9.5
13.68
80
------70

Remarks

Shut Down
Shut Down
Shut Down
Shut Down
Shut Down

Shut Down

Shut Down

Shut Down

Check form for corrosion inhibitor CH1052 & CH 1030 and CH 1038 injection at
the wellheads
SAT

CP

NG-1

NG-2

SG-1
Twice

NO-1

NO-2

Wells
N22
N23
N24
N25
N26
N27
N30
A9
N19
N20
N21
A42
A44
N31
N32
N33
N34
N35
S1
S2
S3
S1
S2
S3
N5
N6
N7
N8
N10
N11
N13
N14
N15
N16
N17
N2
N28
N29
A43
A38

A7
A35
A33
A31
A27
A29
A1
A9
A8
A37
A24
A42
A44
A15
A21
A25
A19
A2
A40
A13
A41
A40
A13
A41
A6
A30
A28
A22
A26
A4
A20
A16
A14
A3
A18
A36
A17
A23
A43
A38

Target
Tank
Check date
cc/min
level %
7.6
10
5.7
15.2
10.7
10.5
7.1
5.9
5.1
10.8
5.0
9.5
9.3
6.2
10.3
11.2
8.9
11.4
14.1
16.4
15.2
14.1
16.4
15.2
14
8.2
2.8
2.4
4.1
6.5
13.2
7.7
2.2
1.5
10.8
9.0
8.3
8.0
9.4
5.9

17/01/10
17/01/10
17/01/10
17/01/10
17/01/10
17/01/10
17/01/10
17/01/10
17/01/10
17/01/10
17/01/10
18/01/10
18/01/10
18/01/10
18/01/10
20/01/10
18/01/10
18/01/10
19/01/10
18/01/10
18/01/10
14/01/10
14/01/10
14/01/10
16/01/10
16/01/10
16/01/10
16/01/10
13/01/10
13/01/10
13/01/10
13/01/10
13/01/10
13/01/10
13/01/10
13/01/10
13/01/10
13/01/10
13/01/10
13/01/10

60
60
50
50
100
70
40
80
85
75
90
40
40
30
20
18
20
85
15
75
40
50
30
80
90
70
85
80
80
---60
70
75
40
60
--90
50
90
---

After Adjustment
Injection rate
Stroke
%
cc / min lts/day
8
11.52
75
10
14.4
85
6
8.64
55
15.5
22.32
100
11
15.84
100
10.5
15.12
100
7.5
10.8
60
------65
5
7.20
50
------95
5
7.20
50
9.5
13.68
80
9.5
13.68
40
6.5
9.36
55
10.5
15.12
100
100
9
12.96
85
11.5
16.56
100
45
16.6
23.76
100
15.5
22.32
50
14
20.16
45
16.5
23.76
100
15.5
22.32
50
14
20.16
100
8.5
12.24
70
3
4.32
40
3
4.32
35
4.5
6.48
50
-------70
13.5
19.44
100
8
11.52
70
2.5
3.6
30
2
2.88
30
11
15.84
95
--------8.5
12.24
75
8
11.52
80
9.5
13.68
80
------70

Remarks

Shut Down
Shut Down

Pump off low level

Pump off low level

Shut Down

Shut Down

Shut Down

Check form for corrosion inhibitor CH1052 & CH 1030 and CH 1038 injection at
the wellheads
SAT

CP

NG-1

NG-2

SG-1
Twice

NO-1

NO-2

Wells
N22
N23
N24
N25
N26
N27
N30
A9
N19
N20
N21
A42
A44
N31
N32
N33
N34
N35
S1
S2
S3
S1
S2
S3
N5
N6
N7
N8
N10
N11
N13
N14
N15
N16
N17
N2
N28
N29
A43
A38

A7
A35
A33
A31
A27
A29
A1
A9
A8
A37
A24
A42
A44
A15
A21
A25
A19
A2
A40
A13
A41
A40
A13
A41
A6
A30
A28
A22
A26
A4
A20
A16
A14
A3
A18
A36
A17
A23
A43
A38

Target
Tank
Check date
cc/min
level %
7.6
10
5.7
15.2
10.7
10.5
7.1
5.9
5.1
10.8
5.0
9.5
9.3
6.2
10.3
11.2
8.9
11.4
14.1
16.4
15.2
14.1
16.4
15.2
14
8.2
2.8
2.4
4.1
6.5
13.2
7.7
2.2
1.5
10.8
9.0
8.3
8.0
9.4
5.9

26/01/10
26/01/10
26/01/10
26/01/10
26/01/10
26/01/10
26/01/10
25/01/10
25/01/10
25/01/10
25/01/10
29/01/10
29/01/10
29/01/10
29/01/10
29/01/10
29/01/10
29/01/10
19/01/10
18/01/10
18/01/10
27/01/10
27/01/10
27/01/10
26/01/10
26/01/10
26/01/10
26/01/10
28/01/10
28/01/10
28/01/10
28/01/10
28/01/10
28/01/10
28/01/10
28/01/10
28/01/10
28/01/10
28/01/10
28/01/10

95
25
90
30
100
75
70
20
60
30
45
50
60
90
20
25
35
15
15
75
40
25
40
40
80
30
30
25
30
---90
65
40
100
90
--30
40
15
---

After Adjustment
Injection rate
Stroke
%
cc / min lts/day
8
11.52
75
10
14.4
85
7
8.64
55
15.5
22.32
100
11
15.84
100
10.5
15.12
100
8
10.8
60
6
8,64
65
5
7.20
50
11
15,84
95
5
7.20
50
10
13.68
80
10
13.68
40
6.5
9.36
55
10.5
15.12
100
12
100
9
12.96
85
11.5
16.56
100
45
16.6
23.76
100
15.5
22.32
50
16,5
20.16
45
10
23.76
100
15.5
22.32
50
14
20.16
100
8.5
12.24
70
4
4.32
40
3
4.32
35
4.5
6.48
50
---------13.5
19.44
100
8
11.52
70
3
3.6
30
2
2.88
30
12
15.84
95
--------8.5
12.24
75
8
11.52
80
9
13.68
80
---------

Remarks

Shut Down

Shut Down

Shut Down

Check form for corrosion inhibitor CH1052 & CH 1030 and CH 1038 injection at
the wellheads
SAT

CP

NG-1

NG-2

SG-1
Twice

NO-1

NO-2

Wells
N22
N23
N24
N25
N26
N27
N30
A9
N19
N20
N21
A42
A44
N31
N32
N33
N34
N35
S1
S2
S3
S1
S2
S3
N5
N6
N7
N8
N10
N11
N13
N14
N15
N16
N17
N2
N28
N29
A43
A38

A7
A35
A33
A31
A27
A29
A1
A9
A8
A37
A24
A42
A44
A15
A21
A25
A19
A2
A40
A13
A41
A40
A13
A41
A6
A30
A28
A22
A26
A4
A20
A16
A14
A3
A18
A36
A17
A23
A43
A38

Target
Tank
Check date
cc/min
level %
7.6
10
5.7
15.2
10.7
10.5
7.1
5.9
5.1
10.8
5.0
9.5
9.3
6.2
10.3
11.2
8.9
11.4
14.1
16.4
15.2
14.1
16.4
15.2
14
8.2
2.8
2.4
4.1
6.5
13.2
7.7
2.2
1.5
10.8
9.0
8.3
8.0
9.4
5.9

2/02/10
2/02/10
2/02/10
2/02/10
2/02/10
2/02/10
2/02/10
2/02/10
2/02/10
2/02/10
2/02/10
4/02/10
4/02/10
4/02/10
4/02/10
4/02/10
4/02/10
4/02/10
03/02/10
03/02/10
03/02/10
27/01/10
27/01/10
27/01/10
2/02/10
2/02/10
2/02/10
2/02/10
28/01/10
28/01/10
28/01/10
28/01/10
28/01/10
28/01/10
28/01/10
28/01/10
28/01/10
28/01/10
28/01/10
28/01/10

50
60
50
45
45
20
30
75
40
40
25
90
20
60
60
60
70
65
50
90
50
25
40
40
20
80
40
30
30
---90
65
40
100
90
--30
40
15
---

After Adjustment
Injection rate
Stroke
%
cc / min lts/day
8
11.52
75
10
14.4
85
7
8.64
55
15.5
22.32
100
11
15.84
100
10.5
15.12
100
8
10.8
60
6
8,64
65
5
7.20
50
11
15,84
95
5
7.20
50
10
13.68
80
10
13.68
40
6.5
9.36
55
10.5
15.12
100
12
15.84
100
9
12.96
85
11.5
16.56
100
14
20.16
45
12
15.84
100
15.5
22.32
50
16,5
20.16
45
10
23.76
100
15.5
22.32
50
14
20.16
100
8.5
12.24
70
4
4.32
40
3
4.32
35
4.5
6.48
50
---------13.5
19.44
100
8
11.52
70
3
3.6
30
2
2.88
30
12
15.84
95
--------8.5
12.24
75
8
11.52
80
9
13.68
80
---------

Remarks

Found pump off

Shut Down

Shut Down

Shut Down

Check form for corrosion inhibitor CH1052 & CH 1030 and CH 1038 injection at
the wellheads
SAT

CP

NG-1

NG-2

SG-1
Twice

NO-1

NO-2

Wells
N22
N23
N24
N25
N26
N27
N30
A9
N19
N20
N21
A42
A44
N31
N32
N33
N34
N35
S1
S2
S3
S1
S2
S3
N5
N6
N7
N8
N10
N11
N13
N14
N15
N16
N17
N2
N28
N29
A43
A38

A7
A35
A33
A31
A27
A29
A1
A9
A8
A37
A24
A42
A44
A15
A21
A25
A19
A2
A40
A13
A41
A40
A13
A41
A6
A30
A28
A22
A26
A4
A20
A16
A14
A3
A18
A36
A17
A23
A43
A38

Target
Tank
Check date
cc/min
level %
7.6
10
5.7
15.2
10.7
10.5
7.1
5.9
5.1
10.8
5.0
9.5
9.3
6.2
10.3
11.2
8.9
11.4
14.1
16.4
15.2
14.1
16.4
15.2
14
8.2
2.8
2.4
4.1
6.5
13.2
7.7
2.2
1.5
10.8
9.0
8.3
8.0
9.4
8.0

11/02/10
11/02/10
11/02/10
13/02/10
11/02/10
13/02/10
11/02/10
7/02/10
7/02/10
7/02/10
7/02/10
13/02/10
13/02/10
13/02/10
13/02/10
11/02/10
13/02/10
13/02/10
03/02/10
03/02/10
03/02/10
11/02/10
11/02/10
11/02/10
7/02/10
7/02/10
7/02/10
7/02/10
4/02/10
4/02/10
4/02/10
4/02/10
4/02/10
4/02/10
4/02/10
4/02/10
4/02/10
4/02/10
4/02/10
4/02/10

100
80
90
60
45
22
80
65
20
90
80
40
75
35
65
80
85
70
50
90
50
20
45
50
95
75
25
100
50
---100
50
45
100
45
--100
100
75
90

After Adjustment
Injection rate
Stroke
%
cc / min lts/day
8
11.52
75
10
14.4
85
55
16
22.32
100
11
15.84
100
11
15.12
100
8
10.8
60
6
8,64
65
5
7.20
50
11
15,84
95
5
7.20
50
10.5
13.68
80
10.5
13.68
40
6.5
9.36
55
10.5
15.12
100
12
15.84
100
9
12.96
85
11.5
16.56
100
14
20.16
45
12
15.84
100
15.5
22.32
50
14
20.16
45
11
23.76
100
15.5
22.32
50
100
70
3
4.32
40
3
4.32
35
4.5
6.48
50
---------13.5
19.44
100
8
11.52
70
3
3.6
30
2
2.88
30
12
15.84
95
--------8.5
12.24
75
8
11.52
80
9
13.68
80
10
14,4
89

Remarks

Pump Off

No Discharge P=0
Pump Off

Shut Down

Shut Down

Check form for corrosion inhibitor CH1052 & CH 1030 and CH 1038 injection at
the wellheads
SAT

CP

NG-1

NG-2

SG-1
Twice

NO-1

NO-2

Wells
N22
N23
N24
N25
N26
N27
N30
A9
N19
N20
N21
A42
A44
N31
N32
N33
N34
N35
S1
S2
S3
S1
S2
S3
N5
N6
N7
N8
N10
N11
N13
N14
N15
N16
N17
N2
N28
N29
A43
A38

A7
A35
A33
A31
A27
A29
A1
A9
A8
A37
A24
A42
A44
A15
A21
A25
A19
A2
A40
A13
A41
A40
A13
A41
A6
A30
A28
A22
A26
A4
A20
A16
A14
A3
A18
A36
A17
A23
A43
A38

Target
Tank
Check date
cc/min
level %
7.6
10
5.7
15.2
10.7
10.5
7.1
5.9
5.1
10.8
5.0
9.5
9.3
6.2
10.3
11.2
8.9
11.4
14.1
16.4
15.2
14.1
16.4
15.2
14
8.2
2.8
2.4
4.1
6.5
13.2
7.7
2.2
1.5
10.8
9.0
8.3
8.0
9.4
8.0

18/02/10
18/02/10
18/02/10
18/02/10
18/02/10
18/02/10
18/02/10
18/02/10
18/02/10
18/02/10
18/02/10
13/02/10
13/02/10
13/02/10
13/02/10
11/02/10
13/02/10
13/02/10
16/02/10
16/02/10
16/02/10
11/02/10
11/02/10
11/02/10
18/02/10
18/02/10
18/02/10
18/02/10
19/02/10
19/02/10
19/02/10
19/02/10
19/02/10
19/02/10
19/02/10
19/02/10
19/02/10
19/02/10
19/02/10
19/02/10

50
40
70
90
60
45
45
30
65
85
40
40
75
35
65
80
85
70
50
100
100
20
45
50
90
50
90
70
80
---70
40
80
50
85
--75
75
70
40

After Adjustment
Injection rate
Stroke
%
cc / min lts/day
8
11.52
75
10
14.4
85
6
8.64
55
15.5
22.32
100
11
15.84
100
10.5
15.12
100
7
10.08
60
6
8.64
55
5
7.20
50
11
15,84
95
5
7.20
50
10.5
13.68
80
10.5
13.68
40
6.5
9.36
55
10.5
15.12
100
12
15.84
100
9
12.96
85
11.5
16.56
100
14
20.16
45
16.5
23.76
100
15.5
22.32
100
14
20.16
45
11
23.76
100
15.5
22.32
50
14
20.16
100
8.5
12.24
70
3
4.32
40
3
4.32
35
4.5
6.48
50
---------13.5
19.44
100
-------70
3
3.6
30
2
2.88
30
12
15.84
95
--------8.5
12.24
75
8
11.52
80
9.5
13.68
80
8
11.52
80

Remarks

Shut Down
No Discharge

Shut Down

Check form for Corrosion Inhibitor CH1052 & CH 1030 and CH 1038 injection at
the wellheads
SAT

Wells

Target

Check date Tank

After Adjustment

Remarks

cc/min

CP

NG-1

NG-2

SG-1
Twice

NO-1

NO-2

N22
N23
N24
N25
N26
N27
N30
A9
N19
N20
N21
A42
A44
N31
N32
N33
N34
N35
S1
S2
S3
S1
S2
S3
N5
N6
N7
N8
N10
N11
N13
N14
N15
N16
N17
N2
N28
N29
A43
A38

A7
A35
A33
A31
A27
A29
A1
A9
A8
A37
A24
A42
A44
A15
A21
A25
A19
A2
A40
A13
A41
A40
A13
A41
A6
A30
A28
A22
A26
A4
A20
A16
A14
A3
A18
A36
A17
A23
A43
A38

7.6
10
5.7
15.2
10.7
10.5
7.1
5.9
5.1
10.8
5.0
9.5
9.3
6.2
10.3
11.2
8.9
11.4
14.1
16.4
15.2
14.1
16.4
15.2
14
8.2
2.8
2.4
4.1
6.5
13.2
7.7
2.2
1.5
10.8
9.0
8.3
8.0
9.4
8.0

level %
24/02/10
24/02/10
24/02/10
24/02/10
24/02/10
24/02/10
24/02/10
24/02/10
24/02/10
24/02/10
24/02/10
22/02/10
22/02/10
22/02/10
22/02/10
22/02/10
22/02/10
22/02/10
26/02/10
26/02/10
26/02/10
20/02/10
20/02/10
20/02/10
23/02/10
23/02/10
23/02/10
23/02/10
25/02/10
25/02/10
25/02/10
25/02/10
25/02/10
25/02/10
25/02/10
25/02/10
25/02/10
25/02/10
25/02/10
25/02/10

90
75
50
25
85
70
85
85
50
30
20
60
40
90
100
75
40
45
50
100
100
30
70
50
60
85
70
50
60
---20
50
70
90
40
--40
30
30
85

Injection rate
Stroke
%
cc / min lts/day
8
11.52
75
10
14.4
85
6
8.64
55
15.5
22.32
100
11
15.84
100
10.5
15.12
100
7
10.08
60
6
8.64
55
5
7.20
50
11
15,84
95
5
7.20
50
9.5
13.68
80
9.5
13.68
40
6.5
9.36
55
-------100
11.5
16.56
100
9
12.96
85
11.5
16.56
100
14
20.16
45
16.5
23.76
100
15.5
22.32
50
14
20.16
45
16.5
23.76
100
15.5
22.32
50
-------100
8.5
12.24
70
3
4.32
40
3
4.32
35
4.5
6.48
50
---------13.5
19.44
100
8
11.52
70
3
3.6
30
2
2.88
30
11
15.84
95
--------8.5
12.24
75
8
11.52
80
9.5
13.68
80
8
11.52
80

Pump Stopped

No Discharge

Shut Down

Shut Down

Check form for Corrosion Inhibitor CH1052 & CH 1030 and CH 1038 injection at
the wellheads
SAT

CP

NG-1

NG-2

SG-1
Twice

NO-1

NO-2

Wells
N22
N23
N24
N25
N26
N27
N30
A9
N19
N20
N21
A42
A44
N31
N32
N33
N34
N35
S1
S2
S3
S1
S2
S3
N5
N6
N7
N8
N10
N11
N13
N14
N15
N16
N17
N2
N28
N29
A43
A38

A7
A35
A33
A31
A27
A29
A1
A9
A8
A37
A24
A42
A44
A15
A21
A25
A19
A2
A40
A13
A41
A40
A13
A41
A6
A30
A28
A22
A26
A4
A20
A16
A14
A3
A18
A36
A17
A23
A43
A38

Target
Tank
Check date
cc/min
level %
7.6
10
5.7
15.2
10.7
10.5
7.1
5.9
5.1
10.8
5.0
9.5
9.3
6.2
10.3
11.2
8.9
11.4
14.1
16.4
15.2
14.1
16.4
15.2
14
8.2
2.8
2.4
4.1
6.5
13.2
7.7
2.2
1.5
10.8
9.0
8.3
8.0
9.4
8.0

01/03/10
01/03/10
01/03/10
02/03/10
02/03/10
02/03/10
02/03/10
01/03/10
01/03/10
01/03/10
01/03/10
27/02/10
27/02/10
27/02/10
27/02/10
27/02/10
27/02/10
27/02/10
04/03/10
04/03/10
04/03/10
02/03/10
02/03/10
02/03/10
01/03/10
01/03/10
01/03/10
01/03/10
03/03/10
03/03/10
03/03/10
03/03/10
03/03/10
03/03/10
03/03/10
03/03/10
03/03/10
03/03/10
03/03/10
03/03/10

60
40
25
40
50
25
50
60
35
75
80
100
50
70
100
30
85
80
70
100
60
90
30
90
15
60
60
90
40
---30
90
60
80
70
--70
75
70
50

After Adjustment
Injection rate
Stroke
%
cc / min lts/day
8
11.52
75
10
14.4
85
6
8.64
55
15.5
22.32
100
11
15.84
100
10.5
15.12
100
7
10.08
60
6
8.64
55
5
7.20
50
11
15,84
95
5
7.20
50
9.5
13.68
80
9.5
13.68
40
6.5
9.36
55
-------100
11.5
16.56
100
9
12.96
85
11.5
16.56
100
14
20.16
45
16.5
23.76
100
15.5
22.32
50
14
20.16
45
16.5
23.76
100
15.5
22.32
50
14
20.16
100
8.5
12.24
70
3
4.32
40
3
4.32
35
4.5
6.48
50
---------13.5
19.44
100
8
11.52
70
3
3.6
30
2
2.88
30
11
15.84
95
--------8.5
12.24
75
8
11.52
80
9.5
13.68
80
8
11.52
80

Remarks

Pump Stopped(electrical)

Shut Down

Shut Down

Check form for Corrosion Inhibitor CH1052 & CH 1030 and CH 1038 injection at
the wellheads
SAT

CP

NG-1

NG-2

SG-1
Twice

NO-1

NO-2

Wells
N22
N23
N24
N25
N26
N27
N30
A9
N19
N20
N21
A42
A44
N31
N32
N33
N34
N35
S1
S2
S3
S1
S2
S3
N5
N6
N7
N8
N10
N11
N13
N14
N15
N16
N17
N2
N28
N29
A43
A38

A7
A35
A33
A31
A27
A29
A1
A9
A8
A37
A24
A42
A44
A15
A21
A25
A19
A2
A40
A13
A41
A40
A13
A41
A6
A30
A28
A22
A26
A4
A20
A16
A14
A3
A18
A36
A17
A23
A43
A38

Target
Tank
Check date
cc/min
level %
7.6
10
5.7
15.2
10.7
10.5
7.1
5.9
5.1
10.8
5.0
9.5
9.3
6.2
10.3
11.2
8.9
11.4
14.1
16.4
15.2
14.1
16.4
15.2
14
8.2
2.8
2.4
4.1
6.5
13.2
7.7
2.2
1.5
10.8
9.0
8.3
8.0
9.4
8.0

10/03/10
10/03/10
10/03/10
10/03/10
10/03/10
10/03/10
10/03/10
11/03/10
11/03/10
11/03/10
11/03/10
10/03/10
10/03/10
10/03/10
10/03/10
09/03/10
09/03/10
09/03/10
04/03/10
04/03/10
04/03/10
07/03/10
07/03/10
07/03/10
11/03/10
11/03/10
11/03/10
11/03/10
03/03/10
03/03/10
03/03/10
03/03/10
03/03/10
03/03/10
03/03/10
03/03/10
03/03/10
03/03/10
03/03/10
03/03/10

90
50
50
60
50
40
85
100
65
75
30
10
70
25
100
30
80
70
70
100
60
45
70
40
30
90
30
80
40
---30
90
60
80
70
--70
75
70
50

After Adjustment
Injection rate
Stroke
%
cc / min lts/day
8
11.52
75
10
14.4
85
6
8.64
55
15.5
22.32
100
11
15.84
100
10.5
15.12
100
7
10.08
60
6
8.64
55
5
7.20
50
11
15,84
95
5
7.20
50
-------80
9.5
13.68
40
6.5
9.36
55
-------100
11.5
16.56
100
9
12.96
85
11.5
16.56
100
14
20.16
45
16.5
23.76
100
15.5
22.32
50
14
20.16
45
16.5
23.76
100
15.5
22.32
50
14
20.16
100
8.5
12.24
70
3
4.32
40
3
4.32
35
4.5
6.48
50
---------13.5
19.44
100
8
11.52
70
3
3.6
30
2
2.88
30
11
15.84
95
--------8.5
12.24
75
8
11.52
80
9.5
13.68
80
8
11.52
80

Remarks

Pump stopped LL level

Pump Stopped(electrical)

Shut Down

Shut Down

Check form for Corrosion Inhibitor CH1052 & CH 1030 and CH 1038 injection at
the wellheads
SAT

CP

NG-1

NG-2

SG-1
Twice

NO-1

NO-2

Wells
N22
N23
N24
N25
N26
N27
N30
A9
N19
N20
N21
A42
A44
N31
N32
N33
N34
N35
S1
S2
S3
S1
S2
S3
N5
N6
N7
N8
N10
N11
N13
N14
N15
N16
N17
N2
N28
N29
A43
A38

A7
A35
A33
A31
A27
A29
A1
A9
A8
A37
A24
A42
A44
A15
A21
A25
A19
A2
A40
A13
A41
A40
A13
A41
A6
A30
A28
A22
A26
A4
A20
A16
A14
A3
A18
A36
A17
A23
A43
A38

Target
Tank
Check date
cc/min
level %
7.6
10
5.7
15.2
10.7
10.5
7.1
5.9
5.1
10.8
5.0
9.5
9.3
6.2
10.3
11.2
8.9
11.4
14.1
16.4
15.2
14.1
16.4
15.2
14
8.2
2.8
2.4
4.1
6.5
13.2
7.7
2.2
1.5
10.8
9.0
8.3
8.0
9.4
8.0

17/03/10
17/03/10
17/03/10
16/03/10
17/03/10
16/03/10
16/03/10
11/03/10
11/03/10
11/03/10
11/03/10
16/03/10
16/03/10
16/03/10
16/03/10
16/03/10
16/03/10
16/03/10
15/03/10
15/03/10
15/03/10
07/03/10
07/03/10
07/03/10
14/03/10
14/03/10
14/03/10
14/03/10
14/03/10
14/03/10
14/03/10
14/03/10
14/03/10
14/03/10
14/03/10
14/03/10
14/03/10
14/03/10
14/03/10
14/03/10

50
90
25
70
70
65
45
100
65
75
30
45
30
75
75
40
35
30
55
70
25
45
70
40
70
65
90
60
60
---40
90
35
60
60
--70
80
70
30

After Adjustment
Injection rate
Stroke
%
cc / min lts/day
8
11.52
75
10
14.4
85
6
8.64
55
15.5
22.32
100
11
15.84
100
10.5
15.12
100
7
10.08
60
6
8.64
55
5
7.20
50
11
15,84
95
5
7.20
50
-------80
9.5
13.68
40
6.5
9.36
55
10.5
15.12
100
11.5
16.56
100
9
12.96
85
11.5
16.56
100
14
20.16
45
16.5
23.76
100
15.5
22.32
50
14
20.16
45
16.5
23.76
100
15.5
22.32
50
14
20.16
100
8.5
12.24
70
3
4.32
40
3
4.32
35
4.5
6.48
50
---------13.5
19.44
100
8
11.52
70
3
3.6
30
2
2.88
30
11
15.84
95
--------8.5
12.24
75
8
11.52
80
9.5
13.68
80
-------80

Remarks

Pump Stopped(leakage)

Shut Down

Shut Down

Pump Stopped(electrical)

Check form for Corrosion Inhibitor CH1052 & CH 1030 and CH 1038 injection at
the wellheads
SAT

CP

NG-1

NG-2

SG-1
Twice

NO-1

NO-2

Wells
N22
N23
N24
N25
N26
N27
N30
A9
N19
N20
N21
A42
A44
N31
N32
N33
N34
N35
S1
S2
S3
S1
S2
S3
N5
N6
N7
N8
N10
N11
N13
N14
N15
N16
N17
N2
N28
N29
A43
A38

A7
A35
A33
A31
A27
A29
A1
A9
A8
A37
A24
A42
A44
A15
A21
A25
A19
A2
A40
A13
A41
A40
A13
A41
A6
A30
A28
A22
A26
A4
A20
A16
A14
A3
A18
A36
A17
A23
A43
A38

Target
Tank
Check date
cc/min
level %
7.6
10
5.7
15.2
10.7
10.5
7.1
5.9
5.1
10.8
5.0
9.5
9.3
6.2
10.3
11.2
8.9
11.4
14.1
16.4
15.2
14.1
16.4
15.2
14
8.2
2.8
2.4
4.1
6.5
13.2
7.7
2.2
1.5
10.8
9.0
8.3
8.0
9.4
8.0

24/03/10
24/03/10
24/03/10
24/03/10
24/03/10
24/03/10
24/03/10
23/03/10
23/03/10
23/03/10
23/03/10
25/03/10
25/03/10
25/03/10
25/03/10
25/03/10
25/03/10
25/03/10
15/03/10
15/03/10
15/03/10
22/03/10
22/03/10
22/03/10
23/03/10
23/03/10
23/03/10
23/03/10
23/03/10
23/03/10
23/03/10
23/03/10
23/03/10
24/03/10

24/03/10
24/03/10
25/03/10
25/03/10
25/03/10
24/03/10

90
40
70
95
95
75
90
50
30
60
70
90
45
35
80
60
65
25
55
70
25
55
80
40
30
35
60
50
60
---80
35
100
45
70
--90
95
80
80

After Adjustment
Injection rate
Stroke
%
cc / min lts/day
8
11.52
75
10
14.4
85
6
8.64
55
15.5
22.32
100
11
15.84
100
10.5
15.12
100
7
10.08
60
6
8.64
55
5
7.20
50
11
15,84
95
5
7.20
50
9.5
13.68
80
9.5
13.68
40
6.5
9.36
55
10.5
15.12
100
11.5
16.56
100
9
12.96
85
11.5
16.56
100
14
20.16
45
16.5
23.76
100
15.5
22.32
50
14
20.16
45
16.5
23.76
100
15.5
22.32
50
14
20.16
100
------70
------40
3
4.32
35
-------50
---------13.5
19.44
100
8
11.52
70
--------30
2
2.88
30
11
15.84
95
--------8.5
12.24
75
8
11.52
80
9.5
13.68
80
8
11.52
80

Remarks

NO Discharge
NO Discharge
NO Discharge
Shut Down

NO Discharge

Shut Down

Check form for Corrosion Inhibitor CH1052 & CH 1030 and CH 1038 injection at
the wellheads
SAT

CP

NG-1

NG-2

SG-1
Twice

NO-1

NO-2

Wells
N22
N23
N24
N25
N26
N27
N30
A9
N19
N20
N21
A42
A44
N31
N32
N33
N34
N35
S1
S2
S3
S1
S2
S3
N5
N6
N7
N8
N10
N11
N13
N14
N15
N16
N17
N2
N28
N29
A43
A38

A7
A35
A33
A31
A27
A29
A1
A9
A8
A37
A24
A42
A44
A15
A21
A25
A19
A2
A40
A13
A41
A40
A13
A41
A6
A30
A28
A22
A26
A4
A20
A16
A14
A3
A18
A36
A17
A23
A43
A38

Target
Tank
Check date
cc/min
level %
7.6
10
5.7
15.2
10.7
10.5
7.1
5.9
5.1
10.8
5.0
9.5
9.3
6.2
10.3
11.2
8.9
11.4
14.1
16.4
15.2
14.1
16.4
15.2
14
8.2
2.8
2.4
4.1
6.5
13.2
7.7
2.2
1.5
10.8
9.0
8.3
8.0
9.4
8.0

31/03/10
31/03/10
31/03/10
31/03/10
31/03/10
31/03/10
31/03/10
29/03/10
29/03/10
29/03/10
29/03/10
30/03/10
30/03/10
30/03/10
30/03/10
30/03/10
30/03/10
30/03/10
30/03/10
30/03/10
30/03/10

22/03/10
22/03/10
22/03/10
29/03/10
29/03/10
29/03/10
29/03/10
28/03/10
28/03/10
28/03/10
28/03/10
28/03/10
28/03/10
28/03/10
28/03/10
28/03/10
28/03/10
28/03/10
28/03/10

60
85
100
40
55
100
50
20
8
55
55
55
100
55
40
30
25
60
60
40
35
55
80
40
60
90
55
35
45
---45
80
90
35
35
--65
75
60
55

After Adjustment
Injection rate
Stroke
%
cc / min lts/day
8
11.52
75
85
10
14.4
6
8.64
55
15.5
22.32
100
100
11
15.84
100
10.5
15.12
7
10.08
60
6
8.64
55
5
7.20
50
11
15,84
95
5
7.20
50
9.5
13.68
80
9.5
13.68
40
6.5
9.36
55
10.5
15.12
100
11.5
16.56
100
9
12.96
85
11.5
16.56
100
14
20.16
45
16.5
23.76
100
15.5
22.32
50
14
20.16
45
16.5
23.76
100
15.5
22.32
50
14
20.16
100
8.5
12.24
70
3
4.32
40
3
4.32
35
4.5
6.48
50
---------13.5
19.44
100
8
11.52
70
3
3.6
30
2
2.88
30
11
15.84
95
--------8.5
12.24
75
8
11.52
80
9.5
13.68
80
-------80

Remarks

Shut Down

Shut Down

Pump Stpped

Check form for Corrosion Inhibitor CH1052 & CH 1030 and CH 1038 injection at
the wellheads
SAT

CP

NG-1

NG-2

SG-1
Twice

NO-1

NO-2

Wells
N22
N23
N24
N25
N26
N27
N30
A9
N19
N20
N21
A42
A44
N31
N32
N33
N34
N35
S1
S2
S3
S1
S2
S3
N5
N6
N7
N8
N10
N11
N13
N14
N15
N16
N17
N2
N28
N29
A43
A38

A7
A35
A33
A31
A27
A29
A1
A9
A8
A37
A24
A42
A44
A15
A21
A25
A19
A2
A40
A13
A41
A40
A13
A41
A6
A30
A28
A22
A26
A4
A20
A16
A14
A3
A18
A36
A17
A23
A43
A38

Target
Tank
Check date
cc/min
level %
7.6
10
5.7
15.2
10.7
10.5
7.1
5.9
5.1
10.8
5.0
9.5
9.3
6.2
10.3
11.2
8.9
11.4
14.1
16.4
15.2
14.1
16.4
15.2
14
8.2
2.8
2.4
4.1
6.5
13.2
7.7
2.2
1.5
10.8
9.0
8.3
8.0
9.4
8.0

07/04/10
07/04/10
07/04/10
07/04/10
07/04/10
07/04/10
07/04/10
03/04/10
03/04/10
03/04/10
03/04/10
09/04/10
08/04/10
09/04/10
09/04/10
08/04/10
08/04/10
08/04/10
06/04/10
06/04/10
06/04/10
22/03/10
22/03/10
22/03/10
03/04/10
03/04/10
03/04/10
03/04/10
28/03/10
28/03/10
28/03/10
28/03/10
28/03/10
28/03/10
28/03/10
28/03/10
28/03/10
28/03/10
28/03/10
28/03/10

30
60
100
35
70
35
25
90
75
25
50
60
60
80
30
12
35
55
75
30
40
55
80
40
75
70
35
30
45
---45
80
90
35
35
--65
75
60
55

After Adjustment
Injection rate
Stroke
%
cc / min lts/day
8
11.52
75
85
----6
8.64
55
15
22.32
100
100
11
15.84
100
11
15.12
7
10.08
60
6
8.64
55
5
7.20
50
11
15,84
95
5
7.20
50
9.5
13.68
80
11
15,84
40
6.5
9.36
55
10.5
15.12
100
12
16.56
100
9
12.96
85
12
16.56
100
13
18.7
45
15
21.6
100
15.5
22.32
50
14
20.16
45
16.5
23.76
100
15.5
22.32
50
14
20.16
100
8.5
12.24
70
3
4.32
40
3
4.32
35
4.5
6.48
50
---------13.5
19.44
100
8
11.52
70
3
3.6
30
2
2.88
30
11
15.84
95
--------8.5
12.24
75
8
11.52
80
9.5
13.68
80
-------80

Remarks

Found MOV opened

Shut Down

Shut Down

Pump Stopped

Check form for Corrosion Inhibitor CH1052 & CH 1030 and CH 1038 injection at
the wellheads
SAT

CP

NG-1

NG-2

SG-1
Twice

NO-1

NO-2

Wells
N22
N23
N24
N25
N26
N27
N30
A9
N19
N20
N21
A42
A44
N31
N32
N33
N34
N35
S1
S2
S3
S1
S2
S3
N5
N6
N7
N8
N10
N11
N13
N14
N15
N16
N17
N2
N28
N29
A43
A38

A7
A35
A33
A31
A27
A29
A1
A9
A8
A37
A24
A42
A44
A15
A21
A25
A19
A2
A40
A13
A41
A40
A13
A41
A6
A30
A28
A22
A26
A4
A20
A16
A14
A3
A18
A36
A17
A23
A43
A38

Target
Tank
Check date
cc/min
level %
7.6
10
5.7
15.2
10.7
10.5
7.1
5.9
5.1
10.8
5.0
9.5
9.3
6.2
10.3
11.2
8.9
11.4
14.1
16.4
15.2
14.1
16.4
15.2
14
8.2
2.8
2.4
4.1
6.5
13.2
7.7
2.2
1.5
10.8
9.0
8.3
8.0
9.4
8.0

16/04/10
16/04/10
16/04/10
16/04/10
16/04/10
16/04/10
16/04/10
16/04/10
16/04/10
16/04/10
16/04/10
13/04/10
13/04/10
13/04/10
13/04/10
13/04/10
13/04/10
13/04/10
06/04/10
06/04/10
06/04/10
12/04/10
12/04/10
12/04/10
11/04/10
16/04/10
16/04/10
11/04/10
11/04/10
11/04/10
11/04/10
11/04/10
11/04/10
11/04/10
11/04/10
11/04/10
11/04/10
11/04/10
11/04/10
11/04/10

70
40
55
35
75
50
25
90
20
25
50
65
65
60
70
80
60
60
75
30
40
25
75
70
75
70
80
30
90
---45
80
90
90
35
--50
60
60
55

After Adjustment
Injection rate
Stroke
%
cc / min lts/day
8
11.52
75
85
10
14.4
6
8.64
55
15
22.32
100
100
11
15.84
100
11
15.12
7
10.08
60
6
8.64
55
5
7.20
50
11
15,84
95
5
7.20
50
10
14.4
80
10
14.4
40
7
10.08
55
10.5
15.12
100
11.5
16.56
100
9.5
13.68
85
11.5
16.56
100
13
18.7
45
15
21.6
100
15.5
22.32
50
13
18.7
45
15.5
22.32
100
15.5
22.32
50
100
8.5
12.24
70
3
4.32
40
35
4.5
6.48
50
---------100
70
30
2
2.88
30
95
--------8.5
12.24
75
8
11.52
80
80
-------80

Remarks

Shut Down

Shut Down

Shut Down
Shut Down

Mov opened for Prod test

Mov opened for Prod test


Shut Down

Mov opened for Prod test


Mov opened for Prod test
Mov opened for Prod test

Mov opened for Prod test


Shut Down

Mov opened for Prod test


Pump Stopped