Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
c. 1.5-3.5
d. 1.0-2.5
10. What do you call Working Drawings, Specification, Estimates and General Conditions?
a. Contract Documents
b. Project Manual
c. Project Requirements
d. Construction Drawings
11. What offense is committed when an architect is found using the seal of another
architect?
a. Illegal practice
b. Misdemeanor
c. Nothing
d. Misrepresentation
12. Who will be liable for seeking and soliciting architecture works by a non-registered
person?
a. The employed and the employee
b. Both the represented and the representative
c. None of the above.
d. All of the above.
13. For specialized allied services, what is the aesthetic designing of the space of a
structure?
a. Landscape Design Services
b. Space Planning Services
c. Architectural Interior Services
d. Architectural Programming Services
Building tech
1. Maximum spacing of posts for 2-story wooden structure with a height of 8 mts.
a. 4.5 mts
b. 4 mts
c. 3.5 mts
d. 3 mts
2. Maximum height of 1st the floor for a 2-story wood structure with a height of 7 mts.
a. 4.5 mts
b. 4 mts
c. 3.5 mts
d. 3 mts
3. the ability of a metal to undergo cold plastic deformation without breaking,
particularly by pulling in cold drawing.
a. Ductility
b. Malleability
c. Elasticity
d. Flexibility
c. 45 mpa [D]
d. 55Mpa
6. Low rise buildings is an enclosed or partially enclosed with mean roof height less than
or equal to? (NSCP 207.20): a
a. 70 Mts.,
b. 50 mts.,
c. 15 mts.,
d. 18 mts.
7. a widening of any structure at the foot to improve its stability, in breakwaters, earth or
other dams, or simple walls.
a. Wall
b. Column
c. Footing
d. Wall Footing.
8. is all concrete used for structural purposes, including plain and reinforced
concrete.
a. Reinforced Concrete
b. Structural Concrete
c. Plain Concrete
d. Rough Concrete
9. is a wall designed to resist lateral forces parallel to the plane of the wall (sometimes
referred to as a vertical diaghpragm).
a. Foundation Wall
b. Retaining Wall
c. Shear Wall
d. Masonry Wall
10. What is the minumum number of vertical bars for spiral column
a. 4
b. 6
c. 8
d. 10
11. your client has entered the bathroom at his newly built house, however, he
immediately went out due to unpleasant smell that is coming out from the water
closet. As the architect of the project, he requested you to inspect and determine what
might be the problem. during your inspection, you noticed that even the bowl is clean
still the foul smell exist. during the construction, the contractor have implemented and
complied in the design intent. proper venting was provided. what might be the
solution for this?
a. Check water closet for trap seal loss
b. Replace Vent
c. Provide air freshener
d. remove existing water closet and install with a new one
12. During construction a concrete ready mix is delivered but should be tested before
pouring in place. Where should be the concrete mix be tested?
a. Plant
b. Site
c. Mixer during travel
d. Portable Mixer
13. As a truss replacement what member can be provided to support roofing materials?
a. Plates
b. Purlins
c. Rafters
d. Planks