CONSTRUCTION OF MODUNAGHAT WATER TREATMENT PLANT & PATENGA BOOSTER

1)

Duty Reshuffling
Sl No.
Work Site
1
Overall responsible of the Project
2

All RMC Plant Handling,Material of RMC


arrange,All Equipment arrange & Handling,All
Sub-Contractor Handling

Designation
Project Manager
Site Manager
Site Manager

Intake Sheet Pile Driving,Structural Work

Assistant Site manager


Project Engineer
River Bank Protection
Engineer

River Bank Protection Work

Project Engineer
Assistant Site manager
Project Engineer

Rapid Sand Filter

Site Engineer
Foreman

Clarifier,Back wash waste tank,Admin


Building,Chemical Building,Boundary wall

Project Engineer
Site Engineer
Foreman
QC & Planning Manager

Quality Control & Lab.

Jr.QC Engineer
Lab Technician
Lab Helper

Planning & Documentation

QC & Planning Manager


Planning Engineer
Jr.QC Engineer

Electrical Building,Ware House

Site Engineer
Foreman

10

Sub-Contractor Bill Checking,Daily Work Program


making & Distribution.

11

All Excavation,Back filling,Cone Remove &


Repair,Bituminous Paint Application.

Planning Engineer
Site Engineer

11

12

All Excavation,Back filling,Cone Remove &


Repair,Bituminous Paint Application.
Clear Water Tank,Pump Station,Dewatering
Building,Uncompensated Land Structure.

Foreman
Senior Engineer
Project Engineer
Foreman

ANT & PATENGA BOOSTER PUMP STATION (CWSISP/W-

ing
Name
Md.Shamim Ahmad
Md.Abdul Motin
Md.Abdul Motin
Bonkim Torofder
Emran Hossain
Md.Shamsul Hoque
Emran Hossain
Bonkim Torofder
Emran Hossain
Jahid
Arongojeb
Shakawat
Habib
Bablu
Mahibul Hasan
Shahi
Prosonjit
Md.Iasin
Mahibul Hasan
Akhter Jamil
Shahi
Emran Hossain (tall)
Md.Sobuj
Akhter Jamil
Emran Hossain (tall)

Remarks

Md.Lutfur
Nirjhor Bissas
Tohid
Md.Jashim