KING ABDULLAH FINANCIAL DISTRICT

- PPA10 B

FTR Rooms

PARCEL 4.07
Location

Inspection Comments

17th Floor

15th Floor

14th Floor

13th Floor

12th Floor

Complete all civil works.


All Cables shall be properly dressed.
Cover and adjust all cable Trunks.
Close all the unused opening and conduits.
2xPDUs for each Patch Panel Rack are recommended by Orange. Patch panel having 1
PDU.
Provide channel support for Liquid tight cable.
Power receptacle to be correctly installed in Patch Panel Rack.
Color Rendering Index (CRI) of all lighting fixtures shall have more than 60.
Provide support for UTP cables in Patch Panel Rack.
ID tagging and Labeling require for panels and cables for identification.

Cover and adjust all cable Trunks.


Cover all pull boxes and knockouts.
Provide channel support for Liquid tight cable.
2xPDUs for each Patch Panel Rack are recommended by Orange. Patch panel having 1
PDU.
Power receptacle to be correctly installed in Patch Panel Rack.
ID tagging and Labeling require for panels and cables for identification.

Complete all civil works.


Cover and adjust all cable Trunks.
Cover all pull boxes and knockouts.
Provide channel support for Liquid tight cable.
Power receptacle to be correctly installed in Patch Panel Rack.
Adjust the level of lighting fixture.
ID tagging and Labeling require for panels and cables for identification.

Complete all civil works.


Cover and adjust all cable Trunks.
Cover all pull boxes and knockouts.
Provide channel support for Liquid tight cable.
Power receptacle to be correctly installed in Patch Panel Rack.
ID tagging and Labeling require for panels and cables for identification.

Complete all civil works.


Clean the room from dust and debris.
Cover and adjust all cable Trunks.
Cover all pull boxes and knockouts.
Provide channel support for Liquid tight cable.
Power receptacle to be correctly installed in Patch Panel Rack.
ID tagging and Labeling require for panels and cables for identification.

1 of 6

KING ABDULLAH FINANCIAL DISTRICT

- PPA10 B

FTR Rooms

PARCEL 4.07

11th Floor

Clean the room from dust and debris.


Cover and adjust all cable Trunks.
All Cables shall be properly dressed.
Protect Low current cables from sharp edges.
Cover all pull boxes and knockouts.
Close all the unused opening and conduits.
Provide channel support for Liquid tight cable.
Power receptacle to be correctly installed in Patch Panel Rack.
Lighting fixture is not working.
ID tagging and Labeling require for panels and cables for identification.

10th Floor

Clean the room from dust and debris.


Cover and adjust all cable Trunks.
All Cables shall be properly dressed.
Protect Low current cables from sharp edges.
Cover all pull boxes and knockouts.
Close all the unused opening and conduits.
Provide channel support for Liquid tight cable.
Power receptacle to be correctly installed in Patch Panel Rack.
Lighting fixture is not working.
ID tagging and Labeling require for panels and cables for identification.

9th Floor

Complete all civil works.


Clean the room from dust and debris.
Cover and adjust all cable Trunks.
All Cables shall be properly dressed.
Protect Low current cables from sharp edges.
Cover all pull boxes and knockouts.
Close all the unused opening and conduits.
Provide channel support for Liquid tight cable.
Provide support for UTP cables in Patch Panel Rack.
ID tagging and Labeling require for panels and cables for identification.

Complete all civil works.


Clean the room from dust and debris.
Cover and adjust all cable Trunks.
All Cables shall be properly dressed.
Protect Low current cables from sharp edges.
Cover all pull boxes and knockouts.
Close all the unused opening and conduits.
Provide channel support for Liquid tight cable.
Provide bushing to adapter of liquid tight conduit in Patch Panel Rack.
ID tagging and Labeling require for panels and cables for identification.

Complete all civil works.


Clean the room from dust and debris.

8th Floor

7th Floor

2 of 6

KING ABDULLAH FINANCIAL DISTRICT

- PPA10 B

FTR Rooms

PARCEL 4.07

6th Floor

Cover and adjust all cable Trunks.


All Cables shall be properly dressed.
Protect Low current cables from sharp edges.
Cover all pull boxes and knockouts.
Close all the unused opening and conduits.
Provide channel support for Liquid tight cable.
Provide support for UTP cables in Patch Panel Rack.
ID tagging and Labeling require for panels and cables for identification.

Complete all civil works.


Clean the room from dust and debris.
Cover and adjust all cable Trunks.
All Cables shall be properly dressed.
Protect Low current cables from sharp edges.
Cover all pull boxes and knockouts.
Close all the unused opening and conduits.
Provide channel support for Liquid tight cable.
2xPDUs for each Patch Panel Rack are recommended by Orange. Patch panel having 1
PDU.
Cooling Fan connection is not completed in Patch Panel Rack.
ID tagging and Labeling require for panels and cables for identification.

5th Floor

4th Floor

Complete all civil works.


Clean the room from dust and debris.
Cover and adjust all cable Trunks.
All Cables shall be properly dressed.
Protect Low current cables from sharp edges.
Cover all pull boxes and knockouts.
Close all the unused opening and conduits.
LC and LV / Earthing cables shall be separated from each other at a distance as per
project requirement in Patch Panel Rack.
Provide channel support for Liquid tight cable.
ID tagging and Labeling require for panels and cables for identification.

Complete all civil works.


Clean the room from dust and debris.
Cover and adjust all cable Trunks.
All Cables shall be properly dressed.
Cover all pull boxes and knockouts.
Close all the unused opening and conduits.
Provide channel support for Liquid tight cable.
2xPDUs for each Patch Panel Rack are recommended by Orange. Patch panel having 1
PDU.
Provide support for UTP cables in Patch Panel Rack.
Bolts installed in Earth bar shall be replace with brass bolts.
ID tagging and Labeling require for panels and cables for identification.

3 of 6

KING ABDULLAH FINANCIAL DISTRICT

- PPA10 B

FTR Rooms

PARCEL 4.07

3rd Floor

2nd Floor

1st Floor

Ground
Floor

Complete all civil works.


Clean the room from dust and debris.
Cover and adjust all cable Trunks.
All Cables shall be properly dressed.
Cover all pull boxes and knockouts.
Close all the unused opening and conduits.
Provide channel support for Liquid tight cable.
2xPDUs for each Patch Panel Rack are recommended by Orange. Patch panel having 1
PDU.
Provide support for UTP cables in Patch Panel Rack.
ID tagging and Labeling require for panels and cables for identification.

Complete all civil works.


Clean the room from dust and debris.
Cover and adjust all cable Trunks.
All Cables shall be properly dressed.
Cover all pull boxes and knockouts.
Close all the unused opening and conduits.
Provide channel support for Liquid tight cable.
Provide support for UTP cables in Patch Panel Rack.
ID tagging and Labeling require for panels and cables for identification.

Complete all civil works.


Clean the room from dust and debris.
Cover and adjust all cable Trunks.
All Cables shall be properly dressed.
Cover all pull boxes and knockouts.
Close all the unused opening and conduits.
Provide channel support for Liquid tight cable.
Provide support for UTP cables in Patch Panel Rack.
ID tagging and Labeling require for panels and cables for identification.

Complete all civil works.


Clean the room from dust and debris.
Cover and adjust all cable Trunks.
All Cables shall be properly dressed.
Cover all pull boxes and knockouts.
Close all the unused opening and conduits.
Provide channel support for Liquid tight cable.
Provide support for UTP cables in Patch Panel Rack.
ID tagging and Labeling require for panels and cables for identification.

Complete all civil works.


Clean the room from dust and debris.
Cover and adjust all cable Trunks.
All Cables shall be properly dressed.
Cover all pull boxes and knockouts.
4 of 6

KING ABDULLAH FINANCIAL DISTRICT

- PPA10 B

FTR Rooms

PARCEL 4.07

B-1 Floor

B-2 Floor

B-3 Floor

B-4 Floor

Close all the unused opening and conduits.


Provide channel support for Liquid tight cable.
2xPDUs for each Patch Panel Rack are recommended by Orange. Patch panel having 1
PDU.
Provide support for UTP cables in Patch Panel Rack.
Lighting fixture is not working.
FAS / Energen system is not completed.
Grounding work is in progress.
ID tagging and Labeling require for panels and cables for identification.

Complete all civil works.


Clean the room from dust and debris.
Cover and adjust all cable Trunks.
All Cables shall be properly dressed.
Cover all pull boxes and knockouts.
Close all the unused opening and conduits.
Provide channel support for Liquid tight cable.
2xPDUs for each Patch Panel Rack are recommended by Orange. Patch panel having 1
PDU.
Provide support for UTP cables in Patch Panel Rack.
Lighting fixture is not working.
FAS / Energen system is not completed.
Grounding work is in progress.
ID tagging and Labeling require for panels and cables for identification.

Complete all civil works.


Clean the room from dust and debris.
Cover and adjust all cable Trunks.
All Cables shall be properly dressed.
Cover all pull boxes and knockouts.
Close all the unused opening and conduits.
Provide channel support for Liquid tight cable.
Provide support for UTP cables in Patch Panel Rack.
Lighting fixture is not working.
FAS / Energen system is not completed.
Grounding work is in progress.
ID tagging and Labeling require for panels and cables for identification.

Complete all civil works.


Clean the room from dust and debris.
Cover and adjust all cable Trunks.
All Cables shall be properly dressed.
Cover all pull boxes and knockouts.
Close all the unused opening and conduits.
Provide channel support for Liquid tight cable.
Provide support for UTP cables in Patch Panel Rack.
5 of 6

KING ABDULLAH FINANCIAL DISTRICT

- PPA10 B

FTR Rooms

PARCEL 4.07

Lighting fixture is not working.


FAS / Energen system is not completed.
Grounding work is in progress.
ID tagging and Labeling require for panels and cables for identification.