Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
LOCATION:
1
SERVICE:
Qty:
PTTEPI
EPCI of Wellhead Platforms,
Associated Pipelines and Tie-Ins for
Zawtika Development Project Phase
1C
DOCUMENT NO
MM-ZTK-1C-WPX-MEC-DTS-0003
JOB NO.
2028
REVISION NO.
A1
DATE
30-Jun-16
CHKD
THP / SMR
DATE
30-Jun-16
APPR'D
TV
DATE
30-Jun-16
SHEET
OF
EQUIP. NO.
3
4
5
6
7
8
9
Sheet
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
1
2
3
4
5
6
7
8
A1
X
X
X
X
B1
C1
Revision
C2
Sheet
A1
B1
C1
Revision
C2
BY
JJN
Revision
CLIENT:
PTTEPI
PROJECT:
LOCATION:
1
SERVICE:
Qty:
DOCUMENT NO
MM-ZTK-1C-WPX-MEC-DTS-0003
JOB NO.
2028
REVISION NO.
A1
DATE
30-Jun-16
CHKD
THP / SMR
DATE
30-Jun-16
APPR'D
TV
DATE
30-Jun-16
SHEET
OF
BY
JJN
Revision
CLIENT:
EQUIP. NO.
V-0833/ V-0933
3
4
1.0 GENERAL
Description
NACE Requirement
Not Required
Vessel Type
Not Required
Design Code
Specification
MM-ZTK-1C-WPX-MEC-SPE-0002
Code Stamped
A1
& PEGS-0710-PVS-001
9
10
11
11 / FV
12
Design Temperature, C
116
8.4 to 8.8
Operating Temperature, C
13
7.8 to 34.5
(Note 15)
14
Density, kg/m3
0.3 / VTC
(Note 15)
Performance required
(Note 14)
Min.
-29
15
16
DESIGN LOADS
17
A1
18
Transportation Loads
A1
19
Earthquake Loads
API RP 2 WSD
A1
20
21
Blast Loads
No
A1
22
23
10 / 10 (VTC)
Cladding Thickness, mm
N/A
24
Shell Material
25
Shell:
SA 105N
26
Internals
Nozzles Flanges
SA 105N
Bolts:
Supports Skirt/Legs
A1
Nuts:
(Note 9)
A1
SS 316L
Nameplate / Bracket
27
28
External Bolting
29
Heads:
A1
30
31
32
Radiograph
Spot:
33
Type of Heads
34
As per Code
35
M.A.P.(New&Cold), Barg
As per Code
Joint Efficiency
Inspection Authority
AI ( Authorized Inspection)
Full:
100%
36
37
A1
38
Inlet Device
Vortex Breakers
No
39
Mist Eliminator
No
Oil Bucket
No
40
Weir
No
Trays
No
41
Filters / Coalescer
No
42
Special Internals
Yes
A1
43
44
45
Insulation / Tracing
No
Lifting Lugs
Yes
46
Ladder
No
Platform
No
47
Manway
N/A
Davit
48
Handholes
Yes
Anchor Bolts
Yes
49
Saddles
No
Skirt/Legs
Skirt
50
Earthing Bosses
Yes
51
Fireproofing
No
No
A1
52
53
54
55
Nozzle
Qty / Size
Rating
Description
Internal Projection
External Projection
56
N1
1 No. / 3"
150# LWN. RF
Feed Inlet
w/ inlet inverter
As per PEGS-0710-PVS-001
57
N2 (Note 11,18)
1 No. / 2"
150# LWN. RF
Gas Outlet
58
N3
1 No. / 2"
150# LWN. RF
Liquid Outlet
59
N4
1 No. / 2"
150# LWN. RF
Drain
"
60
N5
1 No. / 2"
150# LWN. RF
"
61
2 Nos. / 2"
300# LWN. RF
Level Transmitter(H/L)
"
A1
62
2 Nos. / 2"
300# LWN. RF
Level Transmitter(HH/LL)
"
A1
63
N10
1 No. / 2"
150# LWN. RF
Manual Vent
"
64
N11
1 No. / 2"
150# LWN. RF
Pressure Gauge
"
65
N12
1 No. / 2"
150# LWN. RF
Utility Connection
"
66
HH
1 No. / 4"
150# WN. RF
"
"
w/ Bend pipe
67
68
69
70
No
71
Coating (external)
Coating (internal)
No
72
73
74
75
76
77
78
79
80
81
82
8.0 WEIGHTS
VTA
A1
"
PROJECT:
LOCATION:
1
SERVICE:
Qty:
PTTEPI
EPCI of Wellhead Platforms,
Associated Pipelines and Tie-Ins for
Zawtika Development Project Phase
1C
DOCUMENT NO
MM-ZTK-1C-WPX-MEC-DTS-0003
JOB NO.
2028
REVISION NO.
A1
DATE
30-Jun-16
CHKD
THP / SMR
DATE
30-Jun-16
APPR'D
TV
DATE
30-Jun-16
SHEET
EQUIP. NO.:
V-0833/ V-0933
OF
BY
JJN
Revision
CLIENT:
3
4
MECHANICAL NOTE
5
6
This data sheet shall be read in conjunction with MM-ZTK-1C-WPX-MEC-SPE-0002, "Project Particular Specification for Gas Knock Out Drums and Intrument Gas Filter Coalescers".
This vessel is a vertical filter coalescer separator type for instrument gas service. The vessel is to be suitable for operation on a fixed offshore wellhead platform and is to be provided
with all necessary internals and devices to allow correct operation in this environment.
Vendor to provide process and mechanical design calculations in compliance with functional specification and process design condition specified.
10
Vendor shall provide process performance guarantee and mechanical design guarantee for vessel and all internals.
11
Vendor shall design, fabrication, procurement and installation of all the process internals and welded attachments / internal supports inside the vessel i.e. filter elements, and bend pipe as outlet device.
12
External cleats required for piping supports shall be provided by the Vendor. Details of all the external support cleats , clips shall be provided by the Purchaser during the detailed engineering phase.
A1
13
The loads and moments on the nozzles / lugs / support cleats / clips will be provided by the Purchaser, it is the Vendor's responsibility to perform the local load analysis for the
A1
14
15
16
Bolts and nuts shall be zinc plating and Xylan 1070 or 1424 coating (Dark Blue RAL 5003). All pressure bolting shall be per PEGS-0710-PIP-007, "Piping Material Classes" and PEGS-12059-PIP-005,
A1
17
Gasket materials for nozzles shall be comply to PEGS-0710-PIP-007, "Piping Material Classes" as per ASME B 16.20
A1
18
10
The vessel shall be provided with lifting lugs and 2 nos. of M10 earthing bosses located at opposite diagonal.
A1
19
11
The stainless steel weld overlay shall be applied on the vessel nozzle face which connected to stainless steel pipe or stainless steel instrument device, in order to avoid the galvanic corrosion from
A1
20
dissimilar material.
21
12
Pickled and passivation shall be performed on stainless steel surface and weldments.
A1
22
13
VTC - Vendor to Confirm, VTA - Vendor to Advise, TBC - To be Confirmed, N/A = Not Applicable
A1
23
24
PROCESS NOTE
25
26
14
Vendor shall confirm vessel size, level setting and suggest the adequate internals to achieve the efficiency below:
27
28
29
- Solid content in gas outlet shall be less than 0.1 g/m 3 removal of solid particle
30
31
A1
- Maximum oil/liquid carry over at outlet is 0.008 ppm (w/w) based on 40 ppm (w/w) inlet feed gas.
15
Operating conditions and fluid properties shall design as per table below
A1
32
33
Gas
34
35
Molecular weight
36
37
Liquid
38
Flow rate
kg/h
39
kg/m3
747.74 / 1000.30
A1
40
dyne/cm
22.8 to 70.5
A1
41
Viscosity
cP
A1
kg/h
441.29
A1
19.26
kg/m3
7.51
A1
42
43
16
A1
44
17
A1
45
46
47
48
49
A1
50
18
A1
51
19
Gas outlet baffle with a weep hole at bottom shall be provided. Vendor to advise the angle between tip of outlet baffle to center of top surface of filter element. Prefer angle is 60 o.
A1
52
20
Vendor shall suggest the appropriate inlet device for optimum performance of Instrument Gas Filter Coalescer.
A1
53
21
During normal operation, liquid content in feed gas is 0.1 US gallon/MMscf based on UG outlet specification of utility gas knockout drum.
A1
54
During upstream utility gas knockout drum maintenance, liquid content in feed gas will rise and shown below:
55
Liquid flowrate:
56
57
58
36.78 kg/hr
A1
A1
Instrument gas filter coalescer shall be able to treat the above wet feed gas condition with fulfillment of gas outlet quality as required in note 14.
59
22
Liquid flow and properties are considered on assumption of 50% upstream liquid carry over from stand pipe.
A1
60
23
A1
61
24
Liquid properties are based on liquids phase in Utility Gas KO Drum carried over to Instrument Gas Filter Coalescer. The sizing case is WP9 case 5, case 1 composition, U/S choke = 34 barg,
A1
A1
62
63
64
65
66
67
68
69
70
71
72
73
74
25
Gas properties are based on the governing case for equipment sizing (WP9 case 5, case 1 composition, U/S choke = 34 barg and 101C, D/S choke = 30 barg).
A1
PROJECT:
LOCATION:
1
SERVICE:
Qty:
PTTEPI
EPCI of Wellhead Platforms,
Associated Pipelines and Tie-Ins for
Zawtika Development Project Phase
1C
DOCUMENT NO
MM-ZTK-1C-WPX-MEC-DTS-0003
JOB NO.
2028
REVISION NO.
A1
DATE
30-Jun-16
CHKD
THP / SMR
DATE
30-Jun-16
APPR'D
TV
DATE
30-Jun-16
SHEET
EQUIP. NO.:
V-0833/ V-0933
OF
BY
JJN
Revision
CLIENT:
3
4
A1
FEED COMPOSITION:
5
6
COMPONENT
MOLE FRACTION
A1
Case 5 of WP9
A1
CO2
0.0037
A1
Nitrogen
0.2230
A1
10
Methane
0.7526
A1
11
Ethane
0.0072
A1
12
Propane
0.0039
A1
13
i-Butane
0.0016
A1
14
n-Butane
0.0003
A1
15
i-Pentane
0.0003
A1
16
n-Pentane
0.0003
A1
17
n-Hexane
0.0003
A1
18
n-Heptane
0.0004
A1
19
Octane plus*
0.0003
A1
20
Benzene
0.0000
A1
21
Toluene
0.0001
A1
22
E-Benzene
0.0000
A1
23
o-Xylene
0.0000
A1
24
m-Xylene
0.0000
A1
25
p-Xylene
0.0000
A1
26
n-Octane
0.0001
A1
27
n-Nonane
0.0001
A1
28
n-Decane
0.0000
A1
29
n-C11
0.0000
A1
30
n-C12
0.0000
A1
31
n-C13
0.0000
A1
32
n-C14
0.0000
A1
33
n-C15
0.0000
A1
34
n-C16
0.0000
A1
35
n-C17
0.0000
A1
36
n-C18
0.0000
A1
37
n-C19
0.0000
A1
38
n-C20
0.0000
A1
39
n-C21
0.0000
A1
40
n-C22
0.0000
A1
41
n-C23
0.0000
A1
42
n-C24
0.0000
A1
43
n-C25
0.0000
A1
44
n-C26
0.0000
A1
45
n-C27
0.0000
A1
46
n-C28
0.0000
A1
47
n-C29
0.0000
A1
48
n-C30
0.0000
A1
49
c31*
0.0000
A1
50
c32*
0.0000
A1
51
H2O
0.0058
A1
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
WP9 Case 5 : Case 1 Compositions, U/S choke = 34 barg, 101oC, D/S choke = 30 barg.
A1
PROJECT:
LOCATION:
1
SERVICE:
Qty:
PTTEPI
EPCI of Wellhead Platforms,
Associated Pipelines and Tie-Ins for
Zawtika Development Project Phase
1C
DOCUMENT NO
MM-ZTK-1C-WPX-MEC-DTS-0003
JOB NO.
2028
REVISION NO.
A1
DATE
30-Jun-16
CHKD
THP / SMR
DATE
30-Jun-16
APPR'D
TV
DATE
30-Jun-16
SHEET
EQUIP. NO.:
V-0833/ V-0933
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
43
44
45
46
47
48
49
50
51
52
53
55
56
69
70
71
72
NOZZLE ORIENTATION
73
74
75
76
77
78
79
80
81
82
OF
BY
JJN
Revision
CLIENT:
PROJECT:
LOCATION:
1
SERVICE:
Qty:
PTTEPI
EPCI of Wellhead Platforms,
Associated Pipelines and Tie-Ins for
Zawtika Development Project Phase
1C
DOCUMENT NO
MM-ZTK-1C-WPX-MEC-DTS-0003
JOB NO.
2028
REVISION NO.
A1
DATE
30-Jun-16
CHKD
THP / SMR
DATE
30-Jun-16
APPR'D
TV
DATE
30-Jun-16
SHEET
EQUIP. NO.:
V-0833/ V-0933
OF
BY
JJN
Revision
CLIENT:
3
4
5
6
7
8
N10
9
10
11
12
SL
13
14
N11
15
A1
A1
N2
16
17
18
N5
19
20
VGS vane
21
22
23
24
25
26
27
28
29
30
31
(Note 20)
HH
N1
A1
N6
N8
ID194 mm(*)(Note14)
32
33
N9
34
N12
35
N3
TL
36
N7
37
38
39
40
N4
(*)
41
42
43
44
45
46
47
48
49
50
NOZZLE ORIENTATION
51
52
53
54
43
44
45
LAHH=950
46
LAH=800
47
OPEN = 775mm
48
CLOSE = 525mm
49
50
LAL=500
51
52
LALL=300
Bottom Tangent of Vessel
53
A1
55
56
69
REMARK
70
71
2) Size and level setting are considered as minimum requirement and shall be confirmed by vendor.
72
73
74
75
76
77
78
79
80
81
82
A1
PTTEPI
EPCI of Wellhead Platforms,
Associated Pipelines and Tie-Ins
for Zawtika Development Project
Phase 1C
PROJECT:
LOCATION:
MM-ZTK-1C-WPX-MEC-DTS-0003
JOB NO.
2028
REVISION NO.
A1
DATE
30-Jun-16
CHKD
THP / SMR
DATE
30-Jun-16
APPR'D
TV
DATE
30-Jun-16
SHEET
EQUIP. NO.:
V-0833/ V-0933
OF
BY
SERVICE:
Qty:
APPLICABLE TO:
FOR
UNIT
SITE
RFQ / P.O No
TBC
SERVICE
VENDOR
VTA
PRELIMINARY ESTIMATES
DETAILED ESTIMATES
AS BUILT
7
WEIGHT DATA
8
9
WEIGHT STATUS
PROPOSAL
PRELIMINARY EST.
DETAILED EST.
AS BUILT
15%
10%
5%
1%
kg
VTA
VTA
VTA
VTA
13 OPERATING WEIGHT
kg
VTA
VTA
VTA
VTA
14 TRANSPORT WEIGHT
kg
VTA
VTA
VTA
VTA
15 HYDROTEST WEIGHT
kg
VTA
VTA
VTA
VTA
17
kg
VTA
VTA
VTA
VTA
18
kg
VTA
VTA
VTA
VTA
19
kg
VTA
VTA
VTA
VTA
20
21
22
'L'
23
'X'
24
'W'
25
26
FRONT
COG
'Y'
27
28
PLAN
REF POINT (DATUM)
29
EQUIPMENT / SKID
30
31
COG
'H'
'Z'
32
33
34
ELEVATION
35
36
37
38
EQUIPMENT / SKID DIMENSIONS AND COG DATA
39
40 MEASUREMENT STATUS
PROPOSAL
PRELIMINARY EST.
DETAILED EST.
AS BUILT
41 DIMENSION 'L'
VTA
VTA
VTA
VTA
42 DIMENSION 'W'
VTA
VTA
VTA
VTA
43 DIMENSION 'H'
VTA
VTA
VTA
VTA
44 DIMENSION 'X'
VTA
VTA
VTA
VTA
45 DIMENSION 'Y'
VTA
VTA
VTA
VTA
46 DIMENSION 'Z'
VTA
VTA
VTA
VTA
NOTES
47
48 1
49 2
50 3
ALL DIMENSIONS SHALL BE IN MM AND REF POINT BE CLEARLY IDENTIFIED ON DWGS AND EQUIPMENT/SKID.
51 4
PURCHASER SHALL SPECIFY THE TARGET WEIGHT UNCERTAINTY FOR EACH EQUIPMENT/SKID.
52 5
VENDOR SHALL ADVISE THE REASONS AND PROPOSE RECTIFICATION ACTIONS, IF THE WEIGHT ESTIMATE IS OUTSIDE
53
54
55
56
57
58
59
60
61
62
63
64
65
66
FRONT
MAINTENANCE
MAINTENANCE
EQUIPMENT
EQUIPMENT
/ SKID
/ SKID
REF
REF
POINT
POINT
(DATUM)
(DATUM)
'
67
ELEVATIONPLAN
'E'
JJN
Revision
CLIENT:
DOCUMENT NO