AHM

MEDSHAWKY
YsEXAMON
N05022014
1Asperthetrussfigu
ureshown,kn
nowingthatE=250Gpa&A==380mm2.Caalculatethedisplacement at
thejointEE.

The displacement at any point = F*L/EA


The displacement at B = (25*1000*4000)/
(250*1000*380)=1.05mm
The displacement at E = 2*1.05=2.10mm

2Inthessametrussab
bove.CalculattethedisplaccementattheejointB.

3Asperthebeamfigu
ureshownbe
elow,knowinggthatEIiscoonstant.Calcu
ulatethedefleectionatC.

Deflection at C= 5w*L4/384EI=
(5*12*244)/(384*EI)=51840/EI

4Asperthebeamfigu
ureshownbe
elow,knowinggthatEIiscoonstant.Calcu
ulatethedefleectionatC.

It's the longest path of activities in the project

5Definitiionofcriticalpathmethod
d?
6EstimattetimeinPER
RTarecalculaatedNormalo
orBinomialoorLogarithmiccorintegratio
on?
7Change
eorderinanyyprojectwilliimpactwhat??

The time and the cost

Normal

12-18%
8Moisturecontentintimberusedinconstruction?

106.22-6.22=100.00'

9ASHGALmeans:MinistryofPublicworkOrMinistryofurbanplanningorMinistryofwaterand
Other because it's Puplic Work Authority not Ministry
electricityorother?
10Ifalevelinstrumentelevationis106.22,whatsthegroundlevelifthereadingonthestaff6.22?
11Ifyouhaveashallowfoundationcarryinglightstructurewithdrainageembeddedinthesoiland
foundthatthesoilunderthefoundationisexpansive.Whatsthepropersoilreplacementforthat:well
gradedsandwellcompactedorwellcompactedsandwith30%finesorconcretereplacementorsame
expansivesoilbutwellcompacted?
Well graded sand well compacted
12Oneoftheroadtrafficmeasurementsarefoundas250350200320288266at15minutesperiod.
CalculatethePHF?
13Hardnessofwaterisdefinedas:Thetotalsolidcontentinthewaterorthetotaldissolvedcontentin
thewaterortheresistancetoincreasethePHvalueortheresistancetosoapscrum?
14Thenominalmomentatanyconcreterectangularsectionarecalculatedas:Mn=Asfs(da)or
Mn=0.85fcba(da/2)orMn=Asfs(da/2)+0.85fcba?
Mn=0.85fc'ba(d-a/2)
15Thefirststeptodefinetheprojectscopeisto:analyzethebudgetoranalyzetheworkstrategyor
definethemajoractivitiesaccordingtoclientsrequirementormeettheteammembers?

To define the major activities according to client's requirement


16Thefirststeptoidentifytheroadgeometryinroaddesignisto:knowthefunctionalclassificationor
knowthetrafficfloworknowexistingdesignorknowroadsnetwork?
17Usageofplywoodinformworkpreferredbecause:thetensilestrengthisequalatanydirectionor
thetensilestrengthismaximumatshortdirectionorthetensilestrengthisminimumatlongdirection
The tensile strength is equal at any direction
orthetensilestrengthisminimumatshortdirection?
18Iftheinvestmentofaprojectwith2,000,000QARstartwith150,000QARwithannualprofit10%.
Calculatethereturnperiodinyears?(Note:Formulasaregivenintheexam)
19Thepreferredlocationforanewlibrarywillbeon:Besideairportareaorbesidecentralareawith
parkingfacilitiesorremoteareaorhighpopulationarea?
Central area with parking facilities
20Workingbreakstructure(WBS)isdefinedas:1)Graphicalpresentation2)TopDownstructurewith
programadopted3)DownTopstructurewithprogramadopted4)usefulincomplexprojects.Isthe
correctanswer:1,2OR1,3OR2,4OR3,4?
2,4
21Theairentrapmentinconcretewill:1)increasetheworkability2)improvethedurability3)reduce
heconcretedensity4)increaseconcretestrength.
1,3
22Thebearingcapacityforthesoilwillbeaffectedbywhich:shearstrengthparametersorfoundation
dimensionsorfoundationdepthorothers?

shear strength parameters

0.2
23Poissonsratioincommonconcreteis:0.2or0.3or0.45or0.25?

3 layers

24Howmanylayersofconcreteisrequiredinslumptest:4layersor2layersor3layersor7layers?

25Whatsthemeanofcrashingintheproject?

To increase project resources in order to


reduce the project total duration