MEASUREMENT/CALCULATION DETAILS FOR SCHEDULED WORKS

S / No

Item Description

Unit

BILL No. 1: PRELIMINARIES


Conditions of Contract Particulars
Insurance of works, plant and materials

l/s

Insurance against personal injury or death.

l/s

C
D
E

Site investigations & setting out


Testing of materials & samples
Performance security
Specific Matters: the bidder shall allow here for the
specific items.
Tools, plant and scaffolding
Site supervision
Communication
Site office
Water for works
Light and power for works
Site security
Hoarding
Signboards
Removing rubbish and site cleaning
Photographs & site records
TOTAL BILL No.1 (PRELIMINARIES) TO GRAND
SUMMARY

l/s
l/s
l/s

F
G
H
I
J
K
L
M
N
O
P

............................................. Contractor

l/s
l/s
l/s
l/s
l/s
l/s
l/s
l/s
l/s
l/s
l/s

Page 1 of 35

Quantity

Rate (SSP)

Amount (SSP)

1
1
1
1

.............................................County Engineer

S / No

Item Description

Unit

Quantity

Rate (SSP)

Amount (SSP)

Main Building
ELEMENT No. 4: ROOF STRUCTURE
Roof Construction
F

Veranda roof support manufactured from well seasoned


and smooth finish hardwood; fixed and tied to wall and
rafters as as design detail drawing.

no

10

Treat timber surfaces by applying two coats of antitermite/anti-insects (soliginum) to all wood surfaces

TOTAL ELEMENT 4 (ROOF STRUCTURE) CARRIED TO


SUMMARY

............................................. Contractor

Page 2 of 35

.............................................County Engineer

S / No

Item Description

Unit

Quantity

Rate (SSP)

Amount (SSP)

63

ELEMENT NO:5:ROOF FINISHES

Prime grade joinery timber: wrot Pine


225 x 20mm Facia and barge board
28 Gauge pre-painted iron roofing sheets fixed with
11/2 side corrugation laps and 150mm end laps with
and including approved roofing nails or galvanized
steel drive screws with plastic washers to
manufacturer's instructions.

Roof Covering ( Replacing Rusted Iron Sheets)

m2

21.6

Matching ridge capping


Knot prime stop and apply three coats of gloss oil
paint to timber surfaces.

Surfaces exceeding 200mm but not exceeding 300mm


girth.

52.4

Prepare touch up primer and apply one undercoat and two


finishing coats of gloss oil paint: on the old iron sheets

m2

211.68

TOTAL ELEMENT 5 (ROOF FINISHES) CARRIED TO


SUMMARY

ELEMENT NO. 6: ROOF WATER HARVESTING


Supply and Fix: Rain Water Harvesting System UPVC
Gutter to BS 4576
A

110mm streamline gutter complete with gutter unions


fascia clips for fixing to ends of trusses.

35.6

B
C
D

110mm gutter connectors


110mm stop ends
110 x 75mm gutter outlets

no
no
no

11
2
2

100mm rain water down pipe fixed and clipped to walls


with approved holder bats.

............................................. Contractor

Page 3 of 35

.............................................County Engineer

S / No
F
G

Item Description

Unit

Extra over down pipe for bends:


Extra for Horse shoe 100mm

Quantity

no
no

Rate (SSP)

Amount (SSP)
-

The following in 1 No 10,000L rain water storage tank


H

Supply 1, 10,000L tank


Excavate top vegetable soil average 150mm deep and cut
to spoil

Item
m2

Anti-termite treatment to: sides and bottoms of foundations

m2

Ditto: blinded surfaces of hard core

m2

14.4

Excavate foundation trenches: not exceeding 1.0m deep:


commencing from stripped level

m3

9.1

Return fill and ram selected excavated materials around


foundations in 200mm layers compacted to 95% MDD

m3

Surplus excavated material: load up, cut deposit, spread


and level on site where directed

m3

125 mm Murram filling: well watered and compacted to


95% MDD to make up levels under floor bed

m2

150mm hard core bed: in broken stone blinded with and


including 20mm layer of approved blinding under floor bed

m2

15.2

m3

m2

15.2

I
J

Plain concrete class 25/20mm aggregate, in :foundation in


trenches
Ditto: 100mm floor bed

Sawn form work to: edges of bed: 75-150mm width

15.2

230mm wall: built to a radius of 1m : in hard burnt clay


bricks bedded and jointed in cement and sand(1:4) mortar

m2

27.4

15mm cement and sand(1:4) render: steel trowelled


smooth

m2

54.7

............................................. Contractor

Page 4 of 35

.............................................County Engineer

S / No

V
W
X

Item Description

Unit

12mm dia Bip tap: complete with a stop valve and water
supply pipe fixed 3m vertically away from tank to hieght not Item
exceeding 0.5m
300mm x 12mm diameter overflow pipe
1000mm x 25mm dia pipe: wash out complete with stop
valves

Rate (SSP)

Amount (SSP)

0.5

no

TOTAL ELEMENT 6 (ROOF WATER HARVESTING)


CARRIED TO SUMMARY

............................................. Contractor

Quantity

Page 5 of 35

.............................................County Engineer

S / No

Item Description

Unit

Quantity

15

Rate (SSP)

Amount (SSP)

ELEMENT No.7: WINDOWS

Purpose made steel casement windows manufactured


from standard strong Z sections: manufacture,
assemble and deliver to site: Supply and fix
ironmongery comprising approved hinges, stays,
fasteners to opening lights: frames drilled, plugged
and screwed or built into walling: one coat red oxide
primer before delivery.
Supply and fix the following
A

Window (type W1) size 1000 x 1000 mm high overall steel


casementglazed mosquito proof including outer framing, 2
no. side hung opening outside

no

Burglar proofing grille comprising 12mm high yield tensile


bars 150mm centres vertical and 300mm centres
horizontal in cobweb pattern having one coat of red oxide
primer to fit the following window sizes.

C
D

Iron Mongery and matching fixing


Fastener
Stay

no
no

30
30

m2

m2

20

Ordinary quality(OQ) clear sheet glass and glazing


E

4mm glass: glazing to metal casement panes 0.1-0.5mm2


with tropical glazing putty
Prepare touch up primer and apply one undercoat and
two finishing coats of gloss oil paint: on metal
windows

Glazed casement windows (measured flat both faces)


Prepare touch up primer and apply one undercoat and
two finishing coats of gloss oil paint: on concrete

............................................. Contractor

Page 6 of 35

.............................................County Engineer

S / No
G
H

Item Description

Unit

Window cills: 75 x 285mm average


Cement and sand(1:4)
15mm plaster to reveals: average 200-300mm wide: steel
trowelled smooth

Quantity

Rate (SSP)

Amount (SSP)
-

40

20

20

Prepare and apply three coats weather guard emulsion


paint: to
I

Plastered surfaces of reveals 200-300mm wide: external


Prepare surfaces: apply three coats vinyl silk soft
white emulsion paint: on steel trowelled plaster: to

Plastered surfaces of reveals 200-300mm wide: internal


TOTAL ELEMENT 7 (WINDOWS) CARRIED TO
SUMMARY

............................................. Contractor

Page 7 of 35

.............................................County Engineer

S / No

Item Description

Unit

Quantity

Rate (SSP)

Amount (SSP)

no

m2

16

ELEMENT No. 8: DOORS

Purpose made steel door manufactured from standard


strong Z sections and covered both sides with 3mm
steel casement, assemble and deliver to site with all
necessary ironmongery: frames drilled, plugged and
screwed or built into walling: one coat red oxide
primer before delivery:

1000 x 2400mm high overall: permanent vent above


300mm high: opening shutter 1000 x 2100mm high in 3mm
thick steel casement: glazing bars as per design
Painting

Prepare touch up primer and apply one undercoat and two


finishing coats of gloss oil paint: on glazed metal doors.
Supply and fix: English "Union" or other equal
approved ironmongery: matching screws: locks to
include a set of 3 keys. (Prices of locks to be inclusive
of handles)

3 lever steel door lock: complete with lever furniture.

no

38mm diamete rubber door stop.

no

External cement and sand(1:4) render: steel trowelled:


on masonry or concrete: to
E

15mm thick to walls and concrete surfaces on reveals

19.2

Tyrolean render in two coats to plastered surfaces


externally
Walls and Concrete surfaces on reveals.

9.6

............................................. Contractor

Page 8 of 35

.............................................County Engineer

S / No

Item Description

Unit

Quantity

9.6

Rate (SSP)

Amount (SSP)

Prepare surfaces: apply three coats weather guard


emulsion paint as 'Sadolin' or other equal and
approved: on steel trowelled plaster: to
G

Walls and concrete surfaces internally


TOTAL ELEMENT No.8 (DOORS) CARRIED TO
SUMMARY

............................................. Contractor

Page 9 of 35

.............................................County Engineer

S / No

Item Description

Unit

Quantity

Rate (SSP)

Amount (SSP)

m2

180

ELEMENT No. 9: FLOOR FINISHES


Floor Finishes

AA

Remove the existing floor screed by hacking it off . Take


care not to destroy the conrete slab underneath. Clean the
surface and remove all the dirt and dust, water the surface
before applying new screed

Cement and sand (1:3) screeds and pavings: one coat:


steel trowel finish: laid on concrete
A

25mm thick screeding.

m2

180

25 x 100mm skirting with square top edge and coved


junction at bottom of paving.

120

120

Prepare surfaces: apply three coats vinyl emulsion


paint: on steel trowelled plaster: to
C

General surfaces: 75-150mm width in skirting


TOTAL ELEMENT 9 (FLOOR FINISHES) CARRIED TO
SUMMARY

ELEMENT NO. 10: WALL FINISHES


External wall finishes
Cement and sand(1:4)
A

15mm thick to walls and concrete surfaces

m2

300mm x 10mm rendered skirt


Prepare surfaces: apply three coats weather guard
emulsion paint;
Rendered surfaces: walls

36

m2

36

Prepare surfaces: apply three coats bituminous paint;


D

Skirt

............................................. Contractor

Page 10 of 35

.............................................County Engineer

S / No

Item Description

Unit

Quantity

Rate (SSP)

Amount (SSP)

m2

111.6

m2

341

Internal Wall finishes Cement/lime putty/sand(1:2:9)


E

15mm plaster to: walls and concrete surfaces: steel


trowelled smooth
Prepare surfaces: apply three coats vinyl silk soft
white emulsion paint: on steel trowelled plaster: to

Walls and concrete surfaces internally


TOTAL ELEMENT 10 (WALL FINISHES) CARRIED TO
SUMMARY

............................................. Contractor

Page 11 of 35

.............................................County Engineer

S / No

Item Description

Unit

Quantity

Rate (SSP)

Amount (SSP)

ELEMENT No.11: FITTINGS & FIXTURES


The following in 4 No. Pin boards each classroom size
as directed by the Engineer
A

15mm thick 'cellotex, soft board (in 3 No.)

m2

25 x 50mm beading to edges of pin boards

Prepare and apply one under coat and two coats of


emulsion paint : on
General surfaces: soft board lining

m2

Knot prime and stop and apply three gloss oil paint to
timber surfaces not exceeding 100mm girth.
D

Surfaces 25 x 50mm girth: edge trim


The following in blackboards: size 3m x 1.2m high

20mm thick internal lime plaster to walls internally

m2

28.8

50 x 75mm timber chalk rails


Prepare and apply three coats of black bit mastic paint to
blackboard surfaces

24

m2

28.8

12

Knot prime and stop and apply three gloss oil paint to
timber surfaces not exceeding 100mm girth.
H

Surfaces 75-100mm
TOTAL ELEMENT 11 (FITTINGS & FIXTURES) CARRIED
TO SUMMARY

ELEMENT No.12: CLASSROOM FURNITURE


Furniture supply
As detailed in drawings

............................................. Contractor

Page 12 of 35

.............................................County Engineer

S / No

Item Description

Unit

Quantity

Desk to accommodate 3 pupils with a top for


writing and attached bench. Dimensions to be
recoonded by Engineer
Teacher's table with recommended size by Engine
Teacher's Chair with recommended size by Engin

no

48

no

no

B
C

TOTAL ELEMENT 12 (FURNITURE) CARRIED TO


SUMMARY

............................................. Contractor

Page 13 of 35

Rate (SSP)

Amount (SSP)

.............................................County Engineer

S / No

Item Description

Unit

Quantity

Rate (SSP)

Amount (SSP)

ELEMENT No.13:ELECTRICAL INSTALLATION


Lightning Protection

24 x 3mm cross section Copper tape conductor, of Hard


Drawn High conductivity copper plate for Horizontal and
Down Conductors, in and including 32mm diameter heavy
gauge galvanized steel conduit, complete with bonding
conductors, fixing clips and all accessories

Air terminals complete with Tape Adapter and all


accessories as by FURSE or equal.

no

Copper Test Blocks complete as by FURSE or equal.

no

Earth electrodes made from Hard drawn copper or copper


weld 20mm diameter by 1200mm in two length screwed
together complete with cap, earth clamp, manhole and all
accessories.

no

no

Earthing
E

Inspection chamber: size 300 x 300mm international


dimension: complete with lid
TOTAL ELEMENT No.13 (ELECTRICAL INSTALLATION)
CARRIED TO SUMMARY

2 Stance VIP Latrine with Urinals ( for Boys)


ELEMENT NO 1
SUBSTRUCTURE
(All Provisional)
Site Preparation
A

Excavate oversite to remove top soil average 250mm thick


and remove from site.

............................................. Contractor

m2

Page 14 of 35

135

.............................................County Engineer

S / No

Item Description

Unit

Treat surface of subsoil or fillings and surroundings with


approved chemical anti-termite solution: provide ten year
guarantee.

Quantity

m2

Rate (SSP)

Amount (SSP)

Excavation and Earthworks.


Note: Rates for excavation to include for keeping
excavations free from water and planking and strutting
to sides of excavations
C

Excavate to reduce levels and remove from site.

m3

Excavate trenches for wall foundations: commencing from


reduced levels : not exceeding 1.5m deep .

m3

16.5

m3

57.3

Ditto but pit for latrine


Disposal of excavated material

Selected excavated material in filling to foundation


trenches : around walling : placed in 200mm layers :
watered and compacted to 95% MDD

m3

34

Remove surplus excavated material from site

m3

m3

3.8

Insitu concrete grade 20, 20mm aggregate as


described.
H

Foundations in trenches, 150mm thick


Vibrated , reinforced concrete as described.

Cast reinforced concrete with 4Y12 rebars including R6


spaced not more than 300mm apart for footing to pit lining

m3

2.5

Ring beam reinforced with 4 Y12 rebars including R6


spaced not more than 300mm apart

m3

0.8

Ramps and Steps

m3

0.6

Mesh reinforcement Ref No. A98 size 200 x 200 mm


weighing 1.54 kg per square metre: in floor slab:
including all necessary supports

............................................. Contractor

Page 15 of 35

.............................................County Engineer

S / No
L
M
N

Item Description
100mm thick ground floor slab tamped to fabric
reinforcement in suspended slabs
Sawn formwork as described to:
formwork for ring beam
Soffites of suspended slab

Unit

Quantity

Rate (SSP)

Amount (SSP)

m2

14.3

m2
m2

8.2
7.7

Risers of steps exceeding 75 but not exceeding 150mm


high steps

Vertical edges of surface bed : over 75mm but not


exceeding 150 mm high.

1.8

230 mm thick walling for pit lining and plinth.

m2

53.5

One layer 1000 gauge polythene sheet damp proof


membrane : Under bed : 300mm laps.

m2

14.3

Brickwork in cement and sand mortar (1:3) mix; with


and including 25 x 3mm hoop iron strips laid
horizontally every alternate course.
Q
R

Damp proof courses : hessian based bituminous felt:


bedded in cement and sand (1:4) mortar : 300mm laps.
S

Horizontal : 150mm ditto


Plinth wall and splash apron

17.4

100mm Thick well compacted murram bed

m2

8.39

Construct 200mm wide splash apron around the latrine

m2

2.64

15mm Thick cement and sand plaster to plinth walls with


wood float finish.

m2

4.04

TOTAL ELEMENT No.1 (SUBSTRUCTURE) TO GRAND


SUMMARY

............................................. Contractor

Page 16 of 35

.............................................County Engineer

S / No

Item Description

Unit

Quantity

Rate (SSP)

Amount (SSP)

m
m
m

20.2
12.3
9.2

m2

14

15.4

15.4

ELEMENT NO. 2
ROOF
Roof Construction
The following in roof construction including hoisting
and fixing approximately 3.0mm above ground level.

A
B
C

Sawn
cypress
pressure
preservative:50 x 100mm Purlins
50 x 150mm Rafters
100 x 75mm Wall Plate
Roof Covering

impregnated

with

28 Gauge pre-painted iron roofing sheets fixed with 11/2


side corrugation laps and 150mm end laps with and
including approved roofing nails or galvanized steel drive
screws with plastic washers to manufacturer's instructions.
Eaves
25 x 225mm Wrot Cypress fascia board
Painting
Knot prime stop and apply three coats of gloss oil
paint to timber surfaces.
Knot, prime, stop and apply three coats of gloss oil paint to
wood fascia 200-300mm girth.

............................................. Contractor

Page 17 of 35

.............................................County Engineer

S / No

Item Description

Unit

Quantity

TOTAL ELEMENT NO.2 (ROOF) TO SUMMARY

Rate (SSP)

Amount (SSP)
-

EXTERNAL WALLS
Blockwork: cement and sand mortar (1:3) mix; with
and including 25 x 3mm hoop iron strips laid
horizontally every alternate course.
A

150mm thick walling reinforced with and including 25 x


3mm hoop iron strips laid horizontally every alternate
course.

m2

37.9

Extra for 230 x 230 x 2300mm high block piers

no

m2

0.5

m2

40.9

m2

27.1

Precast concrete louvre block walling in cement sand


mortar (1:3) with pointed joints to approval.
C

150mm thick walling


Finishes
Cement and sand ( 1:4) render trowelled smooth on
concrete or masonry

15mm to walls.
Two coats tyrolene rendering on masonry

Walls and concrete surfaces


TOTAL ELEMENT NO.3 (EXTERNAL WALLS) TO
SUMMARY

ELEMENT NO. 4
DOORS
Concrete Work
Precast concrete Class 28/12mm lintel reinforced with
4No. 12 mm high tensile steel bars and 8mm steel
stirrups at 200 mm centres and including all necessary
formwork and hoisting and fixing in position.
A

150 x 230 mm high

............................................. Contractor

Page 18 of 35

4.4

.............................................County Engineer

S / No

Item Description

Unit

Quantity

Rate (SSP)

Amount (SSP)

Provide and fix 800mm wide x 2000mm high ssteel


casement doors, complete with strong locking system both
internally and externallyails.

no

Apply three coats of high gloss paint to casement doors

m2

6.4

Casment doors

TOTAL ELEMENT NO. 4 (DOORS) TO SUMMARY

............................................. Contractor

Page 19 of 35

.............................................County Engineer

S / No

Item Description

Unit

Quantity

Rate (SSP)

Amount (SSP)

ELEMENT NO. 5
INTERNAL FINISHES
Floor Finishes
Cement and sand (1:4) screeds and pavings : one
coat: steel trowell finish : laid on concrete
A

32mm thick paving.

m2

11.8

Construct urinal drainage channel with PVC screen fixed to


100mm PVC drain pipe

m2

3.5

Wall Finishes

Internal cement and sand plaster : steel trowell finish

15mm thick to Walls.

m2

32.7

Internal cement grout including water proof cement :


steel trowell finish
Ditto but 10mm thick cement grout to Walls in the urinal of
at least 1500mm high against which urine drops.

m2

6.6

Painting
D
E

Prepare and apply one undercoat and three finishing coats


of matt vinyl paint to plastered surfaces.
Ditto but black coats of gloss oil paint skirting of 200mm
high .
Soil and vent pipes

m2

46.5

m2

1.84

100mm diameter uPVC soil and vent pipe 3500mm high


with and including wire baloon grating.

no

Provide 200litres plastic tank complete with tap and


600mm high stand for hand washing purpose

no

TOTAL ELEMENT NO. 5 (INTERNAL FINISHES) TO


SUMMARY

............................................. Contractor

Page 20 of 35

.............................................County Engineer

S / No

Item Description

Unit

Quantity

135

Rate (SSP)

Amount (SSP)

2 VIP Latrine Without Urinals ( for Girls)


ELEMENT NO 1
SUBSTRUCTURE
(All Provisional)
Site Preparation
A

Excavate oversite to remove top soil average 250mm thick


and remove from site.

m2

Treat surface of subsoil or fillings and surroundings with


approved chemical anti-termite solution: provide ten year
guarantee.

m2

Excavation and Earthworks.

Note: Rates for excavation to include for keeping


excavations free from water and planking and strutting
to sides of excavations

Excavate to reduce levels and remove from site.

m3

12.7

Excavate trenches for wall foundations: commencing from


reduced levels : not exceeding 1.5m deep .

m3

13

m3

39.1

Ditto but pit for latrine


Disposal of excavated material

Selected excavated material in filling to foundation


trenches : around walling : placed in 200mm layers :
watered and compacted to 95% MDD

m3

25.5

Remove surplus excavated material from site

m3

26.5

Foundations in trenches, 150mm thick

m3

m3

Vibrated , reinforced concrete as described.


I

Cast reinforced concrete with 4Y12 rebars including R6


spaced not more than 300mm apart for footing to pit lining

............................................. Contractor

Page 21 of 35

.............................................County Engineer

S / No

Item Description

Unit

Quantity

Rate (SSP)

Amount (SSP)

Ring beam reinforced with 4 Y12 rebars including R6


spaced not more than 300mm apart

m3

0.6

Ramps and Steps

m3

0.6

m2

9.3

m2
m2

6.7
5

Mesh reinforcement Ref No. A98 size 200 x 200 mm


weighing 1.54 kg per square metre: in floor slab:
including all necessary supports
L
M
N

100mm thick ground floor slab tamped to fabric


reinforcement in suspended slabs
Sawn formwork as described to:
formwork for ring beam
Soffites of suspended slab

Risers of steps exceeding 75 but not exceeding 150mm


high steps

Vertical edges of surface bed : over 75mm but not


exceeding 150 mm high.

1.8

............................................. Contractor

Page 22 of 35

.............................................County Engineer

S / No

Item Description

Unit

Quantity

Rate (SSP)

Amount (SSP)

m2

39.7

m2

9.3

Brickwork in cement and sand mortar (1:3) mix; with


and including 25 x 3mm hoop iron strips laid
horizontally every alternate course.
Q

230 mm thick walling for pit lining and plinth.


Sundries

One layer 1000 gauge polythene sheet damp proof


membrane : Under bed : 300mm laps.
Damp proof courses : hessian based bituminous felt:
bedded in cement and sand (1:4) mortar : 300mm laps.

Horizontal : 150mm ditto


Plinth wall and splash apron

14.3

100mm Thick well compacted murram bed

m2

5.8

Construct 200mm wide splash apron around the latrine

m2

15mm Thick cement and sand plaster to plinth walls with


wood float finish.

m2

TOTAL ELEMENT No.1 (SUBSTRUCTURE) TO GRAND


SUMMARY

ELEMENT NO. 2
ROOF
Roof Construction
The following in roof construction including hoisting and fixing approximately
3.0mm above ground level.
Sawn cypress pressure impregnated with preservative:A
B
C

50 x 100mm Purlins
50 x 150mm Rafters
100 x 75mm Wall Plate
Roof Covering

............................................. Contractor

m
m
m

Page 23 of 35

13.7
9.2
6

.............................................County Engineer

S / No

Item Description

Unit

Quantity

28 Gauge pre-painted iron roofing sheets fixed with 11/2


side corrugation laps and 150mm end laps with and
including approved roofing nails or galvanized steel drive
screws with plastic washers to manufacturer's instructions.

m2

9.5

12.3

12.3

Eaves
25 x 225mm Wrot Cypress fascia board
Painting
Knot prime stop and apply three coats of gloss oil
paint to timber surfaces.
Knot, prime, stop and apply three coats of gloss oil paint to
wood fascia 200-300mm girth.

TOTAL ELEMENT NO.2 (ROOF) TO SUMMARY

............................................. Contractor

Page 24 of 35

Rate (SSP)

Amount (SSP)

.............................................County Engineer

S / No

Item Description

Unit

Quantity

Rate (SSP)

Amount (SSP)

ELEMENT NO. 3
EXTERNAL WALLS
Blockwork: cement and sand mortar (1:3) mix; with
and including 25 x 3mm hoop iron strips laid
horizontally every alternate course.
A

150mm thick walling reinforced with and including 25 x


3mm hoop iron strips laid horizontally every alternate
course.

m2

26.8

Extra for 230 x 230 x 2300mm high block piers

no

m2

0.4

m2

30.3

m2

21

Precast concrete louvre block walling in cement sand


mortar (1:3) with pointed joints to approval.
C

150mm thick walling


Finishes
Cement and sand ( 1:4) render trowelled smooth on
concrete or masonry

D
E

15mm to walls.
Two coats tyrolene rendering on masonry
Walls and concrete surfaces
TOTAL ELEMENT NO.3 (EXTERNAL WALLS) TO
SUMMARY

ELEMENT NO. 4
DOORS
Concrete Work
Precast concrete Class 28/12mm lintel reinforced with
4No. 12 mm high tensile steel bars and 8mm steel
stirrups at 200 mm centres and including all necessary
formwork and hoisting and fixing in position.
A

150 x 230 mm high


Casement doors

............................................. Contractor

Page 25 of 35

2.85

.............................................County Engineer

S / No

Item Description

Unit

Quantity

Provide and fix 800mm wide x 2000mm high ssteel


casement doors, complete with strong locking system both
internally and externallyails.

no

Apply three coats of high gloss paint to casement doors

m2

6.4

TOTAL ELEMENT NO. 4 (DOORS) TO SUMMARY

............................................. Contractor

Page 26 of 35

Rate (SSP)

Amount (SSP)

.............................................County Engineer

S / No

Item Description

Unit

Quantity

Rate (SSP)

Amount (SSP)

m2

7.5

m2

21.4

m2

30.8

m2

1.84

ELEMENT NO. 5
INTERNAL FINISHES
Floor Finishes
Cement and sand (1:4) screeds and pavings : one
coat: steel trowell finish : laid on concrete
A

32mm thick paving.


Wall Finishes
Internal cement and sand plaster : steel trowell finish

D
E

15mm thick to Walls.


Painting
Prepare and apply one undercoat and three finishings
coats of matt vinyl paint to plastered surfaces.
Ditto but black coats of gloss oil paint skirting of 200mm
high .
Soil and vent pipes

100mm diameter uPVC soil and vent pipe 3500mm high


with and including wire baloon grating.

no

Provide 200litres plastic tank complete with tap and


600mm high stand for handwashing prupose

no

TOTAL ELEMENT NO. 5 (INTERNAL FINISHES) TO


SUMMARY.

3 Stance VIP Latrine (Staff)

ELEMENT NO 1
SUBSTRUCTURE
(All Provisional)
Site Preparation
A

Excavate oversite to remove top soil average 250mm thick


and remove from site.

............................................. Contractor

m2

Page 27 of 35

135

.............................................County Engineer

S / No

Item Description

Unit

Treat surface of subsoil or fillings and surroundings with


approved chemical anti-termite solution: provide ten year
guarantee.

Quantity

m2

Rate (SSP)

Amount (SSP)

Excavation and Earthworks.


Note: Rates for excavation to include for keeping
excavations free from water and planking and strutting
to sides of excavations
C

Excavate to reduce levels and remove from site.

m3

17.1

Excavate trenches for wall foundations: commencing from


reduced levels : not exceeding 1.5m deep .

m3

16.7

m3

58.5

Ditto but pit for latrine


Disposal of excavated material

Selected excavated material in filling to foundation


trenches : around walling : placed in 200mm layers :
watered and compacted to 95% MDD

m3

34.6

Remove surplus excavated material from site

m3

40.7

m3

3.8

Insitu concrete grade 20, 20mm aggregate as


described.
H

Foundations in trenches, 150mm thick


Vibrated , reinforced concrete as described.

Cast reinforced concrete with 4Y12 rebars including R6


spaced not more than 300mm apart for footing to pit lining

m3

2.5

Ring beam reinforced with 4 Y12 rebars including R6


spaced not more than 300mm apart

m3

0.8

Ramps and Steps

m3

0.6

Mesh reinforcement Ref No. A98 size 200 x 200 mm


weighing 1.54 kg per square metre: in floor slab:
including all necessary supports

............................................. Contractor

Page 28 of 35

.............................................County Engineer

S / No
L
M
N

Item Description
100mm thick ground floor slab tamped to fabric
reinforcement in suspended slabs
Sawn formwork as described to:
formwork for ring beam
Soffites of suspended slab

............................................. Contractor

Unit

Quantity

m2

14.6

m2
m2

8.3
7.9

Page 29 of 35

Rate (SSP)

Amount (SSP)

.............................................County Engineer

S / No

Item Description

Unit

Quantity

Rate (SSP)

Amount (SSP)

Risers of steps exceeding 75 but not exceeding 150mm


high steps

Vertical edges of surface bed : over 75mm but not


exceeding 150 mm high.

1.8

m2

31.1

m2

14.6

Brickwork in cement and sand mortar (1:3) mix; with


and including 25 x 3mm hoop iron strips laid
horizontally every alternate course.
Q

230 mm thick walling for pit lining and plinth.


Sundries

One layer 1000 gauge polythene sheet damp proof


membrane : Under bed : 300mm laps.
Damp proof courses : hessian based bituminous felt:
bedded in cement and sand (1:4) mortar : 300mm laps.

Horizontal : 150mm ditto


Plinth wall and splash apron

17.8

100mm Thick well compacted murram bed

m2

8.6

Construct 200mm wide splash apron around the latrine

m2

2.7

15mm Thick cement and sand plaster to plinth walls with


wood float finish.

m2

5.4

TOTAL ELEMENT No.1 (SUBSTRUCTURE) TO GRAND


SUMMARY

............................................. Contractor

Page 30 of 35

.............................................County Engineer

S / No

Item Description

Unit

Quantity

Rate (SSP)

Amount (SSP)

ELEMENT NO. 2
ROOF
Roof Construction
The following in roof construction including hoisting and fixing approximately
3.0mm above ground level.

A
B
C

Sawn
cypress
pressure
preservative:50 x 100mm Purlins
50 x 150mm Rafters
100 x 75mm Wall Plate
Roof Covering

impregnated

with

28 Gauge pre-painted iron roofing sheets fixed with 11/2


side corrugation laps and 150mm end laps with and
including approved roofing nails or galvanized steel drive
screws with plastic washers to manufacturer's instructions.
Eaves
25 x 225mm Wrot Cypress fascia board
Painting
Knot prime stop and apply three coats of gloss oil
paint to timber surfaces.
Knot, prime, stop and apply three coats of gloss oil paint to
wood fascia 200-300mm girth.

m
m
m

20.6
12.3
9.5

m2

14.3

15.6

15.6

TOTAL ELEMENT No.2 (ROOF) TO GRAND SUMMARY

ELEMENT NO. 3
EXTERNAL WALLS
Blockwork: cement and sand mortar (1:3) mix; with
and including 25 x 3mm hoop iron strips laid
horizontally every alternate course.
A

150mm thick walling reinforced with and including 25 x


3mm hoop iron strips laid horizontally every alternate
course.

............................................. Contractor

m2

Page 31 of 35

38.8

.............................................County Engineer

S / No
B

Item Description
Extra for 230 x 230 x 2300mm high block piers

Unit

Quantity

Rate (SSP)

Amount (SSP)

no

m2

0.5

m2

41.7

m2

27.5

Precast concrete louvre block walling in cement sand


mortar (1:3) with pointed joints to approval.
C

150mm thick walling


Finishes
Cement and sand ( 1:4) render trowelled smooth on
concrete or masonry

15mm to walls.
Two coats tyrolene rendering on masonry

Walls and concrete surfaces

TOTAL ELEMENT NO.3 (EXTERNAL WALLS) TO SUMMARY

ELEMENT NO. 4
DOORS
Concrete Work
Precast concrete Class 28/12mm lintel reinforced with
4No. 12 mm high tensile steel bars and 8mm steel
stirrups at 200 mm centres and including all necessary
formwork and hoisting and fixing in position.
A

150 x 230 mm high


Casment doors

4.5

Provide and fix 800mm wide x 2000mm high ssteel


casement doors, complete with strong locking system both
internally and externally.

no

Ditto but 900mm wide x 2000mm high door for entrance to


disability unit

no

Apply three coats of high gloss paint to casement doors

m2

10

TOTAL ELEMENT NO. 4 (DOORS) TO SUMMARY

............................................. Contractor

Page 32 of 35

.............................................County Engineer

S / No

Item Description

Unit

Quantity

Rate (SSP)

Amount (SSP)

m2

12.1

m2

33.4

m2

33.4

m2

2.6

ELEMENT NO. 5
INTERNAL FINISHES
Floor Finishes
Cement and sand (1:4) screeds and pavings : one
coat: steel trowell finish : laid on concrete
A

32mm thick paving.


Wall Finishes
Internal cement and sand plaster : steel trowell finish

D
E

15mm thick to Walls.


Painting
Prepare and apply one undercoat and three finishings
coats of matt vinyl paint to plastered surfaces.
Ditto but black coats of gloss oil paint skirting of 200mm
high .
Soil and vent pipes

100mm diameter uPVC soil and vent pipe 3500mm high


with and including wire baloon grating.

no

Provide 200litres plastic tank complete with tap and


600mm high stand for handwashing prupose

no

TOTAL ELEMENT NO. 5 (INTERNAL FINISHES) TO SUMMARY.

Summary
Preliminaries
Main Building
Two Stance VIP Latrine (Boys)
Two Stance VIP Latrine (Girls)
Three Stance VIP Latrine (Staff)

TOTALS

............................................. Contractor

Page 33 of 35

.............................................County Engineer

SUMMARY

S/NO.

BILL NO/ELEMENT

ESTIMATED
AMOUNT (SSP)
TENDER

1
1
2
3
4
5
6
7
8
9
10
11
12
13

PRELIMINARIES AND GENERALS


SUBSTRUCTURE
SUPERSTRUCTURE
WALLING
ROOF STRUCTURE
ROOF FINISHES
ROOF WATER DRAINAGE
WINDOWS
DOORS
FLOOR FINISHES
WALL FINISHES
FITTINGS AND FIXTURES
FURNITURE
ELECTRICAL INSTALLATION
2 Stance VIP Latrine with Urinals ( for Boys)

1
2
3
4
5
6

PRELIMINARIES
SUBSTRUCTURE
ROOF STRUCTURE
EXTERNAL WALLS
DOORS
INTERNAL FINISHES
2 VIP Latrine without Urinals (For Girls)
PRELIMINARIES
SUBSTRUCTURE
ROOF STRUCTURE
EXTERNAL WALLS
DOORS
EXTERNAL FINISHES
3 Stance VIP Latrine ( for Staff and Disabled)
PRELIMINARIES
SUBSTRUCTURE
ROOF STRUCTURE
EXTERNAL WALLS
DOORS
EXTERNAL FINISHES

1
2
3
4
5
6
1
2
3
4
5
6

TOTALS
Note: The Quantities used are Just Estimates and could not be measured due to security situation.will be adjusted in next certif

MARY
MEASURED AMOUNT (SSP)
PREV. CERT

THIS CERT.

% DONE TO
DATE

CUMM. TO DATE

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!
#DIV/0!

#DIV/0!

on.will be adjusted in next certificate