Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Description
C+L
Value
$4.8708
Description
$/ft x ft/hr
Value
$73.062
Value
Consumables
Wire .045 ER70S-6
$/lb
wire weight
lb/in
Shielding gas
Shielding gas flow rate CFH
Shielding gas flow rate CFM
incidentals cost/in (expand if necc)
Wire Cost per inch
Gas cost per inch
Total Cost per inch
Total Cost per foot
$/ft3
ft3/hr (CFH)
ft3/min
tips, liner etc
FS x weight x $/lb)/TS
(CFM x $/CF)/TS
Wire+Gas+Incidental
$/ft
$6.37000
0.000461
$0.5160
35.00
0.58
$0.00
$0.10304
wire diameter
0.045
density of material
0.29
lbs/inch3
volume
0.00159
cu inch
weight/inch
0.00046
lbs/inch
$0.02508
$0.12812
$1.5375
Description
Value
Inch/Min
Inch/Min
Percentage
12.000
400.000
0.950
lb/in
0.016
Deposition rate
lb/hr
Travel speed
travel speed IPM
Wire feed speed WFS
Deposition Efficiency
Description
10.51
Value
$/hr
$50.00
$/hr
$0.00
(L+O/60)/(TSxOF)
$/min
$/ft
Description
$0.2778
$0.83
3.333
Value
Operating Factor
Operating Factor
Arc on time/hr
25%
% On Time
25%
Other
Operating Factor
Total Cost
Consumables
Labor + Overhead
Travel Speed
Operating Factor
Total Cost per inch
Total Cost Per Foot
Description
Value
$0.13
$0.28
Heat Input
Voltage
Amperage
Joules Per Inch
Wedding Budget
V
A
(VxAx60)/Travel S
0.1281
12.00
0.25
$0.41
4.8708
Value
24.0
150.0
18000
Page 1 of 6
Description
C+L
Value
$4.8708
Description
$/ft x ft/hr
Value
$73.062
Wedding Budget
Page 2 of 6
Value
C+L
$3.6065
Description
$/ft x ft/hr
Value
$54.098
Description
Value
$/lb
lb/in
$6.37000
0.000461
$/ft3
$0.2140
ft3/hr (CFH)
35.00
ft3/min
wire diameter
density of materia
volume
0.045
0.29
0.001590
lbs/inch^3
cu inch
weight/inch
0.0004611381
lbs/inch
0.58
tungsten,etc
avel speed x price/lb
$0.00
$0.01236
$0.01040
$0.02277
$/ft
$0.2732
air cost: 0.5-0.435 per 1000 cubic feet
Description
Value
Inch/Min
Inch/Min
12.000
48.000
Inch/inch
Percentage
lb/in
4.000
0.950
0.002
Travel speed
travel speed IPM
Wire feed speed
Wire use inches/inch
Deposition Efficiency
wire use per inch traveled
Deposition rate
lb/hr
Description
$/hr
$/hr
(L+O/60)/(TSxOF)
$/min
$/ft
Description
1.33
Value
$50.00
$0.00
$0.2778
$0.83
3.333
Value
Operating Factor
Operating Factor
Other
Operating Factor
Arc on time/hr
25%
% On Time
25%
Description
Value
0.0228
Total Cost
Consumables
Labor + Overhead
Travel Speed
Operating Factor
Total Cost per inch
Arc on time
C+L
0.25
$0.30
$/FT
3.6065
Description
$0.02
$0.28
12.00
Value
Heat Input
Voltage
Amperage
Joules Per Inch
Wedding Budget
V
A
24.0
150.0
(VxAx60)/Travel S
18000
Page 3 of 6
Value
C+L
$3.6065
Description
$/ft x ft/hr
Value
$54.098
Wedding Budget
Page 4 of 6
Distance In
minutes
IN/min
36
94
108
108
7.25
17.25
23.125
19
0.60
1.57
1.80
1.80
12.083
11.011
12.847
10.556
Distance In
Minutes
In/min
88
92
99
17.75
18
20.25
1.47
1.53
1.65
12.102
11.739
12.273