Sei sulla pagina 1di 6

Centrifugal Pumps (Newtonian Liquids)

AIChE Equipment Testing Procedure

CENTRIFUGAL PUMPS
(Newtonian Liquids)
A Guide to Performance Evaluation

Third Edition

Prepared by the
Equipment Testing Procedures Committee

Copyright 2002
American Institute of Chemical Engineers
3 Park Avenue, New York, NY 10016-5991

AlChE Equipment Testing Procedure

0 2002 by the American Institute of Chemical Engineers

3 Park Avenue, New York, NY 10016-5991


www.aiche.org
ISBN 0-8 169-0876-1
Pub. E-31
Cover and layout by Beth Shery Sisk

All rights reserved. No part of this publication may be reproduced, stored in a


retrieval system, or transmitted in any form or by any means, electronic,
mechanical, photocopying, recording, or otherwise, without the prior
permission of the
American Institute of Chemical Engineers.
Printed in the United States of America.
Officially approved for publication by AIChEs Chemical Engineering
Technology Operating Council in Fall 2001.
~~~~

It is sincerely hoped that the information presented in this document


will lead to even more impressive performance by the chemical
processing and related industries. However, the American Institute of
Chemical Engineers, its employees and consultants, its officers and
directors, Equipment Testing Procedures Committee members, their
employers., and their employers officers and directors disclaim
making or giving any warranties or representations, express or
implied, including with respect to fitness, intended purpose, use or
merchantability and/or correctness or accuracy of the content of the
information presented in this document. Company affiliations are
shown for information only and do not imply approval of the
procedures by the companies listed. As between (1) the American
Institute of Chemical Engineers, its employees and consultants, its
officers and directors, Equipment Testing Procedures Committee
members, their employers., and their employers officers and
directors, and (2) the user of this document, the user accepts any legal
liability or responsibility whatsoever for the consequence of its use
or misuse.

Centrifugal Pumps (Newtonian Liquids)

AMERICAN INSTITUTE OF CHEMICAL


ENGINEERS

EQUIPMENT TESTING PROCEDURES COMMITTEE


Chairman: Thomas H. Yohe
Swenson Process Equipment
Vice Chairman: Dr. P.C. Gopalratnam
E.I. DuPont de Nemours & Co.

CENTRIFUGAL PUMPS (Newtonian Liquids)


PROCEDURES SUBCOMMITTEE
Chairman: Robert J. Hart
E.I. DuPont de Nemours & Co. (Retired)
Subcommittee Members
Gary Clasby
Flowserve Corporation
Dayton, OH

Allen Budris
Goulds Pumps - ITT Industries
Seneca Falls, NY

Roy Dobson
Fluor Daniel
Sugarland, TX

Van Wilkinson
Shell Oil
Houston, TX

AlChE Equipment Testing Procedure

AMERICAN INSTITUTE OF CHEMICAL ENGINEERS


EQUIPMENT TESTING PROCEDURES COMMITTEE

GENERAL COMMITTEE
(2001)

Thomas H. Yohe, Chairman


Swenson Process Equipment

Dr. P.C. Gopalratnam, Vice Chairman


Anthony L. Pezone, Past Chairman
Dr. Soni 0.Oyekan, Council Liaison
Mark Rosenzweig, StaflLiaison

GENERAL COMMITTEE MEMBERS


Prashant Agrawal
S. Dennis Fegan
Dr. John G. Kunesh
J.H. Hasbrouck
Gary 0. Oakeson
Richard P. OConnor
Robert E. McHarg

Centrifugal Pumps (Newtonian Liquids)

CONTENTS
100.0 Purpose and Scope

.....................................................

101.0 Purpose ..............................................................................................


102.0 Scope..................................................................................................

..........................

200.0 Definitions and Descriptions of Terms


20 1.0 Definition ...........................................................................................

202.0 Centrifugal Pumps .............................................................................


203.0 Newtonian Fluids...............................................................................
204.0 Datum ................................................................................................
205.0 Specific Gravity. (s)...........................................................................
206.0 Vapor Pressure, (hv,a> ........................................................................
207.0 Viscosity, (p).....................................................................................
208.0 Pressure Head, (h, ) ............................................................................
209.0 Total Discharge Head, (hd)...............................................................
2 10.0 Total Suction Head, (h,)...................................................................
21 1.0 Total Head, (H)................................................................................
2 12.0 Static Discharge Head, (hSJ .............................................................
2 13.0 Static Suction Head, (h, ) .................................................................
214.0 Suction Surface Pressure, (hps).........................................................
215.0 Discharge Surface Pressure, (hpd).....................................................
2 16.0 Friction Head Loss, (hf)...................................................................
2 17.0 Gravitational Acceleration, (g) .........................................................
2 18.0 Velocity Head, (hv)..........................................................................
2 19.0,Pump Efficiency, (eff) .....................................................................
220.0 Net Positive Suction Head Required, (NPSHR)...............................

300.0 Test Planning

..........................................................

301.0 Conditions........................................................................................
302.0 Resources .........................................................................................
303.0 Process Considerations for Performing Tests..................................
304.0 Data Requirements...........................................................................
305.0 Pump Considerations.......................................................................
306.0 Test Plan ..........................................................................................

400.0 Instrumentation and Measurement Methods

7
7

9
9
9
9
9

9
9
10
10
10
10
10
11
11
11
11
11
11
11

17

17
17
17
18
19
22

...............23

40 1.0 Introduction ..................................................................................... 23


23
402.0 Accuracy and Precision....................................................................
403.0 Measurement of Test Parameters ....................................................
24

AlChE Equipment Testing Procedure

500.0 Test Procedure .........................................................

28

600.0 Computation of Results.............................................


601 .0 Results Required ..............................................................................
602.0 Total Head .......................................................................................
603.0 Capacity ...........................................................................................

31

501.0 Pre-Run Data ...................................................................................


502.0 Pretest Checks .................................................................................
503.0 Trial Run Checks .............................................................................
504.0 Test Run ..........................................................................................

28
28
29
29

31
31
32
604.0 Power ............................................................................................... 32
605.0 Efficiency ......................................................................................... 33
34
606.0 Speed................................................................................................
607.0 Impeller Diameter Variation............................................................. 34
608.0 Sample Test-Run Data Sheet ...........................................................
35

............................................

36

.................................................................

47

700.0 Interpretation of Results


701 .0 Introduction .....................................................................................
702.0 Discussion........................................................................................
703.0 Trouble Checklist.............................................................................
800.0 Appendix

801.0 Nomenclature ...................................................................................


802.0 Sample Test Results ........................................................................
803.0 Sample Calculation (Dual Units) .....................................................
804.0 Related Calculations.........................................................................
805.0 References........................................................................................

36
37
42

47

48
51
55
57

Potrebbero piacerti anche