Prepared By SR
Training Course
Prepared By SR
Training Course
Prepared By SR
Training Course
Now
Name
DISP
ZONE
AREA
CCTR
Length
1
4
4
5
Description
Discipline
Zone
Area
Cost Center
select DISP
System will ask for Save structure edits
Press yes
Values : DISP
Value
C
M
E
Description
Civil
Mechanical
Electrical & Instrumentation
Order
1
2
3
Select ZONE
Values : ZONE
Value
Z1
Z3
Z2
Description
General Civil Works
Utilities & Offsite Zone
Process Zone
Order
1
2
3
Select AREA
Values : Area
Value
Z1A2
Z1A3
Z1A1
Z2A1
Z2A2
Z2A3
Z2A4
Z2A5
Z3A3
Z3A2
Z3A4
Z3A5
Z3A1
Description
Pipe rack/Sleeper foundation
Equipment Foundation
Sub-Station Building
Common Equipment
Process main pipe rack
Compressor feed gas treatment
Sub Station
Common Area
Utility equipment cooling water
Utility Sleeper
Utility offsite pipe rack
Utility equipment boiler
Utility/Offsite
Order
1
2
3
4
5
6
7
8
9
10
11
12
13
Prepared By SR
Training Course
Select CCTR
Values: CCTR
Value
21120
21130
21210
21310
21410
21870
21525
21835
21840
21885
22120
22130
22140
22210
22220
22410
22520
23120
23130
23320
23330
23420
23530
23610
25320
25410
25510
25520
25620
25730
25820
Description
Excavation
Backfilling/Compaction
Concrete Placement
Form work
Rebar fixing rack/sleeper
Anchor bolts and embedded items
Mortar Finishing
Misc. Steel
Protective coating/water proofing
Flooring, doors, finishing etc.
Structure
Pipe support fabrication
Pipe support erection
Equipment installation
Erection of equipment
Insulation
Painting of equipment
Pipe fabrication CS
Pipe erection CS
Pipe fabrication SS
Pipe erection SS
PWHT
NDT
Hydro testing, cleaning flushing
Cable trays and cover installation
Light installation
Cable laying
Cable termination
Field instrument installation
Fabrication & Erection of supports
Loop Test
Prepared By SR
Training Course
Prepared By SR
Training Course
Add Activities
Activity
id
0001
0011
0021
0031
0041
0051
0061
0071
0081
0091
0101
0111
0121
0131
0141
0151
0161
0171
0181
0191
0201
0211
0221
0231
0241
0251
0261
0271
0281
0291
0301
0311
0321
0331
0341
0351
0361
0371
0381
0391
0401
0411
0421
0431
Activity description
PROJECT START
EXCAVATION
REBAR FIXING RACK/SLEEPER
CONCRETE PLACEMENT
BACKFILLING AND COMPACTION
MORTAR FININSHING RACK/SLEEPER FOUNDATION
MISC. STEEL RACK/SLEEPER FOUNDATION
PROTECTTIVE COATING/WATER PROOFING
ANCHOR BOLTS AND EMBEDDED ITEMS
EXCAVATION
REBAR FIXING EQUIP.
CONCRETE PLACEMENT
BACKFILLING & COMPACTION
MORTAR FINISHING
PROTECTIVE COATING/WATER PROOFING
ANCHOR BOLTS/EMBEDDED ITEM
DRAINAGE PIPE WORKS
EXCAVATION
FORMWORK INSTALLATION & REMOVAL
REBAR FIXING
CONCRETE PLACEMENT
Backfilling and compaction
WATER PROOFING
ROOFING SUB STATION
FLOORING
DOORS WINDOWS
PIPING FABRICATION CS
PIPING ERECTION CS
PIPE SUPPORT FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING CLEANING FLUSHING
NDT
PIPING FABRICATION CS
PIPING ERECTION CS
PIPE SUPPORT FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING CLEANING FLUSHING
NDT
PIPING FABRICATION CS
PIPING FABRICATION SS
PIPING ERECTION CS
PIPING ERECTION SS
PIPE SUPPORTS FABRICATION
PIPE SUPPORT ERECTION
Original
duration
0
76
70
68
84
56
70
50
64
55
82
84
75
75
70
75
60
40
82
83
77
84
27
26
50
40
72
131
111
130
86
150
70
131
102
131
120
139
98
32
115
113
104
140
Prepared By SR
Training Course
0441
0451
0461
0471
0481
0491
0501
0511
0521
0531
0541
0551
0561
0571
0581
0591
0601
0611
0621
0631
0641
0651
0661
0671
0681
0691
0701
0711
0721
0731
0741
0751
0761
0771
0781
0791
0801
0811
0821
0831
0841
0851
0861
0871
0881
0891
0901
0911
8
111
21
22
201
201
49
117
160
83
139
108
165
114
168
91
195
204
60
35
64
78
45
39
77
28
62
145
64
170
118
150
170
130
170
27
25
54
10
130
117
99
92
79
120
140
114
153
208
Prepared By SR
Training Course
0921
0931
0941
0951
0961
0971
0981
0991
1001
INSULATION OF EQUIPMENT
CABLE TRAYS & COVERS INSTALLATION
CABLE LAYING
CABLE TERMINATION
FABRICATION AND ERECTION OF SUPPORTS
LIGHT INSTALLATION
INSULATION OF PIPE/MISC. EQPT
PAINTING OF EQUIPMENT AND PIPING
PROJECT COMPLETION
9
49
163
141
66
152
24
190
154
0
Prepared By SR
Training Course
10
Prepared By SR
Training Course
11
ZONE = Z1
AREA = Z1A1
Activity
id
0171
0181
0191
0201
0211
0221
0231
0241
0251
Activity description
EXCAVATION
FORMWORK INSTALLATION & REMOVAL
REBAR FIXING
CONCRETE PLACEMENT
Backfilling and compaction
WATER PROOFING
ROOFING SUB STATION
FLOORING
DOORS WINDOWS
Type
Disp
Zone
Task
Task
Task
Task
Task
Task
Task
Task
Task
C
C
C
C
C
C
C
C
C
Z1
Z1
Z1
Z1
Z1
Z1
Z1
Z1
Z1
Area
CCTR
Z1A1
Z1A1
Z1A1
Z1A1
Z1A1
Z1A1
Z1A1
Z1A1
Z1A1
21120
21310
21410
21210
21130
21885
21885
21885
21885
AREA = Z1A2
0001
0011
0021
0031
0041
0051
0061
0071
0081
PROJECT START
EXCAVATION
REBAR FIXING RACK/SLEEPER
CONCRETE PLACEMENT
BACKFILLING AND COMPACTION
MORTAR FININSHING RACK/SLEEPER
FOUNDATION
MISC. STEEL RACK/SLEEPER FOUNDATION
PROTECTTIVE COATING/WATER PROOFING
ANCHOR BOLTS AND EMBEDDED ITEMS
Start
mile
stone
Task
Task
Task
Task
Task
Task
Task
Task
Z1
Z1A2
C
C
C
C
Z1
Z1
Z1
Z1
Z1A2
Z1A2
Z1A2
Z1A2
21120
21410
21210
21130
Z1
Z1A2
21525
Z1
Z1
Z1
Z1A2
Z1A2
Z1A2
21835
21840
21870
C
C
C
C
Prepared By SR
Training Course
12
AREA = Z1A3
0091
0101
0111
0121
0131
0141
0151
0161
EXCAVATION
REBAR FIXING EQUIP.
CONCRETE PLACEMENT
BACKFILLING & COMPACTION
MORTAR FINISHING
PROTECTIVE COATING/WATER PROOFING
ANCHOR BOLTS/EMBEDDED ITEM
DRAINAGE PIPE WORKS
Task
Task
Task
Task
Task
Task
Task
Task
C
C
C
C
C
C
C
C
Z1
Z1
Z1
Z1
Z1
Z1
Z1
Z1
Z1A3
Z1A3
Z1A3
Z1A3
Z1A3
Z1A3
Z1A3
Z1A3
21120
21410
21210
21130
21525
21840
21870
21885
Prepared By SR
Training Course
13
Prepared By SR
Training Course
14
ZONE = Z2
AREA = Z2A1
Activity
id
0691
Activity description
STATIONARY EQUIPMENT INSTALLATION
Type
Disp
Task
Zon
e
Z2
Task
Task
Task
Task
Task
Task
Task
Task
M
M
M
M
M
M
M
M
Task
Area
CCTR
Z2A1
22210
Z2
Z2
Z2
Z2
Z2
Z2
Z2
Z2
Z2A2
Z2A2
Z2A2
Z2A2
Z2A2
Z2A2
Z2A2
Z2A2
23120
23320
23130
23330
22130
22140
23610
23530
Z2
Z2A2
22210
Z2A2
22210
AREA = Z2A2
0701
0711
0721
0731
0741
0751
0761
0771
0781
0791
0801
0811
PIPING FABRICATION CS
PIPING FABRICATION SS
PIPING ERECTION CS
PIPING ERECTION SS
PIPE SUPPORT FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING CLEANING FLUSHING
NDT
ERECTION OF HEAVY ENDS CONDENSOR
WEST SIDE
ERECTION OF HEAVY ENDS CONDENSOR
EAST SIDE
INSULATION OF EQUIPMENT
ERECTION OF WATER COOLER
Task
Task
Task
Z2
M
M
Z2
Z2
Z2A2
Z2A2
22410
22210
M
M
M
M
M
M
M
M
M
M
M
Z2
Z2
Z2
Z2
Z2
Z2
Z2
Z2
Z2
Z2
Z2
Z2A3
Z2A3
Z2A3
Z2A3
Z2A3
Z2A3
Z2A3
Z2A3
Z2A3
Z2A3
Z2A3
23120
23130
23320
23330
22220
22130
22140
23610
23530
23420
22410
AREA = Z2A3
0821
0831
0841
0851
0861
0871
0881
0891
0901
0911
0921
PIPING FABRICATION CS
PIPING ERECTION CS
PIPING FABRICATION SS
PIPING ERECTION SS
ERECTION OF GAS COMPR/TURBINE
PIPE SUPPORT FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING CLEANING FLUSHING
NDT
PWHT
INSULATION OF EQUIPMENT
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Prepared By SR
Training Course
15
AREA = Z2A4
Activity
id
0931
0941
0951
0961
0971
Disp
Activity description
CABLE TRAYS & COVERS INSTALLATION
CABLE LAYING
CABLE TERMINATION
FABRICATION AND ERECTION OF SUPPORTS
LIGHT INSTALLATION
Type
Task
Task
Task
Task
Task
E
E
E
E
E
Zon
e
Z2
Z2
Z2
Z2
Z2
Area
Z2A4
Z2A4
Z2A4
Z2A4
Z2A4
CCTR
25320
25510
25520
25730
25410
M
M
Z2
Z2
Z2A5
Z2A5
22410
22520
Z2
Z2A5
AREA = Z2A5
0981
0991
1001
PROJECT COMPLETION
Task
Task
Finish
mile
stone
Prepared By SR
Training Course
16
Prepared By SR
Training Course
17
ZONE = Z3
AREA = Z3A1
Activity
id
0621
0631
0641
0651
0661
0671
0681
Disp
Activity description
FIELD INSTRUMENT INSTALLATION UTILITY
FILED INSTRUMENT INSTALLATION OFFSITE
CABLE TRAYS & COVERS INSTALLATION
CABLE LAYING
CABLE TERMINATION
FABRICATION AND ERECTION OF SUPPORTS
LOOP TEST
E
E
E
E
E
E
E
Zon
e
Z3
Z3
Z3
Z3
Z3
Z3
Z3
Z3A1
Z3A1
Z3A1
Z3A1
Z3A1
Z3A1
Z3A1
CCTR
25620
25620
25320
25510
25520
25730
25820
Task
Task
Task
Task
Task
Task
M
M
M
M
M
M
Z3
Z3
Z3
Z3
Z3
Z3
Z3A2
Z3A2
Z3A2
Z3A2
Z3A2
Z3A2
23120
23130
22130
22140
23610
23530
Task
Task
Task
Task
Task
Task
M
M
M
M
M
M
Z3
Z3
Z3
Z3
Z3
Z3
Z3A3
Z3A3
Z3A3
Z3A3
Z3A3
Z3A3
23120
23130
22130
22140
23610
23530
Type
Task
Task
Task
Task
Task
Task
Task
Area
AREA = Z3A2
0321
0331
0341
0351
0361
0371
PIPING FABRICATION CS
PIPING ERECTION CS
PIPE SUPPORT FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING CLEANING FLUSHING
NDT
AREA = Z3A3
0261
0271
0281
0291
0301
0311
PIPING FABRICATION CS
PIPING ERECTION CS
PIPE SUPPORT FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING CLEANING FLUSHING
NDT
Prepared By SR
Training Course
18
AREA = Z3A4
Activity
id
0381
0391
0401
0411
0421
0431
0441
0451
0461
0471
0481
0491
Disp
Activity description
PIPING FABRICATION CS
PIPING FABRICATION SS
PIPING ERECTION CS
PIPING ERECTION SS
PIPE SUPPORTS FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING, CLEANING, FLUSHING
ERECTION OF DUMP STEAM CONDENSOR
ERECTION OF FLASHED STEAM
CONDENSOR
NDT
PWHT
INSULATION OF EQUIPMENT
M
M
M
M
M
M
M
M
M
Zon
e
Z3
Z3
Z3
Z3
Z3
Z3
Z3
Z3
Z3
Z3A4
Z3A4
Z3A4
Z3A4
Z3A4
Z3A4
Z3A4
Z3A4
Z3A4
Task
Task
Task
Task
M
M
M
Z3
Z3
Z3
Z3A4
Z3A4
Z3A4
22210
23530
23420
22410
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
M
M
M
M
M
M
M
M
M
M
M
M
Z3
Z3
Z3
Z3
Z3
Z3
Z3
Z3
Z3
Z3
Z3
Z3
Z3A5
Z3A5
Z3A5
Z3A5
Z3A5
Z3A5
Z3A5
Z3A5
Z3A5
Z3A5
Z3A5
Z3A5
23120
23130
23320
23330
22130
22140
22210
22410
23610
23530
23420
22120
Type
Task
Task
Task
Task
Task
Task
Task
Task
Area
CCTR
23120
23320
23130
23330
22130
22140
23610
22210
AREA = Z3A5
0501
0511
0521
0531
0541
0551
0561
0571
0581
0591
0601
0611
PIPING FABRICATION CS
PIPING ERECTION CS
PIPING FABRICATION SS
PIPING ERECTION SS
PIPE SUPPORTS FABRICATION
PIPE SUPPORT ERECTION
ERECTION OF BOILER
INSULATION OF EQUIPMENT
HYDROTESTING, CLEANING, FLUSHING
NDT
PWHT
STRUCTURE
Prepared By SR
Training Course
19
Prepared By SR
Training Course
20
Prepared By SR
Training Course
21
Prepared By SR
Training Course
22
Activity
id
0001
0011
Activity Description
PROJECT START
EXCAVATION
0051
0061
0071
REL
SS
SS
SS
SS
Lag
0
0
10
30
SS
SS
SS
12
0
10
FF
FF
FS
6
4
0
0071
Activity description
EXCAVATION
PIPING FABRICATION CS
REBAR FIXING RACK/SLEEPER
EXCAVATION
CONCRETE PLACEMENT
MISC. STEEL RACK/SLEEPER
FOUNDATION
ANCHOR BOLTS AND EMBEDDED
ITEMS
BACKFILLING AND COMPACTION
MORTAR FININSHING
RACK/SLEEPER FOUNDATION
PROJECT COMPLETION
PROTECTTIVE COATING/WATER
PROOFING
SS
0401
1001
PIPING ERECTION CS
PROJECT COMPLETION
SS
FS
20
0
0031
0061
0081
CONCRETE PLACEMENT
0041
0051
1001
0021
0031
0041
Successor
Activity
id
0011
0261
0021
0091
Prepared By SR
0091
MORTAR FINISHING
PROTECTIVE COATING/WATER
PROOFING
ANCHOR BOLTS/EMBEDDED ITEM
DRAINAGE PIPE WORKS
0121
0131
CONCRETE PLACEMENT
FLOORING
0201
0211
0221
0231
0241
EXCAVATION
FORMWORK INSTALLATION & REMOVAL
REBAR FIXING
0171
0181
0191
0151
0161
0141
CONCRETE PLACEMENT
0111
EXCAVATION
0081
0101
PROOFING
ANCHOR BOLTS AND EMBEDDED ITEMS
Training Course
0251
0931
0961
0181
0191
0201
0211
0221
1001
0231
0241
1001
0111
1001
0141
0691
0121
0131
0451
0161
Prepared By SR
PROJECT COMPLETION
CONCRETE PLACEMENT
PROJECT COMPLETION
FORMWORK INSTALLATION &
REMOVAL
REBAR FIXING
CONCRETE PLACEMENT
Backfilling and compaction
WATER PROOFING
PROJECT COMPLETION
ROOFING SUB STATION
FLOORING
DOORS WINDOWS
CABLE TRAYS & COVERS
INSTALLATION
FABRICATION AND ERECTION OF
SUPPORTS
EXCAVATION
REBAR FIXING EQUIP.
CONCRETE PLACEMENT
ANCHOR BOLTS/EMBEDDED
ITEM
STATIONARY EQUIPMENT
INSTALLATION
BACKFILLING & COMPACTION
MORTAR FINISHING
ERECTION OF DUMP STEAM
CONDENSOR
DRAINAGE PIPE WORKS
PROTECTIVE COATING/WATER
PROOFING
0171
0101
0111
0151
CONCRETE PLACEMENT
0031
SS
FS
SS
SS
SS
SS
FF
SS
FS
SS
FS
FS
SS
FS
SS
FS
FF
FF
FS
FF
SS
SS
SS
SS
SS
8
0
0
8
0
11
10
40
0
0
0
0
1
0
0
6
4
-6
-2
10
8
30
10
23
PIPING ERECTION CS
0271
0281
0291
0301
0311
PIPING FABRICATION CS
PIPING FABRICATION SS
PIPING ERECTION CS
PIPING ERECTION SS
PIPE SUPPORTS FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING, CLEANING, FLUSHING
ERECTION OF DUMP STEAM
0381
0391
0401
0411
0421
0431
0441
0451
PIPING ERECTION CS
PIPE SUPPORT FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING CLEANING FLUSHING
NDT
0331
0341
0351
0361
0371
PIPING FABRICATION CS
PIPING FABRICATION CS
0261
0321
DOORS WINDOWS
0251
Training Course
0441
0431
0401
0481
0461
0441
0361
0351
0331
1001
1001
0391
0401
0421
0471
0501
0411
0301
0291
0271
1001
1001
0331
0341
0371
0381
1001
0321
0271
0281
0311
Prepared By SR
PROJECT COMPLETION
PIPING FABRICATION CS
PIPING ERECTION CS
PIPE SUPPORT FABRICATION
NDT
HYDROTESTING CLEANING
FLUSHING
PIPE SUPPORT ERECTION
PIPING ERECTION CS
PROJECT COMPLETION
PROJECT COMPLETION
PIPING ERECTION CS
PIPE SUPPORT FABRICATION
NDT
PIPING FABRICATION CS
HYDROTESTING CLEANING
FLUSHING
PIPE SUPPORT ERECTION
PIPING ERECTION CS
PROJECT COMPLETION
PROJECT COMPLETION
PIPING FABRICATION SS
PIPING ERECTION CS
PIPE SUPPORTS FABRICATION
NDT
PIPING FABRICATION CS
PIPING ERECTION SS
HYDROTESTING, CLEANING,
FLUSHING
HYDROTESTING, CLEANING,
FLUSHING
PIPE SUPPORT ERECTION
PIPING ERECTION CS
PWHT
ERECTION OF FLASHED STEAM
SS
SS
SS
FF
SS
FS
FS
SS
SS
FS
FS
SS
SS
SS
SS
SS
SS
FS
SS
SS
FS
FS
SS
SS
SS
SS
FS
SS
SS
SS
SS
30
15
0
0
12
-26
-20
5
0
0
0
26
16
0
10
50
10
-26
12
0
0
0
5
0
0
36
0
26
12
0
0
24
PIPING ERECTION CS
PIPING FABRICATION SS
PIPING ERECTION SS
PIPE SUPPORTS FABRICATION
PIPE SUPPORT ERECTION
ERECTION OF BOILER
INSULATION OF EQUIPMENT
HYDROTESTING, CLEANING, FLUSHING
NDT
PWHT
STRUCTURE
FIELD INSTRUMENT INSTALLATION
UTILITY
0501
0511
0521
0531
0541
0551
0561
0571
0581
0591
0601
0611
0641
0631
PIPING FABRICATION CS
0461
0471
0481
0491
0621
CONDENSOR
ERECTION OF FLASHED STEAM
CONDENSOR
NDT
PWHT
INSULATION OF EQUIPMENT
Training Course
0621
0681
0651
0681
0581
0551
0511
0571
1001
0601
1001
1001
0561
0641
0671
0581
0531
0491
1001
1001
1001
0701
0511
0521
0541
0591
0611
Prepared By SR
LOOP TEST
FIELD INSTRUMENT
INSTALLATION UTILITY
LOOP TEST
CABLE LAYING
INSULATION OF EQUIPMENT
PROJECT COMPLETION
PROJECT COMPLETION
PROJECT COMPLETION
PIPING FABRICATION CS
PIPING ERECTION CS
PIPING FABRICATION SS
PIPE SUPPORTS FABRICATION
NDT
STRUCTURE
CABLE TRAYS & COVERS
INSTALLATION
FABRICATION AND ERECTION OF
SUPPORTS
HYDROTESTING, CLEANING,
FLUSHING
PIPING ERECTION SS
HYDROTESTING, CLEANING,
FLUSHING
PIPE SUPPORT ERECTION
PIPING ERECTION CS
INSULATION OF EQUIPMENT
PROJECT COMPLETION
PWHT
PROJECT COMPLETION
PROJECT COMPLETION
ERECTION OF BOILER
CONDENSOR
SS
FS
SS
FS
SS
SS
SS
FS
FS
FF
FS
FS
FS
FS
FS
FS
SS
FS
FS
FS
FS
SS
SS
SS
SS
SS
SS
7
-6
26
30
10
0
-52
0
0
0
0
-6
-26
-26
-30
15
0
0
0
0
0
10
0
0
0
0
25
CABLE TERMINATION
FABRICATION AND ERECTION OF
SUPPORTS
LOOP TEST
STATIONARY EQUIPMENT INSTALLATION
0661
PIPING FABRICATION SS
PIPING ERECTION CS
PIPING ERECTION SS
PIPE SUPPORT FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING CLEANING FLUSHING
NDT
ERECTION OF HEAVY ENDS
CONDENSOR WEST SIDE
ERECTION OF HEAVY ENDS
CONDENSOR EAST SIDE
INSULATION OF EQUIPMENT
ERECTION OF WATER COOLER
0711
0721
0731
0741
0751
0761
0771
PIPING ERECTION CS
PIPING FABRICATION SS
0831
0841
PIPING FABRICATION CS
0821
0801
0811
0791
0781
PIPING FABRICATION CS
0701
0681
0691
0671
CABLE LAYING
0651
Training Course
0891
0851
0791
0801
0811
1001
1001
0831
0841
0871
0901
0761
0751
0721
1001
1001
0761
0641
1001
1001
0821
0711
0721
0741
0771
0731
0631
0661
0681
Prepared By SR
FILED INSTRUMENT
INSTALLATION OFFSITE
CABLE TERMINATION
LOOP TEST
CABLE TRAYS & COVERS
INSTALLATION
PROJECT COMPLETION
PROJECT COMPLETION
PIPING FABRICATION CS
PIPING FABRICATION SS
PIPING ERECTION CS
PIPE SUPPORT FABRICATION
NDT
PIPING ERECTION SS
HYDROTESTING CLEANING
FLUSHING
HYDROTESTING CLEANING
FLUSHING
PIPE SUPPORT ERECTION
PIPING ERECTION CS
PROJECT COMPLETION
PROJECT COMPLETION
ERECTION OF HEAVY ENDS
CONDENSOR EAST SIDE
INSULATION OF EQUIPMENT
ERECTION OF WATER COOLER
PROJECT COMPLETION
PROJECT COMPLETION
PIPING ERECTION CS
PIPING FABRICATION SS
PIPE SUPPORT FABRICATION
NDT
HYDROTESTING CLEANING
FLUSHING
PIPING ERECTION SS
FS
SS
FS
FS
FS
FS
FS
SS
SS
SS
SS
SS
SS
SS
FS
FS
FS
SS
FS
FS
SS
SS
SS
SS
SS
SS
SS
FF
FS
-26
38
0
0
0
0
0
16
26
0
0
40
12
0
0
0
-40
0
0
0
70
26
13
0
0
38
7
6
0
26
NDT
PWHT
INSULATION OF EQUIPMENT
CABLE TRAYS & COVERS INSTALLATION
CABLE LAYING
CABLE TERMINATION
FABRICATION AND ERECTION OF
SUPPORTS
LIGHT INSTALLATION
0901
0911
0921
0931
0941
0951
0981
0991
1001
0971
0891
0961
PIPING ERECTION SS
ERECTION OF GAS COMPR/TURBINE
PIPE SUPPORT FABRICATION
PIPE SUPPORT ERECTION
0851
0861
0871
0881
Training Course
0991
1001
0931
1001
0911
0981
1001
1001
1001
0941
0951
0971
0891
0921
0881
0831
Prepared By SR
HYDROTESTING CLEANING
FLUSHING
INSULATION OF EQUIPMENT
PIPE SUPPORT ERECTION
PIPING ERECTION CS
PWHT
INSULATION OF PIPE/MISC.
EQPT
PROJECT COMPLETION
PROJECT COMPLETION
PROJECT COMPLETION
CABLE LAYING
CABLE TERMINATION
LIGHT INSTALLATION
CABLE TRAYS & COVERS
INSTALLATION
PROJECT COMPLETION
PAINTING OF EQUIPMENT AND
PIPING
PROJECT COMPLETION
FF
FS
SS
FS
FF
FF
FS
FS
FS
SS
FF
FF
SS
FS
SS
SS
0
0
0
0
-7
20
0
0
0
0
4
0
40
0
15
0
27
Training Course
Prepared By SR
28
Training Course
29
Prepared By SR
Training Course
30
Apply Constraint
Select the activity
Press Constr Tab
Click at Early Constraint and give Start Date
Repeat above steps for each of following constraint:
Activity id
0861
0781
0321
0261
0451
Activity Description
ERECTION OF GAS COMPR/TURBINE
ERECTION OF HEAVY ENDS CONDENSOR
WEST SIDE
PIPING FABRICATION CS
PIPING FABRICATION CS
ERECTION OF DUMP STEAM CONDENSOR
Start Date
11-Aug-06
15-Jul-06
01-Feb-06
01-Feb-06
06-Jun-06
Prepared By SR
Training Course
31
Prepared By SR
Training Course
32
Select Activity
Press RES Tab
Add both resources i.e. MH & 0QTY
Against the row of Budgeted quantity:
o Add the values of MH & 0QTY as given below
Add the value of curve
Press OK
Activity
0001
0011
0021
0031
0041
0051
0061
0071
0081
0091
0101
0111
0121
0131
0141
0151
0161
0171
0181
MH
PROJECT START
EXCAVATION
REBAR FIXING RACK/SLEEPER
CONCRETE PLACEMENT
BACKFILLING AND COMPACTION
MORTAR FININSHING RACK/SLEEPER
FOUNDATION
MISC. STEEL RACK/SLEEPER
FOUNDATION
PROTECTTIVE COATING/WATER
PROOFING
ANCHOR BOLTS AND EMBEDDED ITEMS
EXCAVATION
REBAR FIXING EQUIP.
CONCRETE PLACEMENT
BACKFILLING & COMPACTION
MORTAR FINISHING
PROTECTIVE COATING/WATER
PROOFING
ANCHOR BOLTS/EMBEDDED ITEM
DRAINAGE PIPE WORKS
EXCAVATION
FORMWORK INSTALLATION & REMOVAL
685
954
1,243.00
80
0QTY
0
1712.50
15.90
194.83
88.89
942
471.00
4,760.00
9520.00
655
2,288.00
5,713.00
19,069.00
23,966.00
8,716.00
2,504.00
1637.50
1830.40
14282.50
317.82
3756.43
9684.44
1252.00
3,308.00
4,552.00
2,500.00
975
4,429.00
8270.00
3641.60
12500.00
2437.50
805.27
Curve
6
6
6
6
6
0
0
0
0
6
0
6
6
6
6
6
6
6
Prepared By SR
Training Course
0191
0201
0211
0221
0231
0241
0251
0261
0271
0281
0291
0301
0311
0321
0331
0341
0351
0361
0371
0381
0391
0401
0411
0421
0431
0441
0451
0461
0471
0481
0491
0501
0511
0521
0531
0541
0551
0561
0571
0581
0591
0601
0611
0621
0631
REBAR FIXING
CONCRETE PLACEMENT
Backfilling and compaction
WATER PROOFING
ROOFING SUB STATION
FLOORING
DOORS WINDOWS
PIPING FABRICATION CS
PIPING ERECTION CS
PIPE SUPPORT FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING CLEANING FLUSHING
NDT
PIPING FABRICATION CS
PIPING ERECTION CS
PIPE SUPPORT FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING CLEANING FLUSHING
NDT
PIPING FABRICATION CS
PIPING FABRICATION SS
PIPING ERECTION CS
PIPING ERECTION SS
PIPE SUPPORTS FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING, CLEANING, FLUSHING
ERECTION OF DUMP STEAM
CONDENSOR
ERECTION OF FLASHED STEAM
CONDENSOR
NDT
PWHT
INSULATION OF EQUIPMENT
PIPING FABRICATION CS
PIPING ERECTION CS
PIPING FABRICATION SS
PIPING ERECTION SS
PIPE SUPPORTS FABRICATION
PIPE SUPPORT ERECTION
ERECTION OF BOILER
INSULATION OF EQUIPMENT
HYDROTESTING, CLEANING, FLUSHING
NDT
PWHT
STRUCTURE
FIELD INSTRUMENT INSTALLATION
UTILITY
FILED INSTRUMENT INSTALLATION
OFFSITE
33
1,951.00
1,561.00
8,716.00
390
1,171.00
3,902.00
780
14,645.00
16,981.00
2,147.00
379
3,251.10
1,115.00
5,763.00
26,736.00
6,596.00
1,963.00
20,109.00
1,115.00
8,201.00
1,146.00
14,266.00
4,003.00
1,963.00
346
6,325.00
32.52
244.67
9684.44
1950.00
5855.00
19510.00
3900.00
7040.87
7753.88
7.02
7.02
706.76
1858.33
2770.67
12208.22
21.56
36.35
4371.52
1858.33
3942.79
350.46
6514.16
792.67
6.42
6.41
1375.00
5,220.00
168.39
1,107.00
937
714
7,028.00
16,138.00
13,851.00
5,216.00
8,336.00
2,699.00
476
13,394.00
7,028.00
7,185.00
910
797
3,532.00
35.71
1561.67
1190.00
1464.17
7758.65
6324.66
1595.11
1650.69
8.82
8.81
432.06
1464.17
1561.96
1516.67
1328.33
54.34
1,565.00
558.93
3,186.00
1137.86
6
6
6
6
6
6
6
6
6
6
6
6
6
0
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
Prepared By SR
Training Course
0641
0651
0661
0671
0681
0691
0701
0711
0721
0731
0741
0751
0761
0771
0781
0791
0801
0811
0821
0831
0841
0851
0861
0871
0881
0891
0901
0911
0921
0931
0941
0951
0961
0971
0981
0991
1001
34
7,805.00
4,465.00
274
6504.17
9500.00
830.30
1,291.00
517
17,659.00
23,800.00
4,321.00
64,290.00
23,505.00
12,271.00
2,165.00
25,229.00
1,115.00
2151.67
172.33
569.65
11442.31
1321.41
29356.16
4654.46
40.10
40.09
5484.57
1858.33
26,116.00
842.45
26,116.00
2,289.00
7,592.00
32,748.00
25,319.00
14,816.00
23,039.00
10,811.00
9,510.00
1,678.00
2,786.00
1,115.00
14,813.00
6,017.00
8,395.00
37,766.00
667
842.45
476.88
244.90
15744.23
11561.19
4530.89
4562.18
245.70
31.08
31.07
605.65
1858.33
24688.33
1253.54
6995.83
80353.19
2021.21
1,365.00
3,417.00
98,928.00
8,491.00
2275.00
2278.00
20610.00
9434.44
0
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
Prepared By SR
Training Course
35
Prepared By SR
Training Course
36
Prepared By SR