Defining a project:
File New
Project Name
Number/Version
Project Title
Company Name
Planning Unit
Workdays/week
Project Start
Project must finish by
Decimal Places
week starts on

First four numeric of your


employee#
Rev-0
Methanol Plant Training
Project
DESCON Engineering
Limited
Day
6
02-Jan-06
30-Jun-07
2
Monday

Note: All remaining information will be as default

User Input Document

Prepared By SR

Training Course

User Input Document

Prepared By SR

Training Course

Data Activity Codes


Add following information
Codes
#
1
2
3
4

Now

Name
DISP
ZONE
AREA
CCTR

Length
1
4
4
5

Description
Discipline
Zone
Area
Cost Center

select DISP
System will ask for Save structure edits
Press yes

Values : DISP
Value
C
M
E

Description
Civil
Mechanical
Electrical & Instrumentation

Order
1
2
3

Select ZONE

Values : ZONE
Value
Z1
Z3
Z2

Description
General Civil Works
Utilities & Offsite Zone
Process Zone

Order
1
2
3

Select AREA

Values : Area
Value
Z1A2
Z1A3

Z1A1
Z2A1
Z2A2
Z2A3
Z2A4
Z2A5
Z3A3
Z3A2
Z3A4
Z3A5
Z3A1

Description
Pipe rack/Sleeper foundation
Equipment Foundation
Sub-Station Building
Common Equipment
Process main pipe rack
Compressor feed gas treatment
Sub Station
Common Area
Utility equipment cooling water
Utility Sleeper
Utility offsite pipe rack
Utility equipment boiler
Utility/Offsite

User Input Document

Order
1
2
3
4
5
6
7
8
9
10
11
12
13

Prepared By SR

Training Course

Select CCTR

Values: CCTR
Value
21120
21130
21210
21310
21410
21870
21525
21835
21840
21885
22120
22130
22140
22210
22220
22410
22520
23120
23130
23320
23330
23420
23530
23610
25320
25410
25510
25520
25620
25730
25820

Description
Excavation
Backfilling/Compaction
Concrete Placement
Form work
Rebar fixing rack/sleeper
Anchor bolts and embedded items
Mortar Finishing
Misc. Steel
Protective coating/water proofing
Flooring, doors, finishing etc.
Structure
Pipe support fabrication
Pipe support erection
Equipment installation
Erection of equipment
Insulation
Painting of equipment
Pipe fabrication CS
Pipe erection CS
Pipe fabrication SS
Pipe erection SS
PWHT
NDT
Hydro testing, cleaning flushing
Cable trays and cover installation
Light installation
Cable laying
Cable termination
Field instrument installation
Fabrication & Erection of supports
Loop Test

Press Close button

User Input Document

Prepared By SR

Training Course

User Input Document

Prepared By SR

Training Course

Add Activities
Activity
id
0001
0011
0021
0031
0041
0051
0061
0071
0081
0091
0101
0111
0121
0131
0141
0151
0161
0171
0181
0191
0201
0211
0221
0231
0241
0251
0261
0271
0281
0291
0301
0311
0321
0331
0341
0351
0361
0371
0381
0391
0401
0411
0421
0431

Activity description
PROJECT START
EXCAVATION
REBAR FIXING RACK/SLEEPER
CONCRETE PLACEMENT
BACKFILLING AND COMPACTION
MORTAR FININSHING RACK/SLEEPER FOUNDATION
MISC. STEEL RACK/SLEEPER FOUNDATION
PROTECTTIVE COATING/WATER PROOFING
ANCHOR BOLTS AND EMBEDDED ITEMS
EXCAVATION
REBAR FIXING EQUIP.
CONCRETE PLACEMENT
BACKFILLING & COMPACTION
MORTAR FINISHING
PROTECTIVE COATING/WATER PROOFING
ANCHOR BOLTS/EMBEDDED ITEM
DRAINAGE PIPE WORKS
EXCAVATION
FORMWORK INSTALLATION & REMOVAL
REBAR FIXING
CONCRETE PLACEMENT
Backfilling and compaction
WATER PROOFING
ROOFING SUB STATION
FLOORING
DOORS WINDOWS
PIPING FABRICATION CS
PIPING ERECTION CS
PIPE SUPPORT FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING CLEANING FLUSHING
NDT
PIPING FABRICATION CS
PIPING ERECTION CS
PIPE SUPPORT FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING CLEANING FLUSHING
NDT
PIPING FABRICATION CS
PIPING FABRICATION SS
PIPING ERECTION CS
PIPING ERECTION SS
PIPE SUPPORTS FABRICATION
PIPE SUPPORT ERECTION

User Input Document

Original
duration
0
76
70
68
84
56
70
50
64
55
82
84
75
75
70
75
60
40
82
83
77
84
27
26
50
40
72
131
111
130
86
150
70
131
102
131
120
139
98
32
115
113
104
140
Prepared By SR

Training Course

0441
0451
0461
0471
0481
0491
0501
0511
0521
0531
0541
0551
0561
0571
0581
0591
0601
0611
0621
0631
0641
0651
0661
0671
0681
0691
0701
0711
0721
0731
0741
0751
0761
0771
0781
0791
0801
0811
0821
0831
0841
0851
0861
0871
0881
0891
0901
0911

HYDROTESTING, CLEANING, FLUSHING


ERECTION OF DUMP STEAM CONDENSOR
ERECTION OF FLASHED STEAM CONDENSOR
NDT
PWHT
INSULATION OF EQUIPMENT
PIPING FABRICATION CS
PIPING ERECTION CS
PIPING FABRICATION SS
PIPING ERECTION SS
PIPE SUPPORTS FABRICATION
PIPE SUPPORT ERECTION
ERECTION OF BOILER
INSULATION OF EQUIPMENT
HYDROTESTING, CLEANING, FLUSHING
NDT
PWHT
STRUCTURE
FIELD INSTRUMENT INSTALLATION UTILITY
FILED INSTRUMENT INSTALLATION OFFSITE
CABLE TRAYS & COVERS INSTALLATION
CABLE LAYING
CABLE TERMINATION
FABRICATION AND ERECTION OF SUPPORTS
LOOP TEST
STATIONARY EQUIPMENT INSTALLATION
PIPING FABRICATION CS
PIPING FABRICATION SS
PIPING ERECTION CS
PIPING ERECTION SS
PIPE SUPPORT FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING CLEANING FLUSHING
NDT
ERECTION OF HEAVY ENDS CONDENSOR WEST SIDE
ERECTION OF HEAVY ENDS CONDENSOR EAST SIDE
INSULATION OF EQUIPMENT
ERECTION OF WATER COOLER
PIPING FABRICATION CS
PIPING ERECTION CS
PIPING FABRICATION SS
PIPING ERECTION SS
ERECTION OF GAS COMPR/TURBINE
PIPE SUPPORT FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING CLEANING FLUSHING
NDT
PWHT

User Input Document

8
111
21
22
201
201
49
117
160
83
139
108
165
114
168
91
195
204
60
35
64
78
45
39
77
28
62
145
64
170
118
150
170
130
170
27
25
54
10
130
117
99
92
79
120
140
114
153
208
Prepared By SR

Training Course

0921
0931
0941
0951
0961
0971
0981
0991
1001

INSULATION OF EQUIPMENT
CABLE TRAYS & COVERS INSTALLATION
CABLE LAYING
CABLE TERMINATION
FABRICATION AND ERECTION OF SUPPORTS
LIGHT INSTALLATION
INSULATION OF PIPE/MISC. EQPT
PAINTING OF EQUIPMENT AND PIPING
PROJECT COMPLETION

User Input Document

9
49
163
141
66
152
24
190
154
0

Prepared By SR

Training Course

User Input Document

10

Prepared By SR

Training Course

11

Assign Discipline,Zone,Area & CCTR to Activities


Press F7, it will open activity form
Select the activity one by one
Assign type
Assign Discipline, Zone, Area & CCTR from dropdown menu given at the
bottom of form
Press OK

ZONE = Z1
AREA = Z1A1
Activity
id
0171
0181
0191
0201
0211
0221
0231
0241
0251

Activity description
EXCAVATION
FORMWORK INSTALLATION & REMOVAL
REBAR FIXING
CONCRETE PLACEMENT
Backfilling and compaction
WATER PROOFING
ROOFING SUB STATION
FLOORING
DOORS WINDOWS

Type

Disp

Zone

Task
Task
Task
Task
Task
Task
Task
Task
Task

C
C
C
C
C
C
C
C
C

Z1
Z1
Z1
Z1
Z1
Z1
Z1
Z1
Z1

Area

CCTR

Z1A1
Z1A1
Z1A1
Z1A1
Z1A1
Z1A1
Z1A1
Z1A1
Z1A1

21120
21310
21410
21210
21130
21885
21885
21885
21885

AREA = Z1A2

0001
0011
0021
0031
0041
0051
0061
0071
0081

PROJECT START
EXCAVATION
REBAR FIXING RACK/SLEEPER
CONCRETE PLACEMENT
BACKFILLING AND COMPACTION
MORTAR FININSHING RACK/SLEEPER
FOUNDATION
MISC. STEEL RACK/SLEEPER FOUNDATION
PROTECTTIVE COATING/WATER PROOFING
ANCHOR BOLTS AND EMBEDDED ITEMS

User Input Document

Start
mile
stone
Task
Task
Task
Task
Task
Task
Task
Task

Z1

Z1A2

C
C
C
C

Z1
Z1
Z1
Z1

Z1A2
Z1A2
Z1A2
Z1A2

21120
21410
21210
21130

Z1

Z1A2

21525

Z1
Z1
Z1

Z1A2
Z1A2
Z1A2

21835
21840
21870

C
C
C
C

Prepared By SR

Training Course

12

AREA = Z1A3
0091
0101
0111
0121
0131
0141
0151
0161

EXCAVATION
REBAR FIXING EQUIP.
CONCRETE PLACEMENT
BACKFILLING & COMPACTION
MORTAR FINISHING
PROTECTIVE COATING/WATER PROOFING
ANCHOR BOLTS/EMBEDDED ITEM
DRAINAGE PIPE WORKS

User Input Document

Task
Task
Task
Task
Task
Task
Task
Task

C
C
C
C
C
C
C
C

Z1
Z1
Z1
Z1
Z1
Z1
Z1
Z1

Z1A3
Z1A3
Z1A3
Z1A3
Z1A3
Z1A3
Z1A3
Z1A3

21120
21410
21210
21130
21525
21840
21870
21885

Prepared By SR

Training Course

User Input Document

13

Prepared By SR

Training Course

14

ZONE = Z2
AREA = Z2A1
Activity
id
0691

Activity description
STATIONARY EQUIPMENT INSTALLATION

Type

Disp

Task

Zon
e
Z2

Task
Task
Task
Task
Task
Task
Task
Task

M
M
M
M
M
M
M
M

Task

Area

CCTR

Z2A1

22210

Z2
Z2
Z2
Z2
Z2
Z2
Z2
Z2

Z2A2
Z2A2
Z2A2
Z2A2
Z2A2
Z2A2
Z2A2
Z2A2

23120
23320
23130
23330
22130
22140
23610
23530

Z2

Z2A2

22210

Z2A2

22210

AREA = Z2A2
0701
0711
0721
0731
0741
0751
0761
0771
0781
0791
0801
0811

PIPING FABRICATION CS
PIPING FABRICATION SS
PIPING ERECTION CS
PIPING ERECTION SS
PIPE SUPPORT FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING CLEANING FLUSHING
NDT
ERECTION OF HEAVY ENDS CONDENSOR
WEST SIDE
ERECTION OF HEAVY ENDS CONDENSOR
EAST SIDE
INSULATION OF EQUIPMENT
ERECTION OF WATER COOLER

Task
Task
Task

Z2

M
M

Z2
Z2

Z2A2
Z2A2

22410
22210

M
M
M
M
M
M
M
M
M
M
M

Z2
Z2
Z2
Z2
Z2
Z2
Z2
Z2
Z2
Z2
Z2

Z2A3
Z2A3
Z2A3
Z2A3
Z2A3
Z2A3
Z2A3
Z2A3
Z2A3
Z2A3
Z2A3

23120
23130
23320
23330
22220
22130
22140
23610
23530
23420
22410

AREA = Z2A3
0821
0831
0841
0851
0861
0871
0881
0891
0901
0911
0921

PIPING FABRICATION CS
PIPING ERECTION CS
PIPING FABRICATION SS
PIPING ERECTION SS
ERECTION OF GAS COMPR/TURBINE
PIPE SUPPORT FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING CLEANING FLUSHING
NDT
PWHT
INSULATION OF EQUIPMENT

User Input Document

Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task

Prepared By SR

Training Course

15

AREA = Z2A4
Activity
id
0931
0941
0951
0961
0971

Disp
Activity description
CABLE TRAYS & COVERS INSTALLATION
CABLE LAYING
CABLE TERMINATION
FABRICATION AND ERECTION OF SUPPORTS
LIGHT INSTALLATION

Type
Task
Task
Task
Task
Task

E
E
E
E
E

Zon
e
Z2
Z2
Z2
Z2
Z2

Area
Z2A4
Z2A4
Z2A4
Z2A4
Z2A4

CCTR
25320
25510
25520
25730
25410

M
M

Z2
Z2

Z2A5
Z2A5

22410
22520

Z2

Z2A5

AREA = Z2A5
0981
0991

INSULATION OF PIPE/MISC. EQPT


PAINTING OF EQUIPMENT AND PIPING

1001

PROJECT COMPLETION

User Input Document

Task
Task
Finish
mile
stone

Prepared By SR

Training Course

User Input Document

16

Prepared By SR

Training Course

17

ZONE = Z3
AREA = Z3A1
Activity
id
0621
0631
0641
0651
0661
0671
0681

Disp
Activity description
FIELD INSTRUMENT INSTALLATION UTILITY
FILED INSTRUMENT INSTALLATION OFFSITE
CABLE TRAYS & COVERS INSTALLATION
CABLE LAYING
CABLE TERMINATION
FABRICATION AND ERECTION OF SUPPORTS
LOOP TEST

E
E
E
E
E
E
E

Zon
e
Z3
Z3
Z3
Z3
Z3
Z3
Z3

Z3A1
Z3A1
Z3A1
Z3A1
Z3A1
Z3A1
Z3A1

CCTR
25620
25620
25320
25510
25520
25730
25820

Task
Task
Task
Task
Task
Task

M
M
M
M
M
M

Z3
Z3
Z3
Z3
Z3
Z3

Z3A2
Z3A2
Z3A2
Z3A2
Z3A2
Z3A2

23120
23130
22130
22140
23610
23530

Task
Task
Task
Task
Task
Task

M
M
M
M
M
M

Z3
Z3
Z3
Z3
Z3
Z3

Z3A3
Z3A3
Z3A3
Z3A3
Z3A3
Z3A3

23120
23130
22130
22140
23610
23530

Type
Task
Task
Task
Task
Task
Task
Task

Area

AREA = Z3A2
0321
0331
0341
0351
0361
0371

PIPING FABRICATION CS
PIPING ERECTION CS
PIPE SUPPORT FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING CLEANING FLUSHING
NDT

AREA = Z3A3
0261
0271
0281
0291
0301
0311

PIPING FABRICATION CS
PIPING ERECTION CS
PIPE SUPPORT FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING CLEANING FLUSHING
NDT

User Input Document

Prepared By SR

Training Course

18

AREA = Z3A4
Activity
id
0381
0391
0401
0411
0421
0431
0441
0451
0461
0471
0481
0491

Disp
Activity description
PIPING FABRICATION CS
PIPING FABRICATION SS
PIPING ERECTION CS
PIPING ERECTION SS
PIPE SUPPORTS FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING, CLEANING, FLUSHING
ERECTION OF DUMP STEAM CONDENSOR
ERECTION OF FLASHED STEAM
CONDENSOR
NDT
PWHT
INSULATION OF EQUIPMENT

M
M
M
M
M
M
M
M
M

Zon
e
Z3
Z3
Z3
Z3
Z3
Z3
Z3
Z3
Z3

Z3A4
Z3A4
Z3A4
Z3A4
Z3A4
Z3A4
Z3A4
Z3A4
Z3A4

Task
Task
Task
Task

M
M
M

Z3
Z3
Z3

Z3A4
Z3A4
Z3A4

22210
23530
23420
22410

Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task
Task

M
M
M
M
M
M
M
M
M
M
M
M

Z3
Z3
Z3
Z3
Z3
Z3
Z3
Z3
Z3
Z3
Z3
Z3

Z3A5
Z3A5
Z3A5
Z3A5
Z3A5
Z3A5
Z3A5
Z3A5
Z3A5
Z3A5
Z3A5
Z3A5

23120
23130
23320
23330
22130
22140
22210
22410
23610
23530
23420
22120

Type
Task
Task
Task
Task
Task
Task
Task
Task

Area
CCTR
23120
23320
23130
23330
22130
22140
23610
22210

AREA = Z3A5
0501
0511
0521
0531
0541
0551
0561
0571
0581
0591
0601
0611

PIPING FABRICATION CS
PIPING ERECTION CS
PIPING FABRICATION SS
PIPING ERECTION SS
PIPE SUPPORTS FABRICATION
PIPE SUPPORT ERECTION
ERECTION OF BOILER
INSULATION OF EQUIPMENT
HYDROTESTING, CLEANING, FLUSHING
NDT
PWHT
STRUCTURE

User Input Document

Prepared By SR

Training Course

User Input Document

19

Prepared By SR

Training Course

20

Organize the Schedule


Format Organize
Group By
Project
Zone
Area

Also Select the Background and text colour


Press the button Organize now

User Input Document

Prepared By SR

Training Course

User Input Document

21

Prepared By SR

Training Course

22

Assign Relationship and Schedule


Select the activity
Press SUCC Tab
Select the successor activity
Assign the Relationship
Press OK
Press F9
Press Schedule now
Repeat above steps to assign each of the following relationship:

Activity
id
0001
0011

Activity Description
PROJECT START
EXCAVATION

0051
0061
0071

REL
SS
SS
SS
SS

Lag
0
0
10
30

SS
SS
SS

12
0
10

FF
FF
FS

6
4
0

0071

Activity description
EXCAVATION
PIPING FABRICATION CS
REBAR FIXING RACK/SLEEPER
EXCAVATION
CONCRETE PLACEMENT
MISC. STEEL RACK/SLEEPER
FOUNDATION
ANCHOR BOLTS AND EMBEDDED
ITEMS
BACKFILLING AND COMPACTION
MORTAR FININSHING
RACK/SLEEPER FOUNDATION
PROJECT COMPLETION
PROTECTTIVE COATING/WATER
PROOFING

SS

0401
1001

PIPING ERECTION CS
PROJECT COMPLETION

SS
FS

20
0

REBAR FIXING RACK/SLEEPER

0031
0061
0081

CONCRETE PLACEMENT

0041
0051
1001

0021
0031
0041

Successor
Activity
id
0011
0261
0021
0091

BACKFILLING AND COMPACTION


MORTAR FININSHING RACK/SLEEPER
FOUNDATION
MISC. STEEL RACK/SLEEPER
FOUNDATION
PROTECTTIVE COATING/WATER

User Input Document

Prepared By SR

0091

BACKFILLING & COMPACTION

MORTAR FINISHING
PROTECTIVE COATING/WATER
PROOFING
ANCHOR BOLTS/EMBEDDED ITEM
DRAINAGE PIPE WORKS

0121

0131

CONCRETE PLACEMENT

Backfilling and compaction


WATER PROOFING
ROOFING SUB STATION

FLOORING

0201

0211
0221
0231

0241

User Input Document

EXCAVATION
FORMWORK INSTALLATION & REMOVAL
REBAR FIXING

0171
0181
0191

0151
0161

0141

CONCRETE PLACEMENT

0111

REBAR FIXING EQUIP.

EXCAVATION

0081

0101

PROOFING
ANCHOR BOLTS AND EMBEDDED ITEMS

Training Course

0251
0931
0961

0181
0191
0201
0211
0221
1001
0231
0241

1001
0111
1001

0141

0691
0121
0131
0451
0161

Prepared By SR

PROJECT COMPLETION
CONCRETE PLACEMENT
PROJECT COMPLETION
FORMWORK INSTALLATION &
REMOVAL
REBAR FIXING
CONCRETE PLACEMENT
Backfilling and compaction
WATER PROOFING
PROJECT COMPLETION
ROOFING SUB STATION
FLOORING
DOORS WINDOWS
CABLE TRAYS & COVERS
INSTALLATION
FABRICATION AND ERECTION OF
SUPPORTS

EXCAVATION
REBAR FIXING EQUIP.
CONCRETE PLACEMENT
ANCHOR BOLTS/EMBEDDED
ITEM
STATIONARY EQUIPMENT
INSTALLATION
BACKFILLING & COMPACTION
MORTAR FINISHING
ERECTION OF DUMP STEAM
CONDENSOR
DRAINAGE PIPE WORKS
PROTECTIVE COATING/WATER
PROOFING

0171
0101
0111
0151

CONCRETE PLACEMENT

0031

SS
FS
SS

SS
SS
SS
FF
SS
FS
SS
FS

FS
SS
FS

SS

FS
FF
FF
FS
FF

SS
SS

SS
SS

SS

8
0
0

8
0
11
10
40
0
0
0

0
1
0

0
6
4
-6
-2

10
8

30
10

23

PIPING ERECTION CS

PIPE SUPPORT FABRICATION


PIPE SUPPORT ERECTION
HYDROTESTING CLEANING FLUSHING
NDT

0271

0281
0291
0301
0311

PIPING FABRICATION CS

PIPING FABRICATION SS

PIPING ERECTION CS

PIPING ERECTION SS
PIPE SUPPORTS FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING, CLEANING, FLUSHING
ERECTION OF DUMP STEAM

0381

0391

0401

0411
0421
0431
0441
0451

User Input Document

PIPING ERECTION CS
PIPE SUPPORT FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING CLEANING FLUSHING
NDT

0331
0341
0351
0361
0371

PIPING FABRICATION CS

PIPING FABRICATION CS

0261

0321

DOORS WINDOWS

0251

Training Course

0441
0431
0401
0481
0461

0441

0361
0351
0331
1001
1001
0391
0401
0421
0471
0501
0411

0301
0291
0271
1001
1001
0331
0341
0371
0381

1001
0321
0271
0281
0311

Prepared By SR

PROJECT COMPLETION
PIPING FABRICATION CS
PIPING ERECTION CS
PIPE SUPPORT FABRICATION
NDT
HYDROTESTING CLEANING
FLUSHING
PIPE SUPPORT ERECTION
PIPING ERECTION CS
PROJECT COMPLETION
PROJECT COMPLETION
PIPING ERECTION CS
PIPE SUPPORT FABRICATION
NDT
PIPING FABRICATION CS
HYDROTESTING CLEANING
FLUSHING
PIPE SUPPORT ERECTION
PIPING ERECTION CS
PROJECT COMPLETION
PROJECT COMPLETION
PIPING FABRICATION SS
PIPING ERECTION CS
PIPE SUPPORTS FABRICATION
NDT
PIPING FABRICATION CS
PIPING ERECTION SS
HYDROTESTING, CLEANING,
FLUSHING
HYDROTESTING, CLEANING,
FLUSHING
PIPE SUPPORT ERECTION
PIPING ERECTION CS
PWHT
ERECTION OF FLASHED STEAM
SS
SS
SS
FF
SS

FS

FS
SS
SS
FS
FS
SS
SS
SS
SS
SS
SS

FS
SS
SS
FS
FS
SS
SS
SS
SS

FS
SS
SS
SS
SS

30
15
0
0
12

-26

-20
5
0
0
0
26
16
0
10
50
10

-26
12
0
0
0
5
0
0
36

0
26
12
0
0

24

PIPING ERECTION CS

PIPING FABRICATION SS

PIPING ERECTION SS
PIPE SUPPORTS FABRICATION
PIPE SUPPORT ERECTION
ERECTION OF BOILER
INSULATION OF EQUIPMENT
HYDROTESTING, CLEANING, FLUSHING
NDT
PWHT
STRUCTURE
FIELD INSTRUMENT INSTALLATION
UTILITY

0501

0511

0521

0531
0541
0551
0561
0571
0581
0591
0601
0611

User Input Document

0641

0631

FILED INSTRUMENT INSTALLATION


OFFSITE
CABLE TRAYS & COVERS INSTALLATION

PIPING FABRICATION CS

0461
0471
0481
0491

0621

CONDENSOR
ERECTION OF FLASHED STEAM
CONDENSOR
NDT
PWHT
INSULATION OF EQUIPMENT

Training Course

0621
0681
0651

0681

0581
0551
0511
0571
1001
0601
1001
1001
0561

0641
0671
0581
0531

0491
1001
1001
1001
0701
0511
0521
0541
0591
0611

Prepared By SR

LOOP TEST
FIELD INSTRUMENT
INSTALLATION UTILITY
LOOP TEST
CABLE LAYING

INSULATION OF EQUIPMENT
PROJECT COMPLETION
PROJECT COMPLETION
PROJECT COMPLETION
PIPING FABRICATION CS
PIPING ERECTION CS
PIPING FABRICATION SS
PIPE SUPPORTS FABRICATION
NDT
STRUCTURE
CABLE TRAYS & COVERS
INSTALLATION
FABRICATION AND ERECTION OF
SUPPORTS
HYDROTESTING, CLEANING,
FLUSHING
PIPING ERECTION SS
HYDROTESTING, CLEANING,
FLUSHING
PIPE SUPPORT ERECTION
PIPING ERECTION CS
INSULATION OF EQUIPMENT
PROJECT COMPLETION
PWHT
PROJECT COMPLETION
PROJECT COMPLETION
ERECTION OF BOILER

CONDENSOR

SS
FS
SS

FS

SS
SS
SS
FS
FS
FF
FS
FS
FS

FS
FS
FS
SS

FS
FS
FS
FS
SS
SS
SS
SS
SS
SS

7
-6
26

30
10
0
-52
0
0
0
0
-6

-26
-26
-30
15

0
0
0
0
0
10
0
0
0
0

25

CABLE TERMINATION
FABRICATION AND ERECTION OF
SUPPORTS
LOOP TEST
STATIONARY EQUIPMENT INSTALLATION

0661

PIPING FABRICATION SS

PIPING ERECTION CS

PIPING ERECTION SS
PIPE SUPPORT FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING CLEANING FLUSHING
NDT
ERECTION OF HEAVY ENDS
CONDENSOR WEST SIDE
ERECTION OF HEAVY ENDS
CONDENSOR EAST SIDE
INSULATION OF EQUIPMENT
ERECTION OF WATER COOLER

0711

0721

0731
0741
0751
0761
0771

PIPING ERECTION CS
PIPING FABRICATION SS

0831
0841

User Input Document

PIPING FABRICATION CS

0821

0801
0811

0791

0781

PIPING FABRICATION CS

0701

0681
0691

0671

CABLE LAYING

0651

Training Course

0891
0851

0791
0801
0811
1001
1001
0831
0841
0871
0901

0761
0751
0721
1001
1001

0761

0641
1001
1001
0821
0711
0721
0741
0771
0731

0631
0661
0681

Prepared By SR

FILED INSTRUMENT
INSTALLATION OFFSITE
CABLE TERMINATION
LOOP TEST
CABLE TRAYS & COVERS
INSTALLATION
PROJECT COMPLETION
PROJECT COMPLETION
PIPING FABRICATION CS
PIPING FABRICATION SS
PIPING ERECTION CS
PIPE SUPPORT FABRICATION
NDT
PIPING ERECTION SS
HYDROTESTING CLEANING
FLUSHING
HYDROTESTING CLEANING
FLUSHING
PIPE SUPPORT ERECTION
PIPING ERECTION CS
PROJECT COMPLETION
PROJECT COMPLETION
ERECTION OF HEAVY ENDS
CONDENSOR EAST SIDE
INSULATION OF EQUIPMENT
ERECTION OF WATER COOLER
PROJECT COMPLETION
PROJECT COMPLETION
PIPING ERECTION CS
PIPING FABRICATION SS
PIPE SUPPORT FABRICATION
NDT
HYDROTESTING CLEANING
FLUSHING
PIPING ERECTION SS
FS
SS

FS
FS
FS
FS
FS
SS
SS
SS
SS

SS
SS
SS
FS
FS

FS

SS
FS
FS
SS
SS
SS
SS
SS
SS

SS
FF
FS

-26
38

0
0
0
0
0
16
26
0
0

40
12
0
0
0

-40

0
0
0
70
26
13
0
0
38

7
6
0

26

NDT
PWHT
INSULATION OF EQUIPMENT
CABLE TRAYS & COVERS INSTALLATION
CABLE LAYING
CABLE TERMINATION
FABRICATION AND ERECTION OF
SUPPORTS
LIGHT INSTALLATION

0901
0911
0921
0931
0941
0951

User Input Document

0981
0991
1001

0971

INSULATION OF PIPE/MISC. EQPT


PAINTING OF EQUIPMENT AND PIPING
PROJECT COMPLETION

HYDROTESTING CLEANING FLUSHING

0891

0961

PIPING ERECTION SS
ERECTION OF GAS COMPR/TURBINE
PIPE SUPPORT FABRICATION
PIPE SUPPORT ERECTION

0851
0861
0871
0881

Training Course

0991
1001

0931
1001

0911
0981
1001
1001
1001
0941
0951
0971

0891
0921
0881
0831

Prepared By SR

HYDROTESTING CLEANING
FLUSHING
INSULATION OF EQUIPMENT
PIPE SUPPORT ERECTION
PIPING ERECTION CS
PWHT
INSULATION OF PIPE/MISC.
EQPT
PROJECT COMPLETION
PROJECT COMPLETION
PROJECT COMPLETION
CABLE LAYING
CABLE TERMINATION
LIGHT INSTALLATION
CABLE TRAYS & COVERS
INSTALLATION
PROJECT COMPLETION
PAINTING OF EQUIPMENT AND
PIPING
PROJECT COMPLETION
FF
FS

SS
FS

FF
FF
FS
FS
FS
SS
FF
FF

SS
FS
SS
SS

0
0

0
0

-7
20
0
0
0
0
4
0

40
0
15
0

27

User Input Document

Training Course

Prepared By SR

28

Training Course

User Input Document

29

Prepared By SR

Training Course

30

Apply Constraint
Select the activity
Press Constr Tab
Click at Early Constraint and give Start Date
Repeat above steps for each of following constraint:
Activity id
0861
0781
0321
0261
0451

User Input Document

Activity Description
ERECTION OF GAS COMPR/TURBINE
ERECTION OF HEAVY ENDS CONDENSOR
WEST SIDE
PIPING FABRICATION CS
PIPING FABRICATION CS
ERECTION OF DUMP STEAM CONDENSOR

Start Date
11-Aug-06
15-Jul-06
01-Feb-06
01-Feb-06
06-Jun-06

Prepared By SR

Training Course

User Input Document

31

Prepared By SR

Training Course

32

Defining Resources in Resource Dictionary


Data Resources
Add following two resources:
Resources
0QTY
MH

Press the close button


Assigning Resources to Activities

Select Activity
Press RES Tab
Add both resources i.e. MH & 0QTY
Against the row of Budgeted quantity:
o Add the values of MH & 0QTY as given below
Add the value of curve
Press OK

Activity
0001
0011
0021
0031
0041
0051
0061
0071
0081
0091
0101
0111
0121
0131
0141
0151
0161
0171
0181

MH
PROJECT START
EXCAVATION
REBAR FIXING RACK/SLEEPER
CONCRETE PLACEMENT
BACKFILLING AND COMPACTION
MORTAR FININSHING RACK/SLEEPER
FOUNDATION
MISC. STEEL RACK/SLEEPER
FOUNDATION
PROTECTTIVE COATING/WATER
PROOFING
ANCHOR BOLTS AND EMBEDDED ITEMS
EXCAVATION
REBAR FIXING EQUIP.
CONCRETE PLACEMENT
BACKFILLING & COMPACTION
MORTAR FINISHING
PROTECTIVE COATING/WATER
PROOFING
ANCHOR BOLTS/EMBEDDED ITEM
DRAINAGE PIPE WORKS
EXCAVATION
FORMWORK INSTALLATION & REMOVAL

User Input Document

685
954
1,243.00
80

0QTY
0
1712.50
15.90
194.83
88.89

942

471.00

4,760.00

9520.00

655
2,288.00
5,713.00
19,069.00
23,966.00
8,716.00
2,504.00

1637.50
1830.40
14282.50
317.82
3756.43
9684.44
1252.00

3,308.00
4,552.00
2,500.00
975
4,429.00

8270.00
3641.60
12500.00
2437.50
805.27

Curve
6
6
6
6
6
0
0
0
0
6
0
6
6
6
6
6
6
6
Prepared By SR

Training Course

0191
0201
0211
0221
0231
0241
0251
0261
0271
0281
0291
0301
0311
0321
0331
0341
0351
0361
0371
0381
0391
0401
0411
0421
0431
0441
0451
0461
0471
0481
0491
0501
0511
0521
0531
0541
0551
0561
0571
0581
0591
0601
0611
0621
0631

REBAR FIXING
CONCRETE PLACEMENT
Backfilling and compaction
WATER PROOFING
ROOFING SUB STATION
FLOORING
DOORS WINDOWS
PIPING FABRICATION CS
PIPING ERECTION CS
PIPE SUPPORT FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING CLEANING FLUSHING
NDT
PIPING FABRICATION CS
PIPING ERECTION CS
PIPE SUPPORT FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING CLEANING FLUSHING
NDT
PIPING FABRICATION CS
PIPING FABRICATION SS
PIPING ERECTION CS
PIPING ERECTION SS
PIPE SUPPORTS FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING, CLEANING, FLUSHING
ERECTION OF DUMP STEAM
CONDENSOR
ERECTION OF FLASHED STEAM
CONDENSOR
NDT
PWHT
INSULATION OF EQUIPMENT
PIPING FABRICATION CS
PIPING ERECTION CS
PIPING FABRICATION SS
PIPING ERECTION SS
PIPE SUPPORTS FABRICATION
PIPE SUPPORT ERECTION
ERECTION OF BOILER
INSULATION OF EQUIPMENT
HYDROTESTING, CLEANING, FLUSHING
NDT
PWHT
STRUCTURE
FIELD INSTRUMENT INSTALLATION
UTILITY
FILED INSTRUMENT INSTALLATION
OFFSITE

User Input Document

33
1,951.00
1,561.00
8,716.00
390
1,171.00
3,902.00
780
14,645.00
16,981.00
2,147.00
379
3,251.10
1,115.00
5,763.00
26,736.00
6,596.00
1,963.00
20,109.00
1,115.00
8,201.00
1,146.00
14,266.00
4,003.00
1,963.00
346
6,325.00

32.52
244.67
9684.44
1950.00
5855.00
19510.00
3900.00
7040.87
7753.88
7.02
7.02
706.76
1858.33
2770.67
12208.22
21.56
36.35
4371.52
1858.33
3942.79
350.46
6514.16
792.67
6.42
6.41
1375.00

5,220.00

168.39

1,107.00
937
714
7,028.00
16,138.00
13,851.00
5,216.00
8,336.00
2,699.00
476
13,394.00
7,028.00
7,185.00
910
797
3,532.00

35.71
1561.67
1190.00
1464.17
7758.65
6324.66
1595.11
1650.69
8.82
8.81
432.06
1464.17
1561.96
1516.67
1328.33
54.34

1,565.00

558.93

3,186.00

1137.86

6
6
6
6
6
6
6
6
6
6
6
6
6
0
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
Prepared By SR

Training Course

0641
0651
0661
0671
0681
0691
0701
0711
0721
0731
0741
0751
0761
0771
0781
0791
0801
0811
0821
0831
0841
0851
0861
0871
0881
0891
0901
0911
0921
0931
0941
0951
0961
0971
0981
0991
1001

CABLE TRAYS & COVERS INSTALLATION


CABLE LAYING
CABLE TERMINATION
FABRICATION AND ERECTION OF
SUPPORTS
LOOP TEST
STATIONARY EQUIPMENT INSTALLATION
PIPING FABRICATION CS
PIPING FABRICATION SS
PIPING ERECTION CS
PIPING ERECTION SS
PIPE SUPPORT FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING CLEANING FLUSHING
NDT
ERECTION OF HEAVY ENDS CONDENSOR
WEST SIDE
ERECTION OF HEAVY ENDS CONDENSOR
EAST SIDE
INSULATION OF EQUIPMENT
ERECTION OF WATER COOLER
PIPING FABRICATION CS
PIPING ERECTION CS
PIPING FABRICATION SS
PIPING ERECTION SS
ERECTION OF GAS COMPR/TURBINE
PIPE SUPPORT FABRICATION
PIPE SUPPORT ERECTION
HYDROTESTING CLEANING FLUSHING
NDT
PWHT
INSULATION OF EQUIPMENT
CABLE TRAYS & COVERS INSTALLATION
CABLE LAYING
CABLE TERMINATION
FABRICATION AND ERECTION OF
SUPPORTS
LIGHT INSTALLATION
INSULATION OF PIPE/MISC. EQPT
PAINTING OF EQUIPMENT AND PIPING
PROJECT COMPLETION

User Input Document

34
7,805.00
4,465.00
274

6504.17
9500.00
830.30

1,291.00
517
17,659.00
23,800.00
4,321.00
64,290.00
23,505.00
12,271.00
2,165.00
25,229.00
1,115.00

2151.67
172.33
569.65
11442.31
1321.41
29356.16
4654.46
40.10
40.09
5484.57
1858.33

26,116.00

842.45

26,116.00
2,289.00
7,592.00
32,748.00
25,319.00
14,816.00
23,039.00
10,811.00
9,510.00
1,678.00
2,786.00
1,115.00
14,813.00
6,017.00
8,395.00
37,766.00
667

842.45
476.88
244.90
15744.23
11561.19
4530.89
4562.18
245.70
31.08
31.07
605.65
1858.33
24688.33
1253.54
6995.83
80353.19
2021.21

1,365.00
3,417.00
98,928.00
8,491.00

2275.00
2278.00
20610.00
9434.44
0

6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6

Prepared By SR

Training Course

User Input Document

35

Prepared By SR

Training Course

36

Tools Graphic Report Resource and Cost


Press ADD
Press ADD to automatic number given to report
In Resource Selection tab:
Profile If
EQ

Low Value Resource


MH

In Content tab, Select Divided By=260


In Date tab:
o End Date: 30-Jun-2007
o Title Each: Month
o Time Scale: Month
Press OK
Press Run
View on screen OK
Continue---YES
Histogram will be displayed

User Input Document