Job No.
Customer Name
Item
GE07M126/B
GE07M126/B
PTTUT
Description of production
Model
Delivery Date
Production
Signature
Date
F-QA-004 Rev.1
Page 1
October 27, 2007
QC/QA
Signature
Date
Remark
1 Drawing approval
2 Material verification & identification stamp
3 Boiler body fabrication (pressure part)
4 Boiler body fabrication (non pressure part)
5 Radiography Test
6 Heat Treatment
7 Pressure test of boiler body
8 Pumps and valves installation
9 Refractory, painting, insulation and cladding
10 Burner installation
11 Electrical and instrumentation wiring
12 Function testing of control system
13 Boiler accessories
14 Boile Manual and Manufacturing Data Record
15 Packaging for transportation
Approval
Completed
Incompleted
Completed
Incompleted
Signature
Date
Position
Production Manager
QC/QA Manager
Note : This release note shall be completed at least one day before delivery this boiler.
...
Serial No.
Job No.
Customer Name
Item
GE07M126/B
GE07M126/B
PTTUT
Incompleted remaining
Description
Delivery condition :
Contract delivery date:
On time
Late
days
Reason in case of late delivery is
F-QA-004 Rev.1
Page 2
October 27, 2007
Completed by
Date
RELEASE
RELEASE NOTE
NOTE FOR
FOR DE
DE
Equipment Name
S.No./Model
Job No.
Delivery Date(
Customer Name
Delivery Date(
Result
Item
Acc
1
Drawing Approved
Check for elbow to tube and and header opening (Attach photos)
10
11
Heat treatment
12
13
Pressure Test
14
Check edge preparation of header after partition and Internal Inspection before
closing (Attach Photos)
15
16
17
18
Approval
Completed
Incompleted
Production
Description of production
Production Manager
Note : This release note shall be completed at least one day before delivery this boiler.
Rej
N/A
Signature
Date
RELEASE
RELEASE NOTE
NOTE FOR
FOR DELIVERY
DELIVERY
S.No./Model
Delivery Date(Contract)
Delivery Date(Actual)
Production
Page
QC/QA
Remark
Date
Signature
Completed
Date
Incompleted
QA/QC Manager
of
RELEASE
RELEASE NOTE
NOTE FOR
FOR DELIVERY
DELIVERY
Incomplete Items/Activity
Production
Item
Description
Finished on
Acc
Re-Verification Record
Approval
Applicable
Completed
Not Applicable
Incompleted
Signature
Date
Position
Production Manager
Note : This page shall be filled and signed off only if there is any Incompleted items or activities.
Rej
N/A
Signature
Dat
E NOTE
NOTE FOR
FOR DELIVERY
DELIVERY
e Items/Activity
Page
Production
of
QA/QC
Remarks
Date
Signature
Completed
Date
Incompleted
QA/QC Manager