TITLE: Interdepartmental Check for Rotaing Machineiy Documents Prepared by Other

Departments
TIME OF CHECK: As needed / requested.
Security Level 2

TWC
ISSUED
PAGE
Unless stamped CONTROLLED" , any hard copy from the TEC-STANDARD SYSTEM is handled
as Non-control led" Therefore, users should confirm that the copy is relevant version.

CHECK ITEMS AND POINTS

(1) Process P&ID shall be checked as per TWC1-1211-105E P&ID


Screening Meeting (Design of Rotating Machinery).
(2) Plant plot plan shall be checked as per TWC1-1211-104E Plot Plan
Screening Meeting (Design of Rotating Machinery).
(3) Motor schedule: All items shall be correctly listed. All data shall
conform to ELECTRICAL LOAD LIST informed by Rotating Group. Any
changes to above shall be correctly reflected. - Scope of motor supply (by vendor
or by purchaser) shall be correctly reflected.
(4) Single line diagram -- All items shall be correctly listed. - All items which
require emergency power supply shall be correctly listed. Pay particular attention to
the requirements on turning device and seal/lube oil pumps. - Supplier of e-motor
shall be correctly specified.
(5) Foundation drawing - Foundation size / height / shape shall be appropriate Anchor box location and shape shall conform to vendor information. - Loading
data shall conform to vendor information, For vertical barrel pumps which
require cold insulation, required space for insulation shall be considered. ' Grouting shall be considered as per Rotating Group instruction.
(6) Piping material specification Flanges etc. shall conform to project
requirement. - Lube oil / seal gas piping shall be included, if applicable., Pipe
schedule etc. shall conform to API 614 requirements, if applicable. Piping
specification for leak steam line, balance lfcak line etc. shall be included, if
applicable.

MEMO

1
0
REV.

twc1211400e.doc
0 Toyo Engineering Corp.

TITLE: Interdepartmental Check for Documents Prepared by Other


Departments
TIME OF CHECK: As needed / requested.
Security Level 2

TWC
ISSUED

PAGE
CHECK ITEMS AND POINTS

(7) Interlock block diagram


- Interlocking function shown in vendor P&ID and vendor logic
diagram shall exist in the Interlock block diagram.
- Each trip / auto-start i start-permissives shall be correctly reflected.
- Redundancy requirements shall be correctly reflected.
- Location of annuciators for interlock functions shall be correctly
reflected.
(8) Plot plan (e.g. Plot plan for compressor building)
Foundation shape and height shall be planned taking into
consideration of pipe routing.
- Maintenance space shall be ensured.
- Valves shall be at operable location.
- Anchor bolt type (and insert plate if applicable) shall be correctly
reflected! '
- Crane projection area shall be checked whether appropriate.
- If mobile crane is considered, proper access shall be considered.
(9) Piping drawing
- Required straight length shall be considered.
- Required spools for maintenance shall be considered.
- Location of valves and associate gauges which require urgent
operation during emergency shall be adequate.
- Vent and drain for pipe shall be proper.
- Requirements in P&ID, such as NO POCKET, SLOPED, MIN.
LENGTH, shall be conformed to.
twc12H 400e.doc
0Toyo Engineering Corf.

TITLE: Check of Engineering Interface for Rotating Machinery


TIME OF CHECK: This check shall be done prior to issuance of AFD P&ID.
Security Level 2

TWC
ISSUED
PAGE
Unless stamped "CONTROLLED , any hard copy from the TEC-STANDARD SYSTEM is handled
as "Non-controlled Therefore, users should confirm that the copy is relevant version

CHECK ITEMS AND POINTS


(1) Coordination meeting with other disciplines shall be done as per the
following TWCs: - Instrument group: TWC1-1211-102E - Electric
group: TWC 1-1211-103E - Piping & Civil groups: TWC1-1211-101E

(2) Screening meeting shall be done as per the following TWCs: - P&ID
screening meeting: TWC1-1211-105E - Plot plan screening meeting:
TWC1-1211-104E

(3) Following data for e-motors shall be provided to Electric group: ELECTRIC LOAD LIST - Motor coupling half requirements - Motor
delivery, date & place. Whether equipment vendor will mount the motor
shall also be checked. - Start-torque curve / GD2 / motor shaft
requirements, necessity of mounting plates, thrust load for vertical pumps.
- Necessity of emergency power.
(4) Check following data for e-motor: - Motor bearing type. If sleeve
bearing is applied, application of limited end float coupling. - Lube oil
type / amount / pressure / temperature requirements, if applicable. ' Scope of lube oil supply / return line, if applicable. - Speed range,
control method and necessity of speed pick-up for variable speed drive
motor. - Data for torsional analysis, if needed.

MEMO

1
0
REV.

twc1211600e.doc
0 Toyo Engineering Corp

TITLE: Check of Engineering Interface for Rotating Machinery


TIME OF CHECK: This check shall be done prior to issuance of AFD P&ID.
Security Level 2

TWC
ISSUED

PAGE
CHECK ITEMS AND POINTS
(5) Provide data sheet, performance curve & P&ID to Process Group and
inform the following design data:
- Range of pressure / temperature / turndown
- Maximum operation pressure which affects the downstream pipe
and equipment.
- Guarantee figures.

- Pump NPSHA and min. flow rate.


- Control method.
- Compressor anti-surge system.
- Piping and instrument connection.
- Interlock logic.
- Required utility condition and amount.
(6) Provide outline drawings, piping drawings, P&IDs to Piping Group and
inform the following design data:
- General arrangement and pipe layout.
- Valve and instrument panel location.
- Maintenance space.
- Min. straight pipe length;
- Nozzle allowable force & moment.
- Strainer mesh size.

- Line spec & line no. in contractors P&ID, which shall be provided
byToyo.
- Lines which require insulation and/or heat tracing.
(7) Provide GA drawing to Piping Group and Civil Group and inform the
following design data:
- Foundation drawing with loading data. If required by Civil Group,
provide dynamic load as well.
- Special grout requirement such as epoxy grouting.
- Anchor bolt size and shape.
- Maintenance weight.
- Vibration measures, if any, for table top installed equipment.
. (8) Provide following data to Instrument Group:
- Instrument Specification including instrument manufacturer name.
- Instrument location and its hazardous area.
- Instrument connection (size / threading etc.)
- Instrument outline drawing for those instruments mounted on
Toyos gauge board.
- Interlock logic diagram and set point list
- Failure action of switches and control valves. ;
(9) For reciprocating compressors, obtain .the latest P&IDs from Process
Group and the pipe isometric drawing from Piping Group for pulsation
analysis. After receiving vendor's report, make sure to inform the
necessary modification to Process group and Piping group.
(10) Provide noise data to Applied Analysis Group.
(11) Provide all the necessary information to Inspection Group.
twc1211600e.doc
0Toyo Engineering Core.

TITLE: Check of Engineering Interface for Rotating Machinery


TIME OF CHECK: This check.shall be done prior to issuance of AFD P&tD.
Security Level 2
TWC
ISSUED
PAGE
. CHECK ITEMS AND PQINTS

(12) -In case overdimensioned cargo or separate shipment items exist,


inform packing drawing and packing list to Logistics Group.
(13) After issuance of AFD PAID, all the relevant changes shall be
informed to other disciplines by ERL
(14) Above ERI shall be issued with approval by Project Team.

twc1211600e.doc
0 Toyo Engineering Corp,

TITLE:

CHECK OF VENDORS PRINT FOR ROTATING MACHINERY

(GENERAL & COMMON)

ISSUED MAR.1,2000

TWC 1-1211-700E

TIME OF

CHECK:

ASSIGNED ENGINEERS ARE TO CHECK EACH APPLICABLE VENDOR'S PRINT

PAGE .1/2

ACCORDING TO THIS CHECK LIST AT APPROPRIATE TIME FOR CHECKING ANB ARE TO REPORT SUMMARIZED
RESULTS OF CHECKING AT THETIMEAFD-ISSUE OF P & I DIAGRAM.
NOTE :

HOLDING POINTS, IF ANY, ARE TO BE FOLLOWED AFTER ISSUING THE FIRST REPORT AND THE RESULT OF CHECKING

TO BE REPORTED AT THE TIME OF AFC-ISSUE OF P & l DIAGRAM.


CHECK ITEMS AND POINTS
B
REFERENCE DOC & REMARKS

1. Are the previous issues of vendors prints segregated from


()
()
()

2.
3.
'4.
5.
6.
the latest one in accordance with the manner described in
TMS1-CD401 at par. 4. 4?___
When sending vendors print 'back to the vendor after
checking,
(a)
Are your comments clearly identified by marking them ( )
on the print or typed out separately if required?
(b)
Are any comments, which affect vendors manufacturing ( ) (
schedule, forwarded by faster correspondences such as
Tele-fax in advance of sending the subject print" back
to the vendor by mail?
(c)
Do you designate "APPROVED, APPROVED AS NOTED, ( ) (
REVIEWED and RESUBMIT on each print properly
corresponding to appointment?

)
) APPROVED is appointed to
"FOR APPROVAL. REVIEWED
to FOR INFORMATION.
(d)
In order to minimize the number of approval cycles, do ( ) ( )
you communicate, with the vendor separately by faster
communication ways for clarification or discussion on
the important points preventing the subject print from
being given APPROVED or APPROVED AS NOTED? .
(e)
Do you appoint clearly the resubmission date of the ( )
print when required deemly for resubmission?
(f)
Do you attach a transmittal summarizing status of ( )
approval?
Cg) Do'you designate any important notices to the vendor ( )
or other internal disciplines on the transmittal?
Are the latest revisions, if any, in the print identified ( )
clearly by marking? .
__
Are measuring units and languages applicable in compliance ( )
with pnes appointed?
Are.duplicated informations or data, which are available ( )
on each print or among prints concerned each other,
minimized?
For inter-discipline checking (abbreviated as ID CHECK
hereinafter),
(a)
Do you use the standard form for request of checking ( )
and designate clearly the checking points?
(b)

Do you investigate and incorporate properly the ( )

. comments provided by other disciplines on ID CHECK.


MEMO

1
0

REV.

FORM A-G3Q,015-1f2 (9807)

0 Toyo Engineering Corp.

TITLE:

CHECK OF VENDORS PRINT FOR ROTATING MACHINERY

(GENERAL & COMMON)


TIME OF CHECK: ASSIGNED ENGINEERS ARE TO CHECK EACH APPLICABLE VENDOR'S PRINT
ACCORDING TO THIS CHECK LIST AT APPROPRIATE TIME FOR CHECKING AN& ARE TO ftTOkT ulVIWlAftl2&)
. RESULTS OF CHECKING AT THE TIME AFD:ISSUE OF P & I DIAGRAM.
NOTE :

HOLDING POINTS, IF ANY, ARE TO BE FOLLOWED AFTER ISSUING THE FIRST REPORT AND THE RESULT OF CHECKING

TO BE REPORTED AT THE TIME OF AFC-ISSUE OF P & I DIAGRAM.

TWC
ISSUED

PAGE
CHECK ITEMS AND POINTS

(c) Are the above forms stored during'the period appointed in


TMS1-CD401 in the proper files for the sake of records?
7, Are -the results of your checking authorized within the
department in the manner designated in TMS1-CD003 Department
Approval Procedure?
FORM A-G30.015-2/2 (9807)

0 Toyo Engineering Corf:


TOKYO

() JAPAN

Toyo Engineering Corf.


TITLE:

CHECK OF VENDORS PRINT FOR ROTATING MACHINERY

DATA SHEETS FOR CENTRIFUGAL PUMPS & EXPECTED PERFORMANCE CURVE


TIME OF CHECK: AT THE TIME OF THE FIRST ISSUE OF VENDORS DATASHEETS AND PERFORMANCE CURVES.
WORK FLOW CHART
CHECK ITEMS AND POINTS
CHECK

ABC
REMARKS

(1) Check if data designated by Vendors are coincident with


inquiry spec.
(2)

Check if all data are filled in by vendors.

(3) Check if all latest revisions are identified with mark.

(4) Check if the pump case mounting, foot, centerline or vertical is


in compliance with the applicable spec.
(5)

Check if case split is in accordance with applicable spec.

(6)

Nozzle rating and feeing

- Check if suction nozzle has the same rating as discharge nozzle


for one- or two-stage pumps.
-

Check if a fiat face is applied to cast iron casings.

(7) Check if nozzle size of 1-1/4, (2-1/2), 3-1/2, (5), 7 or 9 inch is


not used.
(8) Check if overhung impellers of two stages or double suction is
not used corresponding to the requirement of applicable spec.
(9)

Impellers

- Check if design tip diameter of impellers is not equal to max.


or min diameter for the case.
- Check if 5 % margin is available in total head to that
developed by an impeller of the max. diameter for the fixed
speed horizontal pumps.
(10) Check if wearing clearances are as per applicable spec, or
standard.

MEMO

WORK NO.

REQ. NO.
VENDOR
DOC. NO.

2
1
0
REV.

TOKYO 0 JAPAN

Toyo Engineering Corp.


TITLE:

CHECK OF VENDORS PRINT FOR ROTATING MACHINERY

DATA SHEETS FOR CENTRIFUGAL PUMPS & EXPECTED PERFORMANCE CURVE


WORK FLOW CHART
CHECK ITEMS AND POINTS

(11) Check if hydrodynamic bearings are required in accordance


with applicable spec, or standard
(12) Check if ball thrust bearings are of duplex single row 40-deg.
angular contact type as par API 610 Standard when applicable.
(13) Check rating life of bearings, if necessary, by vendors
calculation sheet
(14) Couplings
- Check if a flexible coupling are used for horizontal pumps or
vertical pumps with a thrust bearing as per spec. - Check if a rigid coupling is used
for vertical pumps with no
thrust bearings. - Check if a spacer coupling is provided and its space length is
as per spec.
(15) Check if rotating direction is coincident with an outline
drawing and electrical load list.
(16) Materials
- Check compliance of requirement regarding materials as per
applicable spec, and standards. - Check if hardness of wearing rings is correctly
appointed as
per applicable specification. - Check if hardness of sleeves is correctly appointed
according
to type of shaft seals. - Check if any components include materials prohibited from
being used in the inquiry spec. - Check if the materials for low temperature service
are in
compliance with applicable spec, or standards.
(17) Check pump speed according to motor pole & frequency (slip

& speed reducer)


(18) Check if NPSHR has margin to NPSHA appointed as follows;
- min. 0.6 m margin between NPSHR & NPSHA as a guideline
for horizontal pumps. - NPSH margin for the pumps used for Acid Gas Removal
units
according to licensers spec.
REMARKS

TOKYO

JAPAN

Toyo Engineering Core.


TITLE:

CHECK OF VENDORS PRINT FOR ROTATING MACHINERY

DATA SHEETS FOR CENTRIFUGAL PUMPS & EXPECTED PERFORMANCE CURVE


WORK FLOW CHART
CHECK ITEMS AND POINTS
CHECK

ABC
REMARKS

(19) Check pump rated BHP according to the equation using rated
flow, head, spec, gravity and pump efficiency designated by
vendor.

(20) Minimum continuous flow


- Check if the min. continuous flow is greater than normal
flow.
-

Check on P & I DIAGRAM if pumps are protected from the

operation with the flow under the min, continuous flow.


(21)
Max. operating pressure:
- Check if max. operating pressure is equal to or higher than
max. suction pressure + shutoff pressure (with test
tolerance) for fixed speed pumps.
- Check if max. operating pressure is. equal to or higher than
max suction pressure + shutoff pressure at max continuous
speed (with test tolerance) for variable speed pumps

- Check if max. operating press, is within piping spec. &


flange rating.
- Check necessity of a relief valve at suction line to protect the
pump from overpressure during stand-by.

(22)
Check if case design temp, is higher than pumping temp. + 10
deg.C. as per applicable spec.

(23)
Check if case design press, is higher than max. operating
press, appointed.

(24) Hyd. test press.


- 1.5 x design pressure corrected hy design temp.

Applicable high
pressure pumps
(25)
Check if impeller tip speed vs. material is as per the following
guideline;

n
Cast Iron
Bronze
Cast Steel

18-8SS
Niresist
Nodular iron
13% Cr Steel
Ref.
TEG1-121I-105

TOKYO 0 JAPAN

Toyo Engineering Corp.


TITLE:

CHECK OF VENDORS PRINT FOR ROTATING MACHINERY

DATA SHEETS FOR CENTRIFUGAL PUMPS & EXPECTED PERFORMANCE CURVE


WORK FLOW CHART
CHECK ITEMS AND POINTS
CHECK

ABC
REMARKS

(26) Check if suction specific speed is 1900 (rpm,m3/m,m) or


smaller for impellers with no inducer or 3000 or smaller for
the impeller with an inducer.
(27) Mechanical Seals:
- Check if type of mechanical seals is in compliance with the
inquiry spec, and applicable standards.
- Check if face materials are properly selected according to
applicable standards and vendors past experience. Especially
both faces of tungsten carbide or silicon carbide are to be
selected for caustic or slurry services.
- Check if the sealing pressure is positive in any operating
cases. Otherwise, check the protection for the seal against
vacuum pressure.


(28) Auxiliary Piping
- Check if seal piping plan is coincident with type of
mechanical seals selected.
- Check if materials of process piping are equal to or better
than case material.
- Check if cooling water piping is planned as per requirement
of cooling for bearing housings, seal cooling inserts,
pedestal cooling and so on.
- Check if seal quenching is properly appointed for such
services as heavy/crude oil, solidified liquid, caustic service,
ammonium solution, vacuum service and so on.
- Check if the external flushing sources, if any, are available
in such pressure as being supplied suitably to seals or
wearing rings without being vaporized.
- Check if the balance line (chamber), if available, is sized
properly so that the chamber pressure is within the max.
allowable pressure with leakage flow appointed by vendor.

a
D
(29) Casing Tapped Openings:
- Chock if vent and drain system is as appointed in PO
conditions and is compatible with process P & ID.

- Check if the terminal points, if any, have the same pressure


rating as main nozzles, or higher.
Applicable to
the multi-stage
pumps.
(30) Check if pump automatic start and/or stop is correctly
appointed as per P & ID.

TOKYO 0 JAPAN

Toyo Engineering Corp.


TITLE:

CHECK OF VENDORS PRINT FOR ROTATING MACHINERY

DATA SHEETS FOR CENTRIFUGAL PUMPS & EXPECTED PERFORMANCE CURVE


WORK FLOW CHART
CHECK ITEMS AND POINTS

A
(31) Motor or Turbine-Drivers
- Check if supplier and place of mounting of the drivers are
correctly designated as per PO condition.
- Check if the rated output of the drivers are appointed in
accordance with applicable spec, or standards.
- Check if the rated output of electric motors is appointed as per
power rating standardized by TEC.
- Check the expected highest viscosity of the liquid and confirm
that the motor is not overloaded during pump operation under
such a condition.

CHECK

_____

C
REMARKS

(32) Confirm that pump speed is as designated by pump vendor


and that it is not necessarily coincident with motor rated
speed.
(33)

Check if the manufacturers of motors, turbines, seals and 0

couplings are as per job specific requirements if any.


(34) The following vendors data are to be put back to Process or
Utility P & I Diagram;
-

Main and auxiliary connection site and rating

Necessity of additional min, continuous flow line

Necessity and requirement of additional utilities

(35) Centrifugal Pump Expected Performance Curves


-

Check if all data on the curve are coincident with data sheet

- Head margin is available to max. dia. of the impeller


according to applicable spec, and standard, and min, dia.of
impeller is not applicable.
- Check if viscosity correction is done correctly as per Hydraulic
Institute Standard for high viscous service.
-

Check if the curve is continuously rising to shutoff.

- Confirm that the best efficiency point is beyond normal


operating point
- Confirm that the pumps subject to parallel operation have 110
to 120 % of rated head at shutoff.
- Check if larger sized pumps suffer potentially from the
incipient cavitation.

- Verify with the curve that the max, working pressure is


correctly designated in the data sheet

The incipient
cavitation does
potentially occur at
around 50% of
BEP.
(36) Check if specified standard spec. (API GA-112 or GA-102) is

suitable for the service conditions.

TOKYO

JAPAN

Toyo Engineering Corf.

ENGINEERING WORK CHECK SHEET


DESIGN OF ROTATING MACHINE
TWC 1-1211-702E
ISSUED JUL. 1/96
PAGE 1/3
TITLE :

CHECK OF VENDORS PRINT FOR ROTATING MACHINERY

- DATA SHEETS FOR RECIPROCATING PUMPS

TIMEOF CHECK : AT THE TIME OF THE FIRST ISSUE OF VENDORS DATA SHEETS
WORK FLOW CHART
CHECK ITEMS AND POINTS
CHECK

ABC
REMARKS

(1) Check if data designated are coincident with inquiry


specification.
(2)

Check if all data are filled in by vendor.

(3)

Check if all latest revisions are identified with mark.

(4) Check if nozzle rating & facing comply with inquiry


specification.
(5)

Check if a flat face is applied to cast iron cylinders.

(6 Check if nozzle size of 1-1/4, (2-1/2), 3-1/2, (5), 7 or 9 inch is


not used.
(7) Check rotating direction as per pump outline drawings and
motor outline drawings.
(8)

Check if a baseplate is common for a pumps and a driving unit

(9) Check if max. allowable speed rating is within a requirement as


per API Standard 674 when API Standard is applicable
(10) Check if piston pumps are not used for the pressure above
13.8 MPa (2000 psi) in accordance with API Standard
(11) Check if rating & facing of an external relief valve is coincident
with those for pump suction & discharge nozzles.
0

MEMO
WORK NO.
REQ. NO.
VENDER
DOC. NO.

2
1
0
REV.

FORM A-G30,015-1/2 (9305)

TOKYO

JAPAN

Toyo Engineering Corf.

ENGINEERING WORK CHECK SHEET


DESIGN OF ROTATING MACHINE
TWC 1-1211-702E
ISSUED JUL. 1/96
PAGE 2/3
TITLE :

CHECK OF VENDOR' S PRINT FOR ROTATING MACHINERY

- DATA SHEETS FOR RECIPROCATING PUMPS


TIME OF CHECK : AT THE TIME OF THE FIRST ISSUE OF VENDORS DATA SHEETS
WORK FLOW CHART
CHECK ITEMS AND POINTS
CHECK

ABC
REMARKS

(12) Check suitability of cylinder valve type for higher pressure or


slurry service according to vendors past experience.
(13) Check the number & min, size of packing rings as per API
standard when applicable.
(14) Check if pumping temperature does not exceed 150 deg.C for

FIFE diaphragm pumps.


(15) Check if cylinder design temperature is pumping temperature
+ 10 deg.C or higher,
(16) Check if cylinder design pressure is not smaller than relief
valve set pressure.
(17) Check if hydraulic test pressure is 1.5 times design pressure
corrected by design temperature.
(18) Check if relief valve set pressure is 110 % of rated discharge
pressure or 1.7 bar (0.17MPa) above pump rated discharge
pressure(TES), whichever higher.
(19)

Materials

- Check compliance of requirement regarding materials as per


applicable specifications and/or standards.
- Check if any components include materials prohibited from
being used in the inquiry specification.
- Check if the materials for low temperature service are in
compliance with, applicable specifications, or standards.
(20) Check if NPSHR is smaller than NPSHA appointed. Pump inlet
acceleration head is to be included in NPSHR, when it cannot
be ignored.
(21) For larger sized pumps, calculate inlet and outlet acceleration
heads and check if they are within a suitable operating range.
(22) Check pump rated BHP according to the equation using rated
flow, differential pressure and pump efficiency designated by
vendor.

0

MEMO
FORM A-G30.Q15-2/2 (9305)

TOKYO

0
JAPAN
Toyo Engineering Corf.

ENGINEERING WORK CHECK SHEET


DESIGN OF ROTATING MACHINE
TWC 1-1211-702E
ISSUED JUL,

1/96

PAGE 3/3
TITLE :

CHECK OF VENDOR S PRINT FOR ROTATING MACHINERY

- DATA SHEETS FOR RECIPROCATING PUMPS


TIME OF CHECK : AT THE TIME OF THE FIRST ISSUE OF VENDORS DATA SHEETS
WORK FLOW CHART
CHECK ITEMS AND POINTS

A
(23) Check if the relief valve set pressure is not beyond pressure
rating of the discharge flange and piping.

CHECK

C
REMARKS

(24) Check if hazardous area classification is correctly appointed if


the pump is furnished with any electrical equipment
(25) Check if V-belts are limited for electric motors of 150 kW or
less.
(26) Check if the manufacturers of electric motors and couplings are
as per job specific requirements if any.

(27) Check if supplier and place of mounting of the drivers are


correctly designated as per PO condition
(28) Auxiliary Piping
- Check if materials of process piping are equal to or better than
case material.
- Check if the external sources, if any, are available in such
pressure as being supplied suitably to packings.
(27) Check the following data, and follow them on P&I Diagram;
-

Size & rating of main nozzles

Size & rating of nozzles for relief valves

Size & rating of aux. piping connections

MEMO
TOKYO

0
JAPAN
Toyo Engineering Corp.

ENGINEERING WORK CHECK SHEET


DESIGN OF ROTATING MACHINE
TWC 1-1211-703E
issued JUN. 1,96
PAGE 1/2
TITLE

: CHECK OF VENDORS PRINT FOR ROTATING MACHINERY

- OUTLINE DRAWINGS FOR PUMPS


time of check : Assigned engineers are to check applicable vendors prints according to this check list at the time of

checking the first issue of each vendor and are to report results of checking when sending them back to
the vendor
WORK FLOW CHART

CHECK ITEMS AND POINTS

(1) Check if all requirements are filled up on the drawing in accordance with
purchasers instruction.
(2) Check if size, rating and feeing of pump nozzles are coincident with those in
pump data sheet
(3) Check the motor drawing if the rotating direction is compatible with that of the
driving motor.
(4) Check if location and size of grout holes are properly designed according to the
applicable standards and/or specifications if the pump baseplates are provided with
the grout holes.
(5) Check location and size of vent boles of the baseplate as per the applicable
standards and/or specifications.
(6) Check if length of a coupling spacer is in compliance with API Standard when

applicable.
(7) Check if a drain pan or rim is provided as per the applicable standards and/or
specifications.
(8) Check if alignment screws are equipped for the driving motor as per the
applicable standards and/or specifications.
(9) Check if a baseplate drain connection is provided and sized properly as per the
applicable standards and/or specifications.
REMARKS
MEMO
WORK NO,
REQ. NO.
VENDER
DOC. NO.

2
1
0
REV.

FORM A-G30.015-112 (9305)

TOKYO

Qfy JAPAN

Toyo Engineering Corf.

TITLE

: CHECK OF VENDORS PRINT FOR ROTATING MACHINERY

- OUTLINE DRAWINGS FOR PUMPS


TIME OF CHECK : Assigned engineers are to check applicable 'vendors prints according to this check list at the time of

checking the first issue of each vendor and are to report results of checking when sending them back to
the vendor.
WORK FLOW CHART
CHECK ITEMS AND POINTS

A
(10) Check if casing vent & drain connections are coincident with
those as per data sheet with respecificationst to the number,
size, and flanged, blinded or plugged connection.

CHECK

_____
C
REMARKS

(11) Check if the min. liquid level and sump depth from pump
intake for vertical sump pumps are correctly appointed.

(12) Check if an intake strainer is provided for vertical sump pumps


at inlet of a bell-mouth.

(13) Check if the maintenance lifting height is clearly appointed for


vertical barrel or sump pumps and provision for their
maintenance is properly considered into plot planning

(14) Check if the maintenance space is clearly appointed for
horizontal multistage pumps and provision for their
maintenance is properly considered into plot planning
(15) Check if the minimum straight piping length is appointed by

the vendor for the pumps with top/top nozzles.


(16) Check if the max. allowable nozzle forces and moments are
clearly appointed in compliance with the applicable standards
and/or specifications.
0
(17) Check if sufficient radial and axial clearances are appointed for
vertical suspended pumps according to the applicable standards.
n
Refer to API
Standard RP 686.

MEMO
FORM A-G30.015-2/2 (9305)

TOKYO

0
JAPAN

Toyo Engineering Corp.

ENGINEERING WORK CHECK SHEET


DESIGN OF ROTATING MACHINE
TWC 1-1211-704E
ISSUED JUN. 1/96
PAGE 1/2
TITLE

: CHECK OF VENDORS PRINT FOR ROTATING MACHINERY

- MECHANICAL SEAL DRAWINGS


TIME OF CHECK: Assigned engineers are to check applicable vendors prints according to this check list at the time of

checking the first issue of each vendor and are to report results of checking when sending them back to
the vendor.
WORK FLOW CHART
CHECK ITEMS AND POINTS
CHECK

ABC
REMARKS

(1) Check if all requirements are filled up on the drawing in


accordance with purchaser's instruction.
(2) Check if all data are coincident with those in the data sheet
regarding type of seals (single or dual, balance or imbalance,
outside or inside), seal pressure, code no., flushing plan & type,
and manufacturers name & model no.
(3) Check if data are coincident with those in the data sheet
regarding flow rate, pressure and temperature of flushing,
quenching and cooling sources.

(4) Check if a stuffing box is provided with tapped holes in


compliance with the flushing plan and the applicable
specifications.
(5) Check if the number & diameter of stud bolts for seal end plate
are in compliance with the applicable specifications.
(6) Check if seal and box design pressure is equal to the pump max.
working pressure, or larger.
(7) Check if materials of components are in compliance with the
seal code no. and suitable for service conditions.
(8) Check if a stuffing box is provided with a cooling jacket as per
requirements of the applicable specifications.
0

o

MEMO
WORK NO,
REQ. NO.
VENDER
DOC. NO.

2
1
0
REV.

FORM A-G30.Q15-1/2 (0305)

TOKYO

JAPAN

Toyo Engineering Corf.

ENGINEERING WORK CHECK SHEET


DESIGN OF ROTATING MACHINE

TWC 1-1211-704E
ISSUED JUN. 1,96
PAGE 2/2
TITLE

: CHECK OF VENDORS PRINT FOR ROTATING MACHINERY

- MECHANICAL SEAL DRAWINGS


TIME OF CHECK : Assigned engineers are to check applicable vendors prints according to this check list at the time of

checking the first issue of each vendor and are to report results of checking when sending them back to
the vendor.
WORK FLOW CHART
CHECK ITEMS AND POINTS
CHECK

ABC
REMARKS

(9) Check if the clearance of throttle bushings is in compliance


with the applicable standards or specifications.
(10) Check suitability of spring type (single or multi-coil), lace
materials for high viscous, slurry or low/high temperature
service.
(11) Check if a shaft sleeve is provided as per the applicable
specification and extended to outside of the stuffing boxes.
(12) Check if the shaft sleeve is equipped with a seal ring at either
end.
(13) Calculate and check PV (Pressure x Velocity) value and its
acceptability for critical services.
(14) Check heat generation in the stuffing box according to
Vendors information (Note 1) and check suitability of seal
pressure for critical service.
(15) Check if the seal is of cartridge type according to the applicable
standards or specifications.
0

GD

Note 1: To be submitted by Vendor
when required.
MEMO
TOKYO

0
JAPAN
Toyo Engineering Corf.

ENGINEERING WORK CHECK SHEET


DESIGN OF ROTATING MACHINE
TWC 1-1211-705E
ISSUED

JUL. 1,96

PAGE 1/2
TITLE

: CHECK OF VENDORS PRINT FOR ROTATING MACHINERY

- ASSEMBLY (SECTIONAL) DRAWINGS FOR CENTRIFUGAL PUMPS


TIME OF CHECK: Assigned engineers are to check applicable vendors prints according to this check list at the time of
checking the first issue of each vendor and are to report results of checking when sending them back to
the vendor.
WORK FLOW CHART

(1)
CHECK ITEMS AND POINTS

Check if all requirements are filled up on the drawing in


accordance with purchaser's instruction.
CHECK
A

REMARKS

(2) Check if all materials of components are coincident with those


in the data sheet and applicable specifications.

(3) Check if a radially split casings have metal-to-metal fit with


confined gaskets.
(4) Check if the impeller is of single-piece casting according to API
Standard.

(5) Check if the impellers are individually secured against axial


movement for horizontal pumps with multistage.
(6) Check if the shaft sleeves are provided and are extended outside
according to the applicable specifications.
(7) Check if a shaft of one piece is used for vertical pumps
. according to the applicable specifications.
(8) Check if the minimum running clearances are provided in
compliance with the applicable specifications.
(9) Confirm that type and size of bearings are coincident with those
in the data sheet

(10) Confirm that ball thrust bearings are in compliance with the
requirements of API Standard if applicable.

MEMO
WORK NO,
REQ.NO.
VENDER
DOC. NO.

2
1
0
REV.

FORM A-G30.015-1/2 (9305)

TOKYO 0 JAPAN
Tovo Engineering Corf.

TITLE

: CHECK OF VENDORS PRINT FOR ROTATING MACHINERY

- ASSEMBLY (SECTIONAL) DRAWINGS FOR CENTRIFUGAL PUMPS


TIME OF CHECK: Assigned engineers are to check applicable vendors prints according to this check list at the time of
checking the first issue of each vendor and are to report results of checking when sending them back to
the vendor.
WORK FLOW CHART
CHECK ITEMS AND POINTS

A
(11) Check if thrust balancing is properly designated according to
the applicable specifications. A balancing method using backvanes is not permitted by API Standard.

CHECK

C
REMARKS

(12) Check if the sealing pressure is correctly designated in the data


sheet in connection with impeller balance hole.
(13) Check if seal design for vertical barrel pumps is compatible
with that of the data sheet and the seal drawing.
(14)Check if bearing housings are equipped with a labyrinth end
seals and deflectors according to API Standard.

(15) Check if a constant level oiler is provided on an oil lubricated


bearing housing according to the applicable specifications.

(16) Refer to check points in API Standard in terms of high energy O


pumps.
(17) Check if the clearance of throttle bushings is in compliance 1
with the applicable specifications.
MEMO

FORM A-G30.015-2/2 (83055

TITLE:

CHECK OF VENDORS PRINT FOR ROTATING MACHINERY

AUXILIARY PIPING DRAWINGS FOR PUMPS, FANS AND BLOWERS


TIME OF CHECK: Assigned engineers are to check applicable vendors prints .
according to this check list at the time of checking the
first issue of each vendor and are to report results of checking
when sending them back to the vendor
CHECK ITEMS AND POINTS

1. Check if all requirements are filled up on the


drawing in accordance with purchaser's instruction.
2. Check if the min. auxiliary connection size of
the casing is in compliance with the applicable
spec.
3. Check if the min. piping size is in compliance with the
applicable spec.
4. Check if the seal piping (flushing, quenching, cooling
and so on) plan and materials are coincident with those of
the data sheet and in compliance with the applicable spec.
5. Check if size, rating & facing of all aux. connections
are coincident with those in the data sheet and the P&I
Diagram.
Check if casing vent & drain lines and connections are
coincident with the data sheet regarding size, rating,
piping materials and/or valving.
6.

7. Check if cooling water piping plan and materials are


coincident with those in the data sheet and in compliance
with the applicable spec
8. Check if the piping schedules are in accordance with the
applicable spec.
9. Check if pipe size of 1-1/4, 2-1/2, 3-1/2, 5, 7 or 9 are
not used according the applicable spec.
10. Check if type & material of gaskets are selected in
compliance with the applicable spec.
11. Check if a sight flow indicator is provided at each
outlet of cooling water piping.
12, Check if a drain-out connection at each low point is
furnished for cooling water and process piping.
13. Check if pressure-temperature rating and materials are
properly designated for process piping. They should be at
least the same rating as the pump casing.
14. Check if the auxiliary piping is arranged to facilitate
maintenance of pumps and auxiliary equipment.

TWC
ISSUED

PAGE

MEMO

1
0
REV.

FORM A-G30.015-1/2 (9807)

TITLE:

0 TOYO ENGINEERING CORP.

CHECK OF VENDORS PRINT FOR ROTATING MACHINERY

DATA SHEETS AND EXPECTED PERFORMANCE CURVES FOR CENTRIFUGAL COMPRESSOR


TIME OF CHECK: AT THE TIME OF THE FIRST ISSUE OF VENDORS DATA SHEETS AND

EXPECTED PERFORMANCE CURVES


CHECK ITEMS AND POINTS

1. Check if all data specified by Vendor are coincident with


inquiry spec, or PO conditions.
2. Check if all data are filled in by Vendor in accordance
with Purchasers instruction.
3. Check if performance data specified by Vendor are in good
conformity to the figures calculated by means of the TEC
CALCULATION (RDB) SYSTEM and if they are within the
allowable range as inquired and/or ordered.
4. Check if the rated speed of the compressor driven by an
induction motor is decided taking into consideration of
motor speed-slip at the expected torque.
5. Ensure that the maximum continuous speed corresponds to
105% of the compressor rated speed for a variable speed
drive.
6. Ensure that the rated output of the driving system is
specified to be at least 110% of the compressor rated BHP
including all power transmission loss.
7. Ensure that the guaranteed figures such as BHP and the
turndown range are in compliance with PO conditions.
Check if any gas leakage to outside of the compressor
system and leakage at division wall for back to back
impeller arrangement are accounted into Vendors design of
the compressor-performance.
8.

9. Check with Process P & I Diagrams if the compressor flow


control method designated is coincident with the process
design.
10. Ensure that the operating speed range (rpm) is specified
as ordered.
11. Check if the separation margin of the critical speeds
from the operating speed range is in compliance with
applicable spec.
12. Ensure that the split of compressor casings is in
compliance with the applicable spec.

13. Check if max. allowable working pressures (MAWP) of the


compressor casings are the same as or higher than the relief
valve set pressure and/or the pressure specified in the
applicable spec.

TWC
ISSUED

PAGE
MEMO

1
0
REV.

FORM A-G30.015-1/2 (9807)

TITLE:

0 TOYO ENGINEERING CORF.

CHECK OF VENDORS PRINT FOR ROTATING MACHINERY

DATA SHEETS AND EXPECTED PERFORMANCE CURVES FOR CENTRIFUGAL COMPRESSOR


TIME OF CHECK: AT THE TIME OF THE FIRST ISSUE OF VENDORS DATA SHEETS AND

TWC
ISSUED

PAGE
EXPECTED PERFORMANCE CURVES
CHECK ITEMS AND POINTS

14. Check if the sett1ing-out pressure of each casing is


correctly designated in accordance with the compressor
system (process) design.
15. Check if case hydrostatic test pressure is 1.5 times
MAWP corrected by the design temperature.
16. Check if nozzle rating & facing are in compliance with
Piping Material Spec, and are acceptable with regard to
MAWP.
17. Ensure that the polytropic head per each impeller and
pressure coefficients specified are within a reasonable
range. Otherwise, they are to be subject to Vendors past
similar and proven experience.
18. Ensure that the flow coefficients specified are within a
reasonable range. Otherwise, they are to be subject to
Vendors past similar and proven experience.
19. Check if a figure of gas velocity at each nozzle is
within the range of Purchasers standard and/or Vendors
design criteria.
20. Ensure that the type of bearings is in compliance with
the applicable spec.

21. Check if the materials of components are specified as


per ordered and are in compliance with the applicable spec.
22. Check if the material of components subject toH2S, HC1,
low temperature or cryogenic services are properly selected
according to the applicable spec, and standards.
23. Ensure that the type of baseplates (common, separate or
sole) is as ordered.
24. Request Vendor to submit the additional data of
GD2 for a train including a electric driving motor and
a gear unit.
25. Check if the compressor-installations and the
electrical area class are correctly specified as per
inquired or ordered.
26. Expected Performance Curves for Centrifugal Compressors
(1) Check if all data and curves are filled up in accordance
with Purchasers instruction and if they are coincident
with data sheet.
(2) Check if the curve of polytropic head vs. actual flow
for each stage is given.
(3) Ensure that the turndown or stability range is appointed
clearly in compliance with the guaranteed figure.
(4) Check if the performance curves for alternative
operating conditions are included as appointed.
(5) Check with the data sheet if the max. allowable working
pressure.is correctly specified.
FORM A-G30.015-2/2 (9807)

0 Toyo Engineering Corf.

TITLE:

CHECK OF VENDORS PRINT FOR ROTATING MACHINERY

---DATA SHEETS FOR RECIPROCATING COMPRESSOR-TIME OF CHECK: AT THE TIME OF THE FIRST ISSUE OF VENDORS DATA SHEETS

TWO
ISSUED

PAGE
CHECK ITEMS AND POINTS

1. Check if all data designated by Vendor are coincident


with inquiry spec, or PO conditions.
2. Check if all data are filled in by Vendor in accordance
with Purchasers instruction.
3. Check if performance data specified by Vendor are in good
conformity with the figures calculated by means of TEC
CALCULATION SYSTEM (RDB) and if they are within the
allowable range as inquired and/or ordered.
4. Ensure that the compressor rated speed and/or the piston
speed are within the limit of the applicable spec.

5. Ensure that the rated output of the driving system is


specified to be at least 110% of the compressor rated BHP
including all power transmission loss for a motor-drive and
120% for a turbine-drive.
6. Ensure that the guaranteed figures such as BHP are in
compliance with PO conditions.
7. Check if the sizing for cylinders such as bores, stroke,
speed and clearance ratio is properly designated to satisfy
the guaranteed flow with a certain margin.
8. Check with Process P & I Diagrams if the compressor flow
control system appointed is coincident with the process
design.
9. Check if classification for pulsation and vibration
analysis is appointed according to the applicable spec.
Ensure that the sizing of pulsation bottles is designated as
ordered.
10. Ensure that the jacket cooling and/or the packing
cooling systems are designed in compliance with the
applicable spec, and as ordered.
11. Ensure that the max. allowable working pressures (MAWP)
of each cylinder is designed to be equal to, or higher than,
the relief valve set pressure.
12. Check if the figure of the relief valve set pressure is
appointed in compliance with the applicable spec.
13. Check if the figure of max. suction pressure at each
stage is appointed to be concurrent with the process design.
14. Check if nozzle rating & facing are in compliance with
Piping Material Spec, and are acceptable with regard to
MAWP. Ensure that nozzle sizes of 1-1/4, 2-1/2, 3-1/2, 5, 7
& 9 inch are not used.

MEMO

1
0
REV.

FORM A-G30.015-V2 (9307)

TITLE:

0 TOYO ENGINEERING CORP.

CHECK OF VENDORS PRINT FOR ROTATING MACHINERY

---DATA SHEETS FOR RECIPROCATING COMPRESSOR-TIME OF CHECK: AT THE TIME OF THE FIRST ISSUE OF VENDORS DATA SHEETS

TWC
ISSUED

PAGE
CHECK ITEMS AND POINTS

15. Ensure that the type of baseplates (common, separate or


sole) is as ordered.
16. Ensure that the type of bearings is in compliance with
the applicable spec.
17. Check if the materials of components are specified as
per ordered, and are in compliance with the applicable spec.
18. Check if the material of components subject to H2S, HC1,
low temperature or cryogenic services are properly selected
according to the applicable spec, and standards.
19. Check if a type of distance piece is selected in
compliance with the applicable spec, and/or as ordered.
20. Check if the duty and rated/design conditions of interand after-coolers, when provided, are compatible with the
operating and design conditions of the compressor.
21. Ensure that the compressor-installation and the
electrical area classification are correctly specified as
inquired or ordered.
FORM A-G30,015-2/2 (9807)

0 Toyo Engineering Corf.

TITLE:
---

DATA

CHECK OF VENDORS PRINT FOR ROTATING MACHINERY


SHEETS AND EXPECTED PERFORMANCE CURVES

FOR STEAM TURBINES--TIME OF CHECK: AT THE TIME OF THE FIRST ISSUE OF VENDORS DATA SHEETS

TWO
ISSUED

PAGE
CHECK ITEMS AND POINTS

1. Check if all data designated by Vendor are


coincident with inquiry spec, or PO conditions.
2. Check if all data are filled in by Vendor in accordance
with Purchasers instruction.
3. Check if the turbine rated power output is at least 1.1
times rated BHP of the driven equipment or 1.2 times that of
reciprocating compressors.
4. Check if rated and normal output and speed of the steam
turbine are coincident with those of the driven equipment.
5. Ensure that the steam consumption is in compliance with
the guaranteed figure appointed.
6. Ensure that the moisture content in the exhaust steam for
condensing turbines is less than max. allowable value
designated by the vendor.

7. Ensure that the solid rotor is used for tip speeds in


excess of 250 m/s @ MCS or inlet steam temperature exceeds
440 deg.C according to API Standard.
8. Ensure that rotating direction of the turbine is
coincident with that of the driven equipment.
9. Ensure that the maximum continuous speed (MCS) is equal
to 105% of rated speed of the driven equipment and trip
speed to 110% of MCS.
10. Ensure that separation margin of the critical speeds
from the operating speed range is in compliance with the
applicable spec.
11. Check if the governor type and class are in compliance
with the applicable spec, and ensure that they are as
ordered.
12. Check if the trip system type is in compliance with
applicable spec.
13. Check if a turbine speed control system is coincident
with Process P & I Diagram.
14. Check if the type of turbine end seals is in compliance
with the applicable spec.
15. Check if required steam condition for gland ejector and
shaft sealing is coincident with the specified process
condition.
16. Check if tube size and materials of gland condensers are
in compliance with the applicable spec.
17. Ensure that the type of bearings are in compliance with
the applicable spec.
MEMO

1
0
REV.

FORM A-G30.015-1/2 (9807)

TITLE:

TOYO ENGINEERING CORF.

CHECK OF VENDOR'S PRINT FOR ROTATING MACHINERY

--- DATA SHEETS AND EXPECTED PERFORMANCE CURVES


FOR STEAM TURBINES--TIME OF CHECK: AT THE TIME OF THE FIRST ISSUE OF VENDORS DATA SHEETS

TWC
ISSUED

PAGE
CHECK ITEMS AND POINTS

18. Ensure that nozzle sizes of 1-1/4, 2-1/2, 3-1/2, 5, 7


9 inch are not used.

&

19. Check if nozzle fating and facing comply with Piping


Material Spec, and the P&I Diagram.
20. Check if materials of components are in compliance with
the applicable spec.
21. Check if hydrostatic test pressure is larger than 1.5
times the max. allowable pressure corrected by the design
temperature.
22. Check if the turbine-installations and the electrical
area class are correctly specified as per inquired or
ordered.
23. Expected Performance Curves for Steam Turbines (1)
Check if all data and curves are filled up in accordance
with Purchasers instruction and if they are coincident
with the data sheet. (2)
Check if correction factors are
properly appointed in any steam conditions and speed
variations.
FORM A-G30.015-2/2 (9807) '

0 Toyo Engineering Corf.

TITLE:

CHECK OF VENDORS PRINT FOR ROTATING MACHINERY

---P & I FLOW DIAGRAMS--TIME OF CHECK: Assigned engineers are to check applicable vendors prints according to this check
list at the time of checking the first issue of each vendor and are to report results of
checking when sending them back to the vendor.

CHECK ITEMS AND POINTS

1. Check if all requirements are filled up in the diagrams


in accordance with Purchasers instruction.
2. Check if all symbols, abbreviations, item number
including auxiliary equipment, service of machines and
auxiliary equipment, and tag numbers are correctly presented
in the diagram.
3. Check if schematic systems for lube oil, seal oil and
buffer gas are designed according to the applicable spec,
and standards.
.4. Check if vendors scope of supply are consistent with
purchase conditions.
5. Check if all process, oil, and utility services required
for the subject equipment are represented in the diagrams.
6. Check if the equipment and train arrangement is
representative of the actual one referring to the general
layout drawing.
7. Put Purchasers P & ID No. at each connection of
Purchasers piping and wiring.
8. Check if line size, service, spec, and the number are
properly designated according to piping material spec, and
instruction given by Purchaser or Vendor.
9. Check that line sizes of 1-1/4, 2-1/2, 3-1/2, 5, 7 and 9
inch are not used.

10. Check if connection size, rating and facing are


presented in the diagram or separate connection list, and
check if they meet with Purchasers P& I Diagrams and
Piping Material Spec.
11. Check if supplied instruments are necessary,
and
sufficient, in accordance with the applied standard,
engineering specifications, and Licensers or Owners
requirement.
12. Check if location of each instrument is properly
appointed taking into consideration start-up and normal
operation.
13. Check if failure action of control valves and solenoid
valves is properly appointed for safe operation under
emergency conditions.
14. Check if interlocking and annunciation systems are
properly designed and appointed for protection of the
subject equipment. Check if they are compatible with Process
P & I Diagrams and/or the applicable spec.

TWC
ISSUED

PAGE
MEMO

1
0
REV.

FORM A-G30.015-1/2 (9807)

0 Toyo Engineering Corf.

TITLE:

CHECK OF VENDORS PRINT FOR ROTATING MACHINERY

---P & I FLOW DIAGRAMS--TIME OF CHECK: Assigned engineers are to check applicable vendors prints according to this check
list at the time of checking the first issue of each vendor and are to report results of
checking when sending them back to the vendor.

CHECK ITEMS AND POINTS

15. Check if the first elements of the interlocking system


for the unit shutdown are segregated from those for other
interlocking or annunciation systems.
16. Check if electrical and pneumatic signal lines are
clearly identified with the separate line.
17. Check if line sizing and valving for each instrument are
appointed in compliance with the applicable spec.

18. Check if a bore size of each orifice is appointed and


represented.
19. Check if steam and cooling water systems are designed
according to the applicable spec, and standard.
20. Check if an oil reservoir and/or a degassing tank are
provided with sufficient size of vent according to the
applicable spec.
21. Check if all outlets of steam condensate are provided
with a steam trap or a water seal and its bypass.
22. Check if proper treatments such as insulation and steam
trace for winterization and personal protection are
furnished on the equipment or piping.
23. Ensure that flammable or toxic gas is vented to safe
location, or proper disposal system such as a flare stack.
24. Check if all level indicators are of reflex type. Ensure
that the type of level transmitters are in compliance with
the applicable spec.
25.
Ensure
that
bearing
temperature
monitors
and
vibration/axial movement monitors are properly provided as
ordered.
26. Ensure that the redundancy of the instrumentation
complies with the applicable spec.
27. Check if stand-by cooler & filter are properly vented
during operating main units.
28. Check if oil reservoirs are grounded.
29. Check if outlets from the relief valves are vented to
safe location.
30. Check if oil reservoirs are furnished with nitrogen
purging, and a steam or electric heating device.
31. Check if a type of valve (butterfly, gate or globe) is
properly selected according to its use.
32. Check if each rotating equipment is provided with an
inlet strainer as required.
33. Check if the requirements of no pocket, the slope
(followed by the angle required for the slope), and minimum
straight length of suction and discharge piping from
connecting point are indicated.
34. Check if vents & drains from the equipment, and in the
piping are clearly shown, properly installed, safely
disposed of, and adequately treated with.
35. Check if requirements to Purchasers piping design such
as installing expansion bellows are sufficiently designated.
36. Check if al 1 revised parts are clearly marked and
identified.

TWC
ISSUED

PAGE
FORM A-G30.015-2/2 (9807)

0 Toyo Engineering Corp.

TITLE:

CHECK OF VENDOR'S PRINT FOR ROTATING MACHINERY

---GENERAL LAYOUT DRAWINGS--TIME OF CHECK: Assigned engineers are to check applicable vendors prints according to this check
list at the time of checking the first issue of each vendor and are to report results of
checking when sending them back to the vendor.

CHECK ITEMS AND POINTS

1. Check if all requirements are filled up in the drawings


in accordance with Purchasers instructions.
2. Check if rotating directions are coincident with the data
sheets and a drawing of the drivers.
3. Check if maintenance spaces for all equipment are
properly indicated and appointed.
4. Check if foundation height is properly designed
considering the requirements, such as straight length of
main nozzles, piping route of lube oil line, etc., when
table top foundation is applied.
5. Check if the elevation of such equipment as an oil head
tank is properly designed and compatible with requirements
addressed.
6. Check if main connections with purchasers piping are
represented and marked with the identification number.
7. Check if 3 co-ordinates of main nozzle connections are
properly indicated.
Check if loading data, i. e. static & dynamic loads are
properly appointed. When they are appointed in a different
manner from Purchasers standard procedure or Vendors
proven practice, they should be subject to further mutual
discussion referring to the experts checking.
9. Check if vacuum force is indicated, when condensing
turbine is applied.
8.

10. Check if maximum maintenance weight is indicated.


11. Finalize the configuration of foundation according to
information from a civil designer.
12. Check if opening areas of foundation are properly shown
and indicated, when orientations of main nozzle is downward.
13. Check if liners & shims supplied by Vendor are properly
shown.
14. Check if types of foundation bolts supplied by Vendor
are suitable for Purchasers foundation design.
15. Finalize the basic data required for maintenance cranes
such as height, weight, accessible area, etc., when the
cranes are provided.
16. Check if all leveling devices for baseplates and
requirements for grouting are properly designated.

TWC

ISSUED

PAGE
MEMO

1
0
REV.

FORM A-G30,015-1/2 (9807)

TITLE:

0 TOYO ENGINEERING CORP.

CHECK OF VENDORS PRINT FOR ROTATING MACHINERY

---GENERAL LAYOUT DRAWINGS--TIME OF CHECK: Assigned engineers are to check applicable vendors prints according to this check
list at the time of checking the first issue of each vendor and are to report results of
checking when sending them back to the vendor,

CHECK ITEMS AND POINTS

17. Locate the auxiliary equipment such as local gauge


boards, local control panels, buffer gas units, etc.
properly, and check if those locations are suitable for
operation.
18. Check if fixing points of each equipment are clearly and
correctly designated.
19. Check if all revisions are clearly marked and
identified.

TWC
ISSUED

PAGE
FORM A-G30.015-2/2 (9607)

Toyo Engineering Corf,

s Prepared by Other

1-1211-400E
MAR.28,'06
1/2

s relevant version.

()

B
()

C
()

()

()

()

()()()()

()()()
()()
()()()()<)

()()()

Security Level 2

()

SIGN

DATE
A

SIGN
B

1-1211-400E
MAR.2S/06
2/2
A

()
()
()
()

<)

()

()

()

()

()

()

()

()
()

( ).

()

(.)

'< )
.( )

()

C)
()

(>

1-1211-600E
MAR.28/06
1/3

A
(>

B
()

c
()

( )'

()

()

()()C)C)()()

() ( ) ( ) ( ) c > C )

()()()()<)()

() () C) C ) () ()

SIGN

DATE

SIGN

1-1211-600E
MAR.28/06
2/3

()

()

()
()

()
()

()

()

()

()

()

()

()

()

()

()

o
()
()

( >,

()

()

()
<)

()

()

()

()

()

()
()

()

()

()

()
()

()

()

(>

()
()
()
()
()
()
()
<)
()

()

<)
()
()
()

()
()
()

()

()
()

()

()

Security Level 2
1-121 1h600E
MAR.28,06
3/3
A
()

()

()

()

ING MACHINERY

()

TWC 1-1211-700E

()

H APPLICABLE VENDOR'S PRINT

PAGE .1/2

HECKING ANB ARE TO REPORT SUMMARIZED

ER ISSUING THE FIRST REPORT AND THE RESULT OF CHECKING

turing ( ) (

es, do ( ) ( )

SIGN

ING MACHINERY

DATE

SIGN

APPLICABLE VENDOR'S PRINT

HECKING AN& ARE TO ftTOkT ulVIWlAftl2&)

ER ISSUING THE FIRST REPORT AND THE RESULT OF CHECKING

1-1211-700E
MAR.1,2000

2/2
A

TWC

1-1211-701E
JUN.28,'96 1/5

()
()

ENGINEERING WORK CHECK SHEET

ISSUED PAGE

DESIGN OF ROTATING MACHINE

FORMANCE CURVE

DATASHEETS AND PERFORMANCE CURVES.

SIGN

DATE

SIGN

A
ENGINEERING WORK CHECK SHEET
DESIGN OF ROTATING MACHINE

TWC

1-1211-701E

ISSUED
PAGE

JUN.28,'96
2/5

FORMANCE CURVE

CHECK

'

FORMANCE CURVE

ENGINEERING WORK CHECK SHEET


DESIGN OF ROTATING MACHINE

TWC

1-1211-701E

ISSUED
PAGE

JUN.28,*96
3/5

EBARA
35 (m/s)
45
-

NW
45 (m/s)
55
74

TEG
35 (m/s)
45
70

FORMANCE CURVE

65
**

50
70

ENGINEERING WORK CHECK SHEET


DESIGN OF ROTATING MACHINE

90
64
67
85

TWC
ISSUED
PAGE

65
-

50
80

1-1211-701E
JUN.28,596
4/5

FORMANCE CURVE

ENGINEERING WORK CHECK SHEET


DESIGN OF ROTATING MACHINE

TWC

1-1211-701E

ISSUED
PAGE

JUN.28,1'96
5/5

DATA SHEETS

SIGN

DATE
A

SIGN
B

DATA SHEETS

nts according to this check list at the time of


cking when sending them back to

CHECK

ABC
on

SIGN

DATE
A

ENGINEERING WORK CHECK SHEET


DESIGN OF ROTATING MACHINE

rs prints according to this check list at the time of


cking when sending them back to

SIGN
B

TWC

1-1211-703E

ISSUED JUN. 1,*96 PAGE


2/2

s prints according to this check list at the time of


cking when sending them back to

SIGN

DATE

SIGN

s prints according to this check list at the time of


cking when sending them back to

s prints according to this check list at the time of


cking when sending them back to

CHECK
B

SIGN

DATE
A

SIGN
B

ENGINEERING WORK CHECK SHEET


DESIGN OF ROTATING MACHINE

s prints according to this check list at the time of


cking when sending them back to

TWC 1-1211-705E
ISSUED JUL. 1,96
PAGE 2/2

icable vendors prints .

ts of checking

()

()

()

()

()

()

( )

()

()

()

()
()
()
()
()

()

()

()

()

1-1211-706E
MAR.31, 99

1/1

SIGN

DATE

SIGN

RIFUGAL COMPRESSOR

RS DATA SHEETS AND

A
()

B
()

()

()

()

()

()

( )

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

1-1211-707E
MAR. 31/99

1/2

SIGN

DATE

SIGN

RIFUGAL COMPRESSOR

RS DATA SHEETS AND

1-1211-707E
MAR. 31 ,'99

2/2

A
()

B
()

()
()

()

()

()

()

( )

()

()

C
()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

OTATING MACHINERY

S DATA SHEETS

1-1211-708E
MAR.31 ,'99

1/2
A
()

()

()

()

()

()

()

( )

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

SIGN

()

()

DATE

SIGN

OTATING MACHINERY

S DATA SHEETS

1-1211-708E
MAR.31 ,'99

2/2
A

()

()

()

()

()

( )

( )

()

()

()

()

()

()

()

()

()

TATING MACHINERY

E CURVES

S DATA SHEETS

1-1211-709E
MAR. 31 ,'99

1/2
A
()
()
()

()

()

()

()

( )

( )

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

SIGN

()

()

DATE

SIGN

OTATING MACHINERY

NCE CURVES

ENDORS DATA SHEETS


1-1211-709E
MAR. 31 ,'99

2/2
A

B
()

()

()

()

C )

( )

()

()

()

()()

C) ()

()

ts according to this check

A
()

B
()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

C)

()

()

()

()

()

()

()

()

()

()

()

()

()

1-1211-710E
MAR. 31 /99

1/2

SIGN

DATE

SIGN

ts according to this check

A
()

B
()

()

()

()

()

C
()

()

()

()

()

()

()

( )

( )

( )

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

( )

( )

( )

1-1211-71OE
MAR.31/99

2/2

()

()

()

()

( )

rints according to this check

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

()

1-1211-711E

()

()

MAR.31,'99

1/2

SIGN

DATE

SIGN

rints according to this check

( )

( )

( )

()

()

()

1-1211-711E
MAR. 31 ,'99

2/2

REFERENCE DOC & REMARKS

B applicable for critical .


equipment only.

WORK NO. :
REQ.NO.

DATE
B

SIGN

DATE
G

ITEM NO. :

CHECKER

A :df
B :ae
C :D5

REPORT
>

AE
DS
MGR

REFERENCE DOC & REMARKS

If requested by Piping Group

REFERENCE DOC & REMARKS

WORK NO. ;

DATE

SIGN

REFERENCE DOC

DATE
G

& REMARKS

CHECKER

REPORT

REQ. NO. :

A :df

>

AE

ITEM NO. ;

B ;AE

DS

G :ps

>

MGR

REFERENCE DOC & REMARKS

DATE

SIGN

DATE

WORK NO. :

CHECKER

REQ. NO. :

A:aae -9-

AE

ITEM NO.

B :ae

CAE

C :cae

REPORT

REFERENCE DOC & REMARKS

CHECKER

A
B
DATE

SIGN

DATE

REMARKS

REPORT

:ae
:e-sv

C:tl

E-SV
->

TL

->

GM

CHECKER

DATE
B

SIGN

DATE
C

REMARKS

REPORT

A :ae

E-SV

B :e-sv

TL

C:tl

GM

CHECKER
A :ae
DATE
B

SIGN

DATE
C

REMARKS

REPORT
)

E-SV

B :e-sv

TL

C:tl

GM

CHECKER

DATE

SIGN

DATE

REMARKS

A :ae

->

B :e-sv
C :TL

REPORT
E-SV
TL
GM

CHECKER

REPORT

A :ae

E-SV

B :e-sv
DATE
B

SIGN

DATE
C

REMARKS

C :tl

tl'
4

GM

REFERENCE DOC & REMARKS

DATE

REFERENCE DOC & REMARKS

SIGN

DATE

WORK NO. :

CHECKER

REQ. NO. :

A :aae
B :ae -
C :CAE

ITEM NO. :

REPORT
AE
CAE

DATE

REFERENCE DOC & REMARKS

Refer to Piping Material


Spec. H-103

SIGN

DATE

WORK NO. ;

CHECKER

REQ. NO. ;

A
B
C

ITEM NO.

REPORT

:aae ->

AE

:ae

CAE

:cae

Refer To TEAM INSTRUCTION


NO.73

REFERENCE DOC & REMARKS

Refer to Piping Material


Spec. H103

DATE
B

REFERENCE DOC & REMARKS

SIGN

. DATE
C

WORK NO. ;

CHECKER

REQ. NO.

A :aae

AE

ITEM NO. :

B :ae -

CAE

C :cae

REPORT

REFERENCE DOC & REMARKS

DATE

REFERENCE DOC & REMARKS

SIGN

DATE

WORK NO. :

CHECKER

REQ. NO.

A
B
C

ITEM NO.

REPORT

:aae ->

AE

:ae -

CAE

:CAE

Refer to Piping Material


Spec. H-103.

REFERENCE DOC & REMARKS

Refer to Piping Material


Spec. H-103.

Including electrical
equipment and instruments.

DATE

REFERENCE DOC & REMARKS

SIGN

DATE

WORK NO. :

CHECKER

REQ. NO.

A :aae ->

AE

ITEM NO. :

B :ae

CAE

C :CAE

REPORT

REFERENCE DOC & REMARKS

DATE

REFERENCE DOC & REMARKS

SIGN

DATE

C\

WORK NO. :

CHECKER

REPORT

REQ. NO. ;

A :aae ->

AE

ITEM NO. :

B :ae -
C :CAE

CAE

Potrebbero piacerti anche